A5.27 R1 07-16-2024.pdf
PDF 397 KB Posted
- Solicitation number
- S-DASOBO-00009472
- Issued by
- Lake County, Albany City, Oregon
About this file
This document appears to be an Invitation to Bid (ITB) for the construction of a new parole and probation building at the Oak Creek Youth Correctional Facility (OCYCF) in Albany, Oregon. The purpose of the ITB is to establish a contract for all labor, materials, transportation, equipment, and services required for the construction work described in Attachment A, Attachment B, and the ITB documents. The project is located in Lake County and Albany City, Oregon, and the contract term is unspecified.
The ITB requires bidders to provide pricing for the requested construction work. No additional details are provided regarding set-asides, incumbents, funding requirements and sources, or other salient information.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6'-0"
ROOF DRAIN
OVERFLOW DRAIN
TAPERED EDGE STRIP AT PERIMETER OF
DRAIN SUMP
FOR TYPICAL ROOF DRAIN (INSULATION
BELOW MEMBRANE),
FOR TERRACE ROOF DRAIN (INSULATION
ABOVE MEMBRANE),
ADD STAINLESS STEEL SADDLE
FLASHINGS AT ALL WALL
TERMINATIONS /
TRANSITIONS.
SADDLES SHOULD BE FULLY
SOLDIERED WATERTIGHT
AND HAVE 180 DEGREE
HEMS AT ENDS.
INCORPORATE FLANGE INTO
WRB ON WALL, TYP.
OCCURS AT SQUARE
PENETRATIONS THROUGH
ROOF MEMBRANE.
COLLAR SHOULD BE RIVETED
AND FULLY SOLDIERED
WATERTIGHT.
TOP OF PARAPET
15' - 0"
MECHANICAL EQUIPMENT BY
OTHERS.
MECHANICAL CURB BY OTHERS.
TPO ROOFING MEMBRANE.
M
IN
CANT STRIP.
COVER BOARD.
RIGID INSULATION.
TOP OF PARAPET
15' - 0"
HIGH TEMP SELF-ADHERED MEMBRANE
SHEET METAL FLASHING
SCUPPER AND DOWNSPOUT
TOP OF PARAPET
15' - 0"
TOP PLATE UPPER ROOF
16' - 0"
Z-FURRING.
LOUVERED METAL SCREEN,
FINISH TBD.
STEEL FRAMING, REFER TO STRUCTURAL.
VAPOR BARRIER.
FLUID APPLIED WATERPROOFING.
ROUGH CARPENTRY, REFER
TO STRUCTURAL.
FLASHING SHEET CENTERED ON ROOF
DRAIN.
REINFORCING SHEET.
2" COLLAR AT OVERFLOW DRAIN ONLY.
LEAD FLASHING - SET IN CONTINUOUS
BED OF PLASTIC CEMENT.
DRAIN RECEIVER.
ROOF DRAIN ASSEMBLY.
RIGID INSULATION. REFER TO ROOF-
CEILING TYPES.
TPO ROOFING SYSTEM.
SUBSTRATE BOARD.
PLYWOOD ROOF SHEATHING.
CENTERLINE OF ROOF DRAIN.
(2) LAYERS TAPER STRIP.
1'-6"
3"
3"
PROJECT #
DATE:
REVISIONS
Copyright © 2021-22 STUDIO 3 ARCHITECTURE, INC.
SHEET:
A5.27
11/17/2023
2021-208
O ak
C re ek Y ou th
C or re ct io na l F ac ili ty
PR
O
B
AT
IO
N
/P
AR
O
LE
F
AC
IL
IT
Y
L
O C
H N
E R R
D S
E A
LB
A
N Y O
R
C
O N
S T R U
C T
IO
N S
E T
1" = 1'-0"
1 ROOF DRAIN & OVERFLOW SUMP PLAN DETAIL
3" = 1'-0"
4 SADDLE FLASHING DETAIL
6" = 1'-0"
5 STORM COLLAR DETAIL
1 1/2" = 1'-0"
11 SECTION AT MECHANICAL CURB
1 1/2" = 1'-0"
2 SECTION AT DOWNSPOUT
0" 1'-0" 2'-0"2" 4" 8"
0" 1'-0" 2'-0"2" 4" 8"
0" 1'-0" 2'-0"2" 4" 8"0" 1'-0" 2'-0"2" 4" 8"
0" 1'-0" 2'-0"2" 4" 8"
1 1/2" = 1'-0"
12 SECTION AT MECHANICAL SCREEN
0" 1'-0" 2'-0"2" 4" 8" 6" = 1'-0"
9 ROOF DRAIN DETAIL (INSULATION BELOW MEMBRANE)
0" 1'-0" 2'-0"2" 4" 8"
1 07/16/2024
| Sheets |
| A5.27 - EXTERIOR ROOF DETAILS |
| A6.01 - SCHEDULES |
| G0.01 - COVER SHEET |
| G0.03 - GENERAL NOTES |
| G1.01 - CODE REVIEW PLANS |
File details come from the government source that posted it. Updated .