S02 DWG FINAL SUBMITTAL-VOL1 PART A 22 Dec 20.pdf
PDF 15 MB Posted
- Attached to
- Z1DA--Service-Renovate Domestic Water Piping Projects FMS (VA-21-00001742)605-21-1-6043-0001-
- Solicitation number
- 36C25821R0015
About this file
This federal contract opportunity solicitation is for renovating domestic water piping projects at a Department of Veterans Affairs medical center. The solicitation number is 36C25821R0015 and proposals are due no later than August 28, 2021 at 2:00 PM Pacific Standard Time. Any requests for information must be submitted in writing to the listed points of contact no later than August 16. The opportunity type is a solicitation issued by the Veterans Health Administration within the Department of Veterans Affairs. The work required includes renovating domestic water piping projects at multiple VA medical facilities.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TEAM
VA REPRESENTATIVES:
James Otwell Project Manager / COR VA Loma Linda Healthcare System 11201 Benton Street Loma Linda, CA 92357 Phone: (909) 825-7084 ext. 6812 Cell: (951) 258-3920
John T. Kamerer Contract Specialist/NCO 22 Gilbert Office: 520-629-4613 Construction Services 3601 S. 6th Avenue, Building 45 Tucson, AZ 85723
ARCHITECT:
SRD Architects Inc.
3920 East Coronado Street Suite #201 Anaheim, CA 92807 Phone: (714) 688 0212 Fax: (714) 688 0244 www.srdarchitectsinc.com
MECHANICAL/ELECTRICAL/PLUMBING:
PBS Engineers 2100 East Route 66, Suite 210 Glendora, CA 91740 Phone: (626) 650 0350
F
A
D
I
E
T
D
ST
N U
E T
M
AP
R
E
NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S
T
CI
T A
E
S
L
O
R
FI
AC L
HCRA
I T E
C
A N
I
T
E O
N
SE
F
SHIRISH R.DESAI
D
04/30/21
C-20141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D w in g k \D o c u m e n ts
\V A
L L
-2
-2
C e n tr a l_ w in g
.h o .r v t
/7 /2
:2
:3
P
M
GI-000
COVER SHEET RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020 S.D. W.H.
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
DEPARTMENT OF VETERANS AFFAIRS
LOMA LINDA HEALTHCARE SYSTEM
RENOVATE DOMESTIC WATER PIPING
VOLUME -1
11201 BENTON STREET, LOMA LINDA, CA 92357
VA PROJECT NO. 605-20-201
FINAL CONSTRUCTION DOCUMENTS
DATE: DECEMBER 10, 2020
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
95% CONSTRUCTION DOCUMENTS 06/08/2020
100% CONSTRUCTION DOCUMENTS 08/10/2020
FINAL CONSTRUCTION DOCUMENTS 12/10/2020
1 621 62
"FOR THE PURPOSES OF THIS PROJECT THIS FACILITY SHALL BE CONSIDERED AN
ESSENTIAL FACILITY. ALL MATERIALS SHALL CONFORM TO LATEST GOVERNING
BUILDING CODES AND REGULATIONS. CONTRACTOR SHALL PERFORM WORK IN
COMPLIANCE WITH ALL APPLICABLE CODES OF CURRENTLY ADOPTED EDITIONS.
VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS
AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION,
ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE
CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER
SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON
ITS PROJECTS: VA FUNCTIONS AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND
THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH
ENFORCING ITS ADOPTED CODES:
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/)."
1. VHA Directive 1061, PREVENTION OF HEALTHCARE-ASSOCIATED LEGIONELLA
DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION SYSTEMS.
2. "2018 INTERNATIONAL BUILDING CODE, 2018 INTERNATIONAL MECHANICAL
CODE, 2018 INTERNATIONAL PLUMBING CODE AND OTHERS"
3. NFPA 101 LIFE SAFETY CODE – LATEST EDITION.
4. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA
5. "OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS."
6. "VA SEISMIC DESIGN REQUIREMENTS, H-18-8 "
7. 2017 NATIONAL ELECTRICAL CODE (NEC)
8. "SAFETY CODES FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF
MECHANICAL ENGINEERS (ASME) A 17.1."
9. ASME BOILER AND PRESSURE VESSEL CODE
10. ASME CODE FOR PRESSURE PIPING
11. "ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)"
12. "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)"
13. "MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE
OF STEEL CONSTRUCTION (AISC)"
14. ENERGY POLICY ACT OF 2005 (EPACT)
15. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
16. "EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, AND TRANSPORTATION MANAGEMENT."
17. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD
62.1- 2004.
18. SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 -
2007.
19. AIA GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND
OUTPATIENT FACILITIES.
APPLICABLE CODES AND STANDARDS
PROJECT INFORMATION
SCOPE OF WORK
(FOR DETAILED SCOPE OF WORK SEE PLANS AND SPECIFICATIONS)
MAIN HOSPITAL BUILDING, FROM BASEMENT TO PENTHOUSE INCLUDING THE
PLATFORM FLOORS (INTERSTITIAL FLOORS) AND CLC & CLC2:
1. REMOVE AND REPLACE CORRODED DOMESTIC WATER PIPING, PIPING PAST ITS
SERVICE LIFE.
2. REMOVAL OF UNUSED PIPE RUNS (DEAD LEGS).
3. REDUCE FIXTURE RUN OUTS TO AN ALLOWABLE LENGTH.
4. RE-PIPE AREAS INDICATED ON DRAWINGS TO REDUCE STAGNATION.
5. REPLACEMENT OF ALL NON-COMPLIANT, GALVANIZED STEEL PIPING WITH TYPE
“L” COPPER PIPING AND FITTINGS AND ALL COPPER SHALL BE BRAZED.
6. PROVIDE HEAT EXCHANGER AND PUMPS.
7. PIPING FOR RETURN OF THE COLD-WATER SYSTEM.
8. INSTALL INSULATION AND JACKETING ON ALL HOT AND COLD-WATER PIPING.
9. INSTALL DOMESTIC COLD-WATER RECIRCULATION PUMPS.
10. INSTALL CHLORINE ANALYZER SYSTEM.
11. INSTALL CONDENSATE DRAIN PUMPS.
12. INSTALL WATER FLOW METERS.
BUILDING INFORMATION (MAIN BUILDING)
OCCUPANCY: I-2 HEALTHCARE - AMBULATORY
CONSTRUCTION TYPE: I, FULLY SPRINKLERED
ELEVATOR LOBBIES – 1 HR FIRE RATED SMOKE BARRIER ENCLOSURE
SERVICE BAYS – 1 HR FIRE RATED CONSTRUCTION
FLOOR AREAS (APPROXIMATE):
BASEMENT - 39,833 SQ.FT.
FIRST FLOOR - 275,774 SQ.FT.
SECOND FLOOR - 160,486 SQ.FT.
THIRD FLOOR - 151,343 SQ.FT.
FOURTH FLOOR - 150,610 SQ.FT.
F
R W
Y
10 FRWY
60 FRWY
F R
W Y
BARTON RD
M O
U N
T
IA
N V
IE
W
A V
E
PROJECT LOCATION
FIRST FLOOR
0"
BASEMENT 1
-14' - 6"
SECOND FLOOR
18' - 0"
THIRD FLOOR
36' - 0"
FOURTH FLOOR
54' - 0"
PENTHOUSE
72' - 0"
26 25.5 25.4 25 24.9
BASEMENT 2
-13' - 6"
FIRST FLOOR
INTERSTITIAL
9' - 11"
SECOND FLOOR
INTERSTITIAL
27' - 11"
THRID FLOOR
INTERSTITIAL
45' - 11"
FOURTH FLOOR
INTERSTITIAL
63' - 11"
FAN
FR3
SERVBAY
SB01-7
SERVBAY#7
SB01A-7
SERVBAY
SB02-7
SERVBAY#7
SB02A-7
SERVBAY#7
SB03-7
SERVBAY #7
SB03A-7
SERVBAY #7
SB04-7
SERVBAY #7
SB04A-7
TUNNEL 1A
001A
STORAGE
1F-35B
OFFICE
2A-61
PHYS OFF
3A-67
QUARTERS
4A-25G
SHEET INDEX
SHEET
NUMBER SHEET NAME
PW-B01 NEW OVERALL BASEMENT FLOOR PLAN #1
PW-B02 NEW PARTIAL BASEMENT FLOOR PLAN #2
PW-B03 NEW PARTIAL BASEMENT FLOOR PLAN #3
PW-B04 NEW PARTIAL BASEMENT FLOOR PLAN #4
PW-B05 NEW PARTIAL BASEMENT FLOOR PLAN #5
PW-B06 NEW PARTIAL BASEMENT FLOOR PLAN #6
PW-B07 NEW PARTIAL BASEMENT FLOOR PLAN #7
PW-B08 NEW PARTIAL BASEMENT FLOOR PLAN #8
PW-100 OVERALL FIRST FLOOR PLAN
PW-101 NEW PARTIAL FIRST FLOOR PLAN #1
PW-102 NEW PARTIAL FIRST FLOOR PLAN #2
PW-103 NEW PARTIAL FIRST FLOOR PLAN #3
PW-104 NEW PARTIAL FIRST FLOOR PLAN #4
PW-105 NEW PARTIAL FIRST FLOOR PLAN #5
PW-106 NEW PARTIAL FIRST FLOOR PLAN #6
PW-107 NEW PARTIAL FIRST FLOOR PLAN #7
PW-108 NEW PARTIAL FIRST FLOOR PLAN #8
PW-109 NEW PARTIAL FIRST FLOOR PLAN #9
PW-110 NEW PARTIAL FIRST FLOOR PLAN #10
PW-200 OVERALL SECOND FLOOR PLAN
PW-201 NEW PARTIAL SECOND FLOOR PLAN #1
PW-202 NEW PARTIAL SECOND FLOOR PLAN #2
PW-203 NEW PARTIAL SECOND FLOOR PLAN #3
PW-204 NEW PARTIAL SECOND FLOOR PLAN #4
PW-205 NEW PARTIAL SECOND FLOOR PLAN #5
PW-206 NEW PARTIAL SECOND FLOOR PLAN #6
PW-300 OVERALL THIRD FLOOR PLAN
PW-301 NEW PARTIAL THIRD FLOOR PLAN #1
PW-302 NEW PARTIAL THIRD FLOOR PLAN #2
PW-303 NEW PARTIAL THIRD FLOOR PLAN #3
PW-304 NEW PARTIAL THIRD FLOOR PLAN #4
PW-305 NEW PARTIAL THIRD FLOOR PLAN #5
PW-306 NEW PARTIAL THIRD FLOOR PLAN #6
PW-400 OVERALL FOURTH FLOOR PLAN
PW-401 NEW PARTIAL FOURTH FLOOR PLAN #1
PW-402 NEW PARTIAL FOURTH FLOOR PLAN #2
PW-403 NEW PARTIAL FOURTH FLOOR PLAN #3
PW-404 NEW PARTIAL FOURTH FLOOR PLAN #4
PW-405 NEW PARTIAL FOURTH FLOOR PLAN #5
PW-406 NEW PARTIAL FOURTH FLOOR PLAN #6
PW-501 SERVICE BAY ENLARGED PLANS
PW-502 SERVICE BAY ENLARGED PLANS
PW-503 SERVICE BAY ENLARGED PLANS
PW-504 SERVICE BAY ENLARGED PLANS
PW-600 DOMESTIC WATER RISER DIAGRAM
04-ELECTRICAL
EP-001 GENERAL NOTES, SYMBOL LIST AND SHEET INDEX
EP-002 SINGLE LINE DIAGRAMS
EP-003 SINGLE LINE DIAGRAMS
EP-005 PANEL SCHEDULES
EP-006 PANEL SCHEDULES
EP-007 PANEL SCHEDULES
EP-205 PARTIAL BOILER ROOM ELECTRICAL PLAN/EXISTING PHOTO
EP-101 OVERALL FIRST FLOOR ELECTRICAL PLAN
EP-102 OVERALL SECOND FLOOR ELECTRICAL PLAN
EP-103 OVERALL THIRD FLOOR ELECTRICAL PLAN
EP-104 OVERALL FOURTH FLOOR ELECTRICAL PLAN
EP-201 FIRST FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN
EP-202 SECOND FLOOR SERVICE BAYS ELECTRICAL ENLARGED PLANS
EP-203 THIRD FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN
EP-204 FOURTH FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN
EP-004 PANEL SCHEDULES
EP-301 ELECTRICAL DETAILS/EXISTING PHOTOS
05-REFERENCE
RS-101 REFERENCE - STRUCTURAL FRAMING PLAN
RS-102 REFERENCE - STRUCTURAL FRAMING PLAN
RS-103 REFERENCE - STRUCTURAL FRAMING PLAN
RS-104 REFERENCE - STRUCTURAL FRAMING PLAN
RS-105 REFERENCE - STRUCTURAL FRAMING PLAN
RS-106 REFERENCE - STRUCTURAL FRAMING PLAN
RS-107 REFERENCE - STRUCTURAL DETAILS
SHEET INDEX
SHEET
NUMBER SHEET NAME
01-GENERAL
GI-000 COVER SHEET
GI-001 DRAWING INDEX, PROJECT INFORMANTION, VICINITY MAP
GI-002 STAGING PLAN
GI-003 SYMBOLS AND ABBREVIATIONS
GI-004 GENERAL NOTES
02-ARCHITECTURAL
AE-100 OVERALL PLAN - BASEMENT
AE-101 OVERALL PLAN - FIRST FLOOR
AE-102 OVERALL PLAN - FIRST FLOOR
AE-103 OVERALL FIRST FLOOR INTERSTITIAL PLAN
AE-104 OVERALL PLAN - SECOND FLOOR
AE-105 OVERALL SECOND FLOOR INTERSTITIAL PLAN
AE-106 OVERALL THIRD FLOOR PLAN
AE-107 OVERALL THIRD FLOOR INTERSTITIAL FLOOR
AE-108 OVERALL FOURTH FLOOR PLAN
AE-109 OVERALL FOURTH FLOOR INTERSTITIAL PLAN
AE-510 PENETRATION DETAILS
03-PLUMBING
P-001 GENERAL NOTES, LEGEND, ABBREVIATIONS & SHEET INDEX
P-002 PLUMBING SCHEDULE
P-003 PLUMBING DETAILS
P-004 PLUMBING DETAILS
P-005 PLUMBING SECTION DETAILS
P-006 PLUMBING SECTION DETAILS
PD-B01 OVERALL BASEMENT FLOOR PLAN
PD-B02 PARTIAL BASEMENT FLOOR PLAN #1
PD-B03 PARTIAL BASEMENT FLOOR PLAN #2
PD-B04 PARTIAL BASEMENT FLOOR PLAN #3
PD-B05 PARTIAL BASEMENT FLOOR PLAN #4
PD-B06 PARTIAL BASEMENT FLOOR PLAN #5
PD-B07 PARTIAL BASEMENT FLOOR PLAN #6
PD-100 OVERALL FIRST FLOOR PLAN
PD-101 PARTIAL FIRST FLOOR PLAN #1
PD-102 PARTIAL FIRST FLOOR PLAN #2
PD-103 PARTIAL FIRST FLOOR PLAN #3
PD-104 PARTIAL FIRST FLOOR PLAN #4
PD-105 PARTIAL FIRST FLOOR PLAN #5
PD-106 PARTIAL FIRST FLOOR PLAN #6
PD-107 PARTIAL FIRST FLOOR PLAN #7
PD-108 PARTIAL FIRST FLOOR PLAN #8
PD-109 PARTIAL FIRST FLOOR PLAN #9
PD-110 PARTIAL FIRST FLOOR PLAN #10
PD-111 PARTIAL FIRST FLOOR PLAN #11
PD-200 OVERALL SECOND FLOOR PLAN
PD-201 PARTIAL SECOND FLOOR PLAN #1
PD-202 PARTIAL SECOND FLOOR PLAN #2
PD-203 PARTIAL SECOND FLOOR PLAN #3
PD-204 PARTIAL SECOND FLOOR PLAN #4
PD-205 PARTIAL SECOND FLOOR PLAN #5
PD-206 PARTIAL SECOND FLOOR PLAN #6
PD-300 OVERALL THIRD FLOOR PLAN
PD-301 PARTIAL THIRD FLOOR PLAN #1
PD-302 PARTIAL THIRD FLOOR PLAN #2
PD-303 PARTIAL THIRD FLOOR PLAN #3
PD-304 PARTIAL THIRD FLOOR PLAN #4
PD-305 PARTIAL THIRD FLOOR PLAN #5
PD-306 PARTIAL THIRD FLOOR PLAN #6
PD-400 OVERALL FOURTH FLOOR PLAN
PD-401 PARTIAL FOURTH FLOOR PLAN #1
PD-402 PARTIAL FOURTH FLOOR PLAN #2
PD-403 PARTIAL FOURTH FLOOR PLAN #3
PD-404 PARTIAL FOURTH FLOOR PLAN #4
PD-405 PARTIAL FOURTH FLOOR PLAN #5
PD-406 PARTIAL FOURTH FLOOR PLAN #6
T
CI
T A
E
S
L
O
R
FI
AC L
HCRA
I T E
C
A N
I
T
E O
N
SE
F
SHIRISH R.DESAI
D
04/30/21
C-20141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D w in g k \D o c u m e n ts
\V A
L L
-2
-2
C e n tr a l_ w in g
.h o .r v t
/7 /2
:3
:3
A
M
GI-001
DRAWING INDEX, PROJECT
INFORMANTION, VICINITY MAP
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020 S.D. W.H.
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VOLUME 1 VOLUME 2
N.T.S.
F5
VICINITY MAP
1/8" = 1'-0"
F1
BUILDING SECTION
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
95% CONSTRUCTION DOCUMENTS 06/08/2020
100% CONSTRUCTION DOCUMENTS 08/10/2020
2 62
BARTON ROAD
B E
N T
O N
R
O A
D PROJECT LOCATION
CONTRACTOR LAY-DOWN
AREA
CONSTRUCTION STAGING NOTES
THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN
“SPECIFICATION SECTION 01 00 00 - DIVISION I - GENERAL REQUIREMENTS.” THESE
NOTES PARAPHRASE OR SUPPLEMENT THE DIVISION 1 REQUIREMENTS AND ARE NOT
INTENDED TO REPLACE THEM. CONSTRUCTION ACCESS AND PARKING,
CONSTRUCTION STAGING & USE OF SITE, CONSTRUCTION MATERIAL STORAGE,
CONSTRUCTION DEBRIS AND MAINTENANCE OF ONGOING OPERATIONS SHALL BE
COORDINATED WITH VA CONTRACTING OFFICER’S REPRESENTATIVE (COR). SITE
LAYDOWN AREA WILL BE APPROVED BY VA COR. UTILIZE LAYDOWN PLAN FOR
REFERENCE ONLY.
NOTE: THE VA’S ONGOING OPERATIONS SHALL NOT BE HINDERED BY CONTRACTOR’S
TEMPORARY FENCING, STAGING AREAS OR PARKING OF CONTRACTOR’S EQUIPMENT
AND/OR VEHICLES. FIRE DEPT ACCESS TO HOSPITAL SHALL REMAIN UNOBSTRUCTED
DURING CONSTRUCTION.
1. CONSTRUCTION ACCESS AND PARKING:
A. CONTRACTOR’S ACCESS, EGRESS AND ON-SITE PARKING (VEHICLE,
PEDESTRIAN, EQUIPMENT AND DELIVERIES) SHALL BE COORDINATED WITH
VA COR.
B. THE MATERIAL DELIVERIES SHALL BE SCHEDULED IN ADVANCE WITH THE
VA COR.
C. ROADWAYS SHALL REMAIN OPEN AT ALL TIMES, EXCEPT THE
CONSTRUCTION AREAS TO BE COORDINATED WITH VA COR.
D. PROVIDE SAFETY BARRICADES AND CAUTION TAPES. COMPLY WITH OSHA
REGULATIONS AND GUIDELINES.
2. CONSTRUCTION STAGING AND USE OF SITE:
A. THE CONTRACTOR SHALL SUBMIT CONSTRUCTION STAGING AND ACCESS
PLANS TO VA COR FOR REVIEW AND APPROVAL BEFORE ISSUANCE OF
NOTICE TO PROCEED. THE CONSTRUCTION STAGING AND ACCESS PLAN
SUBMITTAL INFORMATION SHALL INCLUDE ALL PROPOSED STAGING AREAS
WITH MATERIAL STORAGE AREAS, TEMPORARY BUILDINGS AND UTILITIES;
CONTRACTOR’S ACCESS AND EGRESS ROUTES AND ON-SITE PARKING;
TEMPORARY FENCING PLAN; DEBRIS CONTAINER LOCATIONS; DEBRIS
HAUL ROUTE.
B. VA WILL PROVIDE ONSITE AREA FOR CONSTRUCTION TRAILER.
C. PARKING IS LIMITED AT VA LOMA LINDA HEALTHCARE CENTER. THE
CONTRACTOR SHALL USE OFFSITE PARKING. COORDINATE WITH VA COR.
D. CONTRACTOR SHALL PROVIDE TEMPORARY SIGNS FOR CONSTRUCTION
PARKING.
E. IN ORDER TO PREPARE STAGING PLAN, CONTRACTOR TO OBTAIN MOST
CURRENT SITE PLAN FROM VA.
F. CONTRACTOR SHALL ARRANGE FOR, IN ADVANCE WITH THE VA COR,
APPROVED SITE VEHICULAR ACCESS AND EGRESS POINTS AND ON-SITE
PARKING.
G. CONTRACTOR SHALL ARRANGE FOR, IN ADVANCE WITH THE VA COR,
CONSTRUCTION STORAGE AND STAGING AREAS NECESSARY TO
COMPLETE THE WORK. ALL STORAGE AND STAGING AREAS SHALL BE
RETURNED TO THE OWNER IN LIKE ORIGINAL CONDITION.
H. NIGHTTIME WORK TO BE COORDINATED WITH AND APPROVED BY VA COR.
3. CONSTRUCTION MATERIAL STORAGE:
A. STORAGE OF CONSTRUCTION MATERIALS AND TEMPORARY TRAILERS
SHALL BE LIMITED TO STAGING AREAS.
B. A CONSTRUCTION FENCE SHALL BE PROVIDED AT THE DISCRETION OF THE
VA COR.
C. CONTRACTOR SHALL PROVIDE A MATERIAL STORAGE AREA ADJACENT TO
THE AREA OF CONSTRUCTION. LOCATION SHALL BE COORDINATED WITH
AND APPROVED BY THE VA COR.
4. CONSTRUCTION DEBRIS:
A. ENCLOSED CONTAINERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL
BE PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA.THE
AREAS AROUND THE CONTAINERS SHALL BE KEPT CLEAN AND FREE OF
DEBRIS AND DUST DURING CONSTRUCTION. THE CONTAINER SHALL BE
HAULED AWAY BY THE CONTRACTOR IN A TIMELY MANNER AT NO MORE
95% FULL AND/OR WHEN IT HAS REACHED THE WEIGHT LIMITS.
B. INDICATE LOCATIONS OF CONTAINERS FOR DEMOLISHED ITEMS,
RECYCLABLES AND/OR TRASH ON CONSTRUCTION STAGING PLANS.
T
CI
T A
E
S
L
O
R
FI
AC L
HCRA
I T E
C
A N
I
T
E O
N
SE
F
SHIRISH R.DESAI
D
04/30/21
C-20141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D w in g k \D o c u m e n ts
\V A
L L
-2
-2
C e n tr a l_ w in g
.h o .r v t
/3 /2
:0
:4
P
M
GI-002
STAGING PLAN RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020 S.D. W.H.
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
F1
STAGING PLAN
12" = 1'-0"
GENERAL NOTES
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
95% CONSTRUCTION DOCUMENTS 06/08/2020
100% CONSTRUCTION DOCUMENTS 08/10/2020
3 623 62
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS
ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE
INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS
ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING
JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S
SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL
WOODWORKING INSTITUTE
AWPA AMERICAN WOOD
PRESERVERS' ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER
BEAD
CBB CEMENTITIOUS (BACKER)
BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS
OR CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR
FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR
CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEANOUT, OR COMPANY
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONFCONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING
STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION
SPECIFICATIONS INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING
ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE
OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF
STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR
FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED
POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM
ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
CONCRETE
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND
AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING
CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR
DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANTANEOUS WATER
HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED
DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING
CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS
ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION
COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER
INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW
ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINSTRATION
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHARPHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE
ORDER
PO PURCHASE ORDER POST
OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE
(PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR
REFRIGERATOR
REFR REFRACTORY REFRIGERATION
REFR REFRIGERATION REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR
SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP
DISPENSER;
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL
FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN
DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ INS QUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR
SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR
TOWEL BAR
TCA TILE COUNCIL OF
AMERICA
TCP TELEPHONE CONTROL
PANEL TEMPERATURE
CONTROL PANEL;
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR
TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER
DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD
FINISH
TRTD TREATED
TS TENSILE STRENGTH OR
TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER
COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS
LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE
NOTED
UPS UNINTERRUPTIBLE
POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VA VETERANS
ADMINISTRATION
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED
ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC
COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR
WATER CLOSET
WC WL HNG WATER CLOSET, WALL
HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL
HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF
MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED
POLYSTYRENE BOARD
(INSULATION)
YD YARD
YR YEAR
A
CORRIDOR
C2
DRAWING BLOCK TITLE
1 1/2" = 1'-0"
A-201 A4
A2 A-202
A
BC
D
A-202 A2
A-201 A4
A-512
D2
A-512
D2
S
A4 A-201
0 16'8'4'
CG
NORTH
DETAIL NUMBER
SHEET WHERE DRAWN
A3.1
FEC
CONTRACT LIMIT LINE (LIMIT OF WORK)
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
HIDDEN FEATURES LINE
NEW LINE
PROPERTY LINE
SMOKE BARRIER LINE
BREAK, ROUND (USER
DEFINES SIZE)
BREAK, STRAIGHT (SEE
SECTION INDICATORS, BUILDING,
WITH BREAK STANDARDS)
DETAIL
INDICATOR
DETAIL INDICATOR FOR SMALL
CONDITIONS
DIMENSION LINE
DOOR OPENING / BORROWED
LIGHT IDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR,
MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR,
SINGLE VIEW
CENTER LINE
BUILDING SECTION INDICATOR
FURNITURE, FIXTURE, &
EQUIPMENT INDICATOR
GRAPHIC SCALE, 1/8" = 1'-0"
ROOM NAME AND NUMBER
COLUMN GRID
CORNER GUARD
NORTH ARROW
DETAIL INDICATOR
CONDUIT RUN, CONCEALED IN CEILING, WALLS
OR UNDER FLOORS.
CONDUIT RUN, EXPOSED.
J JUNCTION BOX IN ACCESSIBLE CEILING SPACE
OR FLUSH IN WALL WITH BLANK COVER PLATE
TO MATCH DEVICE PLATES.
J JUNCTION BOX FLUSHED FLOOR MOUNTED.
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CL
W1
FHC FIRE HOSE CABINET
T
CI
T A
E
S
L
O
R
FI
AC L
HCRA
I T E
C
A N
I
T
E O
N
SE
F
SHIRISH R.DESAI
D
04/30/21
C-20141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D w in g k \D o c u m e n ts
\V A
L L
-2
-2
C e n tr a l_ w in g
.h o .r v t
/3 /2
:0
:4
P
M
GI-003
SYMBOLS AND ABBREVIATIONS RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020 S.D. W.H.
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
95% CONSTRUCTION DOCUMENTS 06/08/2020
100% CONSTRUCTION DOCUMENTS 08/10/2020
4 624 62
GENERAL:
1. ALL BIDDERS SHALL VISIT THE SITE DURING THE BID PHASE TO DETERMINE THE
FULL EXTENT OF DEMOLITION REQUIRED AND TO VERIFY ALL EXISTING
CONDITIONS, INCLUDING ABOVE CEILING UNDER CONSTRUCTION.
2. CONTRACTOR SHALL SUBMIT REQUEST FOR INFORMATION (RFIS) REGARDING
ANY KNOWN DISCREPANCIES WITH THE CONTRACT DOCUMENTS OR
UNFORESEEN SITE CONDITIONS TO THE VA COR FOR CLARIFICATION BEFORE
AND OR AFTER NOTICE TO PROCEED.
3. AT THE END OF THE DAY REMOVE ALL TRASH FROM THE BUILDING. PROVIDE FIRE
EXTINGUISHERS AS REQUESTED BY VA LIFE SAFETY OFFICER.
4. WHERE CONSTRUCTION IS REQUIRED BEYOND THE RENOVATION AREA
COORDINATE ACTIVITIES WITH VA REPRESENTATTIVE. AFTER COMPLETION OF
CONSTRUCTION RESTORE ALL FINISHES, LIGHT FIXTURES, MECH DIFFUSERS TO
THEIR ORIGINAL LOCATION AND CONDITION. ALL ACTIVITIES TO BE SCHEDULES
WITH VA LIFE SAFETY OFFICER.
5. IF APPROVED BY VA, DELINEATE MINIMUM 44” WIDE CLEAR PATH OF EGRESS
THRU CONSTRUCTION AREA OR ZONES WHERE BARRIER WALLS OBSTRUCT THE
WORK.
6. MAINTAIN UNINTERRUPTED EXIT AND MEP SERVICES FOR ALL OCCUPIED AREAS
DURING CONSTRUCTION TO BE FULLY FUNCTIONAL.
CLEAN ATTIRE:
1. GC AND THE SUBCONTRACTOR(S) THAT AS A SERVICE PROVIDER TO THE
VETERANS AND VETERAN AFFAIRS HEALTHCARE TO WEAR APPROPRIATE ATTIRE,
I.E. CLEAN CLOTHING IN THE COMMON AREA EXCLUDING THE WORK AREA.
DEMOLITION:
1. ALL NOISY WORK RELATED TO CEILING SLAB SHALL BE SCHEDULED AFTER
NORMAL BUSINESS HOURS, SINCE THE FIRST FLOOR HAS EXAM ROOMS AND
OTHER HOSPITAL FUNCTIONS ONGOING.
2. COORDINATE ALL DEMOLITION WORK WITH PLANS OF NEW CONSTRUCTION.
3. CONDUCT DEBRIS REMOVAL TO ENSURE MINIMUM INTERFERENCE WITH
OCCUPIED AREAS OF THE BUILDING AND SITE AREAS SUCH AS WALKS &
ROADWAYS.
4. FOR ANY DEMOLITION OR REMOVAL, PROVIDE ADEQUATE PROTECTION OF
ADJACENT SURFACES NOT INCLUDED IN THE DEMOLITION.
5. ALL EXISTING AREAS TO REMAIN THAT ARE DAMAGED BY DEMOLITION OR NEW
CONSTRUCTION WORK SHALL BE PATCHED AS REQUIRED TO MATCH ADJOINING
AREA IN MATERIAL, FINISH, COLOR, U.O.N.
6. COORDINATE WITH VA REPRESENTATIVE FOR WORK IN FLOORS BELOW AND
ABOVE THE FLOOR UNDER CONSTRUCTION.EXERCISE EXTREME CARE TO
MINIMIZE IMPACTS ON HOSPITAL OPERATION THESE FLOORS.
7. THE AREA OF WORK ARE TO BE KEPT CLEAN, CLEAR AND FREE OF DEBRIS.
CONSTRUCTION MATERIAL & PARTILALLY INSTALLED WORK CAN NOT INTERFER
WITH THE OWNER'S OPERATION OR CREATE A HAZARD.
8. THE BUILDING WILL REMAIN OPERATIONAL DURING CONSTRUCTION.
9. CONTRACTOR TO COORDINATE AND VERIFY WITH VA PROJECT ENGINEER FOR
DESIGNATED WORKER ACCESS PATHS, MATERIAL DELIVERY PATHS, TRASH
REMOVAL & DISPOSAL PATHS, ETC.
10. CONSTRUCT ONE-HOUR RESISTIVE CONSTRUCTION BARRIER TO SEPARATE
AREAS UNDER CONSTRUCTION FROM ADJACENT AREAS WITH EXITS AS
REQUIRED. TEMPORARY PARTITIONS SHALL BE CONSTRUCTED AS REQUIRED
DURING CONSTRUCTION FOR INFECTION CONTROL AND MINIMIZE THE SPREAD
OF DUST AND NOISE.
11. CONTRACTOR TO COORDINATE THE REMOVAL OF TEMPORARY PARTITIONS
AFTER COMPLETION OF WORK. PATCH REPAIR ALL DAMAGED SURFACES. GC TO
COORDINATE THE REMOVAL OF THE TEMPORARY PARTITION UPON APPROVAL
FROM SAFETY OFFICE AND COR.
12. THE CONTRACTOR SHALL SWEEP VACCUM AND MOP CONSTRUCTION AREAS
CLEAN AT THE END OF THE WORK DAY. KEEP NOISE AND DUST TO A MINIMUM AT
ALL TIMES. USE FILTERED VACCUMS. WET MOP AREAS WITH DISINFECTANT AS
APPLICABLE. SEE INFECTION CONTROL REQUIREMENTS.
13. ALL DEMOLITION AND RENOVATION WORK SHALL BE CONDUCTED UNDER
NEGATIVE PRESSURE, USING VACUUM WITH HEPA FILTER. GC TO PROVIDE
MANOMETER.
14. REMOVE EXISTING FLOOR FINISH AND WALL BASE DOWN TO CONCRETE SLAB.
REMOVE ALL ADHESIVE; GLUE, MASTIC, LAITANCE, ETC. PREPARE SURFACE TO
RECEIVE NEW FINISH. COMPLY WITH THE REQUIREMENTS BY MANUFACTURER OF
THE FLOORING FOR SURFACE PREPARATION. CONTRACTOR TO COORDINATE THE
REMOVAL OF TEMPORARY PARTITIONS AFTER COMPLETION OF WORK. PATCH
REPAIR ALL DAMAGED SURFACES. GC TO COORDINATE THE REMOVAL OF THE
TEMPORARY PARTITION UPON APPROVAL FROM SAFETY OFFICE AND COR.
15. ISOLATE HVAC SYSTEMS IN AREAS WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
16. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING FIRE RATED
WALLS.
17. CONTRACTOR TO X-RAY TOP AND BOTTOM OF THE EXISTING FLOOR SLAB AND
AVOID CUTTING IN TO REBARS DURING CORING OF THE CONCRETE SLAB FOR
FLOOR DRAIN AND ALL OTHER PLUMBING PIPES ETC. SUBMIT X-RAYS TO A/E FOR
FINAL DETERMINATION OF THE LOCATION OF THE PIPES/DRAINS BEFORE CORING
THE SLAB. INDICATE AREAS WHERE CORING CANNOT BE DONE. USE SIMILAR
NON-DESTRUCTIVE TESTING EQUIPMENT OF EXISTING UTILITIES BEHIND WALLS.
AFTER SURVEY OF SLAB, SAWCUT EXISTING CONCRETE FLOOR SLAB FOR NEW
WORK AS REQUIRED, REFER TO MECH, PLUMBING, ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
18. NO STRUCTURAL BEAMS, COLUMNS, SLAB SHALL BE COMPROMISED BY CORING
OR ANY OTHER MEANS. REFER TO SPECIFICATION SECTION 03 81 27 CONCRETE
CORING.
19. WALLS TO BE DEMOLISHED ARE OF STEEL STUDS AND GYPSUM BOARD
EXTENDED TO SLAB ABOVE.
20. PROTECT IN PLACE MAIN FIRE SPRINKLER LINES AND STAND PIPES. MODIFY
SPRINKLER LINES AS REQUIRED TO INSTALL CEILING/LIGHTS/DUCT WORK.
21. GC TO SUBMIT EXITING PLAN FOR EACH PHASE FOR APPROVAL PRIOR TO
STARTING AND DEMOLTION WORK.
22. VERIFY THAT CONSTRUCTION OF EXISTING WALLS WITHIN THE AREA OF
RENOVATION (SMOKE RESISTIVE HAZARODOUS AREA) MEETS THE FIRE
PROTECTION RATINGS DESIGNATED ON THE FIRE LIFE SAFETY PLAN. MAKE ANY
REPAIRS OR MODIFICATIONS NECESSARY TO BRING EXISTING WALLS, DOORS,
DUCTS ETC. UP TO THE PROPER FIRE PROTECTION RATING AND REPAIR ANY
DAMAGED FIRE RATED ASSEMBLIES TO THEIR ORGINAL CONDITIONS.
23. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF FIRE RATED WALL.
PROVIDE A FIRE WATCH WHILE WORKING ON FIRE RATED WALLS.
24. GENERAL CONTRACTOR TO PROVIDE ONE HOUR FIRE RESISTIVE
CONSTRUCTION BARRIERS FOR VA APROVAL PRIOR TO STARTING ANY
DEMOLITION WORK.
25. AIR QUALITY AND INFECTION CONTROL DURING CONSTRUCTION TO COMPLY
WITH VA STANDARDS AND AS OUTLINED IN PROJECT MANUAL.
26. DURING CONSTRUCTION PROVIDE CONTINOUS AND UNOBSTRUCTED EXIT PATHS
TO EXISTING EXIT CORRIDORS AND EXIT STAIRS AT AL T IMES. MAINTAIN EXIT
PATHS AS SHOWN ON THE LIFE SAFETY DRAWINGS ON SHEET DRAWING NO
GI-101, GI-102, GI-103.
27. PATCH AND REPAIR OR PAINT AS REQUIRED. ALL EXITING CONTRUCTION TO
REMAIN THAT HAS BEEN DAMAGED BY ADJACENT CONSTRUCTION ACTIVITIES TO
RESTORE THE ORIGINAL CONSTRUCTION.
28. WHERE NEW FINISHES ARE TO BE INSTALLED ON EXISTING SURFACES, REMOVE
THE EXISTING FINISH AND PREPARE SURFACES TO RECEIVE NEW FINISH.
29. WHERE THE DEMOLITION CAUSES UNEVENNESS OR VOIDS IN FLOOR, THE
CONTRACTOR SHALL PATCH TO LEVEL THE FLOOR WITH THE EXISTING SLAB
AND/OR REQUIRED SURFACE TO RECEIVE THE NEW FINISH.
30. PIPES AND CONDUITS ENCOUNTERED IN DEMOLITION AREAS WHICH ARE TO
REMAIN IN USE SHALL BE REROUTED AND CONCEALED. THOSE WHICH ARE TO BE
ABANDONED SHALL BE CAPPED AND CONCEALED IN FLOOR, WALL OR CEILING TO
COMPLY WITH LEGIONELLA DIRECTIVE.
31. FOR OTHER DEMOLITION ITEMS SEE PLUMBING & ELECTRICAL DRAWINGS.
32. COORDINATE WITH VA'S FIRE LIFE SAFETY COORDINATOR FOR SMOKE
DETECTORS AND FIRE ALARM EQUIPMENT DURING CONSTRUCTION PHASES.
33. PROVIDE FIRE EXTINGUISHERS AS REQUESTED BY VA LIFE SAFETY OFFICER.
34. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS NOT LIMITED TO AS
SHOWN ON THE DRAWINGS AND IDENTIFY ALL BEARING STRUCTURAL ELEMENTS,
MECHANICAL, PLUMBING, ELECTRICAL, COMMUNICATIONS, AND ALL OTHER
EXISTING SYSTEMS (AND MAKE NECESSARY PROVISIONS TO MAINTAIN THE
INTEGRITY OF SAID SYSTEMS) PRIOR TO COMMENCEMENT OF DEMOLITION.
35. THE CONTRACTOR SHALL REFER TO DRAWINGS FOR EXTENT OF AND
INFORMATION PARTICULAR TO THE REMOVAL OF EXISTING SYSTEMS.
36. PER DIRECTION OF VA COR, ALL SALVAGEABLE ITEMS SHALL BE THE PROPERTY
OF THE VA AND SHALL BE REUSED OR STORED AS DESIGNATED BY THE VA.
37. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT FINISHED
PARTS OF THE MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM ANY CAUSE
DURING THE PROGRESS OF THE WORK AND UNTIL ACCEPTANCE BY THE OWNER.
38. IN THE INTERIOR SPACES REPAIR/REPLACE, AS A RESULT OF THE DEMOLITION
AND NEW CONSTRUCTION, TO MATCH EXISTING CONDITIONS.
39. IF JACK-HAMMERING CORE DRILLING OR CONCRETE SAWING IS TO BE UTILIZED,
IT SHALL BE KEPT TO A MINIMUM AND SHALL BE DONE ONLY WITH THE WRITTEN
APPROVAL OF THE VA COR AND AT SUCH TIMES AS DESIGNATED.
40. WHERE EXISTING CONSTRUCTION IS CUT OR OTHERWISE DISTURBED TO PERMIT
INSTALLATION OF NEW WORK, REPAIR AND PATCH TO MATCH EXISTING
CONSTRUCTION. USE METHODS AND MATERIALS WHICH ARE SIMILAR IN
APPEARANCE AND EQUAL IN QUALITY TO THOSE AREAS BEING REPAIRED.
41. ALL ABANDONED PLUMBING LINES, WILL BE REMOVED BACK TO CLOSEST FEEDER
POINT, PER PLUMBING DRAWINGS.
42. DEMOLITION SHALL BE EXECUTED IN CONFORMANCE WITH ALL CODES AND
STANDARDS AS SET FORTH BY THE VETERANS ADMINISTRATION.
43. DO NOT COMPROMISE ANY STRUCTURES OR STRUCTURAL ELEMENTS DURING
DEMOLITION.
44. THESE DRAWINGS WERE DEVELOPED FROM EXISTING DRAWINGS AFTER VISIBLE
FIELD VERIFICATIONS. VERIFY EXISTING CONDITIONS AND NOTIFY VA AND
ARCHITECT BEFORE PROCEEDING WITH CONSTRUCTION.
45. REMOVE ALL MATERIALS IN COVERED CONTAINERS AND SHALL BE TAKEN OUT AT
THE END OF THE DAY.
46. CONTRACTOR TO PROVIDE PHOTOGRAPHIC DOCUMENTATION OF AS-BUILT
CONDITIONS AS WELL AS IN BIM.
47. PROVIDE 3-WEEK ADVANCE NOTICE FOR ANY UTILITY SHUTDOWN AND
ALTERNATE SYSTEM FOR VA APPROVAL. THE CONTRACTOR SHALL IDENTIFY THE
DATE, TIME AND DESCRIPTION OF THE SHUT DOWN, REQUEST A UTILITY
COORDINATION MEETING WITH VA SHOP AND VA COR.
48. CONTRACTOR TO X-RAY FLOORS FOR CONNECTIONS TO EXISTING UTILITIES
AND/OR INSTALL NEW UTILITIES.
49. CONTRACTOR SHALL PERFORM ALL DEMOLITION WITH UTMOST CARE TO AVOID
DAMAGE TO EXISTING UTILITIES AND OTHER BUILDING STRUCTURES.
50. CONTRACTOR SHALL PERFORM SURVEY OF EXISTING CONDITIONS OF ALL
EQUIPMENT, FIXTURES OF ALL TRADES (DISCIPLINES) AND PROVIDE A SIGNED
WRITTEN REPORT WITH LIST OF ALL EXISTING FIXTURES, LOCATIONS FOR ALL
SYSTEM TO VA-COR, AT LEAST 7 DAYS BEFORE START OF CONSTRUCTION.
51. CONDUCT DEBRIS REMOVAL TO ENSURE MINIMUM INTERFERENCE WITH
OCCUPIED AREAS OF THE BUILDING AND SITE AREAS SUCH AS WALKS &
ROADWAYS.
52. THE WORD "REMOVE" INCLUDES DISPOSAL OF THE MATERIAL OFF SITE TO
APPROVED LANDFILLS AND IN ACCORDANCE WITH APPLICABLE REGULATIONS
AND PER VA'S STANDARD. SUBMIT DISPOSAL REPORT FOR VA APPROVAL.
53. THE BUILDING WILL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY
DISRUPTIONS TO UTILITIES REQUIRES 21-DAY ADVANCE NOTIFICATION TO VA.
54. ALL DEMOLITION AND RENOVATION WORK SHALL BE CONDUCTED UNDER
NEGATIVE PRESSURE, USING VACUUM WITH HEPA FILTER. GC TO PROVIDE
MANOMETER AS APPROVED BY VA SAFETY OFFICER.
55. ISOLATE HVAC SYSTEMS IN AREAS WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
56. THE AREA OF WORK ARE TO BE KEPT CLEAN, CLEAR AND FREE OF DEBRIS.
CONSTRUCTION MATERIAL & PARTIALLY INSTALLED WORK CANNOT INTERFERE
WITH THE OWNER'S OPERATION OR CREATE A HAZARD.
57. THE CONTRACTOR SHALL SWEEP VACUUM AND MOP CONSTRUCTION AREAS
CLEAN AT THE END OF THE WORK DAY. KEEP NOISE AND DUST TO A MINIMUM AT
ALL TIMES. USE FILTERED VACUUMS. WET MOP AREAS WITH DISINFECTANT AS
APPLICABLE. SEE INFECTION CONTROL REQUIREMENTS.
58. FOR ANY DEMOLITION OR REMOVAL, PROVIDE ADEQUATE PROTECTION OF
ADJACENT SURFACES NOT INCLUDED IN THE DEMOLITION.
59. ALL EXISTING AREAS TO REMAIN THAT ARE DAMAGED BY DEMOLITION OR NEW
CONSTRUCTION WORK SHALL BE PATCHED AS REQUIRED TO MATCH ADJOINING
AREA IN MATERIAL, FINISH, COLOR, U.O.N.
60. CONTRACTOR TO COORDINATE AND VERIFY WITH VA COR FOR DESIGNATED
WORKER ACCESS PATHS, MATERIAL DELIVERY PATHS, TRASH REMOVAL &
DISPOSAL PATHS, ETC. MATERIAL SHALL BE DELIVERED AFTER NORMAL
BUSINESS HOURS.
61. REMOVE ALL EQUIPMENT AND ALL ACCESSORIES WHERE WALLS ARE TO BE
DEMOLISHED. DISPOSE OFF WITH VA APPROVAL.
62. WHERE THE DEMOLITION CAUSES UNEVENNESS OR VOIDS IN FLOOR, THE
CONTRACTOR SHALL PATCH TO LEVEL THE FLOOR WITH THE EXISTING SLAB
AND/OR REQUIRED SURFACE TO RECEIVE THE NEW FINISH.
63. ALL EXISTING FLOOR SURFACES TO REMAIN U.O.N. PROVIDE FLOOR LEVELING AT
ALL EXISTING FLOOR TRANSITIONS TO PROVIDE A SMOOTH TRANSITION THAT
WILL ACCEPT NEW SPECIFIED FLOOR FINISH.
64. FOR OTHER DEMOLITION ITEMS SEE MECHANICAL, PLUMBING & ELECTRICAL
DRAWINGS.
65. REMOVE ALL FLOOR/WALL/COLUMN CONCEALED OR SURFACE MOUNTED
ELECTRICAL OUTLETS, JUNCTION BOXES AND DATA CONDUITS WHICH ARE NOT
TO REPURPOSED PER VA COR.
66. CONTRACTOR TO COORDINATE REMOVAL OF TEMPORARY PARTITION UPON
COMPLETION OF WORK.
67. REMOVE ALL WALL AND CEILING MOUNTED EXIT SIGNS WITHIN AREAS OF
CONSTRUCTION. PROVIDE EXIT SIGNS AT TEMPORARY PARTITIONS
68. COORDINATE WITH VA'S FIRE LIFE SAFETY COORDINATOR FOR REMAINING
SMOKE DETECTORS AND FIRE ALARM EQUIPMENT DURING CONSTRUCTION
PHASES.
69. COORDINATE WITH VA'S FIRE ALARM TECHS AND VA SHOPS FOR PROPER
OUTAGES.
70. PROVIDE FIRE EXTINGUISHERS AS INDICATED AND AS REQUESTED BY VA LIFE
SAFETY OFFICER.
71. INSTALL EQUIVALENT TEMPORARY UTILITIES (FIRE ALARM, FIRE SPRINKLERS
ETC.)
NEW CONSTRUCTION:
1. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONSTRUCTION
MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, FOR SAFETY
PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, AND FOR THE
ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR OR ANY OTHER
PERSONS PERFORMING ANY OF THE WORK OR THE FAILURE OF ANY OF THEM TO
CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD
CONDITIONS WITH THE CONTRACT DOCUMENTS BEFORE COMMENCING
ACTIVITIES. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL
DIMENSIONS INSOFAR AS NECESSARY TO INSTALL THE WORK PROPERLY AND
RELATIVE TO THE SURROUNDING CONSTRUCTION.
3. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS, SECTIONS, ELEVATIONS
OR DETAILS. ALL DRAWINGS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATING
PURPOSES.
4. AT ANY TIME SHOULD ANY CONDITIONS ARISE WHEREIN THE INTENT OF THE
DRAWINGS IS IN DOUBT OR WHERE THERE IS A DISCREPANCY BETWEEN THE
DRAWINGS AND FIELD CONDITIONS THE ARCHITECT SHALL BE NOTIFIED
IMMEDIATELY FOR WRITTEN CLARIFICATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER LOCATION AND
SIZE OF OPENINGS FOR ALL TRADES AND SHALL COORDINATE ALL
CONSTRUCTION AS INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING SHOP
DRAWINGS REVISED BY THE ARCHITECT.
6. THE V.A. IS NOT RESPONSIBLE FOR ANY LOSS OR DAMAGE TO CONTRACTOR'S
EQUIPMENT, TOOLS, ETC.
7. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT FINISHED
PARTS OF THE MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM ANY CAUSE
DURING THE PROGRESS OF THE WORK AND UNTIL ACCEPTANCE BY THE OWNER.
8. CONTRACTOR SHALL MAINTAIN A CLEAN WORK PLACE. DUST PALLIATION AND
PREVENTION OF DUST CONTAMINATION OF NON-WORK SPACES WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR ON AN ONGOING, DAILY BASIS.
9. ALL DIMENSIONS ARE TO FACE OF STUD OF NEW CONSTRUCTION AND FACE OF
FINISH OF EXISTING CONSTRUCTION UNLESS OTHERWISE NOTED.
10. SPECIAL TOOLS, IF ANY PART OF EQUIPMENT FURNISHED UNDER THIS CONTRACT
REQUIRES A SPECIAL TOOL FOR ASSEMBLY, ADJUSTMENT, SETTING OF
MAINTENANCE THEREOF, SHALL BE FURNISHED WITH EQUIPMENT AS A
STANDARD ACCESSORY.
11. CONTRACTOR TO PATCH AND REPAIR ALL WALLS, FLOORS, AND CEILINGS
DAMAGED DURING CONSTRUCTION TO MATCH EXISTING.
12. THE CONTRACTOR SHALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .