This document is a Q&A from a pre-bid meeting for the construction of a new parole and probation building at the Oak Creek Youth Correctional Facility (OCYCF) in Albany, Oregon. The project scope includes all labor, materials, transportation, equipment and services for the construction work as detailed in the attachments. The Q&A addresses clarifications on screen wall post sizes, privacy screen embed and bracket details, concrete floor finishes, cable routing requirements, and the exclusion of electric vehicle charging stations from the project scope. The solicitation requires bids to be submitted through the OregonBuys system and identifies several rejected product substitutions.
The contract opportunity is for the State of Oregon, specifically involving Lake County and the City of Albany. Bids are not accepted by email, and the project has a specified completion date of November 21, 2024. The contract does not include pricing details, set asides, or funding sources, as this information is not provided in the Q&A document.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-DASOBO-00009472_OCYCF New Parole & Probation Project – Q&A dated 11/21/2024
Questions & Answers, S-DASOBO-00009472 dated 11/21/2024 The following questions were received prior to the deadline listed in the Addendum 009. The questions were submitted timely and the answers to those questions appear below.
Q1: S2.10 shows HSS 6x6x1/4 posts supporting the screen wall. Section 5/S8.11 calls out the posts as HSS 3x3x3/16.
MSC Engineering's calcs call out 3x1-1/2x3/16. Which is the correct post size? Can the L2x2x3/16 angles at top and bottom of the posts be a field-bolted connection at the posts?
A1: Correct screen wall support posts are HSS 3x3x3/16. L2x2x3/16 angles may be field-bolted.
Q2: Clarification/additional information needed in regards of Q16 from Q&As date 11/128/2024:
“Q16: Detail 1&2/A5.29 call for a steel embed and bracket per structural for the privacy screen.
Structural drawings do not show details for this embed/bracket. Please provide structural details for the privacy screen embed & bracket.
A16: See Addendum 009, sheets S5.10, Revision 2 dated 07-16-24 for additional detail.”
No details are provided for privacy screen embed and bracket. Are steel plate and weld sizes available? Anchor bolt sizes and embed distance? Are Simpson CB66 Column Bases acceptable for the privacy screen-wall 6x6 post bases?
A2: Bracket is comprised of 5” x 8” x ¼” plates with (2) 5/8” diameter thru bolts, welded to 12” x 12” x 3/8” base plate with 3/16” fillet welds, anchored with (4) 1/2" diameter wedge anchors, embedded 3”.
Q3: Clarification/additional information needed in regards of Q62 from Q&As date 11/128/2024:
“Q62: Div 09 – Concrete Finishes - CONC-1 is called out on A1.22 in Rms 104, 121, 122, 125. Materials Legend A6.01 defines CONC-1 as “CONCRETE S.O.G”. Are there any specs in terms of products or type of polishing for these areas?
A62: Conc-1 is unfinished exposed concrete. “
Please state whether “Concrete S.O.G.” will be either:
a. Float finish
b. Broom finish
c. Trowel finish
d. Burnished finish
A3: Concrete SOG to be float finish.
Q4: Clarification/additional information needed in regards of Q45 from Q&As date 11/128/2024:
“Q45: Are the FA and LV cabling permitted to be 'free air' above accessible ceilings? Will backboxes and conduit stubs be required in wall spaces or free air?
A45: "Free air" cabling above accessible ceilings is acceptable, backboxes and conduits stubs not required in walls or free air.”
Please, confirm that the backboxes or conduits in the walls for F/A and LV are not required. This is typically not common.
A4: Provide back boxes and conduit stubbed up to ceiling for all low voltage in walls. Free air only above accessible ceilings
Q5: Is Div 26 expected to provide (3) Chargepoint CT4000 EV Chargers or equal for this project. If so, will these need to be single or dual head chargers?
A5: Charging stations and installation are excluded from this project scope. Dual head chargers are intended in future.
S-DASOBO-00009472_OCYCF New Parole & Probation Project – Q&A dated 11/21/2024
Q6: Please provide numbers and locations of access control and video devises per added Specifications, Project
Manual, Div 27 and 28 and Appendix 3.02 (sheet G0.03 revision 1).
A6: Required security and access control devices are as follows: Access control points are identified on the door/hardware schedules (see A6.02). Owner furnished/Owner installed cameras (six total) will be located at each exterior building corner (4) and at opposite corners of the main reception area (2). Head end equipment (racks/switches/etc.) to be located in IT room (121). No other security devices are required.
Q7: Fire alarm Specifications, page 3 references the inclusion of speaker zones. Since this is a B occupancy building, only sprinkler monitoring is required for the fire alarm system. Please, confirm that inclusion of voice evacuation coverage (as suggested in the Specifications) is required for this project.
A7: Yes, requirement for the voice evacuation coverage/speaker zones is confirmed.
Q8: Can bids be submitted by e-mail?
A8: No. OregonBuys is the only acceptable form of submission of bids for this ITB. See Section C.8 of the ITB. If you need assistance with submitting a bid, please, contact OregonBuys support/helpdesk for assistance.
Rejected Substitutions:
• Section 26 5100, page 2 of 6, sub-section 2.01 – Luminaire R3A and R3B by Lumination – rejected on
11/15/2024.
• Section 26 5100, page 2 of 6, sub-section 2.01 – Luminaire W1 by Beacon – rejected on 11/15/2024.
• Q30 from Q&As dated 11/18/2024 – Siemens system by Siemens – rejected on 11/21/2024.
• Plans, sheet A0.21, detail 4 EA-1.2 Stucco Assembly – Dryvit system (Driwall Rainscreen by Keene, Clark
Dietrich Control Joint and Starter Strip Casing Bead, PermaBase 1/2" Cement Board, Dryvit Grid Tape, Genesis Acrylic-Modified Base Coat, Reinforcing Mesh, Genesis Acrylic-Modified Base Coat (2), DPR Finish
- Sandpebble (standard neutral color finishes) - rejected on 11/21/2024.