Quality Assurance Surveillance Plan.docx
DOCX document 112 KB Posted
- Solicitation number
- 36C78625R50086
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for grounds maintenance services at Sacramento Valley National Cemetery. The QASP outlines the systematic methods for monitoring contractor performance across 14 specific performance objectives, including tasks such as installing and adjusting interment markers, maintaining turf and vegetation, cleaning paved areas and structures, managing drainage systems, removing trash, and supporting cemetery ceremonies. The surveillance plan enables the government to assess the contractor's performance through various monitoring techniques including random sampling, 100% inspection, periodic inspection, and customer feedback, with performance thresholds ranging from 90-100% compliance.
The plan is associated with Solicitation Number 36C78625R50086 issued by the Department of Veterans Affairs National Cemetery Administration for grounds maintenance services. Key surveillance methods include daily and monthly inspections by the Contracting Officer's Representative (COR) team and the contractor's foreman, with potential consequences for repeated deficiencies including meetings, quality control updates, Contract Discrepancy Reports (CDR), and potential contractual corrections. The QASP emphasizes a performance management approach that focuses on achieving desired outcomes rather than strictly monitoring compliance processes, giving the contractor flexibility in how work is performed while maintaining high-quality service standards.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ground Maintenance Performance Work Statement
Sacramento Valley National Cemetery
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Sacramento Valley National Cemetery Grounds Maintenance
TABLE OF CONTENTS
| INTRODUCTION | 1 | |
| Purpose | 1 | |
| Performance Management Approach | 1 | |
| Performance Management Strategy | 1 | |
| ROLES AND RESPONSIBILITIES | 2 | |
| The Contracting Officer | 2 | |
| The Contracting Officer’s Technical Representative | 2 | |
| IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS | 2 | |
| METHODOLOGIES TO MONITOR PERFORMANCE | 2 | |
| Surveillance Techniques | 2 | |
| Customer Feedback | 3 | |
| QUALITY ASSURANCE DOCUMENTATION | 3 | |
| The Performance Management Feedback Loop | 3 | |
| Monitoring Forms | 3 | |
| ANALYSIS OF QUALITY ASSURANCE ASSESSMENT | 3 | |
| Determining Performance | 3 | |
| Reporting | 4 | |
| Reviews and Resolution | 4 | |
| TECHNICAL EXHIBIT | 1: SVNC QUALITY ASSURANCE SURVEILLANCE PLAN……………. | 5 |
| TECHNICAL EXHIBIT | 2: SAMPLE QUALITY ASSURANCE MONITORING FORM…………... | 8 |
| TECHNICAL EXHIBIT | 3: CUSTOMER COMPLAINT RECORD……………………………...…… | 9 |
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1 INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Grounds Maintenance Services PWS. This plan sets forth the procedures and guidelines for surveillance that the Pacific District will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the COR to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer's Representative (COR), and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The Contracting Officer’s Representative
The Contracting Officer’s Representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Technical Exhibit 1, “Quality Assurance Surveillance Plan.” Failure to meet the required service or performance level will result in a Contract Discrepancy Report (CDR). The COR will notify the Contractor of any detected non- compliance with the foregoing requirements. The Contractor must take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, must be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Random Sampling, which shall be performed by the COR as the designated inspector.
· 100% Inspection – Each workday, the COR, shall review critical and high priority level work, generate documentation, and enter summary results into the Surveillance Activity Checklist.
· Periodic Inspection – COR typically performs the periodic inspection monthly.
· Customer Complaints – COR addresses immediately.
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or Cemetery Director, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Technical Exhibit 2.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Technical Exhibit 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Technical Exhibits 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 At the end of each contract option year, the COR will prepare a written report for the Contract Analyst/District COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Technical Exhibit 2 and 3), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other government IPT personnel as deemed necessary to discuss performance evaluation. The CO and COR, will define a frequency of in-depth reviews with the contractor, including appropriate self- assessments by the contractor; however, if the need arises, the contractor will meet with the COR, as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis.
· Recommendations for improved efficiency and/or effectiveness
· Issues arising from the performance monitoring processes.
6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR, and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.
TECHNICAL EXHIBIT 1
SVNC Quality Assurance Surveillance Plan ** QASP The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success and may impact payment and/or CPARS.
Performance Objective
| Standard |
| PERFORMANCE THRESHOLD |
Method of Surveillance
SP# 1
The Contractor shall provide a detailed grounds maintenance management plan (GMP) in accordance with PWS 4.1.2.
| The Contractor provided GMP shows detailed daily, weekly, monthly, and annual tasks and is submitted within the first 30 workdays of the contract and updated as necessary. |
| 100% Correction(s) required within one work week to provide acceptable report. |
| Review by COR TEAM. |
SP # 2
The Contractor shall install first interment markers. PWS 5.2.2.
| All first interment grave markers are set within 5 working days of damage to the marker and/or surrounding area. PWS 5.2.2.4. requirements are met. No grave is unmarked at any time. |
| Contractor shall perform/ reperform to ensure the grave is properly marked without delay or deficiency. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Daily inspection of work completed: Joint inspection by Contractor Foreman and COR TEAM. |
SP # 3
The Contractor shall install all replacement interment markers. PWS 5.2.2.
All replacement interment grave markers are set without delay or damage to the marker and/or surrounding area. PWS 5.2.2.9. requirements are met. No grave is unmarked at any time.
Contractor shall perform/ reperform to ensure the grave is properly marked without delay or deficiency. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction.
Daily inspection of work completed: Joint inspection by Contractor Foreman and COR TEAM.
SP # 4
The Contractor shall adjust all interment markers to ensure proper height and alignment. PWS 5.2.2.
All adjusted markers shall result in proper alignment without delay or damage to the marker and/or surrounding area. PWS 5.2.2. requirements are met. No grave is unmarked at any time.
100% Contractor shall perform/ reperform to ensure the grave is properly marked without delay or deficiency. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction.
Daily inspection of work completed: Joint inspection by Contractor Foreman and COR TEAM.
SP # 5
The Contractor restore sunken graves and renovate turf to the proper grade. PWS 5.3.1.
| All turf, including sunken graves are restored and renovated to the proper grade and same soil condition as surrounding graves. Sod is restored and thrives. PWS 5.3.1.6. requirements are met. No grave is unmarked at any time. |
| 90% Contractor shall provide an action plan to bring area into acceptance within one workday with corrections completed as approved by COR. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Monthly inspection of random areas throughout the cemetery by COR Team. |
SP # 6
The Contractor shall maintain turf. PWS 5.4.
| Turf is maintained within proper height for its area PWS 5.4.12.13. Sod is healthy and in good condition 5.4. |
| 90%. Contractor shall provide an action plan to bring area into acceptance within one workday with corrections completed as approved by COR. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| COR TEAM and contractor foreman will perform a joint monthly inspection of random turf areas throughout the cemetery. |
SP # 7
The Contractor shall maintain trees, shrubs, plants, beds, and related non-weed vegetation. PWS 5.5.
| Trees, shrubs, plants, beds, and related non-weed vegetation flourish and do not need to be replaced. They are weed-free with adequate drainage and mulch. They do not show any sign of disease or pests and appear healthy. They are pruned properly and in a timely manner. Fertilizer, soil amendments, and irrigation properly applied. Soil is aerated, and mulches are groomed based on type and area requirements. Storm damage is promptly cleared. PWS 5.5. requirements are met. |
| Contractor shall perform/ reperform to bring area into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| COR TEAM and contractor foreman will perform a joint monthly inspection of random turf areas throughout the cemetery. |
SP # 8
The Contractor shall maintain lakes, ponds, drainage, and storm water systems. PWS 5.7. – 5.8.
| Water storage and drainage systems are cleared of trash and operating optimally. No standing water is observable on markers, roads, or other areas. PWS 5.7.1.1.1. requirements are met. |
| Contractor shall perform/ reperform to bring area(s) into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Monthly inspection by Contractor Foreman and COR Team of random water features throughout the cemetery and 100% inspection following storms and/or flooding. |
SP # 9
The Contractor shall clean remove trash, including floral arrangements and unauthorized grave adornments. PWS 5.9.
| Trash and debris are removed promptly ensuring the national cemetery is free of clutter and unauthorized items contrary to operations. PWS 5.9.1. requirements are met. |
| Contractor shall perform/ reperform to bring area(s) into acceptance the same day. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Weekly inspection of burial areas throughout the cemetery by the Contractor Foreman and COR Team. |
SP #10
The Contractor shall clean paved areas. PWS 5.10.
| All paved areas are clean and groomed. Ongoing maintenance of areas is apparent and there is no evidence of dirt build-up. PWS 5.10. requirements are met. |
| 95% Contractor shall perform/ reperform to bring area(s) into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Monthly inspection by Contractor Foreman and COR Team of random paved features throughout the cemetery. |
SP # 11
The Contractor shall perform structure cleaning and light maintenance. PWS 5.11.
| National Cemetery structures, monuments, and included elements are clean and function properly. PWS 5.11. requirements are met. |
| Contractor shall provide an action plan to bring area into acceptance within one workday with corrections completed as approved by COR. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Monthly inspection by Contractor Foreman and COR Team. Customer complaints shall not exceed three (3) per month. |
SP # 12
The Contractor shall clean Assembly Area/Rostrum Structure. 5.11.8.
| National Cemetery Assembly Area/Rostrum Structure will be pressure washed 3 times a year (one week prior to Memorial Day, Veterans Day, and a third time as directed by COR. 5.11.8.1. |
| Contractor shall perform/ reperform to bring area(s) into acceptance the same day. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Inspection for cleanliness by COR Team. |
SP # 13
The Contractor shall support ceremonies and portable restroom requirements. PWS 5.12.2.7.
Contractor shall supply six (6) portable restrooms for Memorial Day, Veterans Day and Wreaths Across America Ceremonies with a minimum of two (2) restrooms being handicapped accessible, and two handwashing stations. Set up restrooms in locations as approved by the COR.
| 100% Contractor shall perform/ reperform to bring area(s) into acceptance the same day. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. |
| Review by COR TEAM. |
SP # 14
The Contractor shall provide deliverables in accordance with PWS requirements and ATTACHMENT G.
| Reports are submitted on time and provide the contracted details. |
| Information is detailed and provides relevant/ actionable data for planning and quality assurance. Correction and resubmittal within 10 workdays is allowable, however tasks requiring prior approval may not proceed. |
| Review by COR TEAM. |
TECHNICAL EXHIBIT 2:
SAMPLE QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: %
| Service Provider’s Performance (Check): | Meets Standards | |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: DATE:
TECHINICAL EXHIBIT 3:
CUSTOMER COMPLAINT RECORD
| CUSTOMER COMPLAINT RECORD |
| DATE OF COMPLAINT |
SOURCE OF COMPLAINT
| ORGANIZATION |
| BUILDING/SECTION |
| INDIVIDUAL |
| PHONE NUMBER |
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
File details come from the government source that posted it. Updated .