The file is a Dignity Clause document detailing specific protocols for contractor personnel working in national cemeteries, specifically focused on respectful handling of headstones, markers, and gravesites. The clause mandates that all contractor activities must be performed with utmost care, reverence, and dignity, recognizing the cemetery as a memorial to service members and veterans.
Key requirements include strict prohibitions against walking, standing, leaning, sitting, or driving on headstones and markers, as well as preventing any tools or equipment from being placed on these markers. Contractors are responsible for immediately reporting any damage to remains, burial containers, or markers to the Contracting Officer's Representative (COR), Director, or Contracting Officer. Additionally, contractors must ensure all employees sign a compliance statement acknowledging these guidelines before beginning work, with the specific context being grounds maintenance services for the Sacramento Valley National Cemetery under a Department of Veterans Affairs National Cemetery Administration solicitation (Solicitation Number: 36C78625R50086).
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIGNITY CLAUSE
Respect for Headstones and Markers in National Cemeteries, Handling of Markers and Headstones
1. Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them.
b. No tools, equipment or other items will be placed or leaned on headstones or markers.
c. Use care not to scratch or damage markers in any manner.
d. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.
e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (e.g., casket or urn), or outer burial container, the contractor must contact the COR, Director/Assistant Director, or Contracting Officer (CO) for guidance.
2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, or CO for guidance or resolution.
3. The contractor is required to discuss the guidance with employees and/or subcontractors and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.