Attachment 3.6 Earth Bond Testing.xlsx

XLSX spreadsheet 8 MB Posted

Attached to
Facility Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES22R0011
Issued by

About this file

This document outlines earth bonding and grounding testing criteria and results for various facilities at Fort McCoy, Wisconsin. Testing was conducted in accordance with NFPA 70B, NFPA 407, NFPA 780, DA PAM 385-64, and TB 385-4 to evaluate grounding systems and ensure minimum resistance requirements were met. Facility locations that were tested include the airfield control tower, aircraft maintenance hangar, tanker points, refueling area, aircraft hangar, U-fuel tank, and fuel/POL building. Test equipment used included a DET4TC2 meter. Results are provided for point-to-point ground resistance readings and bonding connections at each location. Notes sections are included but left blank, suggesting follow up may be needed.

View the file

Other files

File Type Posted
Amendment 0003 .pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Site Visit List .pdf PDF
Amendment 0001.pdf PDF
CBA Fort McCoy July 1 2021 - June 30 2024 .pdf PDF
Attachment 9 Available Automation Equipment.xlsx XLSX spreadsheet
Attachment 3.7 Cathodic Protection.xlsx XLSX spreadsheet
Attachment 10 Form TR-WM-118.pdf PDF
Attachment 7 Government Furnished Facilities.xlsx XLSX spreadsheet
Attachment 3.3 Fire Suppression (Wet Pipe).xlsx XLSX spreadsheet
Attachment 3.1 Fire Suppression (Ansul-Chemical).xlsx XLSX spreadsheet
Attachment 6 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 8 Facility Maintenance Repair ATOPSEC Cover Sheet.pdf PDF
Attachment 3.8 Cathodic Protection WWTP.pdf PDF
Attachment 4 Ice Melt Monthly Report.xlsx XLSX spreadsheet
Attachment 3.11 Water Meters Calibration.xlsx XLSX spreadsheet
Attachment 13 Facility Activation.xlsx XLSX spreadsheet
Attachment 1 Performance Requirements Summary.docx DOCX document
Blank Price Schedule - FM Services 15 FEB 2022.xlsx XLSX spreadsheet
Attachment 15 DD Form 254.pdf PDF
Attachment 3.5 Fire Alarm System.docx DOCX document
Attachment 16 Wisconsin HVAC Qualifier Application.pdf PDF
Attachment 18 Water System Valves Lines and Hydrants.pdf PDF
Attachment 10.1 Aboveground Storage Tank Inspection Form 372.xlsx XLSX spreadsheet
Attachment 21 FMF452 Installation Access Pass Request .pdf PDF
Attachment 3.4 Fire Suppression (Dry Pipe).xlsx XLSX spreadsheet
Attachment 20 FMF451 Installation Access NCIC-III Check Request .pdf PDF
Attachment 3.10 Runway Lighting.pdf PDF
Attachment 3.2 Fire Suppression (Kitchen Hood Cleaning).xlsx XLSX spreadsheet
Attachment 2 Fort McCoy Base Data.xlsx XLSX spreadsheet
Solicitation Fort McCoy Fac Maint Services .pdf PDF
Attachment 12 Generator Log.xlsx XLSX spreadsheet
Attachment 3.9 Elevators and Lifts.xlsx XLSX spreadsheet
Attachment 14 Facility Deactivation.docx DOCX document
Attachment 3.7.1 TR-WM-141 UST Corrosion Protection Test Form.pdf PDF
Attachment 19 POL System Block Book.pdf PDF
Past Performance Questionnaire.pdf PDF
Attachment 6.1 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 11 Facility Standards.docx DOCX document
Attachment 3 PM Task and Frequency Chart.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AP-B6058

Bond & Earth Testing – B-6058 Control Tower

Site: B6058
Description of Site: Building 6051 Airfield Control Tower (3rd Floor Equip Rm)
Date:
Condition:
Testing Criteria:Per NFPA70B, TM5-684 - Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Floor – TB 385-4 min 1 megohm/kilovolt
Test Equipment: DET4TC2
Room 301 Ground Point:
· Use a high-resistance measuring instrument.
· Connect one electrode of the measuring instrument to the facility ground.
· Connect the other electrode to a five-pound weight that has a contact surface of

five square inches of good conducting material.

· Attach a non-conductive strap or handle to the block.
· Apply voltage
· Pull the block along all points of the floor or work surface under test to verify that the complete

surface meets the minimum resistance requirement of one megohm per kilovolt.

Building Ground Resistance:
Locate and test one of the exterior grounding rods around the exterior of the

building near the control tower.

Test Results:
Room 301:PassFail

Ground Resistance: Ω

Notes:

AP-01 B 6050

Bond & Earth Testing - Airport

Site: AP-01
Description of Site: Building 6050 Aircraft Maintenance Hanger
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:
6 - 16 - 26 - 36 - 46 - 56 - 76 - 86 - 96 - 106-Building Ground Ω
ΩΩΩΩΩΩΩΩΩ

Ground Resistance: Ω

Pass/Fail _______ Notes:

AP-02 B6050

Bond & Earth Testing - Airport

Site: AP-02
Description of Site: Building 6050 Tanker Points
Date:
Condition:
Testing Criteria:
Per NFPA 780 – Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Ground Resistance:
1234567891011
Bonding:
1 - 22 - 33 - 45 - 66 - 78 - 99 - 10

Note:

AP-03 B 6050

Bond & Earth Testing – Airport

Site: AP-03
Description of Site: Building 6050 Refueling Area
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
DISP1DISP1DISP1DISP2DISP2DISP2DISP3DISP3DISP3DISP4DISP4DISP4
A-BB-CD-EA-BB-CD-EA-BB-CD-EA-BB-CD-E

Test Results

Ground Resistance (Point -GROUND): DISP1 DISP2 DISP3 DISP4

Notes:

AP-04 B6058

Bond & Earth Testing – Airport
Site: AP-04
Description of Site: Building 6058 Aircraft Hanger
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2

R - Reference point connected to building steel near Point 1

Test Results (ohms):
R-1R-2R-3R-4R-5R-6R-7R-8R-9

R-10 R-11 R-12 R-13 R-14 R-15 R-16 R-17 R-18

Notes:

AP-05 U-fuel tank Bond & Earth Testing - Airport

Site: AP-05
Description of Site: U-Fuel Tank
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:

1 2

Ground Resistance: Ω

Note:

AP-06 B6010

Site: AP-06
Description of Site: Building #6010 Fuel/POL Building
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
NFPA 407 - <25 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:
Building ground-1Building ground-2Building ground-3Building ground-4Building ground-5Building ground-6Building ground-7Building ground-8Building ground-9

Ground Resistance: Ω

Notes:

CF-01

Bond & Earth Testing – Central Fuels

Site: CF-01
Description of Site: Fuel Dispensing Area
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:
1-21-34-54-67-87-910-2211-1211-116-1716-1819-20
NA
19-2122-2322-2422-1919-1610-227-44-125-2627-2829-3031-32
NA
Ground Resistance (10 – Ground):Ω
Ground Resistance (11 - Ground):Ω

Notes:

CF-02

Bond & Earth Testing – Central Fuels

Site: CF-02
Description of Site: Track Vehicle Refueling Site
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:
1-21-34-54-6

Ground Resistance: Ω

Notes:

CF-03

Bond & Earth Testing – Central Fuels

Site: CF-03
Description of Site: Tank Farm Area
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:
1-21-3

Ground Resistance: Ω

Notes:

NDB-01

Bond & Earth Testing – Nondirectional Beacon Site

Site: NDB-01
Description of Site: Nondirectional Beacon Site
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Test Results:
1-2

Ground Resistance: Ω

Notes:

SPC-01

Bond & Earth Testing –
South Post Communications Tower
Site: SPC-01
Description of Site: Building CV001
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Ground Resistance:Ω

Notes:

SPC-02

Bond & Earth Testing –
South Post Communications Tower
Site: SPC-01
Description of Site: Building CV001-02
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Notes:
Test Results (Ω):
RefPt - 1RefPt - 2

Ground Resistance Ω

B200

Bond & Earth Testing – B-200
Site: B200
Description of Site: Building 200 Maintenance Facility
Date:
Condition:
Testing Criteria:Per NFPA70B, TM5-684 - Ground Resistance ≤25.0 Ω,
Bond Testing DA PAM 385-64 ≤1.0Ω
Floor – TB 385-4 min 1 megohm/kilovolt
Test Equipment: DET4TC2
Room 145 Floor:
· Use a high-resistance measuring instrument.
· Connect one electrode of the measuring instrument to the facility ground.
· Connect the other electrode to a five-pound weight that has a contact

surface of five square inches of good conducting material.

· Attach a non-conductive strap or handle to the block.
· Apply voltage
· Pull the block along all points of the floor or work surface under test to verify

that the complete surface meets the minimum resistance requirement of one megohm per kilovolt.

Building Ground Resistance:
Locate and test one of the exterior grounding rods around the exterior of the building.
Test Results:
Room 145: ____Pass _____ Fail

Ground Resistance: Ω Notes:

ASP-02

Bond & Earth Testing - Ammo Supply Point

Site:ASP-02
Discription of Site:Bunker #9006Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9G - 10

Ground Resistance: Ω

Pass/Fail: Notes:

ASP-03-O

Bond & Earth Testing - Ammo Supply Point
Site:ASP-03Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Discription of Site:Bldg 9005 - OutsideDA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Date:Test Equipment: DET4TC2
Weather:
Test Results (Ω):
1 - 21 - 31 - 41 - 51 - 61 - 7
Pass/Fail:
Notes:
Ground Resistance:Ω

ASP-03-I

Bond & Earth Testing - Ammo Supply Point
Site:ASP-03Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Discription of Site:Bldg 9005 - InsideDA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Date:Test Equipment: DET4TC2
Weather:
Test Results (Ω):
RefPt - 1RefPt - 2RefPt - 3RefPt - 4RefPt - 5RefPt - 6RefPt - 7RefPt - 8
Pass/Fail:
Notes:
Ground ResistanceΩ

ASP-04

Bond & Earth Testing - Ammo Supply Point

Site:ASP-04
Discription of Site:Bunker #9004Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9G - 10

Ground Resistance: Ω

Pass/Fail: Notes:

ASP-05

Bond & Earth Testing – Ammo Supply Point

Site: ASP-05
Description of Site: Ammo Storage Pad #9015
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Notes:
Test Results (Ω):
1 - 2

Ground Resistance Ω

ASP-06

Bond & Earth Testing – Ammo Supply Point

Site: ASP-06
Description of Site: Ammo Storage Pad #9018
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2

Notes:

Notes: Point#1 = North pole Point#2 = South pole
Points# 3,4,5 have been removed when pad was renovated
Test Results (Ω):
1 - 21 - 31 - 41 - 5
NANANA
Ground ResistanceΩ

ASP-07

Bond & Earth Testing – Ammo Supply Point

Site: ASP-07
Description of Site: Ammo Storage Pad #9016
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Notes:
Test Results (Ω):
1 - 2

Ground Resistance Ω

ASP-08

Bond & Earth Testing – Ammo Supply Point

Site: ASP-08
Description of Site: Ammo Storage Pad #9017
Date:
Condition:
Testing Criteria:Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω
Test Equipment: DET4TC2
Notes:
Test Results (Ω):
1 - 2

Ground Resistance Ω

ASP-09

Bond & Earth Testing - Ammo Supply Point

Site:ASP-09
Discription of Site:Bunker #9011Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-10

Bond & Earth Testing - Ammo Supply Point

Site:ASP-10
Discription of Site:Bunker #9024Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-11

Bond & Earth Testing - Ammo Supply Point

Site:ASP-11
Discription of Site:Bunker #9012Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-12

Bond & Earth Testing - Ammo Supply Point

Site:ASP-12
Discription of Site:Bunker #9025Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-13

Bond & Earth Testing - Ammo Supply Point

Site:ASP-13
Discription of Site:Bunker #9013Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-14

Bond & Earth Testing - Ammo Supply Point

Site:ASP-14
Discription of Site:Bunker #9026Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-15

Bond & Earth Testing - Ammo Supply Point

Site:ASP-15
Discription of Site:Bunker #9014Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9

Ground Resistance: Ω

Pass/Fail:
Notes:

ASP-16

Bond & Earth Testing - Ammo Supply Point

Site:ASP-16
Discription of Site:Bunker #9007Testing Criteria:NFPA 780 - Ground Resistance ≤ 25.0 Ω
Date:DA PAM 385-64 - Bond Testing ≤ 1.0 Ω
Weather:Test Equipment: DET4TC2
Test Results (Ω):
G - 1G - 2G - 3G - 4G - 5G - 6G - 7G - 8G - 9G - 10

Ground Resistance: Ω

Pass/Fail:
Notes:

image1.png image2.png image3.png image4.jpg image5.png image6.png image7.png image8.tiff image9.tiff image10.png image11.tiff image12.tiff image13.tiff image14.tiff image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.jpeg image23.tiff image24.tiff image25.tiff image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png