OCYCF Substitution Request 265100_Approved.pdf
PDF 16 MB Posted
- Solicitation number
- S-DASOBO-00009472
- Issued by
- Lake County, Albany City, Oregon
About this file
This document is a Substitution Request for the construction of a new parole and probation building at the Oak Creek Youth Correctional Facility (OCYCF) in Albany, Oregon. The project is being managed by the State of Oregon, with the jurisdictions of Lake County and Albany City involved. The work includes all labor, materials, transportation, equipment, and services as described in Attachments A and B and the ITB documents. No specific item quantities, response dates, site visits, or award dates are provided. The term of the contract is not specified.
The document does not contain details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information. It focuses solely on the substitution request for the construction project.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBSTITUTION
CSI Form 1.5C REQUEST
(During the Bid Period)
Substitution Request Number: Project:
From:
Date: To:
A/E Project Number:
Contract For: Re:
© Copyright 2007, Construction Specifications Institute, 110 South Union Street, Suite 100, Alexandria, VA 22314
Page 1 Form Version: June 2004 CSI Form 1.5C
This is not an official CSI Construction Contract Administration (CCA) Form. Please use CSI's official CCA Forms if required by your project needs.
Specification Title: Description:
Section: Page: Article/Paragraph:
Proposed Substitution:
Manufacturer: Address: Phone:
Trade Name: Model No.:
Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.
Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.
The Undersigned certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
• Same warranty will be furnished for proposed substitution as for specified product.
• Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Proposed substitution does not affect dimensions and functional clearances.
• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
Submitted by:
Signed by:
Firm:
Address:
Telephone:
A/E’s REVIEW AND ACTION
Substitution approved - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures.
Substitution approved as noted - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures.
Substitution rejected - Use specified materials.
Substitution Request received too late - Use specified materials.
Signed by: Date:
Supporting Data Attached: Drawings Product Data Samples Tests Reports
Oak Creek Youth Correctional Facility New Parole and Probation
Lighting Fixtures
Victory Electric Company
07/23/2024
Oregon Youth Auhority
Yulia Niece
Victory Electric Company
Makenzie Kilborn
541-570-7175
90 E Grant St. Lebanon, OR 97355
Victory Electric Company
7/23/2024
SLG Lighting
Lighting Package
26 5100
Fixture Types: R1, R2, R3A/R3B, S1, X1, W1, G1/G2
11325 Cash Rd Suite #100 Houston, TX 77477 713-389-5680 x yulia.niece@das.oregon.gov
Multiple See attached
R1
R2
R3A/R3B
S1
V1
W1
G1/G2
Albany Parole
| OCYCF Substitution Request 265100.pdf |
| Clean CSI Form 1.5C Prod Subst |
OCYCF Parole and Probation Lighting Substitution.pdf
File details come from the government source that posted it. Updated .