G0.01 R1 07-16-2024 and R3 11-18-2024.pdf

PDF 2 MB Posted

Attached to
Oak Creek Youth Correctional Facility (OCYCF) New Parole and Probation
Solicitation number
S-DASOBO-00009472
Issued by
Lake County, Albany City, Oregon

About this file

The provided document is a construction set for the new Probation/Parole Facility at the Oak Creek Youth Correctional Facility in Albany, Oregon. The project is being led by the Oregon Youth Authority, with design and engineering services provided by Studio 3 Architecture, Westech Engineering, Laurus Designs, MSC Engineers, and Colebreit Engineering. The construction set includes detailed drawings and specifications for the site work, landscaping, architectural, structural, plumbing, mechanical, and electrical components of the new facility.

The related state and local contract opportunity is for the construction of this new parole and probation building at the Oak Creek Youth Correctional Facility in Albany, Oregon. The work includes all labor, materials, transportation, equipment, and services necessary to complete the construction as described in the attachments and bid documents. The project is funded by the state of Oregon and the jurisdictions of Lake County and Albany City.

View the file

Other files

File Type Posted
Specs_Project Manual_Appendix.pdf PDF
Addendum4_S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
A1.61 R2 11-13-2024.pdf PDF
Addendum 2 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
EP-0097-23 OYA New Building Improvements EPSC Plan-1.pdf PDF
S-DASOBO-00009472_Q&A_07192024.pdf PDF
S1.10 R2_S5.10 R2.pdf PDF
Addendum 3 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
S0.10 R3 07-31-2024.pdf PDF
C3.00 R2 11-13-2024.pdf PDF
S-DASOBO-00009472_OCYCF Parole_ PreBidAttendance.pdf PDF
IntentToAward_Notice_AllBidders_12052024.pdf PDF
OCYCF Substitution Request 265100_Approved.pdf PDF
Addendum 5 S-DASOBO-00009472_OCYCF_ParoleProbation_08222024.pdf PDF
OCYCF Substitution Request 074113_Approved.pdf PDF
Addendum 008 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
Addendum1_Attachment1_Geotech Report YWTP.pdf PDF
First Tier Filled Out FCC.pdf PDF
FINAL_OYA Construction Set_2024-0412.pdf PDF
A6.01 R2 11-13-2024.pdf PDF
S2.10 R1_S2.11 R1_S8.11 R1_S8.12 R1.pdf PDF
A6.01 R1 07-16-2024.pdf PDF
Addendum 1 S-DASOBO-00009472_OCYCF_ParoleProbation_Corrected.pdf PDF
Addendum 7 S-DASOBO-00009472_OCYCF_ParoleProbation_10162024.pdf PDF
FINAL_OCYCF_Specifications_2024-0614.pdf PDF
REVISED SPECIFICATIONS 11-13-2024_corrected.pdf PDF
A5.27 R1 07-16-2024.pdf PDF
Structural Calculations_Stamped.pdf PDF
Bid_Tab_S-DASOBO-00009472_OCYCF Parole and Probation.pdf PDF
SK2 R3 11-18-2024.pdf PDF
Structural Calculations _Add_MechanicalScreenWall.pdf PDF
S-DASOBO-00009472_OCYCF_Parole_Probation_06242024.pdf PDF
S-DASOBO-00009472_Q&A_11212024_Final.pdf PDF
SK1 R3 11-18-2024.pdf PDF
S-DASOBO-00009472_Q&A_11182024_Final.pdf PDF
G0.03 R1 07-16-2024.pdf PDF
G1.01 R1 07-16-2024.pdf PDF
Addendum 009 S-DASOBO-00009472_OCYCF_ParoleProbation_FinalApproved_11182024.pdf PDF
9473 ITB.pdf PDF
Addendum 6 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
OCYCF Substitution Request 075400_Approved.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOOR NUMBER

SECTION REFERENCE:

DETAIL REFERENCE:

ELEVATION REFERENCE:

PLAN NOTE DESIGNATION

F

XXXX

XXXX

ROOM

SIM

A2.5X

A

B

C

D

A3.1X

SIM

100 A

X

A5.X

X

A3.1X

WALL TYPE MARK:

ROOM TITLE + NUMER:

WINDOW TYPE:

W-X

ELEVATION DATUM:

As4a

WALL OR PARTITION

CONSTRUCTION TYPE.

SEE LEGEND.

ROOM NAME

ROOM NUMBER

PLAN OR SIDE NOTE

NUMBER

MARK OR DIAGONAL NOTE

NUMBER

REVISION NUMBER

DOOR SIZE OR NUMBER

REFER TO WINDOW

ELEVATIONS SHOWN ON

DRAWINGS A5.1X

100.00' F.F.E.

ELEVATION

ELEVATION DATUM

LOCATION:

FILLED ARROW DENOTES

BUILDING SECTION

OPEN ARROW DENOTES

WALL SECTION/DETAIL

DETAIL NUMBER

SHEET NUMBER

SIDE NOTE IF REQUIRED

ELEVATION NUMBER OR

DESIGNATION AS OCCURS

SHEET NUMBER

DETAIL NUMBER

SHEET NUMBER

SIDE NOTE IF REQUIRED

DETAIL CUT LOCATION IF

SHOWN

SYMBOL LEGEND:

SITE VICINITY IMAGE:

SITE IMAGE:

PROJECT #

DATE:

REVISIONS

Copyright © 2021-22 STUDIO 3 ARCHITECTURE, INC.

SHEET:

G0.01

11/17/2023

2021-208

O ak

C re ek Y ou th

C or re ct io na l F ac ili ty

PR

O

B

AT

IO

N

/P

AR

O

LE

F

AC

IL

IT

Y

L

O C

H N

E R R

D S

E A

LB

A

N Y O

R

C

O N

S T R U

C T

IO

N S

E T

NEW PROBATION / PAROLE FACILITY

Oak Creek Youth Correctional Facility

4400 LOCHNER RD SE ALBANY OR 97322

PROJECT TEAM:DRAWINGS LIST:

OWNER:

OREGON YOUTH AUTHORITY

ARCHITECT:

STUDIO 3 ARCHITECTURE, Inc.

275 Court Street St. NE Salem OR 97303-3442 P: 503.390.6500, Ext. 126

Project Architect: Scott McDonald, AIA D: 971.239.0250

E: scott@studio3architecture.com W: www.studio3architecture.com

CIVIL ENGINEERING:

WESTECH ENGINEERING, Inc.

3841 Fairview Industrial Dr. SE, Suite 100 Salem OR 97302 Ray Engel, P.E.

P: 503.585.2474 E: rengel@westech-eng.com

LANDSCAPE ARCHITECT:

LAURUS DESIGNS, LLC

1012 Pine Street Silverton OR 97381 Laura A. Antonson, LA

P: 503.784.6494 E: laura_a_antonson@hotmail.com

STRUCTURAL ENGINEERING:

MSC ENGINEERS, INC.

1045 13th St. SE Salem, OR 97302-2506 Cameron Swearingen, P.E.

P: 503.399.1399 E: camerons@mscengineersinc.com

MEP ENGINEERING:

COLEBREIT ENGINEERING

2021 NW Grant Ave. Corvallis, OR 97330 Nick Evano, P.E.

P: 541.728.3293 E: nick.evano@colebreit.com

Sheet Number Sheet Name Sheet Issue Date Current Revision Revision Description

GENERAL DRAWINGS

G0.01 COVER SHEET 11/17/2023 1

G0.02 GENERAL NOTES 11/17/2023

G0.03 GENERAL NOTES 11/17/2023 1

G1.01 CODE REVIEW PLANS 11/17/2023 1

G2.01 ACCESSIBILITY REQUIREMENTS 11/17/2023

CIVIL ENGINEERING DRAWINGS

C0.0 CIVIL COVER SHEET 11/17/2023

C1.01 NOTES 11/17/2023

C1.02 NOTES 11/17/2023

C2.01 EROSION CONTROL PLAN 11/17/2023

C2.02 EROSION CONTROL NOTES & DETAILS 11/17/2023

C3.00 SURVEY & DEMO PLAN 11/17/2023

C4.00 GRADING & DRAINAGE PLAN 11/17/2023

C5.00 SURFACING PLAN 11/17/2023

C6.01 EROSION CONTROL NOTES & DETAILS 11/17/2023

C6.02 EROSION CONTROL NOTES & DETAILS 11/17/2023

C6.03 EROSION CONTROL NOTES & DETAILS 11/17/2023

LANDSCAPE DRAWINGS

L0.0 COVER SHEET 11/17/2023

L1.1 PLANTING PLAN NAD SCHEDULE 11/17/2023

L1.2 PLANTING NOTES AND DETAILS 11/17/2023

L2.1 IRRIGATION PLAN AND SCHEDULE 11/17/2023

L2.2 IRRIGATION NOTES AND DETAILS 11/17/2023

ARCHITECTURAL DRAWINGS

A0.21 WALL/ROOF TYPES 11/17/2023

A1.01 SITE PLAN 11/17/2023

Sheet Number Sheet Name Sheet Issue Date Current Revision Revision Description

A1.02 SITE PLAN 11/17/2023

A1.22 LEVEL 01 - FLOOR PLAN 11/17/2023

A1.23 LOW ROOF PLAN 11/17/2023

A1.24 HIGH ROOF PLAN 11/17/2023

A1.61 LEVEL 01 - REFLECTED CEILING PLAN 11/17/2023

A2.01 ELEVATIONS 11/17/2023

A2.02 ELEVATIONS 11/17/2023

A2.51 INTERIOR ELEVATIONS 11/17/2023

A2.52 INTERIOR ELEVATIONS 11/17/2023

A2.53 INTERIOR ELEVATIONS 11/17/2023

A3.01 BUILDING SECTIONS 11/17/2023

A3.02 BUILDING SECTIONS 11/17/2023

A3.11 WALL SECTIONS 11/17/2023

A4.01 DETAIL RESTROOM PLANS 11/17/2023

A5.01 EXTERIOR SITE PLAN DETAILS 11/17/2023

A5.11 STOREFRONT & WINDOW ELEVATIONS 11/17/2023

A5.21 EXTERIOR FOUNDATION DETAILS 11/17/2023

A5.22 EXTERIOR HOLLOW METAL DOOR DETAILS 11/17/2023

A5.23 EXTERIOR STOREFRONT DETAILS 11/17/2023

A5.24 EXTERIOR FLUID APPLIED DETAILS 11/17/2023

A5.25 EXTERIOR STUCCO DETAILS 11/17/2023

A5.26 EXTERIOR FIBERGLASS WINDOW DETAILS 11/17/2023

A5.27 EXTERIOR ROOF DETAILS 11/17/2023 1

A5.28 EXTERIOR ROOF DETAILS 11/17/2023

A5.41 INTERIOR MISC DETAILS 11/17/2023

A5.42 INTERIOR CEILING DETAILS 11/17/2023

A5.43 INTERIOR CASEWORK DETAILS 11/17/2023

A5.44 INTERIOR CASEWORK DETAILS 11/17/2023

A6.01 SCHEDULES 11/17/2023 1

A6.02 SCHEDULES 11/17/2023

STRUCTURAL DRAWINGS

S0.10 NOTES 11/17/2023

S1.10 FOUNDATION PLAN 11/17/2023

S2.10 MAIN ROOF FRAMING PLAN 11/17/2023

S2.11 UPPER ROOF FRAMING PLAN 11/17/2023

S5.10 CONCRETE DETAILS 11/17/2023

S8.10 WOOD DETAILS 11/17/2023

S8.11 WOOD DETAILS 11/17/2023

S8.12 WOOD DETAILS 11/17/2023

PLUMBING DRAWING

P0.01 LEGEND 11/17/2023

P0.02 SCHEDULES AND CALCULATIONS 11/17/2023

P2.01 WASTE AND STORM 11/17/2023

P2.02 ROOF - WASTE AND STORM 11/17/2023

P3.01 WATER 11/17/2023

P4.01 ENLARGED PLANS 11/17/2023

P6.01 DETAILS 11/17/2023

MECHANICAL DRAWINGS

M0.01 LEGEND 11/17/2023

M0.02 SCHEDULES 11/17/2023

M2.01 HVAC 11/17/2023

M2.02 ROOF - HVAC 11/17/2023

M6.01 DETAILS 11/17/2023

ELECTRICAL DRAWINGS

E0.01 LEGEND 11/17/2023

E0.02 LUMINAIRE SCHEDULE 11/17/2023

E1.01 SITE PLAN 11/17/2023

E2.01 LIGHTING 11/17/2023

E3.01 POWER AND DATA 11/17/2023

E3.02 ROOF - POWER AND DATA 11/17/2023

E5.01 ONE-LINE DIAGRAM 11/17/2023

E6.01 SCHEDULES AND DETAILS 11/17/2023

E6.02 SCHEDULES 11/17/2023

E7.01 DETAILS 11/17/2023

GENERAL NOTE: CONTRACTOR TO PROVIDE FIRE ALARM

DESIGN/BUILD DRAWINGS. SEE SHEET G0.03 FOR

OWNER/CONTRACTOR LOW VOLTAGE RESPONSIBILITY

MATRIX.

1 07/16/2024

3 11/18/2024

SKETCHES

SK#1 CPI DESIGN SKETCH 11/18/2024 3

SK#2 POLE BASE DETAIL 11/18/2024 3

Sheets
A5.27 - EXTERIOR ROOF DETAILS
A6.01 - SCHEDULES
G0.01 - COVER SHEET
G0.03 - GENERAL NOTES
G1.01 - CODE REVIEW PLANS

File details come from the government source that posted it. Updated .