This document is an Erosion Prevention and Sediment Control (EPSC) plan for the Oak Creek Youth Correctional Facility (OCYCF) New Parole and Probation building construction project in Albany, Oregon. The EPSC plan outlines the minimum requirements for erosion and sediment control measures to be implemented by the contractor, including providing runoff controls for wet weather trenching work, using compost filter socks or berms instead of sediment fences, covering soil stockpiles, and having a dewatering plan in place. The contractor is responsible for upgrading the EPSC controls as needed during construction to ensure sediment-laden water does not leave the site. Inspections can be requested by calling the provided phone number.
The related state and local contract opportunity is for the construction of the new parole and probation building at the OCYCF in Albany, Oregon. The work includes all labor, materials, transportation, equipment, and services as described in the attachments and ITB documents. The project is located in Linn County and the City of Albany, Oregon.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michael Ficek Ellipse
Michael Ficek Arrow
Michael Ficek Text Box Outlet Protection
Michael Ficek Cloud
Michael Ficek Text Box Provide Runoff Controls for wet weather trenching work.
Michael Ficek Cloud
Michael Ficek Arrow
Michael Ficek Text Box Compost Filter Socks or Compost Filter Berms may be used instead of Sediment Fence.
Michael Ficek Cloud
Michael Ficek Arrow
Michael Ficek Text Box Cover Soil Stockpile.
Michael Ficek Cloud
Michael Ficek Reviewed for Code Compliance
Michael Ficek Text Box All EPSC controls shall be in place and approved by the City of Albany before land disturbing work begins. The implementation of these EPSC plans and the construction maintenance, replacement and upgrading of these plans is the responsibility of the contractor until all construction is completed and approved and vegetation is established and/or all disturbed areas have been permanently stabilized. Have a Dewatering Plan in place. The EPSC controls shown on this plan are the minimum requirements for anticipated site conditions. During the construction period, these EPSC controls shall be upgraded, as needed, for unexpected storm events and to ensure that sediment-laden water does not leave the site. For inspections call 541-791-0116.
Michael Ficek Reviewed for Code Compliance