S-DASOBO-00009472_Q&A_11212024_Final.pdf

PDF 113 KB Posted

Attached to
Oak Creek Youth Correctional Facility (OCYCF) New Parole and Probation
Solicitation number
S-DASOBO-00009472
Issued by
Lake County, Albany City, Oregon

About this file

This document is a Q&A from a pre-bid meeting for the construction of a new parole and probation building at the Oak Creek Youth Correctional Facility (OCYCF) in Albany, Oregon. The project scope includes all labor, materials, transportation, equipment and services for the construction work as detailed in the attachments. The Q&A addresses clarifications on screen wall post sizes, privacy screen embed and bracket details, concrete floor finishes, cable routing requirements, and the exclusion of electric vehicle charging stations from the project scope. The solicitation requires bids to be submitted through the OregonBuys system and identifies several rejected product substitutions.

The contract opportunity is for the State of Oregon, specifically involving Lake County and the City of Albany. Bids are not accepted by email, and the project has a specified completion date of November 21, 2024. The contract does not include pricing details, set asides, or funding sources, as this information is not provided in the Q&A document.

View the file

Other files

File Type Posted
Specs_Project Manual_Appendix.pdf PDF
G0.01 R1 07-16-2024 and R3 11-18-2024.pdf PDF
Addendum4_S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
A1.61 R2 11-13-2024.pdf PDF
Addendum 2 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
EP-0097-23 OYA New Building Improvements EPSC Plan-1.pdf PDF
S-DASOBO-00009472_Q&A_07192024.pdf PDF
S1.10 R2_S5.10 R2.pdf PDF
Addendum 3 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
S0.10 R3 07-31-2024.pdf PDF
C3.00 R2 11-13-2024.pdf PDF
S-DASOBO-00009472_OCYCF Parole_ PreBidAttendance.pdf PDF
IntentToAward_Notice_AllBidders_12052024.pdf PDF
OCYCF Substitution Request 265100_Approved.pdf PDF
Addendum 5 S-DASOBO-00009472_OCYCF_ParoleProbation_08222024.pdf PDF
OCYCF Substitution Request 074113_Approved.pdf PDF
Addendum 008 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
Addendum1_Attachment1_Geotech Report YWTP.pdf PDF
First Tier Filled Out FCC.pdf PDF
FINAL_OYA Construction Set_2024-0412.pdf PDF
A6.01 R2 11-13-2024.pdf PDF
S2.10 R1_S2.11 R1_S8.11 R1_S8.12 R1.pdf PDF
A6.01 R1 07-16-2024.pdf PDF
Addendum 1 S-DASOBO-00009472_OCYCF_ParoleProbation_Corrected.pdf PDF
Addendum 7 S-DASOBO-00009472_OCYCF_ParoleProbation_10162024.pdf PDF
FINAL_OCYCF_Specifications_2024-0614.pdf PDF
REVISED SPECIFICATIONS 11-13-2024_corrected.pdf PDF
A5.27 R1 07-16-2024.pdf PDF
Structural Calculations_Stamped.pdf PDF
Bid_Tab_S-DASOBO-00009472_OCYCF Parole and Probation.pdf PDF
SK2 R3 11-18-2024.pdf PDF
Structural Calculations _Add_MechanicalScreenWall.pdf PDF
S-DASOBO-00009472_OCYCF_Parole_Probation_06242024.pdf PDF
SK1 R3 11-18-2024.pdf PDF
S-DASOBO-00009472_Q&A_11182024_Final.pdf PDF
G0.03 R1 07-16-2024.pdf PDF
G1.01 R1 07-16-2024.pdf PDF
Addendum 009 S-DASOBO-00009472_OCYCF_ParoleProbation_FinalApproved_11182024.pdf PDF
9473 ITB.pdf PDF
Addendum 6 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
OCYCF Substitution Request 075400_Approved.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-DASOBO-00009472_OCYCF New Parole & Probation Project – Q&A dated 11/21/2024

Questions & Answers, S-DASOBO-00009472 dated 11/21/2024 The following questions were received prior to the deadline listed in the Addendum 009. The questions were submitted timely and the answers to those questions appear below.

Q1: S2.10 shows HSS 6x6x1/4 posts supporting the screen wall. Section 5/S8.11 calls out the posts as HSS 3x3x3/16.

MSC Engineering's calcs call out 3x1-1/2x3/16. Which is the correct post size? Can the L2x2x3/16 angles at top and bottom of the posts be a field-bolted connection at the posts?

A1: Correct screen wall support posts are HSS 3x3x3/16. L2x2x3/16 angles may be field-bolted.

Q2: Clarification/additional information needed in regards of Q16 from Q&As date 11/128/2024:

“Q16: Detail 1&2/A5.29 call for a steel embed and bracket per structural for the privacy screen.

Structural drawings do not show details for this embed/bracket. Please provide structural details for the privacy screen embed & bracket.

A16: See Addendum 009, sheets S5.10, Revision 2 dated 07-16-24 for additional detail.”

No details are provided for privacy screen embed and bracket. Are steel plate and weld sizes available? Anchor bolt sizes and embed distance? Are Simpson CB66 Column Bases acceptable for the privacy screen-wall 6x6 post bases?

A2: Bracket is comprised of 5” x 8” x ¼” plates with (2) 5/8” diameter thru bolts, welded to 12” x 12” x 3/8” base plate with 3/16” fillet welds, anchored with (4) 1/2" diameter wedge anchors, embedded 3”.

Q3: Clarification/additional information needed in regards of Q62 from Q&As date 11/128/2024:

“Q62: Div 09 – Concrete Finishes - CONC-1 is called out on A1.22 in Rms 104, 121, 122, 125. Materials Legend A6.01 defines CONC-1 as “CONCRETE S.O.G”. Are there any specs in terms of products or type of polishing for these areas?

A62: Conc-1 is unfinished exposed concrete. “

Please state whether “Concrete S.O.G.” will be either:

a. Float finish

b. Broom finish

c. Trowel finish

d. Burnished finish

A3: Concrete SOG to be float finish.

Q4: Clarification/additional information needed in regards of Q45 from Q&As date 11/128/2024:

“Q45: Are the FA and LV cabling permitted to be 'free air' above accessible ceilings? Will backboxes and conduit stubs be required in wall spaces or free air?

A45: "Free air" cabling above accessible ceilings is acceptable, backboxes and conduits stubs not required in walls or free air.”

Please, confirm that the backboxes or conduits in the walls for F/A and LV are not required. This is typically not common.

A4: Provide back boxes and conduit stubbed up to ceiling for all low voltage in walls. Free air only above accessible ceilings

Q5: Is Div 26 expected to provide (3) Chargepoint CT4000 EV Chargers or equal for this project. If so, will these need to be single or dual head chargers?

A5: Charging stations and installation are excluded from this project scope. Dual head chargers are intended in future.

S-DASOBO-00009472_OCYCF New Parole & Probation Project – Q&A dated 11/21/2024

Q6: Please provide numbers and locations of access control and video devises per added Specifications, Project

Manual, Div 27 and 28 and Appendix 3.02 (sheet G0.03 revision 1).

A6: Required security and access control devices are as follows: Access control points are identified on the door/hardware schedules (see A6.02). Owner furnished/Owner installed cameras (six total) will be located at each exterior building corner (4) and at opposite corners of the main reception area (2). Head end equipment (racks/switches/etc.) to be located in IT room (121). No other security devices are required.

Q7: Fire alarm Specifications, page 3 references the inclusion of speaker zones. Since this is a B occupancy building, only sprinkler monitoring is required for the fire alarm system. Please, confirm that inclusion of voice evacuation coverage (as suggested in the Specifications) is required for this project.

A7: Yes, requirement for the voice evacuation coverage/speaker zones is confirmed.

Q8: Can bids be submitted by e-mail?

A8: No. OregonBuys is the only acceptable form of submission of bids for this ITB. See Section C.8 of the ITB. If you need assistance with submitting a bid, please, contact OregonBuys support/helpdesk for assistance.

Rejected Substitutions:

• Section 26 5100, page 2 of 6, sub-section 2.01 – Luminaire R3A and R3B by Lumination – rejected on

11/15/2024.

• Section 26 5100, page 2 of 6, sub-section 2.01 – Luminaire W1 by Beacon – rejected on 11/15/2024.

• Q30 from Q&As dated 11/18/2024 – Siemens system by Siemens – rejected on 11/21/2024.

• Plans, sheet A0.21, detail 4 EA-1.2 Stucco Assembly – Dryvit system (Driwall Rainscreen by Keene, Clark

Dietrich Control Joint and Starter Strip Casing Bead, PermaBase 1/2" Cement Board, Dryvit Grid Tape, Genesis Acrylic-Modified Base Coat, Reinforcing Mesh, Genesis Acrylic-Modified Base Coat (2), DPR Finish

- Sandpebble (standard neutral color finishes) - rejected on 11/21/2024.