These are record drawings for the Sacramento Valley National Cemetery Phase 2 Development project located at 5810 Midway Road, Dixon, California 95620. The drawings were prepared as of June 27, 2018, and issued on September 21, 2021. The project involves irrigation system design and installation across multiple planting areas designated as existing (EX.) sections with varying soil and drainage conditions (IGC for In-Ground Conditions and PPC for Previously Placed Cover).
The irrigation plans detail comprehensive water distribution systems including mainline pipes ranging from 6 to 12 inches in diameter, lateral lines from 1 to 3 inches, and valve assemblies with specific head spacing measurements (ranging from 10 to 30 feet between irrigation heads). Key features include remote control valve relocations, new 10-inch PVC mainline pipe installation, isolation gate valves, and control wire splicing in traffic-rated concrete boxes. The project involves excavation and exposure of existing 10-inch mainlines, removal of obsolete underground piping, and installation of new irrigation infrastructure across multiple planting beds designated EX. 4 through EX. 31. The design was prepared by Anderson Engineering of Minnesota, LLC, with irrigation design by Aqua Engineering under the direction of Project Manager Michael Brandvold and Project Director Robert Holmer. The U.S. Department of Veterans Affairs Office of Construction and Facilities Management oversaw the project development.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIERRA NEVADA DRIVE
DE
LT
A W
AY
MIDWAY ROAD
SIERRA NEVADA DR.
EX. 19
IGC
EX. 16
IGC
EX. 18
TG
EX. 14
IGC
EX. 4
TG
EX. 15
IGC
EX. 21
IGC
EX. 17
IGC
SIERRA NEVADA DRIVE
DE
LT
A W
AY
MIDWAY ROAD
SIERRA NEVADA DR.
EX. 19
IGC
EX. 16
IGC
EX. 18
TG
EX. 14
IGC
EX. 4
TG
EX. 15
IGC
EX. 21
IGC
EX. 17
IGC
1"
3"
6"
6"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10" 10"
10"
10"
8" 10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
10"
8" 8"
6"
6"
6"
10"
1.25"
1.5"
1.25"
1.25"1.25" 1.5"
1.5"
1.5"1.25"
1.25"
2"1.5"
1.25"
1.25" 1.25"
2"
1.25"
1.25"
1.5"
1.5"
1.25"
1.25"
1.25"
1.25"
1.5"
1.5"
2"1.5"
1.25" 1.25"
1.25"
1.25"
2"
2" 1.5"
1.25"
2"
2"
1.25"
2"
1.25"
2" 2"1.5"
1.25"
2"
1.5"1.25"
1.25" 1.25"
1.5"
1.5"
1.25"
1.25"
EX. 21
EX. 20
IGC
EX. 19
IGC
EX. 18
TG
EX. 17
IGC
EX. 18
IGC
EX. 4
TG
EX. 15
IGC
EX. 14
IGC
.5.5 .5
.5
.5
.5
AA
B
C
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5 .5
.5
.5
.5
.5.5
.5 .5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5 .5.5
.5 .5
.5 .5
.5.5 .5.5
.5 .5
.5 .5.5.5
.5 .5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5.5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5.5
.5
.5
.5 .5
.5 .5.5
.5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5.5
.5
.5 .5
.5
.5
.5
.5
.5.5
.5 .5
.5 .5.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5.5
.5 .5
.5
.5
.5.5 .5 .5 .5 .5
.5
.5.5
.5
.5
.5.5
.5
.5
.5
.5 .5
.5
.5 .5
.5.5 .5
.5.5
.5.5.5 .5.5
.5.5 .5 .5.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5.5.5
.5 .5.5.5 .5.5 .5
.5 .5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5.5
.5.5 .5
.5 .5.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5
.5.5
.5 .5
.5
.5 .5 .5
.5 .5
.5 .5
.5 .5.5
.5 .5
.5 .5
.5.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.25
.25
.25 .25
.25
.25
.25
.25
.25
.25
.25
.25
.25
.25
.25
.25
.5
.5
.5
1.5"
1.5"
1"
1"
1"
1.5"
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5
.5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI106
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 6
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
LEGEND
Q
2"
F
H
Q
F
H
Q
F
H
Q
0 30' 60'
SI
ER
RA
N
EV
AD
A
DR
IV
E
DE
LT
A W
AY
SIERRA NEVADA DR.
EX. 22
IGC
EX. 24
IGC
EX. 23
PPC
EX. 25
PPC
EX. 27
PPC
EX. 26
PPC
EX. 12
PPC
EX. 11
IGC
EX. 13
PPC
EX. 21
IGC
WAY
SI
ER
RA
N
EV
AD
A
DR
IV
E
DE
LT
A W
AY
SIERRA NEVADA DR.
EX. 22
IGC
EX. 24
IGC
EX. 23
PPC
EX. 25
PPC
EX. 27
PPC
EX. 26
PPC
EX. 12
PPC
EX. 11
IGC
EX. 13
PPC
EX. 21
IGC
WAY
4"
4"
4"
4"
118VAC, 5.8 AMP
6"
10"
10"
10"
10"
10"
10"
10"
1.5"
2"
1.5"
1.5"
EX. 26
PPC
EX. 25
PPC
EX. 23
PPC
EX. 24
IGC
EX. 12
PPC
EX. 13
PPC
EX. 11
IGC
EX. 8
IGC
EX. 22
IGC
EX. 21
IGC
1.5" 1.25"
1.25"
1.25"
1.25"
C
H
I
Q
.25
.25
.25
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
10 10
10 10
.5 .5
.5
.5 .5
1.5"
1"
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5 .5
.5 .5
J-33
1"
J-32
1.5"
.5
.5 .5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5 .5 .5
.5 .5 .5
.5 .5
.5
.5
.5 .5 .5 .5
20 20
202010
DG
.5
.5
.5
.5.5
.5 .5
.5
.5
.5
.5.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI107
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 7
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
VF
D
T
EX. 5
PPC
EX. 7
IGC
EX. 28
PPC
EX. 8
IGC
EX.
POND
(1.2 ac.)
SUTTER BUTTE DRIVE
SOLANO
IGC
IGC
PPC
29PPC
DRIVE
FOLSOM LAKE WAY
VF
D
T
EX. 5
PPC
EX. 7
IGC
EX. 28
PPC
EX. 8
IGC
EX.
POND
(1.2 ac.)
SUTTER BUTTE DRIVE
SOLANO
IGC
IGC
PPC
29PPC
DRIVE
FOLSOM LAKE WAY
4"
4"
4"
4"
4" NEW BOARD;
NO LONGER
MASTER CONTROLLER
ET GAUGE
OLD LOCATION
4"
4"
10"
10"
10"
10"
10"
10"
10"
10"
10"
6"
6"
6"
12"
10"
10"
10"
6"
6"
4"
2"
1.5"
1.25"
3"
3"
2" 1.5"
1.5"
1.5"
2.5"
2"
1.25"
2.5"
2"
1.25" 2" 1.25"
2.5"
1.25"
1.25"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
1.25"
2"
1.25"
2.5" 1.25"
2.5"
1.5"
2"
1.5"
1.25"
1.25"
2"
2" 2.5"
2"
2"
2"
3"
2" 2.5"
1.25"
2" 1.25"
2.5"
2"
2.5"
3"
1.5"
2.5"
1.5"
4"
4"
4"
4"
4"
2"
2"
1.25"
3"
2.5"
2"
1.5"
3" 2"
2"
1.25"
2.5"
1.25"
2.5"
2.5"
2"
1.25"
2.5"
2.5" 1.25"
2"
1.25"
2.5" 2"
1.25"
1.25"1.5" 1.25"
1.25"
1.25"
2" 1.5"
1.25"
1.25"
2" 1.5" 1.25"
1.25"
1.25"
3"
1.25"
1.25"
2.5"
2"
2.5"
1.5" 1.25"
1.5"
2"
1.25"
2"
3"
2.5"
1.25"
3"
1.5"
1.25"
1.25"
1.25"
2"
1.25"
1.5"
2.5"
1.25"
3"
1.5"
1.25"
1.25"
6"
10"
2"
1.25"
1.5"
1.25"
1.25"
TYP
TYP
TYP
1.25"
3"
2.5"
2.5"
1.25" 1.25"
2.5"
3"
2.5"
3"
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF THE
PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO PLANTING BEDS.
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF THE
PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO PLANTING BEDS.
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF THE
PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO PLANTING BEDS.
IRRIGATION VALVES MAY BE SHOWN OUTSIDE OF THE
PLANTING BED FOR CLARITY ONLY.
INSTALL ALL VALVES ATLEAST 2-FEET INTO PLANTING BEDS.
3"
2" 2"
1.25"
2"
1.25"
3"
3"
2.5"
2" 2" 1.25"
1.25"
3"
2.5"
1.25"
2.5"
2"
2"
1.25"
1.25"
2.5"
2.5"
2"
1.25"
3"
3"
1.25"
2.5"
2"
1.5"
3"
3"
2.5"
2" 1.25"
2.5" 2"
2"
1.5"
1.5" 1.25" 1.25"
1.25"
1.25"
2"
1.5"
1.5" 1.25"
1.25"
1.5"
1.5"
2"1.5" 1.25"
1.25"
2.5" 2"
2"
1.5" 1.25"
1.25"
3"
1.25"
2"
1.25"
2.5"
2"
1.25"
RB 5000 MPR-25 THIS
AREA
PPC
PPC
IGC
IGC
EX. 5
PPC
EX. 7
IGC
EX. 28
PPC
EX. 27
PPC
IGC
2"
1.25"
1.25"
1.25"
4"
G
ET
.5
.5 .5
.5 .5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5 .5 .5 .5
.5
.5 .5
.5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5
.5
.5
.5 .5
.5
.5 .5 .5 .5
.5.5
.5 .5
.5 .5
.5 .5 .5
.5
.5
.5 .5 .5
.5
.5 .5
.5 .5 .5
.5 .5 .5
.5
.5 .5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5 .5 .5 .5 .5 .5 .5
.5 .5 .5
.5 .5
.5.5.5.5.5 .5
.5
.5 .5.5 .5
.5 .5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5 .5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5 .5
.5 .5
.5
.5
K-43
1.5"
K-63
1"
20 20
20 10
20 20
10 10
Q
K-56
2"
K-59
1.5"
K-58
2"
K-55
2"
K-49
2"
K-48
2"
K-47
2"
K-46
2"
K-52
2"
K-51
2"
K-50
1.5"
K-57
2"
K-54
1.5"
K-53
2"
K-44
2"
K-45
1"
K-35
1.5"
K-36
2"
K-37
2"
K-24
2"
- K-23
2"
- K-22
2"
- K-21
2"
.5 .5
.5
.5 .5
.5
.5 .5.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5
.5 .5
.5 .5
.5.5 .5
.5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5.5 .5 .5 .5
.5
.5
.5
.5
.5 .5.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5 .5 .5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5.5
.5 .5
.5.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
10 10
10 10
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5.5
.5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5 .5
.5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5
.5
.5 .5
.5
.5.5
.5 .5 .5
.5
.5 .5
.5 .5
.5 .5
.5.5
.5
.5.5
.5 .5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5 .5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5.5
.5
.5
.5
.5 .5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5 .5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5
.5 .5
.5 .5
.5
30 30
.5
.5
.5 .5
.5
.5
.5 .5
.5
.5
.5
.5 .5
.5
10 10
10 10
K-42
1"
K-41
2"
.5 .5 .5 .5
.5 .5
.5
.5
.5 .5
.5 .5
K-64
1"
K-63
2"
K-62
2"
.5
.5 .5
.5
.5 .5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5
.5
.5
.5
.5 .5
.5
.5
.5 .5 .5
.5
.5 .5 .5
.5.5
.5 .5
.5 .5 .5
.5 .5
.5
.5
.5 .5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5 .5
.5 .5
.5
.5 .5
.5
.5
.5
.5 .5 .5
.5
.5 K-40
1.5"
K-39
1"
K-38
1"
1.5"
1"
1"
Q
Q
Q
Q
Q
K-34
2"
- K-33
2"
K-32
2"
K-25
2"
K-26
2"
K-27
2"
K-28
2"
K-30
2"
- K-29
1"
K-31
1"
.5 .5
.5
.5.5 .5 .5.5
.5
.5 .5
.5
.5 .5
.5 .5
.5
.5.5 .5
.5 .5 .5
.5
.5
.5 .5
.5
.5 .5
.5
.5 .5 .5
.5
.5 .5
.5 .5
.5 .5 .5 .5
.5 .5 .5 .5 .5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5 .5
.5
.5 .5
.5
.5.5
10 10 10
10 10
K-60
1"
.5
.5
G
G
G
G
G
RELOCATE 1 REMOTE CONTROL VALVE ASSEMBLIES VALVES FEEDING EX. PPC 5.
CONNECT TO EXISTING LATERAL PIPE.
10"
10"
10"
10"
EXCAVATE AND EXPOSE EXISTING 10-INCH MAINLINE
AT END OF ROAD. EXPOSE 3-FEET OF CONTROL
CABLES ALSO. SPLICE POMMUNICATION IN TRAFFIC
RATED CONCRETE BOX WITH STEEL LID. ROUTE WIRE
AND SLEEVES UNDER HARDSCAPE IN SEPARATE
SLEEVES. ROUTE CONTROL WIRE WITH MAINLINE
TRENCH IN TURF AREA.
REMOVE EXISTING MAINLINE UNDER ROAD AND DISPOSE OF LEGALLY OFFSITE
RELOCATED VALVES FEEDING EX. PPC 5.
CONNECT TO EXISTING LATERAL PIPE. INSTALL ON NEW 10-INCH PVC
MAINLINE PIPE PER CONSTRUCTION DOCUMENTS.
RELOCATE 2 REMOTE CONTROL VALVE ASSEMBLIES VALVES
FEEDING EX. PPC 5.
CONNECT TO EXISTING LATERAL PIPE.
INSTAL NEW ISOLATION GATE VALVE.
NEW 10-INCH MAINLINE PIPE
EXCAVATE AND EXPOSE EXISTING 10-INCH MAINLINE
AT END OF ROAD. EXPOSE 3-FEET OF CONTROL WIRE,.
SPLICE WIRES IN TRAFFIC RATED CONCRETE BOX
WITH STEEL LID. OUTE CONTROL WIRE WITH MAINLINE
TRENCH IN TURF AREA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
RECORD DRAWINGS
SEPTEMBER 21, 2021
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018 RWB JDL/TWRevisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot th re e in ch es o ne fo ot
6"
6"
6"
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
LI108
OF 262
RECORD DRAWINGS 09/21/2021
Ce rti f ie d Irrigation Designer
I R R
I G A T I O N A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
6/27/2018
NOTE:
THESE RECORD DRAWINGS
HAVE BEEN PREPARED
BASED ON INFORMATION
PROVIDED BY THE
CONTRACTOR. THE
INFORMATION PROVIDED BY
THE CONTRACTOR IS
BELIEVED TO BE RELIABLE
AND CORRECT, HOWEVER
AQUA ENGINEERING HAS
NOT FIELD VERIFIED THE
INFORMATION PROVIDED
AND IS NOT RESPONSIBLE
FOR ITS ACCURACY, NOR
FOR ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN
INCORPORATED INTO THESE
DRAWINGS AS A RESULT.
IRRIGATION PLAN 8
LI101
LI102
LI103
LI104
LI105
LI106
LI107
LI108
LI109
LI110
LI111
LI112
LI113
| P-SACVAL2-RD-LI106 |
| Sheets and Views |
| LI106 |
| P-SACVAL2-RD-LI107 |
| Sheets and Views |
| LI107 |
| P-SACVAL2-RD-LI108 |
| Sheets and Views |
| LI108 |