0010 Phase II As Builts 3.pdf
PDF 5 MB Posted
- Solicitation number
- 36C78625R50086
About this file
This file contains record drawings for irrigation plan pages 9-11 of the Sacramento Valley National Cemetery Phase 2 Development project located at 5810 Midway Road, Dixon, California. The drawings were prepared by Anderson Engineering of Minnesota, LLC (Project Manager: Michael Brandvold) with geotechnical engineering by Terracon Consultants, Inc., and approved by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management. The drawings are dated June 27, 2018, with record drawing issuance on September 21, 2021, and are certified by John D. Leonard, a Certified Irrigation Designer with the Irrigation Association (CID #46102).
The irrigation plans detail the sprinkler and bubbler system layout across multiple cemetery sections (Solano Committal Shelter Road and Sutter areas), specifying valve locations, line sizes ranging from 1 inch to 10 inches in diameter, and irrigation zones designated by letters (D, G, Q, F, H). Key features include spray zones, drip irrigation, and bubbler installations in planting beds with valve locations noted as being at least 2 feet into planting beds. The plans indicate existing infrastructure to remain (marked as "EX."), areas with existing bubbler systems requiring modification, and contractor responsibilities for repairing or replacing broken irrigation equipment on haul routes. A controller relocation to a new position with traffic-rated concrete box installation is also specified, along with power and communication cable routing requirements beneath hardscape in separate sleeves.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMITTAL SHELTER ROAD
SOLANO
SUTTER
IGC
DRIVE
BUTTE
COMMITTAL SHELTER ROAD
SOLANO
SUTTER
IGC
DRIVE
BUTTE
4"
10"
10"
10"
10"10"
10"
4"
4"
4"
4"
2.5" 1.25"
1.25"
1.25"
2" 1.25"
1.5"
3"
2.5"
2"
1.25"
1.25"
2.5"
2.5"
2"
1.25"
1.25"
2"
1.25"
2.5"
2"
2"
1.25" 1.25"
2" 1.25"
2.5"
1.25"
2" 1.5"
1.25"
2"
2"
1.5"
1.25"
1.25"
1.25"
1.25"
1.25"
1.5" 1.5"
1.25"
2"
2"
2"
1.25"
1.25" 1.5"
1.25"
1.25"
1.5" 1.5"
1.25" 1.5"
1.25"
1.25" 1.5"
1.25"
1.25"
1.25"
3"
2.5"
2"
4"
4"
10"
10"
2.5"
1.5"
2"
1.5"
1.5"
1.5"
1.25"
1.25"
1.25"
1.25"
TYP
TYP
3"
2.5"
1.25"
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF THE
PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO PLANTING BEDS.
1.25"
1.25"
1.25"
1.25"
1.25"
1.25"
1.25"
2"
1.25"
1.5"
1.25"
1.5" 1.25"
2"
1.5" 1.25"
1.25"
1.25"
2.5"
1.25"
2.5"2"
1.25"
1.25"
PPC
1.5"
1.5"
1.5" 1.25"
1.25"
2"
3" 2.5"1.25"
2"
1.5"
2"
1.25"
1.25"
1.25"
1.25"
1.25"1.25"
1.25"
1.5"
1.25"
3"
2.5"
4"
4"
.5
.5 .5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
2"
- .5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5 .5 .5 .5 .5
.5 .5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5.5
.5
.5 .5
.5
.5
.5 .5
.5.5
.5.5.5 .5
.5
.5 .5 .5
.5
.5
.5 .5 .5
.5
.5
K-18
1"
K-20
1.5"
K-72
2"
K-71
2"
K-70
1.5"
-K-69
1.5"
Q
.5
.5 1.5"
-2"
.5
.5 .5
.5 .5
.5 .5.5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5.5 .5
.5.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5.5
.5
.5
.5
.5
.5
.5
.5.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5 .5
.5.5
.5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5.5
.5.5
.5
.5
.5
.5
.5
.5
.5.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5.5 .5
.5
K-66
2"
303030
20 30
30 30
30 30
30 30
10 10 20
20 20
K-65
1.5"
K-19
1.5"
K-73
2"
Q
Q
Q
Q
Q
.5 .5.5 .5 .5 .5
.5
.5 .5
10 10 20 20
.5
.5 .5
.5 .5 .5 .5 .5
1020201010
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5
202020
202020
30 30
K-74
1.5"
20 20
D
D
G
G
G
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5.5
.5.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5 .5 .5.5
.5.5
.5 .5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
K-67
2"
K-68
2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI109
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 9
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
0 30' 60'
SO
LA
NO
D
RI
VE
MIDWAY ROAD
EX. 1
PPC
EX. 2
PPC
SO
LA
NO
D
RI
VE
MIDWAY ROAD
EX. 1
PPC
EX. 2
PPC
10"
10"
8" 8"
10"
10"
6"
10"
10"
10"
10"
10"
1.25"
ENTRY PLANTER TO REMAIN
SPRAY ZONE DUE TO PLANTING
DENSITY
1.25"
2"
1.5"
1.5"
1.25"
1.25"
1.25"
1.25"
1.25"
1.5" 2"
2"
2.5"
2.5"
CURRENTLY IRRIGATED WITH
BUBBLERSCURRENTLY IRRIGATED WITH
BUBBLERS
2"
2"
2" 1.5" 1.5"
1.25"
2"
2.5"
2"
1.25"
EX. 2
PPC
EX. 1
PPC
D
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5.5
.5.5
.5.5 .5
.5
.5.5
.5
.5.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5.5
.5 .5
.5
.5.5
.5
.5.5.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5.5
.5.5
.5 .5
.5 .5.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5.5.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5.5.5.5
.5 .5.5
.5.5
.5
.5
.5 .5.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5.5
.5.5
.5 .5
.5.5.5 .5
.5
.5 .5
.5
.5 .5
.5.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
20 20
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
1"
1.5"
1"
1.5"
1"
1.5"
1.5"
20 20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI110
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 10
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
CENTRAL
VALLEY
W
AY
EX. 3
PPC
EX. 9
IGC
EX. 10
IGC
CENTRAL
VALLEY
W
AY
EX. 3
PPC
EX. 9
IGC
EX. 10
IGC
EXISTING
CENTRAL
CONTROL
COMPUTER
LOCATION
10"
10"
10"
10"
6"
6"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
6"
6"
3"
10"
10"
10"
10"
10"
10"
10"
10"
PLANTERS BEHIND
COLUMBARIUM TO REMAIN
SPRAY ZONES DUE TO PLANTING
DENSITY
PLANTERS BEHIND
COLUMBARIUM TO REMAIN
SPRAY ZONES DUE TO PLANTING
DENSITY
AREA AROUND BUILDING
TO REMAIN SPRAY ZONES
DUE TO PLANTING
DENSITY
THIS AREA TO REMAIN SPRAY
ZONES DUE TO PLANTING
DENSITY
THIS AREA TO BE CONVERTED
FROM ROTOR SPRINKLERS TO
INDIVIDUAL BUBBLERS FOR
TREES AND SHRUBS
THIS AREA TO BE CONVERTED
FROM ROTOR SPRINKLERS TO
INDIVIDUAL BUBBLERS FOR
TREES AND SHRUBS
1.5"
1.25"
1.5" 1.25"
1.25"
1.25"
1.25"
1.25"
1.25"
1.25"
1.5"
1.25" 1.25"
1.25"
1.5" 2"
1.25"
1.25" 1.5"
1.5"
1.5"
10"
1.25"
1.25"
1.5"
1.5"
1.25"
1.25"
1.25"
2"
1.5"
1.5"
2"
2" 1.5"
1.25"1.25"
1.25"
1.25"
2.5"
2" 1.25"
1.25"
1.5" 1.25"
1.25"
2" 1.5"
1.5" 1.25"
1.25"
1.25" 1.25"
EX. 3
PPC
EX. 10
IGC
EX. 9
IGC
CONTRACTOR RESPONSIBLE
REPAIR OR REPLACE ANY
BROKEN IRRIGATION
EQUIPMENT ON HAUL ROUTE
E
CC
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5 .5
.5 .5 .5
.5 .5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5.5 .5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5 .5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5
10 10
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
1.5"
10 10
10 10
.5
.5
.5 .5 .5
.5
.5
.5 .5
.5
.5 .5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5.5
.5
.5
.5
.5
.5
.5
.5.5
.5
1.5"
10 10
1.5"
1"
1.5"
1"
1"
1.5"
1"
1"
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5 .5
10 1010
.5
.5
.5
20 20
1"
10"
10"
10"
RELOCATE CONTROLLER E TO
LOCATION INDICATED.
EXCAVATE AND EXPOSE EXISTING 10-INCH
MAINLINE AT ELBOW AND WIRE SLEEVES
SHOWN. EXPOSE 3-FEET OF POWER AND
CONTROL CABLES ALSO. SPLICE POWER AND
COMMUNICATION IN TRAFFIC RATED
CONCRETE BOX WITH STEEL LID.ROUTE
POWER WIRE AND SLEEVES UNDER
HARDSCAPE IN SEPARATE SLEEVES. ROUTE
POWER WIRE AND CONTROL WIRE WITH
MAINLINE TRENCH AS INDICATED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI111
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 11
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
| P-SACVAL2-RD-LI109 |
| Sheets and Views |
| LI109 |
| P-SACVAL2-RD-LI110 |
| Sheets and Views |
| LI110 |
| P-SACVAL2-RD-LI111 |
| Sheets and Views |
| LI111 |
File details come from the government source that posted it. Updated .