This is a Request for Proposals issued by the City of Pasadena, through Pasadena Water and Power (PWP), for Design-Build services for solar and energy storage installations at Category 1 city-owned properties in California. The RFP solicits proposals from qualified firms to provide comprehensive design-build services including site evaluation, feasibility assessment, engineering and design, permitting, procurement, construction, installation, interconnection, and commissioning of solar photovoltaic and energy storage systems. The project targets near-term implementation with completion by June 2028. Solar installations are desired at all sites, and energy storage is highly desired where feasible based on site-specific conditions, technical constraints, and cost considerations. The Glenarm Power Plant project, located at 72 E Glenarm Street in Pasadena, serves as a Category 1 priority site and includes conceptual designs for rooftop solar, carport solar, ground-mounted solar, and battery storage across three designated areas. The scope of work requires the selected contractor to perform on-site field surveys to verify existing conditions, evaluate existing electrical infrastructure, and account for future electric vehicle charging expansion in design approaches.

The RFP includes specific technical requirements and performance standards for the Glenarm Power Plant installation, including minimum carport canopy height of 14 feet 6 inches, battery storage specifications ranging from 20 kilowatts/80 kilowatt-hours in wall-mounted configurations to 250 kilowatts/500 kilowatt-hours in ground-mounted systems, and lighting compliance with Illuminating Engineering Society standards. The contractor assumes full responsibility for repairing or replacing any existing property or utilities damaged during construction and for parking lot striping. All electrical service installations must comply with PWP's Electrical Service Requirements (Regulation 21), with PWP providing transformers, high-voltage cables, and service entrance conductors while the contractor procures and installs service equipment including transformer vaults, switchgear, and electrical panels. The City reserves the right to award one contract, multiple contracts, individual sites, combinations of sites, or the entire project scope, with final system sizes, configurations, and energy storage inclusion to be determined based on site-specific evaluation and feasibility assessment.

View the file

Other files

File Type Posted
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#4_Revision).pdf PDF
Solar_and_Energy_Storage_-_09.29.2026.pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#2_Revision).pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement_Place_Holder.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
PWP_Rooftop_Solar_Design_Build_Project.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
FAITHFUL_PERFORMANCE_BOND_FORM_(2).pdf PDF
Allendale_Branch_Library_RFP.pdf PDF
Madison_Parking_Lot_RFP.pdf PDF
Central_Library_RFP.pdf PDF
Washington_Park-public_RFP.pdf PDF
Victory_Park_South_RFP.pdf PDF
San_Rafael_Branch_Library_RFP.pdf PDF
Robinson_Park_and_Recreation_Center_RFP.pdf PDF
Linda_Vista_Branch_Library_RFP.pdf PDF
Lamanda_Park_Branch_Library-public_RFP.pdf PDF
La_Pintoresca_Branch_Library-public_RFP.pdf PDF
Jackie_Robinson_Community_Center_RFP.pdf PDF
Hamilton_Park-public_RFP.pdf PDF
Emergency_FEMA_TC.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
AR_4.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(N) CARPORT

SOLAR

(N) GROUND

MOUNTED SOLAR

(N) ROOFTOP SOLAR

(N) ROOFTOP SOLAR

(N) CARPORT SOLAR

(N) ELECTRICAL PANEL

AND CONDUITS FROM

P/L TO PANEL

(N) UNDERGROUND VAULT,

ELECTRICAL PANEL

AND CONDUITS FROM P/L TO

PANEL,

COMMUNICATIONS CABINET

(N) ELECTRICAL PANEL

AND CONDUITS

(N) ROOFTOP SOLAR

MM M

SEAL:

RE

VIS

ION

S

CIT

Y O

F P

AS

AD

EN

A -

DE

PA

RT

ME

NT

OF

W

AT

ER

AN

D P

OW

ER

G

LE

N

AR

M P

O W

ER

P

LA

N

T

E

G

LE

N

AR

M S

T

PA

SA

D

EN

A, C A

CONCEPTUAL

DESIGN

PLOT PLAN

SCALE: NONE

GLENARM POWER PLANT

CONCEPTUAL SINGLE LINE DIAGRAM

SCALE: NONE

AREA A

AREA B

AREA C

NOTES:

1. LAYOUT IS CONCEPTUAL. CONTRACTOR SHALL SUBMIT PROPOSAL TO MAXIMIZE SOLAR AND

BATTERIES AT THE SITE WHILE MAINTAINING COMPLIANCE WITH ALL APPLICABLE FEDERAL,

STATE, AND LOCAL CODES.

2. PROPOSED DESIGN MAY DEVIATE FROM CONCEPTUAL DESIGN PROVIDED IT MEETS THE

FOLLOWING REQUIREMENTS:

2.1. SOLAR AND BATTERIES SHALL NOT OFFSET BUILDING METER

2.2. SOLAR AND BATTERIES SHALL BE CAPABLE OF AUTOMATIC MICROGRID OPERATION

AND PROVIDE BACKUP POWER TO THE BUILDING IN CASES OF A POWER OUTAGE

3. THE CONTRACTOR IS FULLY RESPONSIBLE FOR REPAIRING OR REPLACING ANY EXISTING

PROPERTY OR UTILITIES DAMAGED DURING CONSTRUCTION. ALL REPAIRS SHALL BE

EXECUTED TO A CONDITION EQUAL OR BETTER THAN THE PRE-CONSTRUCTION CONDITION

4. CONTRACTOR SHALL PERFORM ON-SITE FIELD SURVEY TO VERIFY ALL EXISTING CONDITIONS

AND DIMENSIONS PRIOR TO PROCEEDING WITH DESIGN

5. SOLAR CANOPIES

5.1. MINIMUM HEIGHT OF CARPORT CANOPY SHALL BE 14'-6"

5.2. THERE SHALL BE A 2-1" CONDUIT FROM THE SWITCHGEAR TO EACH SOLAR CANOPY

AND GROUND MOUNT FOR CAMERAS (TOTAL OF 8) - EXACT CAMERA LOCATIONS TO

BE DETERMINED DURING DESIGN PHASE

5.3. CONTRACTOR TO PROVIDE LIGHTING WHICH COMPLIES WITH THE ILLUMINATING

ENGINEERING SOCIETY (IES) - CHAPTER 17 PARKING LOTS AND PARKING GARAGES

5.4. VERTICAL SUPPORT STRUCTURES SHALL BE PROTECTED FROM VEHICULAR TRAFFIC

5.5. SOLAR CANOPY AND EQUIPMENT (UNLESS MARKED IN THE CONCEPTUAL PLOT PLAN)

SHALL NOT CAUSE ANY PARKING SPACES TO BE LOST

5.6. 1-1" SPARE CONDUIT SHALL BE RAN TO EACH VERTICAL SUPPORT FROM THE SOLAR

AND STORAGE SUBPANEL

6. BATTERY

6.1. DIMENSIONS TO BE PROVIDED BY CONTRACTOR AND SITING TO BE DETERMINED AT A

FUTURE POINT

6.2. PREFERABLE TO HAVE BATTERIES MOUNTED ON SOLAR STRUCTURE

6.3. OTHERWISE PROPOSAL SHALL SPECIFY A BATTERY SYSTEM AT A MINIMUM OF

6.3.1. AREA A - WALL MOUNTED 20KW, 80KWH

6.3.2. AREA B - 250KW, 500KWH

6.3.3. AREA C - WALL MOUNTED 20KW, 80KWH

6.4. GROUND MOUNTED BATTERIES SHALL BE PROTECTED WITH A CMU BLOCK WALL,

WALL MOUNTED BATTERIES SHALL HAVE A PROTECTIVE CAGE INSTALLED

7. CONTRACTOR TO PROCURE AND INSTALL COMMUNICATIONS CABINET, PAD, CONDUITS, AND

POWER FOR TELECOM

8. PARKING LOT

8.1. CONTRACTOR IS RESPONSIBLE FOR PARKING STRIPING

9. ELECTRIC SERVICE NOTES

9.1. ALL NEW ELECTRICAL SERVICE INSTALLATIONS SHALL COMPLY WITH THE CITY OF

PASADENA WATER AND POWER DEPARTMENT'S ELECTRICAL SERVICE

REQUIREMENTS (REGULATION 21). ONCE AWARDED, THE CONTRACTOR SHALL

SUBMIT PRELIMINARY SERVICE EQUIPMENT INFORMATION TO PWP FOR ELECTRICAL

SERVICE DESIGN. ELECTRICAL SERVICE INFORMATION ON THIS PAGE IS CONCEPTUAL

ONLY AND MAY CHANGE DEPENDENT ON THE CONTRACTOR EQUIPMENT AND SIZING.

9.1.1. EQUIPMENT LOCATIONS AND DESIGN ARE CONCEPTUAL. CONTRACTOR

SHALL BE RESPONSIBLE FOR COORDINATING WITH PWP'S ELECTRIC SERVICE

PLANNING GROUP TO OBTAIN AN APPROVED SERVICE DESIGN

9.1.2. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING ALL REQUIREMENTS STATED

ON THE PWP SERVICE DESIGN

9.2. CONTRACTOR IS RESPONSIBLE FOR THE PROCUREMENT AND INSTALLATION OF THE

FOLLOWING SERVICE EQUIPMENT

9.2.1. TRANSFORMER VAULT 6'X10'X9'4" JENSEN PRECAST K610-DV112-20466 WITH A

4'X6'6" TRAFFIC RATED VAULT COVER

9.2.2. VAULT LIGHTS, BLOWER, VENTS, AND ASSOCIATED WIRING AND CONDUITS

9.2.3. PRIMARY CONDUITS ON PRIVATE PROPERTY

9.2.4. SECONDARY CONDUITS ON PRIVATE PROPERTY

9.2.5. SWITCHGEAR AND ELECTRICAL PANELS

9.3. PWP SHALL PROVIDE THE FOLLOWING:

9.3.1. TRANSFORMERS LOCATED INSIDE THE UNDERGROUND VAULT

9.3.2. HIGH VOLTAGE CABLES FROM PWP SYSTEM TO TRANSFORMER

9.3.3. SERVICE ENTRANCE CONDUCTORS FROM THE TRANSFORMER TO

SWITCHGEAR

9.3.4. CAMERAS

CONCEPTUAL

DESIGN NOT FOR

CONSTRUCTION

AutoCAD SHX Text

TO PWP

AutoCAD SHX Text

(N) UNDERGROUND UNDERGROUND VAULT 6'X10'

AutoCAD SHX Text P/L

AutoCAD SHX Text

(N) SOLAR AND BATTERY

AutoCAD SHX Text

(N) ELECTRICAL PANEL - AREA B

AutoCAD SHX Text

AUX POWER (LIGHTS, CAMERAS, ETC)

AutoCAD SHX Text

TO EXISTING VAULT

AutoCAD SHX Text

(N) SOLAR AND BATTERY

AutoCAD SHX Text

(N) ELECTRICAL PANEL - AREA A

AutoCAD SHX Text

AUX POWER (LIGHTS, CAMERAS, ETC)

AutoCAD SHX Text

TO PWP

AutoCAD SHX Text P/L

AutoCAD SHX Text

(N) SOLAR AND BATTERY

AutoCAD SHX Text

(N) ELECTRICAL PANEL - AREA C

AutoCAD SHX Text

AUX POWER (LIGHTS, CAMERAS, ETC)

AutoCAD SHX Text

AS BUILT

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

CHKD.

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

CIP:

AutoCAD SHX Text

AutoCAD SHX Text