First Tier Filled Out FCC.pdf

PDF 131 KB Posted

Attached to
Oak Creek Youth Correctional Facility (OCYCF) New Parole and Probation
Solicitation number
S-DASOBO-00009472
Issued by
Lake County, Albany City, Oregon

About this file

This document is a First-Tier Subcontractor Disclosure Form for the Oak Creek Youth Correctional Facility (OCYCF) New Parole and Probation Building project in Albany, OR (Bid #S-DASBO-00009472). The form was submitted by First Cascade Corporation and lists subcontractors that will be providing labor or materials for the project. The bid opening date is set for November 26, 2024, at 2:00 PM, with the form required to be submitted either with the bid or within two working hours after the advertised bid opening time.

The form lists six subcontractors with their respective categories of work and dollar values: Superior Excavation ($225,500), Western States Electric ($214,970), FM Sheet Metal ($254,283), D&S Concrete ($115,000), P365 ($194,506), and Sunset Stucco ($193,125). The form is signed by Madison Pihl, Vice President of First Cascade Corporation, and appears as page 24 of 51 in the bid package.

View the file

Other files

File Type Posted
Specs_Project Manual_Appendix.pdf PDF
G0.01 R1 07-16-2024 and R3 11-18-2024.pdf PDF
Addendum4_S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
A1.61 R2 11-13-2024.pdf PDF
Addendum 2 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
EP-0097-23 OYA New Building Improvements EPSC Plan-1.pdf PDF
S-DASOBO-00009472_Q&A_07192024.pdf PDF
S1.10 R2_S5.10 R2.pdf PDF
Addendum 3 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
S0.10 R3 07-31-2024.pdf PDF
C3.00 R2 11-13-2024.pdf PDF
S-DASOBO-00009472_OCYCF Parole_ PreBidAttendance.pdf PDF
IntentToAward_Notice_AllBidders_12052024.pdf PDF
OCYCF Substitution Request 265100_Approved.pdf PDF
Addendum 5 S-DASOBO-00009472_OCYCF_ParoleProbation_08222024.pdf PDF
OCYCF Substitution Request 074113_Approved.pdf PDF
Addendum 008 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
Addendum1_Attachment1_Geotech Report YWTP.pdf PDF
FINAL_OYA Construction Set_2024-0412.pdf PDF
A6.01 R2 11-13-2024.pdf PDF
S2.10 R1_S2.11 R1_S8.11 R1_S8.12 R1.pdf PDF
A6.01 R1 07-16-2024.pdf PDF
Addendum 1 S-DASOBO-00009472_OCYCF_ParoleProbation_Corrected.pdf PDF
Addendum 7 S-DASOBO-00009472_OCYCF_ParoleProbation_10162024.pdf PDF
FINAL_OCYCF_Specifications_2024-0614.pdf PDF
REVISED SPECIFICATIONS 11-13-2024_corrected.pdf PDF
A5.27 R1 07-16-2024.pdf PDF
Structural Calculations_Stamped.pdf PDF
Bid_Tab_S-DASOBO-00009472_OCYCF Parole and Probation.pdf PDF
SK2 R3 11-18-2024.pdf PDF
Structural Calculations _Add_MechanicalScreenWall.pdf PDF
S-DASOBO-00009472_OCYCF_Parole_Probation_06242024.pdf PDF
S-DASOBO-00009472_Q&A_11212024_Final.pdf PDF
SK1 R3 11-18-2024.pdf PDF
S-DASOBO-00009472_Q&A_11182024_Final.pdf PDF
G0.03 R1 07-16-2024.pdf PDF
G1.01 R1 07-16-2024.pdf PDF
Addendum 009 S-DASOBO-00009472_OCYCF_ParoleProbation_FinalApproved_11182024.pdf PDF
9473 ITB.pdf PDF
Addendum 6 S-DASOBO-00009472_OCYCF_ParoleProbation.pdf PDF
OCYCF Substitution Request 075400_Approved.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .