S02 DWG FINAL SUBMITTAL-VOL1 PART A 22 Dec 20.pdf

PDF 15 MB Posted

Attached to
Z1DA--Service-Renovate Domestic Water Piping Projects FMS (VA-21-00001742)605-21-1-6043-0001-
Solicitation number
36C25821R0015
Issued by

About this file

This federal contract opportunity solicitation is for renovating domestic water piping projects at a Department of Veterans Affairs medical center. The solicitation number is 36C25821R0015 and proposals are due no later than August 28, 2021 at 2:00 PM Pacific Standard Time. Any requests for information must be submitted in writing to the listed points of contact no later than August 16. The opportunity type is a solicitation issued by the Veterans Health Administration within the Department of Veterans Affairs. The work required includes renovating domestic water piping projects at multiple VA medical facilities.

View the file

Other files

File Type Posted
36C25821R0015 0006.docx DOCX document
Questions - RFI last Questions.pdf PDF
36C25821R0015 0005.docx DOCX document
CLC_RCP-A-131-2019-11-18.pdf PDF
CLC2_RCP-AE1-16-2019-11-18.pdf PDF
Second Set of Questions.pdf PDF
36C25821R0015 0004.docx DOCX document
Site Walk Sign In Sheet.pdf PDF
36C25821R0015 0003.docx DOCX document
Questions.pdf PDF
Volume II Building 1 Loma Linda Final.pdf PDF
36C25821R0015 0002.docx DOCX document
36C25821R0015 0001.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part C 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part A 22 Dec 20.pdf PDF
Attachment J Legionella 1061 Directive.pdf PDF
Attachment F AWWA C651-14 Disinfecting Water Mains.pdf PDF
Attachment H Loma Linda HCS Infection Prevention Guide.pdf PDF
Attachment C Self Performance Calculations.docx DOCX document
Attachment B Bid Breakout Form.docx DOCX document
S20 SPEC FINAL SUBMITTAL 22 Dec 20.pdf PDF
Attachment I 1061 D 2021-02-16.pdf PDF
Attachment E Davis Bacon Wage 06.25.21.docx DOCX document
Attachment A Instructions for Contractors 07.27.docx DOCX document
Attachment G Part 8 ICRA for Loma Linda Renovate Domestic Piping.doc DOC document
Attachment D Past Performance Survey 07.27.docx DOCX document
36C25821R0015_1.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TEAM

VA REPRESENTATIVES:

James Otwell Project Manager / COR VA Loma Linda Healthcare System 11201 Benton Street Loma Linda, CA 92357 Phone: (909) 825-7084 ext. 6812 Cell: (951) 258-3920

John T. Kamerer Contract Specialist/NCO 22 Gilbert Office: 520-629-4613 Construction Services 3601 S. 6th Avenue, Building 45 Tucson, AZ 85723

ARCHITECT:

SRD Architects Inc.

3920 East Coronado Street Suite #201 Anaheim, CA 92807 Phone: (714) 688 0212 Fax: (714) 688 0244 www.srdarchitectsinc.com

MECHANICAL/ELECTRICAL/PLUMBING:

PBS Engineers 2100 East Route 66, Suite 210 Glendora, CA 91740 Phone: (626) 650 0350

F

A

D

I

E

T

D

ST

N U

E T

M

AP

R

E

NT O

S

A

T SE FO

R E

M

A

CI

N

VE RA

TE

A

FA

I R F

S

T

CI

T A

E

S

L

O

R

FI

AC L

HCRA

I T E

C

A N

I

T

E O

N

SE

F

SHIRISH R.DESAI

D

04/30/21

C-20141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

F

IN

A L

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

D w in g k \D o c u m e n ts

\V A

L L

-2

-2

C e n tr a l_ w in g

.h o .r v t

/7 /2

:2

:3

P

M

GI-000

COVER SHEET RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020 S.D. W.H.

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

DEPARTMENT OF VETERANS AFFAIRS

LOMA LINDA HEALTHCARE SYSTEM

RENOVATE DOMESTIC WATER PIPING

VOLUME -1

11201 BENTON STREET, LOMA LINDA, CA 92357

VA PROJECT NO. 605-20-201

FINAL CONSTRUCTION DOCUMENTS

DATE: DECEMBER 10, 2020

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

95% CONSTRUCTION DOCUMENTS 06/08/2020

100% CONSTRUCTION DOCUMENTS 08/10/2020

FINAL CONSTRUCTION DOCUMENTS 12/10/2020

1 621 62

"FOR THE PURPOSES OF THIS PROJECT THIS FACILITY SHALL BE CONSIDERED AN

ESSENTIAL FACILITY. ALL MATERIALS SHALL CONFORM TO LATEST GOVERNING

BUILDING CODES AND REGULATIONS. CONTRACTOR SHALL PERFORM WORK IN

COMPLIANCE WITH ALL APPLICABLE CODES OF CURRENTLY ADOPTED EDITIONS.

VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS

AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION,

ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE

CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER

SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON

ITS PROJECTS: VA FUNCTIONS AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND

THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH

ENFORCING ITS ADOPTED CODES:

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/)."

1. VHA Directive 1061, PREVENTION OF HEALTHCARE-ASSOCIATED LEGIONELLA

DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION SYSTEMS.

2. "2018 INTERNATIONAL BUILDING CODE, 2018 INTERNATIONAL MECHANICAL

CODE, 2018 INTERNATIONAL PLUMBING CODE AND OTHERS"

3. NFPA 101 LIFE SAFETY CODE – LATEST EDITION.

4. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA

5. "OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS."

6. "VA SEISMIC DESIGN REQUIREMENTS, H-18-8 "

7. 2017 NATIONAL ELECTRICAL CODE (NEC)

8. "SAFETY CODES FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF

MECHANICAL ENGINEERS (ASME) A 17.1."

9. ASME BOILER AND PRESSURE VESSEL CODE

10. ASME CODE FOR PRESSURE PIPING

11. "ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)"

12. "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN

CONCRETE INSTITUTE AND COMMENTARY (ACI 318)"

13. "MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN

SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE

OF STEEL CONSTRUCTION (AISC)"

14. ENERGY POLICY ACT OF 2005 (EPACT)

15. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

16. "EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,

ENERGY, AND TRANSPORTATION MANAGEMENT."

17. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD

62.1- 2004.

18. SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 -

2007.

19. AIA GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND

OUTPATIENT FACILITIES.

APPLICABLE CODES AND STANDARDS

PROJECT INFORMATION

SCOPE OF WORK

(FOR DETAILED SCOPE OF WORK SEE PLANS AND SPECIFICATIONS)

MAIN HOSPITAL BUILDING, FROM BASEMENT TO PENTHOUSE INCLUDING THE

PLATFORM FLOORS (INTERSTITIAL FLOORS) AND CLC & CLC2:

1. REMOVE AND REPLACE CORRODED DOMESTIC WATER PIPING, PIPING PAST ITS

SERVICE LIFE.

2. REMOVAL OF UNUSED PIPE RUNS (DEAD LEGS).

3. REDUCE FIXTURE RUN OUTS TO AN ALLOWABLE LENGTH.

4. RE-PIPE AREAS INDICATED ON DRAWINGS TO REDUCE STAGNATION.

5. REPLACEMENT OF ALL NON-COMPLIANT, GALVANIZED STEEL PIPING WITH TYPE

“L” COPPER PIPING AND FITTINGS AND ALL COPPER SHALL BE BRAZED.

6. PROVIDE HEAT EXCHANGER AND PUMPS.

7. PIPING FOR RETURN OF THE COLD-WATER SYSTEM.

8. INSTALL INSULATION AND JACKETING ON ALL HOT AND COLD-WATER PIPING.

9. INSTALL DOMESTIC COLD-WATER RECIRCULATION PUMPS.

10. INSTALL CHLORINE ANALYZER SYSTEM.

11. INSTALL CONDENSATE DRAIN PUMPS.

12. INSTALL WATER FLOW METERS.

BUILDING INFORMATION (MAIN BUILDING)

OCCUPANCY: I-2 HEALTHCARE - AMBULATORY

CONSTRUCTION TYPE: I, FULLY SPRINKLERED

ELEVATOR LOBBIES – 1 HR FIRE RATED SMOKE BARRIER ENCLOSURE

SERVICE BAYS – 1 HR FIRE RATED CONSTRUCTION

FLOOR AREAS (APPROXIMATE):

BASEMENT - 39,833 SQ.FT.

FIRST FLOOR - 275,774 SQ.FT.

SECOND FLOOR - 160,486 SQ.FT.

THIRD FLOOR - 151,343 SQ.FT.

FOURTH FLOOR - 150,610 SQ.FT.

F

R W

Y

10 FRWY

60 FRWY

F R

W Y

BARTON RD

M O

U N

T

IA

N V

IE

W

A V

E

PROJECT LOCATION

FIRST FLOOR

0"

BASEMENT 1

-14' - 6"

SECOND FLOOR

18' - 0"

THIRD FLOOR

36' - 0"

FOURTH FLOOR

54' - 0"

PENTHOUSE

72' - 0"

26 25.5 25.4 25 24.9

BASEMENT 2

-13' - 6"

FIRST FLOOR

INTERSTITIAL

9' - 11"

SECOND FLOOR

INTERSTITIAL

27' - 11"

THRID FLOOR

INTERSTITIAL

45' - 11"

FOURTH FLOOR

INTERSTITIAL

63' - 11"

FAN

FR3

SERVBAY

SB01-7

SERVBAY#7

SB01A-7

SERVBAY

SB02-7

SERVBAY#7

SB02A-7

SERVBAY#7

SB03-7

SERVBAY #7

SB03A-7

SERVBAY #7

SB04-7

SERVBAY #7

SB04A-7

TUNNEL 1A

001A

STORAGE

1F-35B

OFFICE

2A-61

PHYS OFF

3A-67

QUARTERS

4A-25G

SHEET INDEX

SHEET

NUMBER SHEET NAME

PW-B01 NEW OVERALL BASEMENT FLOOR PLAN #1

PW-B02 NEW PARTIAL BASEMENT FLOOR PLAN #2

PW-B03 NEW PARTIAL BASEMENT FLOOR PLAN #3

PW-B04 NEW PARTIAL BASEMENT FLOOR PLAN #4

PW-B05 NEW PARTIAL BASEMENT FLOOR PLAN #5

PW-B06 NEW PARTIAL BASEMENT FLOOR PLAN #6

PW-B07 NEW PARTIAL BASEMENT FLOOR PLAN #7

PW-B08 NEW PARTIAL BASEMENT FLOOR PLAN #8

PW-100 OVERALL FIRST FLOOR PLAN

PW-101 NEW PARTIAL FIRST FLOOR PLAN #1

PW-102 NEW PARTIAL FIRST FLOOR PLAN #2

PW-103 NEW PARTIAL FIRST FLOOR PLAN #3

PW-104 NEW PARTIAL FIRST FLOOR PLAN #4

PW-105 NEW PARTIAL FIRST FLOOR PLAN #5

PW-106 NEW PARTIAL FIRST FLOOR PLAN #6

PW-107 NEW PARTIAL FIRST FLOOR PLAN #7

PW-108 NEW PARTIAL FIRST FLOOR PLAN #8

PW-109 NEW PARTIAL FIRST FLOOR PLAN #9

PW-110 NEW PARTIAL FIRST FLOOR PLAN #10

PW-200 OVERALL SECOND FLOOR PLAN

PW-201 NEW PARTIAL SECOND FLOOR PLAN #1

PW-202 NEW PARTIAL SECOND FLOOR PLAN #2

PW-203 NEW PARTIAL SECOND FLOOR PLAN #3

PW-204 NEW PARTIAL SECOND FLOOR PLAN #4

PW-205 NEW PARTIAL SECOND FLOOR PLAN #5

PW-206 NEW PARTIAL SECOND FLOOR PLAN #6

PW-300 OVERALL THIRD FLOOR PLAN

PW-301 NEW PARTIAL THIRD FLOOR PLAN #1

PW-302 NEW PARTIAL THIRD FLOOR PLAN #2

PW-303 NEW PARTIAL THIRD FLOOR PLAN #3

PW-304 NEW PARTIAL THIRD FLOOR PLAN #4

PW-305 NEW PARTIAL THIRD FLOOR PLAN #5

PW-306 NEW PARTIAL THIRD FLOOR PLAN #6

PW-400 OVERALL FOURTH FLOOR PLAN

PW-401 NEW PARTIAL FOURTH FLOOR PLAN #1

PW-402 NEW PARTIAL FOURTH FLOOR PLAN #2

PW-403 NEW PARTIAL FOURTH FLOOR PLAN #3

PW-404 NEW PARTIAL FOURTH FLOOR PLAN #4

PW-405 NEW PARTIAL FOURTH FLOOR PLAN #5

PW-406 NEW PARTIAL FOURTH FLOOR PLAN #6

PW-501 SERVICE BAY ENLARGED PLANS

PW-502 SERVICE BAY ENLARGED PLANS

PW-503 SERVICE BAY ENLARGED PLANS

PW-504 SERVICE BAY ENLARGED PLANS

PW-600 DOMESTIC WATER RISER DIAGRAM

04-ELECTRICAL

EP-001 GENERAL NOTES, SYMBOL LIST AND SHEET INDEX

EP-002 SINGLE LINE DIAGRAMS

EP-003 SINGLE LINE DIAGRAMS

EP-005 PANEL SCHEDULES

EP-006 PANEL SCHEDULES

EP-007 PANEL SCHEDULES

EP-205 PARTIAL BOILER ROOM ELECTRICAL PLAN/EXISTING PHOTO

EP-101 OVERALL FIRST FLOOR ELECTRICAL PLAN

EP-102 OVERALL SECOND FLOOR ELECTRICAL PLAN

EP-103 OVERALL THIRD FLOOR ELECTRICAL PLAN

EP-104 OVERALL FOURTH FLOOR ELECTRICAL PLAN

EP-201 FIRST FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN

EP-202 SECOND FLOOR SERVICE BAYS ELECTRICAL ENLARGED PLANS

EP-203 THIRD FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN

EP-204 FOURTH FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN

EP-004 PANEL SCHEDULES

EP-301 ELECTRICAL DETAILS/EXISTING PHOTOS

05-REFERENCE

RS-101 REFERENCE - STRUCTURAL FRAMING PLAN

RS-102 REFERENCE - STRUCTURAL FRAMING PLAN

RS-103 REFERENCE - STRUCTURAL FRAMING PLAN

RS-104 REFERENCE - STRUCTURAL FRAMING PLAN

RS-105 REFERENCE - STRUCTURAL FRAMING PLAN

RS-106 REFERENCE - STRUCTURAL FRAMING PLAN

RS-107 REFERENCE - STRUCTURAL DETAILS

SHEET INDEX

SHEET

NUMBER SHEET NAME

01-GENERAL

GI-000 COVER SHEET

GI-001 DRAWING INDEX, PROJECT INFORMANTION, VICINITY MAP

GI-002 STAGING PLAN

GI-003 SYMBOLS AND ABBREVIATIONS

GI-004 GENERAL NOTES

02-ARCHITECTURAL

AE-100 OVERALL PLAN - BASEMENT

AE-101 OVERALL PLAN - FIRST FLOOR

AE-102 OVERALL PLAN - FIRST FLOOR

AE-103 OVERALL FIRST FLOOR INTERSTITIAL PLAN

AE-104 OVERALL PLAN - SECOND FLOOR

AE-105 OVERALL SECOND FLOOR INTERSTITIAL PLAN

AE-106 OVERALL THIRD FLOOR PLAN

AE-107 OVERALL THIRD FLOOR INTERSTITIAL FLOOR

AE-108 OVERALL FOURTH FLOOR PLAN

AE-109 OVERALL FOURTH FLOOR INTERSTITIAL PLAN

AE-510 PENETRATION DETAILS

03-PLUMBING

P-001 GENERAL NOTES, LEGEND, ABBREVIATIONS & SHEET INDEX

P-002 PLUMBING SCHEDULE

P-003 PLUMBING DETAILS

P-004 PLUMBING DETAILS

P-005 PLUMBING SECTION DETAILS

P-006 PLUMBING SECTION DETAILS

PD-B01 OVERALL BASEMENT FLOOR PLAN

PD-B02 PARTIAL BASEMENT FLOOR PLAN #1

PD-B03 PARTIAL BASEMENT FLOOR PLAN #2

PD-B04 PARTIAL BASEMENT FLOOR PLAN #3

PD-B05 PARTIAL BASEMENT FLOOR PLAN #4

PD-B06 PARTIAL BASEMENT FLOOR PLAN #5

PD-B07 PARTIAL BASEMENT FLOOR PLAN #6

PD-100 OVERALL FIRST FLOOR PLAN

PD-101 PARTIAL FIRST FLOOR PLAN #1

PD-102 PARTIAL FIRST FLOOR PLAN #2

PD-103 PARTIAL FIRST FLOOR PLAN #3

PD-104 PARTIAL FIRST FLOOR PLAN #4

PD-105 PARTIAL FIRST FLOOR PLAN #5

PD-106 PARTIAL FIRST FLOOR PLAN #6

PD-107 PARTIAL FIRST FLOOR PLAN #7

PD-108 PARTIAL FIRST FLOOR PLAN #8

PD-109 PARTIAL FIRST FLOOR PLAN #9

PD-110 PARTIAL FIRST FLOOR PLAN #10

PD-111 PARTIAL FIRST FLOOR PLAN #11

PD-200 OVERALL SECOND FLOOR PLAN

PD-201 PARTIAL SECOND FLOOR PLAN #1

PD-202 PARTIAL SECOND FLOOR PLAN #2

PD-203 PARTIAL SECOND FLOOR PLAN #3

PD-204 PARTIAL SECOND FLOOR PLAN #4

PD-205 PARTIAL SECOND FLOOR PLAN #5

PD-206 PARTIAL SECOND FLOOR PLAN #6

PD-300 OVERALL THIRD FLOOR PLAN

PD-301 PARTIAL THIRD FLOOR PLAN #1

PD-302 PARTIAL THIRD FLOOR PLAN #2

PD-303 PARTIAL THIRD FLOOR PLAN #3

PD-304 PARTIAL THIRD FLOOR PLAN #4

PD-305 PARTIAL THIRD FLOOR PLAN #5

PD-306 PARTIAL THIRD FLOOR PLAN #6

PD-400 OVERALL FOURTH FLOOR PLAN

PD-401 PARTIAL FOURTH FLOOR PLAN #1

PD-402 PARTIAL FOURTH FLOOR PLAN #2

PD-403 PARTIAL FOURTH FLOOR PLAN #3

PD-404 PARTIAL FOURTH FLOOR PLAN #4

PD-405 PARTIAL FOURTH FLOOR PLAN #5

PD-406 PARTIAL FOURTH FLOOR PLAN #6

T

CI

T A

E

S

L

O

R

FI

AC L

HCRA

I T E

C

A N

I

T

E O

N

SE

F

SHIRISH R.DESAI

D

04/30/21

C-20141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

F

IN

A L

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

D w in g k \D o c u m e n ts

\V A

L L

-2

-2

C e n tr a l_ w in g

.h o .r v t

/7 /2

:3

:3

A

M

GI-001

DRAWING INDEX, PROJECT

INFORMANTION, VICINITY MAP

RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020 S.D. W.H.

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

VOLUME 1 VOLUME 2

N.T.S.

F5

VICINITY MAP

1/8" = 1'-0"

F1

BUILDING SECTION

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

95% CONSTRUCTION DOCUMENTS 06/08/2020

100% CONSTRUCTION DOCUMENTS 08/10/2020

2 62

BARTON ROAD

B E

N T

O N

R

O A

D PROJECT LOCATION

CONTRACTOR LAY-DOWN

AREA

CONSTRUCTION STAGING NOTES

THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN

“SPECIFICATION SECTION 01 00 00 - DIVISION I - GENERAL REQUIREMENTS.” THESE

NOTES PARAPHRASE OR SUPPLEMENT THE DIVISION 1 REQUIREMENTS AND ARE NOT

INTENDED TO REPLACE THEM. CONSTRUCTION ACCESS AND PARKING,

CONSTRUCTION STAGING & USE OF SITE, CONSTRUCTION MATERIAL STORAGE,

CONSTRUCTION DEBRIS AND MAINTENANCE OF ONGOING OPERATIONS SHALL BE

COORDINATED WITH VA CONTRACTING OFFICER’S REPRESENTATIVE (COR). SITE

LAYDOWN AREA WILL BE APPROVED BY VA COR. UTILIZE LAYDOWN PLAN FOR

REFERENCE ONLY.

NOTE: THE VA’S ONGOING OPERATIONS SHALL NOT BE HINDERED BY CONTRACTOR’S

TEMPORARY FENCING, STAGING AREAS OR PARKING OF CONTRACTOR’S EQUIPMENT

AND/OR VEHICLES. FIRE DEPT ACCESS TO HOSPITAL SHALL REMAIN UNOBSTRUCTED

DURING CONSTRUCTION.

1. CONSTRUCTION ACCESS AND PARKING:

A. CONTRACTOR’S ACCESS, EGRESS AND ON-SITE PARKING (VEHICLE,

PEDESTRIAN, EQUIPMENT AND DELIVERIES) SHALL BE COORDINATED WITH

VA COR.

B. THE MATERIAL DELIVERIES SHALL BE SCHEDULED IN ADVANCE WITH THE

VA COR.

C. ROADWAYS SHALL REMAIN OPEN AT ALL TIMES, EXCEPT THE

CONSTRUCTION AREAS TO BE COORDINATED WITH VA COR.

D. PROVIDE SAFETY BARRICADES AND CAUTION TAPES. COMPLY WITH OSHA

REGULATIONS AND GUIDELINES.

2. CONSTRUCTION STAGING AND USE OF SITE:

A. THE CONTRACTOR SHALL SUBMIT CONSTRUCTION STAGING AND ACCESS

PLANS TO VA COR FOR REVIEW AND APPROVAL BEFORE ISSUANCE OF

NOTICE TO PROCEED. THE CONSTRUCTION STAGING AND ACCESS PLAN

SUBMITTAL INFORMATION SHALL INCLUDE ALL PROPOSED STAGING AREAS

WITH MATERIAL STORAGE AREAS, TEMPORARY BUILDINGS AND UTILITIES;

CONTRACTOR’S ACCESS AND EGRESS ROUTES AND ON-SITE PARKING;

TEMPORARY FENCING PLAN; DEBRIS CONTAINER LOCATIONS; DEBRIS

HAUL ROUTE.

B. VA WILL PROVIDE ONSITE AREA FOR CONSTRUCTION TRAILER.

C. PARKING IS LIMITED AT VA LOMA LINDA HEALTHCARE CENTER. THE

CONTRACTOR SHALL USE OFFSITE PARKING. COORDINATE WITH VA COR.

D. CONTRACTOR SHALL PROVIDE TEMPORARY SIGNS FOR CONSTRUCTION

PARKING.

E. IN ORDER TO PREPARE STAGING PLAN, CONTRACTOR TO OBTAIN MOST

CURRENT SITE PLAN FROM VA.

F. CONTRACTOR SHALL ARRANGE FOR, IN ADVANCE WITH THE VA COR,

APPROVED SITE VEHICULAR ACCESS AND EGRESS POINTS AND ON-SITE

PARKING.

G. CONTRACTOR SHALL ARRANGE FOR, IN ADVANCE WITH THE VA COR,

CONSTRUCTION STORAGE AND STAGING AREAS NECESSARY TO

COMPLETE THE WORK. ALL STORAGE AND STAGING AREAS SHALL BE

RETURNED TO THE OWNER IN LIKE ORIGINAL CONDITION.

H. NIGHTTIME WORK TO BE COORDINATED WITH AND APPROVED BY VA COR.

3. CONSTRUCTION MATERIAL STORAGE:

A. STORAGE OF CONSTRUCTION MATERIALS AND TEMPORARY TRAILERS

SHALL BE LIMITED TO STAGING AREAS.

B. A CONSTRUCTION FENCE SHALL BE PROVIDED AT THE DISCRETION OF THE

VA COR.

C. CONTRACTOR SHALL PROVIDE A MATERIAL STORAGE AREA ADJACENT TO

THE AREA OF CONSTRUCTION. LOCATION SHALL BE COORDINATED WITH

AND APPROVED BY THE VA COR.

4. CONSTRUCTION DEBRIS:

A. ENCLOSED CONTAINERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL

BE PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA.THE

AREAS AROUND THE CONTAINERS SHALL BE KEPT CLEAN AND FREE OF

DEBRIS AND DUST DURING CONSTRUCTION. THE CONTAINER SHALL BE

HAULED AWAY BY THE CONTRACTOR IN A TIMELY MANNER AT NO MORE

95% FULL AND/OR WHEN IT HAS REACHED THE WEIGHT LIMITS.

B. INDICATE LOCATIONS OF CONTAINERS FOR DEMOLISHED ITEMS,

RECYCLABLES AND/OR TRASH ON CONSTRUCTION STAGING PLANS.

T

CI

T A

E

S

L

O

R

FI

AC L

HCRA

I T E

C

A N

I

T

E O

N

SE

F

SHIRISH R.DESAI

D

04/30/21

C-20141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

F

IN

A L

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

D w in g k \D o c u m e n ts

\V A

L L

-2

-2

C e n tr a l_ w in g

.h o .r v t

/3 /2

:0

:4

P

M

GI-002

STAGING PLAN RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020 S.D. W.H.

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

F1

STAGING PLAN

12" = 1'-0"

GENERAL NOTES

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

95% CONSTRUCTION DOCUMENTS 06/08/2020

100% CONSTRUCTION DOCUMENTS 08/10/2020

3 623 62

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS

ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE

INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS

ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF

STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S

SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL

WOODWORKING INSTITUTE

AWPA AMERICAN WOOD

PRESERVERS' ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S

ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER

BEAD

CBB CEMENTITIOUS (BACKER)

BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS

OR CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR

CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONFCONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING

STEEL INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION

SPECIFICATIONS INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING

ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE

OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF

STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR

FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED

POLYESTER OR FIBERGLASS

REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM

ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

CONCRETE

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND

AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING

CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR

DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE

ASSEMBLY

IWH INSTANTANEOUS WATER

HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED

DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT

HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING

CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS

ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION

COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER FURNISHED/

CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER

INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW

ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINSTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHARPHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE

ORDER

PO PURCHASE ORDER POST

OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE

(PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR

REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR

SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP

DISPENSER;

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL

FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN

DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ INS QUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR

SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR

TOWEL BAR

TCA TILE COUNCIL OF

AMERICA

TCP TELEPHONE CONTROL

PANEL TEMPERATURE

CONTROL PANEL;

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR

TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER

DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD

FINISH

TRTD TREATED

TS TENSILE STRENGTH OR

TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER

COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS

LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE

NOTED

UPS UNINTERRUPTIBLE

POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VA VETERANS

ADMINISTRATION

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED

ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC

COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR

WATER CLOSET

WC WL HNG WATER CLOSET, WALL

HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL

HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF

MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED

POLYSTYRENE BOARD

(INSULATION)

YD YARD

YR YEAR

A

CORRIDOR

C2

DRAWING BLOCK TITLE

1 1/2" = 1'-0"

A-201 A4

A2 A-202

A

BC

D

A-202 A2

A-201 A4

A-512

D2

A-512

D2

S

A4 A-201

0 16'8'4'

CG

NORTH

DETAIL NUMBER

SHEET WHERE DRAWN

A3.1

FEC

CONTRACT LIMIT LINE (LIMIT OF WORK)

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

SMOKE BARRIER LINE

BREAK, ROUND (USER

DEFINES SIZE)

BREAK, STRAIGHT (SEE

SECTION INDICATORS, BUILDING,

WITH BREAK STANDARDS)

DETAIL

INDICATOR

DETAIL INDICATOR FOR SMALL

CONDITIONS

DIMENSION LINE

DOOR OPENING / BORROWED

LIGHT IDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR,

MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR,

SINGLE VIEW

CENTER LINE

BUILDING SECTION INDICATOR

FURNITURE, FIXTURE, &

EQUIPMENT INDICATOR

GRAPHIC SCALE, 1/8" = 1'-0"

ROOM NAME AND NUMBER

COLUMN GRID

CORNER GUARD

NORTH ARROW

DETAIL INDICATOR

CONDUIT RUN, CONCEALED IN CEILING, WALLS

OR UNDER FLOORS.

CONDUIT RUN, EXPOSED.

J JUNCTION BOX IN ACCESSIBLE CEILING SPACE

OR FLUSH IN WALL WITH BLANK COVER PLATE

TO MATCH DEVICE PLATES.

J JUNCTION BOX FLUSHED FLOOR MOUNTED.

KEYNOTE

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CL

W1

FHC FIRE HOSE CABINET

T

CI

T A

E

S

L

O

R

FI

AC L

HCRA

I T E

C

A N

I

T

E O

N

SE

F

SHIRISH R.DESAI

D

04/30/21

C-20141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

F

IN

A L

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

D w in g k \D o c u m e n ts

\V A

L L

-2

-2

C e n tr a l_ w in g

.h o .r v t

/3 /2

:0

:4

P

M

GI-003

SYMBOLS AND ABBREVIATIONS RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020 S.D. W.H.

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

95% CONSTRUCTION DOCUMENTS 06/08/2020

100% CONSTRUCTION DOCUMENTS 08/10/2020

4 624 62

GENERAL:

1. ALL BIDDERS SHALL VISIT THE SITE DURING THE BID PHASE TO DETERMINE THE

FULL EXTENT OF DEMOLITION REQUIRED AND TO VERIFY ALL EXISTING

CONDITIONS, INCLUDING ABOVE CEILING UNDER CONSTRUCTION.

2. CONTRACTOR SHALL SUBMIT REQUEST FOR INFORMATION (RFIS) REGARDING

ANY KNOWN DISCREPANCIES WITH THE CONTRACT DOCUMENTS OR

UNFORESEEN SITE CONDITIONS TO THE VA COR FOR CLARIFICATION BEFORE

AND OR AFTER NOTICE TO PROCEED.

3. AT THE END OF THE DAY REMOVE ALL TRASH FROM THE BUILDING. PROVIDE FIRE

EXTINGUISHERS AS REQUESTED BY VA LIFE SAFETY OFFICER.

4. WHERE CONSTRUCTION IS REQUIRED BEYOND THE RENOVATION AREA

COORDINATE ACTIVITIES WITH VA REPRESENTATTIVE. AFTER COMPLETION OF

CONSTRUCTION RESTORE ALL FINISHES, LIGHT FIXTURES, MECH DIFFUSERS TO

THEIR ORIGINAL LOCATION AND CONDITION. ALL ACTIVITIES TO BE SCHEDULES

WITH VA LIFE SAFETY OFFICER.

5. IF APPROVED BY VA, DELINEATE MINIMUM 44” WIDE CLEAR PATH OF EGRESS

THRU CONSTRUCTION AREA OR ZONES WHERE BARRIER WALLS OBSTRUCT THE

WORK.

6. MAINTAIN UNINTERRUPTED EXIT AND MEP SERVICES FOR ALL OCCUPIED AREAS

DURING CONSTRUCTION TO BE FULLY FUNCTIONAL.

CLEAN ATTIRE:

1. GC AND THE SUBCONTRACTOR(S) THAT AS A SERVICE PROVIDER TO THE

VETERANS AND VETERAN AFFAIRS HEALTHCARE TO WEAR APPROPRIATE ATTIRE,

I.E. CLEAN CLOTHING IN THE COMMON AREA EXCLUDING THE WORK AREA.

DEMOLITION:

1. ALL NOISY WORK RELATED TO CEILING SLAB SHALL BE SCHEDULED AFTER

NORMAL BUSINESS HOURS, SINCE THE FIRST FLOOR HAS EXAM ROOMS AND

OTHER HOSPITAL FUNCTIONS ONGOING.

2. COORDINATE ALL DEMOLITION WORK WITH PLANS OF NEW CONSTRUCTION.

3. CONDUCT DEBRIS REMOVAL TO ENSURE MINIMUM INTERFERENCE WITH

OCCUPIED AREAS OF THE BUILDING AND SITE AREAS SUCH AS WALKS &

ROADWAYS.

4. FOR ANY DEMOLITION OR REMOVAL, PROVIDE ADEQUATE PROTECTION OF

ADJACENT SURFACES NOT INCLUDED IN THE DEMOLITION.

5. ALL EXISTING AREAS TO REMAIN THAT ARE DAMAGED BY DEMOLITION OR NEW

CONSTRUCTION WORK SHALL BE PATCHED AS REQUIRED TO MATCH ADJOINING

AREA IN MATERIAL, FINISH, COLOR, U.O.N.

6. COORDINATE WITH VA REPRESENTATIVE FOR WORK IN FLOORS BELOW AND

ABOVE THE FLOOR UNDER CONSTRUCTION.EXERCISE EXTREME CARE TO

MINIMIZE IMPACTS ON HOSPITAL OPERATION THESE FLOORS.

7. THE AREA OF WORK ARE TO BE KEPT CLEAN, CLEAR AND FREE OF DEBRIS.

CONSTRUCTION MATERIAL & PARTILALLY INSTALLED WORK CAN NOT INTERFER

WITH THE OWNER'S OPERATION OR CREATE A HAZARD.

8. THE BUILDING WILL REMAIN OPERATIONAL DURING CONSTRUCTION.

9. CONTRACTOR TO COORDINATE AND VERIFY WITH VA PROJECT ENGINEER FOR

DESIGNATED WORKER ACCESS PATHS, MATERIAL DELIVERY PATHS, TRASH

REMOVAL & DISPOSAL PATHS, ETC.

10. CONSTRUCT ONE-HOUR RESISTIVE CONSTRUCTION BARRIER TO SEPARATE

AREAS UNDER CONSTRUCTION FROM ADJACENT AREAS WITH EXITS AS

REQUIRED. TEMPORARY PARTITIONS SHALL BE CONSTRUCTED AS REQUIRED

DURING CONSTRUCTION FOR INFECTION CONTROL AND MINIMIZE THE SPREAD

OF DUST AND NOISE.

11. CONTRACTOR TO COORDINATE THE REMOVAL OF TEMPORARY PARTITIONS

AFTER COMPLETION OF WORK. PATCH REPAIR ALL DAMAGED SURFACES. GC TO

COORDINATE THE REMOVAL OF THE TEMPORARY PARTITION UPON APPROVAL

FROM SAFETY OFFICE AND COR.

12. THE CONTRACTOR SHALL SWEEP VACCUM AND MOP CONSTRUCTION AREAS

CLEAN AT THE END OF THE WORK DAY. KEEP NOISE AND DUST TO A MINIMUM AT

ALL TIMES. USE FILTERED VACCUMS. WET MOP AREAS WITH DISINFECTANT AS

APPLICABLE. SEE INFECTION CONTROL REQUIREMENTS.

13. ALL DEMOLITION AND RENOVATION WORK SHALL BE CONDUCTED UNDER

NEGATIVE PRESSURE, USING VACUUM WITH HEPA FILTER. GC TO PROVIDE

MANOMETER.

14. REMOVE EXISTING FLOOR FINISH AND WALL BASE DOWN TO CONCRETE SLAB.

REMOVE ALL ADHESIVE; GLUE, MASTIC, LAITANCE, ETC. PREPARE SURFACE TO

RECEIVE NEW FINISH. COMPLY WITH THE REQUIREMENTS BY MANUFACTURER OF

THE FLOORING FOR SURFACE PREPARATION. CONTRACTOR TO COORDINATE THE

REMOVAL OF TEMPORARY PARTITIONS AFTER COMPLETION OF WORK. PATCH

REPAIR ALL DAMAGED SURFACES. GC TO COORDINATE THE REMOVAL OF THE

TEMPORARY PARTITION UPON APPROVAL FROM SAFETY OFFICE AND COR.

15. ISOLATE HVAC SYSTEMS IN AREAS WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

16. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING FIRE RATED

WALLS.

17. CONTRACTOR TO X-RAY TOP AND BOTTOM OF THE EXISTING FLOOR SLAB AND

AVOID CUTTING IN TO REBARS DURING CORING OF THE CONCRETE SLAB FOR

FLOOR DRAIN AND ALL OTHER PLUMBING PIPES ETC. SUBMIT X-RAYS TO A/E FOR

FINAL DETERMINATION OF THE LOCATION OF THE PIPES/DRAINS BEFORE CORING

THE SLAB. INDICATE AREAS WHERE CORING CANNOT BE DONE. USE SIMILAR

NON-DESTRUCTIVE TESTING EQUIPMENT OF EXISTING UTILITIES BEHIND WALLS.

AFTER SURVEY OF SLAB, SAWCUT EXISTING CONCRETE FLOOR SLAB FOR NEW

WORK AS REQUIRED, REFER TO MECH, PLUMBING, ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

18. NO STRUCTURAL BEAMS, COLUMNS, SLAB SHALL BE COMPROMISED BY CORING

OR ANY OTHER MEANS. REFER TO SPECIFICATION SECTION 03 81 27 CONCRETE

CORING.

19. WALLS TO BE DEMOLISHED ARE OF STEEL STUDS AND GYPSUM BOARD

EXTENDED TO SLAB ABOVE.

20. PROTECT IN PLACE MAIN FIRE SPRINKLER LINES AND STAND PIPES. MODIFY

SPRINKLER LINES AS REQUIRED TO INSTALL CEILING/LIGHTS/DUCT WORK.

21. GC TO SUBMIT EXITING PLAN FOR EACH PHASE FOR APPROVAL PRIOR TO

STARTING AND DEMOLTION WORK.

22. VERIFY THAT CONSTRUCTION OF EXISTING WALLS WITHIN THE AREA OF

RENOVATION (SMOKE RESISTIVE HAZARODOUS AREA) MEETS THE FIRE

PROTECTION RATINGS DESIGNATED ON THE FIRE LIFE SAFETY PLAN. MAKE ANY

REPAIRS OR MODIFICATIONS NECESSARY TO BRING EXISTING WALLS, DOORS,

DUCTS ETC. UP TO THE PROPER FIRE PROTECTION RATING AND REPAIR ANY

DAMAGED FIRE RATED ASSEMBLIES TO THEIR ORGINAL CONDITIONS.

23. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF FIRE RATED WALL.

PROVIDE A FIRE WATCH WHILE WORKING ON FIRE RATED WALLS.

24. GENERAL CONTRACTOR TO PROVIDE ONE HOUR FIRE RESISTIVE

CONSTRUCTION BARRIERS FOR VA APROVAL PRIOR TO STARTING ANY

DEMOLITION WORK.

25. AIR QUALITY AND INFECTION CONTROL DURING CONSTRUCTION TO COMPLY

WITH VA STANDARDS AND AS OUTLINED IN PROJECT MANUAL.

26. DURING CONSTRUCTION PROVIDE CONTINOUS AND UNOBSTRUCTED EXIT PATHS

TO EXISTING EXIT CORRIDORS AND EXIT STAIRS AT AL T IMES. MAINTAIN EXIT

PATHS AS SHOWN ON THE LIFE SAFETY DRAWINGS ON SHEET DRAWING NO

GI-101, GI-102, GI-103.

27. PATCH AND REPAIR OR PAINT AS REQUIRED. ALL EXITING CONTRUCTION TO

REMAIN THAT HAS BEEN DAMAGED BY ADJACENT CONSTRUCTION ACTIVITIES TO

RESTORE THE ORIGINAL CONSTRUCTION.

28. WHERE NEW FINISHES ARE TO BE INSTALLED ON EXISTING SURFACES, REMOVE

THE EXISTING FINISH AND PREPARE SURFACES TO RECEIVE NEW FINISH.

29. WHERE THE DEMOLITION CAUSES UNEVENNESS OR VOIDS IN FLOOR, THE

CONTRACTOR SHALL PATCH TO LEVEL THE FLOOR WITH THE EXISTING SLAB

AND/OR REQUIRED SURFACE TO RECEIVE THE NEW FINISH.

30. PIPES AND CONDUITS ENCOUNTERED IN DEMOLITION AREAS WHICH ARE TO

REMAIN IN USE SHALL BE REROUTED AND CONCEALED. THOSE WHICH ARE TO BE

ABANDONED SHALL BE CAPPED AND CONCEALED IN FLOOR, WALL OR CEILING TO

COMPLY WITH LEGIONELLA DIRECTIVE.

31. FOR OTHER DEMOLITION ITEMS SEE PLUMBING & ELECTRICAL DRAWINGS.

32. COORDINATE WITH VA'S FIRE LIFE SAFETY COORDINATOR FOR SMOKE

DETECTORS AND FIRE ALARM EQUIPMENT DURING CONSTRUCTION PHASES.

33. PROVIDE FIRE EXTINGUISHERS AS REQUESTED BY VA LIFE SAFETY OFFICER.

34. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS NOT LIMITED TO AS

SHOWN ON THE DRAWINGS AND IDENTIFY ALL BEARING STRUCTURAL ELEMENTS,

MECHANICAL, PLUMBING, ELECTRICAL, COMMUNICATIONS, AND ALL OTHER

EXISTING SYSTEMS (AND MAKE NECESSARY PROVISIONS TO MAINTAIN THE

INTEGRITY OF SAID SYSTEMS) PRIOR TO COMMENCEMENT OF DEMOLITION.

35. THE CONTRACTOR SHALL REFER TO DRAWINGS FOR EXTENT OF AND

INFORMATION PARTICULAR TO THE REMOVAL OF EXISTING SYSTEMS.

36. PER DIRECTION OF VA COR, ALL SALVAGEABLE ITEMS SHALL BE THE PROPERTY

OF THE VA AND SHALL BE REUSED OR STORED AS DESIGNATED BY THE VA.

37. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT FINISHED

PARTS OF THE MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM ANY CAUSE

DURING THE PROGRESS OF THE WORK AND UNTIL ACCEPTANCE BY THE OWNER.

38. IN THE INTERIOR SPACES REPAIR/REPLACE, AS A RESULT OF THE DEMOLITION

AND NEW CONSTRUCTION, TO MATCH EXISTING CONDITIONS.

39. IF JACK-HAMMERING CORE DRILLING OR CONCRETE SAWING IS TO BE UTILIZED,

IT SHALL BE KEPT TO A MINIMUM AND SHALL BE DONE ONLY WITH THE WRITTEN

APPROVAL OF THE VA COR AND AT SUCH TIMES AS DESIGNATED.

40. WHERE EXISTING CONSTRUCTION IS CUT OR OTHERWISE DISTURBED TO PERMIT

INSTALLATION OF NEW WORK, REPAIR AND PATCH TO MATCH EXISTING

CONSTRUCTION. USE METHODS AND MATERIALS WHICH ARE SIMILAR IN

APPEARANCE AND EQUAL IN QUALITY TO THOSE AREAS BEING REPAIRED.

41. ALL ABANDONED PLUMBING LINES, WILL BE REMOVED BACK TO CLOSEST FEEDER

POINT, PER PLUMBING DRAWINGS.

42. DEMOLITION SHALL BE EXECUTED IN CONFORMANCE WITH ALL CODES AND

STANDARDS AS SET FORTH BY THE VETERANS ADMINISTRATION.

43. DO NOT COMPROMISE ANY STRUCTURES OR STRUCTURAL ELEMENTS DURING

DEMOLITION.

44. THESE DRAWINGS WERE DEVELOPED FROM EXISTING DRAWINGS AFTER VISIBLE

FIELD VERIFICATIONS. VERIFY EXISTING CONDITIONS AND NOTIFY VA AND

ARCHITECT BEFORE PROCEEDING WITH CONSTRUCTION.

45. REMOVE ALL MATERIALS IN COVERED CONTAINERS AND SHALL BE TAKEN OUT AT

THE END OF THE DAY.

46. CONTRACTOR TO PROVIDE PHOTOGRAPHIC DOCUMENTATION OF AS-BUILT

CONDITIONS AS WELL AS IN BIM.

47. PROVIDE 3-WEEK ADVANCE NOTICE FOR ANY UTILITY SHUTDOWN AND

ALTERNATE SYSTEM FOR VA APPROVAL. THE CONTRACTOR SHALL IDENTIFY THE

DATE, TIME AND DESCRIPTION OF THE SHUT DOWN, REQUEST A UTILITY

COORDINATION MEETING WITH VA SHOP AND VA COR.

48. CONTRACTOR TO X-RAY FLOORS FOR CONNECTIONS TO EXISTING UTILITIES

AND/OR INSTALL NEW UTILITIES.

49. CONTRACTOR SHALL PERFORM ALL DEMOLITION WITH UTMOST CARE TO AVOID

DAMAGE TO EXISTING UTILITIES AND OTHER BUILDING STRUCTURES.

50. CONTRACTOR SHALL PERFORM SURVEY OF EXISTING CONDITIONS OF ALL

EQUIPMENT, FIXTURES OF ALL TRADES (DISCIPLINES) AND PROVIDE A SIGNED

WRITTEN REPORT WITH LIST OF ALL EXISTING FIXTURES, LOCATIONS FOR ALL

SYSTEM TO VA-COR, AT LEAST 7 DAYS BEFORE START OF CONSTRUCTION.

51. CONDUCT DEBRIS REMOVAL TO ENSURE MINIMUM INTERFERENCE WITH

OCCUPIED AREAS OF THE BUILDING AND SITE AREAS SUCH AS WALKS &

ROADWAYS.

52. THE WORD "REMOVE" INCLUDES DISPOSAL OF THE MATERIAL OFF SITE TO

APPROVED LANDFILLS AND IN ACCORDANCE WITH APPLICABLE REGULATIONS

AND PER VA'S STANDARD. SUBMIT DISPOSAL REPORT FOR VA APPROVAL.

53. THE BUILDING WILL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY

DISRUPTIONS TO UTILITIES REQUIRES 21-DAY ADVANCE NOTIFICATION TO VA.

54. ALL DEMOLITION AND RENOVATION WORK SHALL BE CONDUCTED UNDER

NEGATIVE PRESSURE, USING VACUUM WITH HEPA FILTER. GC TO PROVIDE

MANOMETER AS APPROVED BY VA SAFETY OFFICER.

55. ISOLATE HVAC SYSTEMS IN AREAS WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

56. THE AREA OF WORK ARE TO BE KEPT CLEAN, CLEAR AND FREE OF DEBRIS.

CONSTRUCTION MATERIAL & PARTIALLY INSTALLED WORK CANNOT INTERFERE

WITH THE OWNER'S OPERATION OR CREATE A HAZARD.

57. THE CONTRACTOR SHALL SWEEP VACUUM AND MOP CONSTRUCTION AREAS

CLEAN AT THE END OF THE WORK DAY. KEEP NOISE AND DUST TO A MINIMUM AT

ALL TIMES. USE FILTERED VACUUMS. WET MOP AREAS WITH DISINFECTANT AS

APPLICABLE. SEE INFECTION CONTROL REQUIREMENTS.

58. FOR ANY DEMOLITION OR REMOVAL, PROVIDE ADEQUATE PROTECTION OF

ADJACENT SURFACES NOT INCLUDED IN THE DEMOLITION.

59. ALL EXISTING AREAS TO REMAIN THAT ARE DAMAGED BY DEMOLITION OR NEW

CONSTRUCTION WORK SHALL BE PATCHED AS REQUIRED TO MATCH ADJOINING

AREA IN MATERIAL, FINISH, COLOR, U.O.N.

60. CONTRACTOR TO COORDINATE AND VERIFY WITH VA COR FOR DESIGNATED

WORKER ACCESS PATHS, MATERIAL DELIVERY PATHS, TRASH REMOVAL &

DISPOSAL PATHS, ETC. MATERIAL SHALL BE DELIVERED AFTER NORMAL

BUSINESS HOURS.

61. REMOVE ALL EQUIPMENT AND ALL ACCESSORIES WHERE WALLS ARE TO BE

DEMOLISHED. DISPOSE OFF WITH VA APPROVAL.

62. WHERE THE DEMOLITION CAUSES UNEVENNESS OR VOIDS IN FLOOR, THE

CONTRACTOR SHALL PATCH TO LEVEL THE FLOOR WITH THE EXISTING SLAB

AND/OR REQUIRED SURFACE TO RECEIVE THE NEW FINISH.

63. ALL EXISTING FLOOR SURFACES TO REMAIN U.O.N. PROVIDE FLOOR LEVELING AT

ALL EXISTING FLOOR TRANSITIONS TO PROVIDE A SMOOTH TRANSITION THAT

WILL ACCEPT NEW SPECIFIED FLOOR FINISH.

64. FOR OTHER DEMOLITION ITEMS SEE MECHANICAL, PLUMBING & ELECTRICAL

DRAWINGS.

65. REMOVE ALL FLOOR/WALL/COLUMN CONCEALED OR SURFACE MOUNTED

ELECTRICAL OUTLETS, JUNCTION BOXES AND DATA CONDUITS WHICH ARE NOT

TO REPURPOSED PER VA COR.

66. CONTRACTOR TO COORDINATE REMOVAL OF TEMPORARY PARTITION UPON

COMPLETION OF WORK.

67. REMOVE ALL WALL AND CEILING MOUNTED EXIT SIGNS WITHIN AREAS OF

CONSTRUCTION. PROVIDE EXIT SIGNS AT TEMPORARY PARTITIONS

68. COORDINATE WITH VA'S FIRE LIFE SAFETY COORDINATOR FOR REMAINING

SMOKE DETECTORS AND FIRE ALARM EQUIPMENT DURING CONSTRUCTION

PHASES.

69. COORDINATE WITH VA'S FIRE ALARM TECHS AND VA SHOPS FOR PROPER

OUTAGES.

70. PROVIDE FIRE EXTINGUISHERS AS INDICATED AND AS REQUESTED BY VA LIFE

SAFETY OFFICER.

71. INSTALL EQUIVALENT TEMPORARY UTILITIES (FIRE ALARM, FIRE SPRINKLERS

ETC.)

NEW CONSTRUCTION:

1. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONSTRUCTION

MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, FOR SAFETY

PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, AND FOR THE

ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR OR ANY OTHER

PERSONS PERFORMING ANY OF THE WORK OR THE FAILURE OF ANY OF THEM TO

CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

2. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD

CONDITIONS WITH THE CONTRACT DOCUMENTS BEFORE COMMENCING

ACTIVITIES. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL

DIMENSIONS INSOFAR AS NECESSARY TO INSTALL THE WORK PROPERLY AND

RELATIVE TO THE SURROUNDING CONSTRUCTION.

3. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS, SECTIONS, ELEVATIONS

OR DETAILS. ALL DRAWINGS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATING

PURPOSES.

4. AT ANY TIME SHOULD ANY CONDITIONS ARISE WHEREIN THE INTENT OF THE

DRAWINGS IS IN DOUBT OR WHERE THERE IS A DISCREPANCY BETWEEN THE

DRAWINGS AND FIELD CONDITIONS THE ARCHITECT SHALL BE NOTIFIED

IMMEDIATELY FOR WRITTEN CLARIFICATION.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER LOCATION AND

SIZE OF OPENINGS FOR ALL TRADES AND SHALL COORDINATE ALL

CONSTRUCTION AS INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING SHOP

DRAWINGS REVISED BY THE ARCHITECT.

6. THE V.A. IS NOT RESPONSIBLE FOR ANY LOSS OR DAMAGE TO CONTRACTOR'S

EQUIPMENT, TOOLS, ETC.

7. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT FINISHED

PARTS OF THE MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM ANY CAUSE

DURING THE PROGRESS OF THE WORK AND UNTIL ACCEPTANCE BY THE OWNER.

8. CONTRACTOR SHALL MAINTAIN A CLEAN WORK PLACE. DUST PALLIATION AND

PREVENTION OF DUST CONTAMINATION OF NON-WORK SPACES WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR ON AN ONGOING, DAILY BASIS.

9. ALL DIMENSIONS ARE TO FACE OF STUD OF NEW CONSTRUCTION AND FACE OF

FINISH OF EXISTING CONSTRUCTION UNLESS OTHERWISE NOTED.

10. SPECIAL TOOLS, IF ANY PART OF EQUIPMENT FURNISHED UNDER THIS CONTRACT

REQUIRES A SPECIAL TOOL FOR ASSEMBLY, ADJUSTMENT, SETTING OF

MAINTENANCE THEREOF, SHALL BE FURNISHED WITH EQUIPMENT AS A

STANDARD ACCESSORY.

11. CONTRACTOR TO PATCH AND REPAIR ALL WALLS, FLOORS, AND CEILINGS

DAMAGED DURING CONSTRUCTION TO MATCH EXISTING.

12. THE CONTRACTOR SHALL…