Past Performance Questionnaire.pdf

PDF 399 KB Posted

Attached to
Facility Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES22R0011
Issued by

About this file

This document contains a past performance questionnaire template to be completed for a facility maintenance services contract opportunity with the Department of the Army Corps of Engineers Engineering District St Paul. The contractor shall provide maintenance, repairs, and preventive maintenance to enable full capacity and intended use of facilities, utilities, equipment, and areas identified by service orders or preventive maintenance schedules at Fort McCoy in Wisconsin. This includes maintenance, repair, and installation of all facility and building components, devices, equipment, and associated subsystems in accordance with manufacturer manuals. The period of performance and response date are not specified in the opportunity description. The past performance questionnaire requests adverse ratings and definitions, and information on similar past projects completed within the last five years, including contract details, descriptions, and client references to evaluate performance risk for quality, schedule, customer satisfaction, management, cost, safety, and compliance.

View the file

Other files

File Type Posted
Amendment 0003 .pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Site Visit List .pdf PDF
Amendment 0001.pdf PDF
CBA Fort McCoy July 1 2021 - June 30 2024 .pdf PDF
Attachment 9 Available Automation Equipment.xlsx XLSX spreadsheet
Attachment 3.7 Cathodic Protection.xlsx XLSX spreadsheet
Attachment 10 Form TR-WM-118.pdf PDF
Attachment 7 Government Furnished Facilities.xlsx XLSX spreadsheet
Attachment 3.3 Fire Suppression (Wet Pipe).xlsx XLSX spreadsheet
Attachment 3.1 Fire Suppression (Ansul-Chemical).xlsx XLSX spreadsheet
Attachment 6 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 8 Facility Maintenance Repair ATOPSEC Cover Sheet.pdf PDF
Attachment 3.8 Cathodic Protection WWTP.pdf PDF
Attachment 4 Ice Melt Monthly Report.xlsx XLSX spreadsheet
Attachment 3.11 Water Meters Calibration.xlsx XLSX spreadsheet
Attachment 13 Facility Activation.xlsx XLSX spreadsheet
Attachment 1 Performance Requirements Summary.docx DOCX document
Blank Price Schedule - FM Services 15 FEB 2022.xlsx XLSX spreadsheet
Attachment 15 DD Form 254.pdf PDF
Attachment 3.5 Fire Alarm System.docx DOCX document
Attachment 16 Wisconsin HVAC Qualifier Application.pdf PDF
Attachment 18 Water System Valves Lines and Hydrants.pdf PDF
Attachment 10.1 Aboveground Storage Tank Inspection Form 372.xlsx XLSX spreadsheet
Attachment 21 FMF452 Installation Access Pass Request .pdf PDF
Attachment 3.4 Fire Suppression (Dry Pipe).xlsx XLSX spreadsheet
Attachment 20 FMF451 Installation Access NCIC-III Check Request .pdf PDF
Attachment 3.10 Runway Lighting.pdf PDF
Attachment 3.2 Fire Suppression (Kitchen Hood Cleaning).xlsx XLSX spreadsheet
Attachment 2 Fort McCoy Base Data.xlsx XLSX spreadsheet
Solicitation Fort McCoy Fac Maint Services .pdf PDF
Attachment 12 Generator Log.xlsx XLSX spreadsheet
Attachment 3.6 Earth Bond Testing.xlsx XLSX spreadsheet
Attachment 3.9 Elevators and Lifts.xlsx XLSX spreadsheet
Attachment 14 Facility Deactivation.docx DOCX document
Attachment 3.7.1 TR-WM-141 UST Corrosion Protection Test Form.pdf PDF
Attachment 19 POL System Block Book.pdf PDF
Attachment 6.1 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 11 Facility Standards.docx DOCX document
Attachment 3 PM Task and Frequency Chart.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Past Performance Questionnaire

Copy Attachment as needed. Offerors shall provide information for at least two (2) projects for work completed by the Offeror within the past five (5) years.

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.

CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner.

A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

(VG) Very Good

Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?

E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort

E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel

E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the E VG S M U N project and personnel security requirements.

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below)

Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .