Robinson_Park_and_Recreation_Center_RFP.pdf

PDF 118 MB Posted

Attached to
Design-Build Services for Solar and Energy Storage Installations at Category 1 City-Owned Properties
Solicitation number
2026-RFP-0189
Issued by
Los Angeles County, California

About this file

This is a Request for Proposals (RFP) issued by the City of Pasadena, through Pasadena Water and Power (PWP), soliciting Design-Build services for solar and energy storage installations at Category 1 City-owned properties. The Project encompasses design, procurement, construction, installation, interconnection, commissioning, and potential operations and maintenance of solar photovoltaic systems and energy storage solutions across multiple municipal facilities, with completion targeted by June 2028. Solar installations are desired at all sites, while energy storage systems are highly desired where feasible based on site-specific conditions and cost considerations. The Scope of Work includes comprehensive site evaluation and feasibility assessment, engineering and design, permitting, equipment procurement, construction, installation, interconnection, commissioning, stakeholder engagement support, and ongoing operations and maintenance services. The selected contractor must evaluate existing electrical infrastructure and account for future electric vehicle charging expansion potential, ensuring that EV-related load assumptions are incorporated into equipment sizing and system component specifications. The City reserves the right to award one contract, multiple contracts by individual site, by combination of sites, or for the entire project portfolio, at its discretion.

The RFP permits the City to select the award structure and contract structure that best serves its interests. Site capacities identified in the RFP are estimated figures provided for planning purposes, with final system size, configuration, and inclusion of energy storage to be determined through site-specific evaluation, design development, feasibility analysis, cost assessment, and City direction during the project execution phase. The file references Robinson Park and Recreation Center as a Category 1 priority site, indicating this facility is among the near-term implementation priorities for the solar and energy storage program.

View the file

Other files

File Type Posted
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#4_Revision).pdf PDF
Solar_and_Energy_Storage_-_09.29.2026.pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#2_Revision).pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement_Place_Holder.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
PWP_Rooftop_Solar_Design_Build_Project.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
FAITHFUL_PERFORMANCE_BOND_FORM_(2).pdf PDF
Allendale_Branch_Library_RFP.pdf PDF
Madison_Parking_Lot_RFP.pdf PDF
Glenarm_Power_Plant-RFP.pdf PDF
Central_Library_RFP.pdf PDF
Washington_Park-public_RFP.pdf PDF
Victory_Park_South_RFP.pdf PDF
San_Rafael_Branch_Library_RFP.pdf PDF
Linda_Vista_Branch_Library_RFP.pdf PDF
Lamanda_Park_Branch_Library-public_RFP.pdf PDF
La_Pintoresca_Branch_Library-public_RFP.pdf PDF
Jackie_Robinson_Community_Center_RFP.pdf PDF
Hamilton_Park-public_RFP.pdf PDF
Emergency_FEMA_TC.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
AR_4.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .