Hamilton_Park-public_RFP.pdf

PDF 1 MB Posted

Attached to
Design-Build Services for Solar and Energy Storage Installations at Category 1 City-Owned Properties
Solicitation number
2026-RFP-0189
Issued by
Los Angeles County, California

About this file

This is a conceptual design document and technical specifications sheet prepared by the City of Pasadena Department of Water and Power for the Hamilton Park solar and energy storage installation project. The project involves design-build services for solar canopy and carport systems, battery energy storage, electrical infrastructure upgrades, EV charging station preparation, and associated site improvements. The design includes a cantilever solar canopy overhanging the playground with support structures located within planters, a solar carport with a minimum height of 14 feet 6 inches, battery systems with a minimum capacity of 250 kilowatts for 4 hours, a buried transformer enclosure, switchgear rated for 277/480 volts 3-phase 4-wire, conduit systems for future DC fast chargers, lighting compliant with Illuminating Engineering Society standards for parking lots, and ADA-compliant parking spaces and pathways. The contractor is responsible for on-site field surveys, design optimization to maximize solar and battery capacity while maintaining code compliance, procurement and installation of communications cabinets and telecom infrastructure, parking lot striping, and coordination with Pasadena Water and Power's Electric Service Planning Group for final service design approval.

The contractor bears full responsibility for repairing or replacing any existing property or utilities damaged during construction and must ensure all work meets or exceeds pre-construction conditions. The design is conceptual and may deviate from the provided plot plan and single-line diagram provided the final design meets specified requirements, including ensuring solar and batteries do not offset the building meter and are capable of automatic microgrid operation with backup power capability during outages. The contractor must design switchgear and infrastructure to accommodate future installation of four 75-kilowatt DC fast chargers without additional civil work. All electrical installations must comply with the City of Pasadena Water and Power Department's Electrical Service Requirements (Regulation 21), with Pasadena Water and Power providing transformers, high-voltage cables, and service entrance conductors while the contractor procures all other service equipment including the buried transformer enclosure, primary and secondary conduits, switchgear, electrical panels, and protective fencing and retaining walls.

View the file

Other files

File Type Posted
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#4_Revision).pdf PDF
Solar_and_Energy_Storage_-_09.29.2026.pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#2_Revision).pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement_Place_Holder.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
PWP_Rooftop_Solar_Design_Build_Project.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
FAITHFUL_PERFORMANCE_BOND_FORM_(2).pdf PDF
Allendale_Branch_Library_RFP.pdf PDF
Madison_Parking_Lot_RFP.pdf PDF
Glenarm_Power_Plant-RFP.pdf PDF
Central_Library_RFP.pdf PDF
Washington_Park-public_RFP.pdf PDF
Victory_Park_South_RFP.pdf PDF
San_Rafael_Branch_Library_RFP.pdf PDF
Robinson_Park_and_Recreation_Center_RFP.pdf PDF
Linda_Vista_Branch_Library_RFP.pdf PDF
Lamanda_Park_Branch_Library-public_RFP.pdf PDF
La_Pintoresca_Branch_Library-public_RFP.pdf PDF
Jackie_Robinson_Community_Center_RFP.pdf PDF
Emergency_FEMA_TC.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
AR_4.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(N) FENCED IN

ELECTRICAL EQUIPMENT (SWITCHGEAR,

COMMUNICATIONS CABINET, ETC)

(N) RETAINING WALL

(N) CANTILEVER SOLAR CANOPY

OVERHANGING

OVER PLAYGROUND. SUPPORT

STRUCTURE MUST BE LOCATED

WITHIN PLANTER

(N) SOLAR

CARPORT

(N) BURIED

TRANSFORMER

ENCLOSURE

LOCATION OF 4 FUTURE

DC FAST CHARGERS

(E) POLE

(N) ADD CONDUIT

FUTURE COMPLIANT EV ADA

SPACES AND PATH OF TRAVEL

(N) 3'X5' PULL BOX

M M

RE

VIS

ION

S

CIT

Y O

F P

AS

AD

EN

A -

DE

PA

RT

ME

NT

OF

W

AT

ER

AN

D P

OW

ER

H

AM

IL

TO

N P

AR

K

C

AR

TW

R

IG

H

T

ST

PA

SA

D

EN

A, C A

SEAL:

CONCEPTUAL

DESIGN

PLOT PLAN

SCALE: NONE

HAMILTON PARK

CONCEPTUAL SINGLE LINE DIAGRAM

SCALE: NONE

NOTES:

1. LAYOUT IS CONCEPTUAL. CONTRACTOR SHALL SUBMIT PROPOSAL TO MAXIMIZE SOLAR AND

BATTERIES AT THE SITE WHILE MAINTAINING COMPLIANCE WITH ALL APPLICABLE FEDERAL,

STATE, AND LOCAL CODES.

2. PROPOSED DESIGN MAY DEVIATE FROM CONCEPTUAL DESIGN PROVIDED IT MEETS THE

FOLLOWING REQUIREMENTS:

2.1. SOLAR AND BATTERIES SHALL NOT OFFSET BUILDING METER

2.2. SOLAR AND BATTERIES SHALL BE CAPABLE OF AUTOMATIC MICROGRID OPERATION

AND PROVIDE BACKUP POWER TO THE BUILDING IN CASES OF A POWER OUTAGE

3. THE CONTRACTOR IS FULLY RESPONSIBLE FOR REPAIRING OR REPLACING ANY EXISTING

PROPERTY OR UTILITIES DAMAGED DURING CONSTRUCTION. ALL REPAIRS SHALL BE

EXECUTED TO A CONDITION EQUAL OR BETTER THAN THE PRE-CONSTRUCTION CONDITION

4. CONTRACTOR SHALL PERFORM ON-SITE FIELD SURVEY TO VERIFY ALL EXISTING CONDITIONS

AND DIMENSIONS PRIOR TO PROCEEDING WITH DESIGN

5. SOLAR CANOPIES

5.1. MINIMUM HEIGHT OF CARPORT CANOPY SHALL BE 14'-6"

5.2. THERE SHALL BE 4-1" CONDUIT FROM THE SWITCHGEAR TO EACH SOLAR CANOPY

FOR CAMERAS AND 2-1" CONDUITS FROM THE SWITCHGEAR TO THE CANTILEVER

OVERHANG (TOTAL OF 10) - EXACT CAMERA LOCATIONS TO BE DETERMINED DURING

DESIGN PHASE

5.3. CONTRACTOR TO PROVIDE LIGHTING WHICH COMPLIES WITH THE ILLUMINATING

ENGINEERING SOCIETY (IES) - CHAPTER 17 PARKING LOTS AND PARKING GARAGES

5.4. VERTICAL SUPPORT STRUCTURES SHALL BE PROTECTED FROM VEHICULAR TRAFFIC

5.5. SOLAR CANOPY AND EQUIPMENT (UNLESS MARKED IN THE CONCEPTUAL PLOT PLAN)

SHALL NOT CAUSE ANY PARKING SPACES TO BE LOST

5.6. 2-1" SPARE CONDUIT SHALL BE RAN TO EACH VERTICAL SUPPORT FROM

SWITCHGEAR

6. BATTERY

6.1. DIMENSIONS TO BE PROVIDED BY CONTRACTOR AND SITING TO BE DETERMINED AT A

FUTURE POINT

6.2. PREFERABLE TO HAVE BATTERIES MOUNTED ON SOLAR STRUCTURE

6.3. OTHERWISE PROPOSAL SHALL SPECIFY A BATTERY SYSTEM AT A MINIMUM OF 250KW,

4 HR

6.4. BATTERIES SHALL BE PROTECTED WITH A CMU BLOCK WALL, UNLESS MOUNTED ON

THE SOLAR STRUCTURE

7. CONTRACTOR TO PROCURE AND INSTALL COMMUNICATIONS CABINET, PAD, CONDUITS, AND

POWER FOR TELECOM

8. PARKING LOT

8.1. CONTRACTOR SHALL ENSURE PARKING SPACES AND PATH OF TRAVEL ARE

COMPLIANT WITH ADA REQUIREMENTS

8.2. CONTRACTOR SHALL ENSURE FUTURE EV CHARGING ADA SPACES AND PATH OF

TRAVEL ARE COMPLIANT WITH ADA REQUIREMENTS

8.3. CONTRACTOR IS RESPONSIBLE FOR PARKING STRIPING

9. EV CHARGERS

9.1. SWITCHGEAR SHALL BE DESIGNED FOR FUTURE (4) 75KW DC FAST CHARGERS

9.2. CONTRACTOR TO DESIGN AND INSTALL SWITCHGEAR SECTION, CONDUITS,

PULLBOXES, AND CONCRETE PADS TO ALLOW FOR FUTURE EV CHARGER

INSTALLATION WITHOUT ANY ADDITIONAL CIVIL WORK

10.ELECTRIC SERVICE NOTES

10.2. ALL NEW ELECTRICAL SERVICE INSTALLATIONS SHALL COMPLY WITH THE CITY OF

PASADENA WATER AND POWER DEPARTMENT'S ELECTRICAL SERVICE

REQUIREMENTS (REGULATION 21). ONCE AWARDED, THE CONTRACTOR SHALL

SUBMIT PRELIMINARY SERVICE EQUIPMENT INFORMATION TO PWP FOR ELECTRICAL

SERVICE DESIGN. ELECTRICAL SERVICE INFORMATION ON THIS PAGE IS CONCEPTUAL

ONLY AND MAY CHANGE DEPENDENT ON THE CONTRACTOR EQUIPMENT AND SIZING.

10.2.1. EQUIPMENT LOCATIONS AND DESIGN ARE CONCEPTUAL. CONTRACTOR

SHALL BE RESPONSIBLE FOR COORDINATING WITH PWP'S ELECTRIC SERVICE

PLANNING GROUP TO OBTAIN AN APPROVED SERVICE DESIGN

10.2.2. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING ALL REQUIREMENTS STATED

ON THE PWP SERVICE DESIGN

10.3. CONTRACTOR IS RESPONSIBLE FOR THE PROCUREMENT AND INSTALLATION OF THE

FOLLOWING SERVICE EQUIPMENT

10.3.1. BURIED TRANSFORMER ENCLOSURE - 4'6"X8'6" JENSEN PRECAST

K4686-TE78-20 OR EQUIVALENT

10.3.2. PRIMARY CONDUITS ON PRIVATE PROPERTY

10.3.3. SECONDARY CONDUITS ON PRIVATE PROPERTY

10.3.4. SWITCHGEAR AND ELECTRICAL PANELS

10.3.5. FENCE AROUND ELECTRICAL EQUIPMENT

10.3.6. RETAINING WALL AROUND EQUIPMENT

10.4. PWP SHALL PROVIDE THE FOLLOWING:

10.4.1. TRANSFORMERS LOCATED INSIDE THE UNDERGROUND VAULT

10.4.2. HIGH VOLTAGE CABLES FROM PWP SYSTEM TO TRANSFORMER

10.4.3. SERVICE ENTRANCE CONDUCTORS FROM THE TRANSFORMER TO

SWITCHGEAR

CONCEPTUAL

DESIGN NOT FOR

CONSTRUCTION

AutoCAD SHX Text

TO PWP

AutoCAD SHX Text

(N) BURIED TRANSFORMER BURIED TRANSFORMER ENCLOSURE

AutoCAD SHX Text P/L

AutoCAD SHX Text

(N) TO SOLAR AND TO SOLAR AND BATTERIES

AutoCAD SHX Text

(N) FUTURE DC FAST FUTURE DC FAST CHARGERS

AutoCAD SHX Text

(N) PULLBOXPULLBOX

AutoCAD SHX Text

AUX POWER (COMM., LIGHTING, ETC)LIGHTING, ETC)

AutoCAD SHX Text

(N) SWITCHBOARD 277/480V 3PH 4W

AutoCAD SHX Text

AS BUILT

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

CHKD.

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

CIP:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PJO:

Sheets and Views
public

File details come from the government source that posted it. Updated .