Design-Build Services for Solar and Energy Storage Installations at Category 1 City-Owned Properties
Solicitation number
2026-RFP-0189
Issued by
Los Angeles County, California

About this file

This file is a conceptual design plot plan and single-line electrical diagram for the Jackie Robinson Community Center solar and energy storage installation project in Pasadena, California, prepared by the City of Pasadena Department of Water and Power (PWP). The project involves the design and installation of solar canopies, battery energy storage systems, electrical infrastructure, and future electric vehicle charging capabilities at the community center located at 1020 N. Fir Oak Avenue in Pasadena. The contractor is responsible for submitting proposals to maximize solar and battery installation while maintaining compliance with federal, state, and local codes, conducting on-site field surveys to verify existing conditions, and designing systems capable of automatic microgrid operation with backup power capabilities during outages. Key specifications include solar canopy structures with a minimum height of 14 feet 6 inches, battery systems with a minimum capacity of 60 kilowatts for 4 hours, installation of three 1-inch conduits to each solar canopy for cameras, IES-compliant parking lot lighting, AV-compliant parking spaces and paths of travel, and infrastructure designed to accommodate future Level 2 EV chargers without additional civil work.

The contractor bears full responsibility for repairing or replacing any existing property or utilities damaged during construction, procuring and installing all service equipment on private property including primary and secondary conduits, switchgear, and electrical panels, and coordinating with PWP's Electric Service Planning Group to obtain approved service designs in accordance with PWP Regulation 21. The main switchgear must include motorized main breaker controls and relaying capable of supporting microgrid operations. PWP will provide transformers located in an underground vault, high voltage cables from the PWP system to the transformer, and service entrance conductors from the transformer to switchgear. The conceptual electrical design is subject to change based on final equipment selection and contractor sizing requirements, and all new electrical service installations must comply with City of Pasadena regulations and PWP requirements.

View the file

Other files

File Type Posted
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#4_Revision).pdf PDF
Solar_and_Energy_Storage_-_09.29.2026.pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties_(Addendum_#2_Revision).pdf PDF
Design-Build_Services_for_Solar_and_Energy_Storage_Installations_at_Category_1_City-Owned_Properties.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement_Place_Holder.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
PWP_Rooftop_Solar_Design_Build_Project.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
FAITHFUL_PERFORMANCE_BOND_FORM_(2).pdf PDF
Allendale_Branch_Library_RFP.pdf PDF
Madison_Parking_Lot_RFP.pdf PDF
Glenarm_Power_Plant-RFP.pdf PDF
Central_Library_RFP.pdf PDF
Washington_Park-public_RFP.pdf PDF
Victory_Park_South_RFP.pdf PDF
San_Rafael_Branch_Library_RFP.pdf PDF
Robinson_Park_and_Recreation_Center_RFP.pdf PDF
Linda_Vista_Branch_Library_RFP.pdf PDF
Lamanda_Park_Branch_Library-public_RFP.pdf PDF
La_Pintoresca_Branch_Library-public_RFP.pdf PDF
Hamilton_Park-public_RFP.pdf PDF
Emergency_FEMA_TC.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
AR_4.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E) BUILDING LOADS

SWITCHGEAR

(N) ELECTRICAL EQUIPMENT

TO BE LOCATED WITHIN

ELECTRICAL ROOM

(E) ELECTRICAL

ROOM

(E) TRANSFORMER

VAULT

FUTURE EV

CHARGING SPACES

(N) CURB CUT FOR ADA PATH

OF TRAVEL FOR FUTURE EV

CHARGERS

(F) EV ELECTRICAL PANEL

(N) CONDUIT AND CABLES

M

M M

M

RE

VIS

ION

S

CIT

Y O

F P

AS

AD

EN

A -

DE

PA

RT

ME

NT

OF

W

AT

ER

AN

D P

OW

ER

JA

C

KI

E

R O

BI

N

SO

N

C O

M M

U N

IT

Y

C

EN

TE

R

N . F

AR

O

AK

S

AV

E.

PA

SA

D

EN

A, C

A

SEAL:

JACKIE ROBINSON COMMUNITY CENTER

CONCEPTUAL

DESIGN

PLOT PLAN

SCALE: NONE

CONCEPTUAL SINGLE LINE DIAGRAM

SCALE: NONE

NOTES:

1. LAYOUT IS CONCEPTUAL. CONTRACTOR SHALL SUBMIT PROPOSAL TO MAXIMIZE

SOLAR AND BATTERIES AT THE SITE WHILE MAINTAINING COMPLIANCE WITH ALL

APPLICABLE FEDERAL, STATE, AND LOCAL CODES.

2. PROPOSED DESIGN MAY DEVIATE FROM CONCEPTUAL DESIGN PROVIDED IT

MEETS THE FOLLOWING REQUIREMENTS:

2.1. SOLAR AND BATTERIES SHALL NOT OFFSET BUILDING METER

2.2. SOLAR AND BATTERIES SHALL BE CAPABLE OF AUTOMATIC MICROGRID

OPERATION AND PROVIDE BACKUP POWER TO THE BUILDING IN CASES OF

A POWER OUTAGE

3. THE CONTRACTOR IS FULLY RESPONSIBLE FOR REPAIRING OR REPLACING ANY

EXISTING PROPERTY OR UTILITIES DAMAGED DURING CONSTRUCTION. ALL

REPAIRS SHALL BE EXECUTED TO A CONDITION EQUAL OR BETTER THAN THE

PRE-CONSTRUCTION CONDITION

4. CONTRACTOR SHALL PERFORM ON-SITE FIELD SURVEY TO VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING WITH DESIGN

5. SOLAR CANOPIES

5.1. MINIMUM HEIGHT OF CARPORT CANOPY SHALL BE 14'-6"

5.2. THERE SHALL BE 3-1" CONDUIT FROM THE SWITCHGEAR TO EACH SOLAR

CANOPY FOR CAMERAS (TOTAL OF 12) - EXACT CAMERA LOCATIONS TO BE

DETERMINED DURING DESIGN PHASE

5.3. CONTRACTOR TO PROVIDE LIGHTING WHICH COMPLIES WITH THE

ILLUMINATING ENGINEERING SOCIETY (IES) - CHAPTER 17 PARKING LOTS

AND PARKING GARAGES

5.4. VERTICAL SUPPORT STRUCTURES SHALL BE PROTECTED FROM

VEHICULAR TRAFFIC

5.5. SOLAR CANOPY AND EQUIPMENT (UNLESS MARKED IN THE CONCEPTUAL

PLOT PLAN) SHALL NOT CAUSE ANY PARKING SPACES TO BE LOST

5.6. 2-1" SPARE CONDUIT SHALL BE RAN TO EACH VERTICAL SUPPORT

6. BATTERY

6.1. DIMENSIONS TO BE PROVIDED BY CONTRACTOR AND SITING TO BE

DETERMINED AT A FUTURE POINT

6.2. PREFERABLE TO HAVE BATTERIES MOUNTED ON SOLAR STRUCTURE

6.3. OTHERWISE PROPOSAL SHALL SPECIFY A BATTERY SYSTEM AT A MINIMUM

OF 60KW, 4 HR

6.4. GROUND MOUNTED BATTERIES SHALL BE PROTECTED WITH A CMU BLOCK

WALL, WALL MOUNTED UNITS SHALL HAVE A PROTECTIVE CAGE

INSTALLED

7. CONTRACTOR TO PROCURE AND INSTALL COMMUNICATIONS CABINET, PAD,

CONDUITS, AND POWER FOR TELECOM

8. PARKING LOT

8.1. CONTRACTOR SHALL ENSURE PARKING SPACES AND PATH OF TRAVEL

ARE COMPLIANT WITH ADA REQUIREMENTS

8.2. CONTRACTOR SHALL ENSURE FUTURE EV CHARGING ADA SPACES AND

PATH OF TRAVEL ARE COMPLIANT WITH ADA REQUIREMENTS

8.3. CONTRACTOR IS RESPONSIBLE FOR PARKING STRIPING

9. EV CHARGERS

9.1. SWITCHGEAR SHALL BE DESIGNED FOR FUTURE LEVEL 2 EV CHARGERS

9.2. CONTRACTOR TO DESIGN AND INSTALL SWITCHGEAR SECTION, CONDUITS,

PULLBOXES, AND CONCRETE PADS TO ALLOW FOR FUTURE EV CHARGER

INSTALLATION WITHOUT ANY ADDITIONAL CIVIL WORK

10.ELECTRIC SERVICE NOTES

10.2. ALL NEW ELECTRICAL SERVICE INSTALLATIONS SHALL COMPLY WITH THE

CITY OF PASADENA WATER AND POWER DEPARTMENT'S ELECTRICAL

SERVICE REQUIREMENTS (REGULATION 21). ONCE AWARDED, THE

CONTRACTOR SHALL SUBMIT PRELIMINARY SERVICE EQUIPMENT

INFORMATION TO PWP FOR ELECTRICAL SERVICE DESIGN. ELECTRICAL

SERVICE INFORMATION ON THIS PAGE IS CONCEPTUAL ONLY AND MAY

CHANGE DEPENDENT ON THE CONTRACTOR EQUIPMENT AND SIZING.

10.2.1. EQUIPMENT LOCATIONS AND DESIGN ARE CONCEPTUAL.

CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH

PWP'S ELECTRIC SERVICE PLANNING GROUP TO OBTAIN AN

APPROVED SERVICE DESIGN

10.2.2. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING ALL

REQUIREMENTS STATED ON THE PWP SERVICE DESIGN

10.3. CONTRACTOR IS RESPONSIBLE FOR THE PROCUREMENT AND

INSTALLATION OF THE FOLLOWING SERVICE EQUIPMENT

10.3.1. PRIMARY CONDUITS ON PRIVATE PROPERTY

10.3.2. SECONDARY CONDUITS ON PRIVATE PROPERTY

10.3.3. SWITCHGEAR AND ELECTRICAL PANELS

10.3.3.1. NEW MAIN SWITCHGEAR SHALL INCLUDE CONTROLS,

MOTORIZED MAIN BREAKER, AND RELAYING CAPABLE OF

AUTOMATICALLY ISLANDING AND SYNCHRONIZING THE

SITE TO SUPPORT MICROGRID OPERATIONS

10.4. PWP SHALL PROVIDE THE FOLLOWING:

10.4.1. TRANSFORMERS LOCATED INSIDE THE UNDERGROUND VAULT

10.4.2. HIGH VOLTAGE CABLES FROM PWP SYSTEM TO TRANSFORMER

10.4.3. SERVICE ENTRANCE CONDUCTORS FROM THE TRANSFORMER TO

SWITCHGEAR

10.4.4. CAMERAS

CONCEPTUAL

DESIGN NOT FOR

CONSTRUCTION

AutoCAD SHX Text

(N) SWITCHGEAR 120/208V 3PH 4W

AutoCAD SHX Text

(N) SOLAR AND BATTERY SWITCHGEAR

AutoCAD SHX Text

(N) EV CHARGER PANEL - 120/208V 3PH 4W

AutoCAD SHX Text

(F) FUTURE EV CHARGERS

AutoCAD SHX Text

(E) BUILDING LOADS - 1200A 120/208V 3PH, 4W

AutoCAD SHX Text

PANEL MAY NEED TO BE REPLACED DUE TO SPACE CONTRAINTS

AutoCAD SHX Text

(E) BUILDING BUILDING LOADS

AutoCAD SHX Text

(N) SOLAR AND BATTERY

AutoCAD SHX Text 200A

AutoCAD SHX Text

MAIN BREAKER MUST BE CAPABLE OF MICROGRID CAPABILITIES

AutoCAD SHX Text

TO PWP

AutoCAD SHX Text

(E) TRANSFORMER ENCLOSURE

AutoCAD SHX Text P/L

AutoCAD SHX Text

AS BUILT

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

CHKD.

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

CIP:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PJO:

Jackie Robinson Community Center-public
Sheets and Views
public
PXL_20260602_215217308
PXL_20260602_215228560
PXL_20260602_215244010
Northwest Neighborhood Center 1973 (1)
SCAN00257
SCAN00256
SCAN00255
SCAN00254
SCAN00253
SCAN00252
SCAN00251
SCAN00250
SCAN00249
SCAN00248
SCAN00247
SCAN00246
SCAN00245
SCAN00244
SCAN00243
SCAN00242
SCAN00241
SCAN00240
SCAN00239
SCAN00238
SCAN00237
SCAN00236
SCAN00235
SCAN00234
SCAN00233
SCAN00232
SCAN00231

File details come from the government source that posted it. Updated .