These are record irrigation drawings for the Sacramento Valley National Cemetery Phase 2 Development project located at 5810 Midway Road, Dixon, California 95620. The drawings were prepared by Anderson Engineering of MN, LLC in coordination with Aqua Engineering and issued September 21, 2021, based on contractor-provided information. The document comprises multiple irrigation plan sheets (LI101-LI113) detailing the complete irrigation system design for the cemetery expansion.
The irrigation system design includes PVC mainlines, laterals, and control components distributed across five detailed plan sheets covering different sections of the property. Key features include multiple irrigation controllers with varying capacities (ranging from 16 to 56 stations), pop-up rotor sprinklers at 45 and 50 PSI, rain bird spray heads, quick coupling valves, isolation gate valves, and remote control valves. Pipe sizes range from 1.25 inches to 10 inches, with specific flow rates and specifications noted throughout. The system incorporates existing irrigation infrastructure (PPC and IGC zones) while integrating new master controllers, valve stations, and distribution lines. Demolition notes indicate removal of existing sprinklers, lateral pipe, and mainline components in specific areas. The drawings include a legend identifying all valve types, sprinkler models, and flow specifications, with flag notes providing additional installation requirements and clarifications for contractors implementing the irrigation system.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI001R
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION COVER SHEET
GENERAL DESCRIPTION
GENERAL NOTES
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
FLAG NOTES
DEMOLITION FLAG NOTES
D1
D2
D3
D4
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
MIDWAY ROAD
45PPC
EX. 20
IGC
SIERRA NEVADA DR.
MIDWAY ROAD
45PPC
EX. 20
IGC
SIERRA NEVADA DR.
NEW
MASTER
NEW LOCATION
FOR ET GAUGE,
MOVE FROM
OLD LOCATION
6"
6"
6" 6"
6"
6"
6"
1.25"
3"
2.5"
2"
1.25"
2"
1.25"
3"
2.5"
2"
1.25"
2.5"
2.5"
2"
3"1.25" 2.5"
2"
1.25"
3"2.5"
2.5" 2"
1.25"
1.25"
3"
2" 2"
2"
1.25"
1.25"
1.25"
1.25"
1.25"
3"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
1.25"
2"
1.5"
1.25"
1.25"
2"
1.25" 1.25"
2"
1.25"
2.5"
2"
1.25"
2.5"
2.5"
3"
1.25"
1.5" 2.5"
1.25"
1.25"
1.5" 2"
2"
2.5"1.25"
3"
6"
6"
1.5"
2"
2"
1.5"
1.5" 1.25"
1.25"
TYP
IF ADD ALT #2 NOT ACCEPTED: WITHIN THE BOUNDARY
INDICATED INSTALL MAINLINE AND REMOTE CONTROL
VALVES AS SHOWN. STUB OUT VALVES DOWNSTREAM
OF OUTLET.
ADD TWO 2-INCH REMOTE CONTROL VALVE WITH
SHORT RADIUS ROTOR SPRINKLERS TO IRRIGATE SOD
ALONG ROADWAY IF ADD ALTERNATE #2 IS NOT
ACCEPTED.
ADD ALTERNATE #2 BOUNDARY
2.5"
1.25"
1.5"
3"
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF THE
PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO PLANTING BEDS.
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF
THE PLANTING BED FOR CLARITY ONLY.
2"
1.5"
2" 1.25"
1.25"
1.25"
1.25"
1.25"
RB 5000 MPR-25 THIS
AREA
PPC
IGC
SITE CONSTRUCTION LIMIT
J
ET
Q
Q
Q
J-27
1.5"
J-26
2"
J-21
2"
J-22
1"
J-23
2"
J-40
J-41
2"
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5 .5
.5 .5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5.5 .5.5
.5
.5 .5 .5 .5
.5.5.5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5.5.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
J-24
1"
J-25
2"
.5
J-19
2"
J-18
2"
J-20
1.5"
Q
J-44
1"
J-45
1"
J-42
2"
J-43
2"
Q
Q
.5 .5 .5
.5
D
G
G
G S
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q 25
Q 25
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q25
Q
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI101
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 1
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
0 30' 60'
SERVICE ROADSERVICE ROAD
NEW CENTRAL
CONTROL COMPUTER LOCATED IN MAP ROOM
CONTROL WIRE
SITE CONSTRUCTION LIMIT
CC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI102
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 2
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
LA
KE
BE
RR
YE
SS
A D
RIV
E
JE
PS
ON
PR
AIR
IE
DR
SERVICE ROAD PUTAH
IGC
IGC
COLUMBARIUM3
44PPC
SIERRA NEVADA DR.
CREEK WAY
LA
KE
BE
RR
YE
SS
A D
RIV
E
JE
PS
ON
PR
AIR
IE
DR
SERVICE ROAD PUTAH
IGC
IGC
COLUMBARIUM3
44PPC
SIERRA NEVADA DR.
CREEK WAY
NEW
MASTER
CONTROLLER
118VAC, 5.8 AMP
4"
6"
6"
6"
6"
6"
6"
6"
6"
2.5"
2"
1.25"
1.25"
1.25"
1.25"
1.25"
1.25"
1.25"
2.5"
2.5"
2"
3"
2"
1.25"
1.25"
2.5" 2"
1.25"
1.25"
1.25" 1.25"
3"
2.5"
2"
1.25"
3"
2"
1.25"
1.25"
1.25"
2" 1.25"
3"
2.5"
1.25"
2"
1.5"
3"2.5"
2" 1.25"1.25"1.25"
2"
2"
1.5"1.25" 1.25"
1.25"
1.25"
2"1.25"
1.25"1.25"
1.5"
3"
3"
2" 2"
1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
2"
1.25"
2" 2"
1.5"
1.25"
1.25"
2" 2.5"
1.5"
2.5"
1.5"
1.5"
1.25" 1.25"
1.25"
1.25"
1.25"
3" 2.5"
3"
1.25"
2"
2"
6"
4"
4"
1.25"
1.5"
3"
3"
3"
TYP
TYP
IF ADD ALT #1 NOT ACCEPTED: WITHIN THE BOUNDARY
INDICATED INSTALL MAINLINE, REMOTE CONTROL
VALVES, AND DECODER CABLE AS SHOWN. STUB OUT
VALVES DOWNSTREAM OF OUTLET.
ADD ONE 2-INCH REMOTE CONTROL VALVE WITH
SHORT RADIUS ROTOR SPRINKLERS TO IRRIGATE THE
TURF IF ADD ALTERNATE #1 IS NOT ACCEPTED.
8 8 8
2" 1.5"
1.5"
1.25" 1.25"
2"
1.5"
1.5"1.25"
1.25"
2"1.5"
1.25"
2.5"
2.5"
2.5"
1.25"2"
2" 1.5"1.5"
1.25"
1.5" 1.5"
1.25"
1.25"
2"1.5"
1.25"
2"
1.5"
1.5"
1.5"
1.5"
2.5"
2"
1.25"
2"
1.25"
3"
3" 2"
2"
1.25"
3"3"
3"
2"
1.5"
2.5"
1.5"
2"
2.5"
1.25"
3"
1.25"
1.25"
1.25"
1.25"
2"
2.5"
2"
1.25"
1.25"
1.25"
3"
3"
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF
THE PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO
PLANTING BEDS.
6"
6"
6"
6"
6"
6"
6"
6"
1.5"1.25"1.25"
1.5"
1.5"
1.25"
1.25"
1.25"
1.25"
2"
1.25"
1.25"
1.25"
1.25"
1.25"
1.5"
2.5"
2"
1.5"
1.25"
1.25"
1.5"
1.25"
1.25"
1.5"
1.25"
IGC
IGC
IGC
PPC
1.25"
1.25"
1.25"
2.5"
3"
1.5"2" 2"
1.25"
1.25"
8'
8'
3"
2.5"1.25" 1.25"3"
2.5"
2.5"
2.5"
2"
2" 1.25"
3"
3" 3"
3"
3" 3"
3"
3"
J
ET
Q
Q
Q
20 20
J-31
2"
J-28
2"
J-29
2"
J-30
1"
-J-38
2"
J-37
2"
J-39
2"
J-40
2"
J-41
2"
20 20
10 10 10
20 20 20
10 10
10 20
.5 .5 .5 .5
.5 .5 .5 .5 .5
.5 .5 .5
.5.5.5
.5 .5 .5
.5
.5
.5 .5
.5 .5
.5 .5 .5 .5
.5 .5 .5
.5 .5
.5 .5
.5 .5 .5
.5 .5
.5 .5.5
.5.5.5
.5 .5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5 .5
.5
.5
.5 .5
.5.5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5.5.5.5 .5 .5 .5 .5 .5 .5
.5.5.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5.5 .5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5 .5 .5 .5
.5
.5.5.5.5.5.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5 .5.5
.5 .5
.5 .5.5
.5.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5 .5 .5 .5 .5
.5.5.5.5.5.5.5.5.5
.5 .5 .5 .5 .5 .5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5.5
.5 .5
.5 .5
.5
.5.5 .5 .5.5
.5.5
.5.5 .5
.5 .5
.5 .5
.5
.5
.5 .5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5 .5
.5
.5 .5 .5
.5
.5 .5
.5 .5 .5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
J-36
1.5"
J-12
2"
J-11
2"
J-8
1.5"
J-6
1.5"
J-3
1.5"
J-48
1.5"
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
J-34
1"
J-35
1"
J-13
1.5"
- J-9
1"
J-7
1.5"
J-2
1.5"
J-49
1"
J-17
2"
- J-16
2"
J-15
2"
J-14
2"
Q
K-10
1"
Q
Q
Q
Q Q
Q
Q
J-52
2"
J-51
2"
J-50
1.5"
J-63
2"
J-62
2"
J-61
2"
J-60
2"
.5 .5
.5.5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5 .5 .5 .5 .5 .5 .5 .5 .5
.5.5
.5
.5
.5 .5
.5 .5
.5.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5 .5
.5
.5
.5
.5
10 10 10 20 10 10
10 10
10 10
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
J-1
1"
J-4
1"
.5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
J-47
1.5"
.5
.5 .5
.5
.5
.5
.5
.5 .5 .5
.5
J-46
1"
J-5
1.5"
.5
D
D
D
G
G
G
G
G G
.5
.5 .5
.5
.5
.5
Q G
J-53
2"
J-54
2"
J-55
2"
J-56
1.5"
- J-57
1"
J-58
1.5"
J-59
1"
QG
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI103
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 3
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
EX.
POND
(1.2 ac.)
BERRYESSA
PPC
PPC
A
N O
LAKE
DRIVE
EX.
POND
(1.2 ac.)
BERRYESSA
PPC
PPC
LAKE
56.0000
57.4870
2"
1.25"
1.25"
3"
2.5"
2"
1.5"
2.5"
2"
1.25"
2.5"
2" 1.25"
3" 2.5"
2"
1.25"
1.25" 1.25"
1.25"
3"
2.5"
2" 1.25"
2.5"
2.5"
2"
1.25"
2.5" 2"
1.25"
2"
1.5"
3"
3"
2.5"
2"
1.5"
2"
1.5"
1.5"
1.25"
3"
2"
3"
2.5"
2"
1.5"
2.5"
2"
2"
1.25"
3"
2.5"
2"
1.25"
2.5"
2"
2"
1.25" 1.25"
3"
2"
2"
1.25"
2"
1.25"
3"
1.25"
2.5" 2"
1.25"
2.5"
2"
1.25" 1.25"
1.25"
3"2.5"
1.25"
2"
1.25"
2.5"
1.25" 2"
1.25"
1.25" 2"
2"
1.25"
2"
1.25"
1.25"
2.5"
2"
1.5"
2"
3"
3"
3"
3"
1.25"
2.5"
3"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
1.25"
1.25"
1.25"
2"
2"
1.5"
1.5"
3"
2.5"
2.5"
2"
1.25"
4"
4" 4"
4" 4"
4"
4"
4"
4"
4"
4"
2"
1.5"
2"
1.5"1.5"
1.25"1.25"
1.5"
1.25"
15' TURF STRIP &
SPRAY HEADS
15' TURF STRIP &
SPRAY HEADS
PPC
PPC
.5
.5
.5
.5
20 20
20 20 20
.5 .5
.5 .5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5 .5 .5
.5 .5
.5
.5 .5
.5
.5.5
.5.5 .5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5 .5.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5.5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5 .5
.5
J-72
2"
J-71
2"
J-70
1"
J-69
1"
J-66
2"
J-65
2"
J-64
2"
J-68
2"
J-67
1.5"
J-73
2"
J-74
2"
J-75
2"
- J-78
2"
J-77
2"
J-76
2"
J-80
1.5"
J-79
1"
- J-81
1"
J-82
2"
J-83
2"
J-84
1.5"
Q
Q
Q
Q
Q
K-2
1.5"
K-1
1.5"
.5
.5 .5 .5 .5
.5 .5 .5 .5 .5 .5
.5 .5
.5.5 .5
.5.5 .5
.5.5 .5
.5 .5 .5 .5
.5 .5 .5 .5
.5 .5 .5 .5
.5 .5 .5 .5
.5 .5
.5.5.5 .5 .5
.5 .5.5
.5
.5 .5
.5 .5
.5.5
.5 .5 .5
.5
.5 .5
.5
G
G
G
G
G
.5 .5
.5 .5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI104
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 4
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
ROAD A
37IGC
IGC
IGC
33A
34PPC
33B
S
O
L
D
R
I
V
E
S
O
L
I
V
E
SOLANO DRIVE
ROAD A
37IGC
IGC
IGC
33A
34PPC
33B
S
O
L
I
V
E
S
O
L
I
V
E
SOLANO
10"
10"
10"
3"
3"
4"
10"
3"
3"
3"
3"
2"
2"
2"
1.25"
3"
2.5"
3"
2"
1.25"
1.25"
2.5"
1.25"
1.25"
1.25"
3"
1.25"
2"
1.25"
2.5" 3"
1.25"
2"
3"
10"
2.5"
2"
2"
1.25"
2.5"
2" 1.25"
2.5"
2.5"
1.25"
2"
1.25"
3"2"
1.25"
2"
1.25"
1.25"
1.25"
10"
10"
10"
1.25"
1.25"
1.25"
10"
TYP
TYP
3" 2.5" 2"
2"
1.25"
2.5"
2"
3"
2.5"
2"
3"
2.5"
2"
1.25"
2.5"
2"
1.25" 1.5"
1.25"
1.5" 1.25"
1.25"
1.5"1.5" 1.25"
1.25"
2"
1.25"
1.25"
2"
3"
2.5"
10"
6"
6"
6"
3"
3"
3"
2"1.5" 1.25"
1.5" 1.25"1.25"
4"
4" 4"
4"
4"
4"
4"
2"
1.25"
1.25"
1.25"
1.25"
2.5"
2" 1.5"
1.25"
1.25"
2"
2"
1.5" 1.5"
1.25"
1.25"
2"
2"
2" 2"
2"
1.5"
1.5"
1.5"
1.5"
2"
1.5"
1.5"
1.25"
1.25"
2.5" 1.5"
2"
1.5"
1.25"
3"
2.5"2.5"
2"
1.25"
1.25"
2.5"
1.25" 2"
1.25"
3"
2" 2"
1.25"
1.25"
RB 5000 MPR-25 THIS
AREA
PPC
IGC 36
IGC 35
IGC
33A 33B
1.5"
1.5"
1.25"
2"
1.5"
1.25"
1.25"
1.5"1.25"
Q
20 20
Q
K-8
2"
K-7
2"
K-6
2"
K-5
2"
K-15
2"
-K-14
2"
K-13
2"
K-12
2"
K-11
2"
K-10
2"
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5 .5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5 .5.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5.5 .5
.5
.5 .5 .5
.5
.5 .5
.5
.5.5
.5
.5.5
.5 .5
.5.5 .5
.5 .5
.5
.5
.5
.5.5
.5
.5
.5.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
30 30
Q
J-93
1"
J-94
1"
J-95
1"
J-96
1"
.5
Q
Q
Q
Q
Q
K 5
J-87
2"
J-86
2"
J-85
2"
- J-92
2"
J-91
2"
J-90
2"
J-88
2"
J-89
1.5"
Q
Q
K-3
1.5"
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5.5
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5 .5
.5 .5
.5 .5 .5
.5
.5
.5
.5 .5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5 .5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
1010101010
10 10 10 10 10 10 10 10
101010
101010
10 10 10
10 10
101010101020
101010102020
K-16
1.5"
-K-9
1.5"
K-17
1.5"
K-4
1.5"
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5 .5 .5
.5 .5.5
D
D
D
D
G
G
G
G
G
S
K-18
1"
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5.5 .5
.5 .5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
Q
Q
Q
Q 25 Q
Q
Q
Q
Q
Q
Q
Q
1"1" 1"
1"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI105
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 5
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
| P-SACVAL2-RD-LI001R |
| Sheets and Views |
| LI001R |
| P-SACVAL2-RD-LI101 |
| Sheets and Views |
| LI101 |
| P-SACVAL2-RD-LI102 |
| Sheets and Views |
| LI102 |
| P-SACVAL2-RD-LI103 |
| Sheets and Views |
| LI103 |
| P-SACVAL2-RD-LI104 |
| Sheets and Views |
| LI104 |
| P-SACVAL2-RD-LI105 |
| Sheets and Views |
| LI105 |
File details come from the government source that posted it. Updated .