This document outlines earth bonding and grounding testing criteria and results for various facilities at Fort McCoy, Wisconsin. Testing was conducted in accordance with NFPA 70B, NFPA 407, NFPA 780, DA PAM 385-64, and TB 385-4 to evaluate grounding systems and ensure minimum resistance requirements were met. Facility locations that were tested include the airfield control tower, aircraft maintenance hangar, tanker points, refueling area, aircraft hangar, U-fuel tank, and fuel/POL building. Test equipment used included a DET4TC2 meter. Results are provided for point-to-point ground resistance readings and bonding connections at each location. Notes sections are included but left blank, suggesting follow up may be needed.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AP-B6058
Bond & Earth Testing – B-6058 Control Tower
| Site: B6058 | |
| Description of Site: Building 6051 Airfield Control Tower (3rd Floor Equip Rm) | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA70B, TM5-684 - Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Floor – TB 385-4 min 1 megohm/kilovolt | |
| Test Equipment: DET4TC2 |
| Room 301 Ground Point: |
| · Use a high-resistance measuring instrument. |
| · Connect one electrode of the measuring instrument to the facility ground. |
| · Connect the other electrode to a five-pound weight that has a contact surface of |
five square inches of good conducting material.
| · Attach a non-conductive strap or handle to the block. |
| · Apply voltage |
| · Pull the block along all points of the floor or work surface under test to verify that the complete |
surface meets the minimum resistance requirement of one megohm per kilovolt.
| Building Ground Resistance: |
| Locate and test one of the exterior grounding rods around the exterior of the |
building near the control tower.
| Test Results: | |||
| Room 301: | Pass | Fail |
Ground Resistance: Ω
Notes:
AP-01 B 6050
Bond & Earth Testing - Airport
| Site: AP-01 | |
| Description of Site: Building 6050 Aircraft Maintenance Hanger | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| Test Results: | |||||||||
| 6 - 1 | 6 - 2 | 6 - 3 | 6 - 4 | 6 - 5 | 6 - 7 | 6 - 8 | 6 - 9 | 6 - 10 | 6-Building Ground Ω |
| Ω | Ω | Ω | Ω | Ω | Ω | Ω | Ω | Ω |
Ground Resistance: Ω
Pass/Fail _______ Notes:
AP-02 B6050
Bond & Earth Testing - Airport
| Site: AP-02 |
| Description of Site: Building 6050 Tanker Points |
| Date: |
| Condition: |
| Testing Criteria: |
| Per NFPA 780 – Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω |
| Test Equipment: DET4TC2 |
| Ground Resistance: | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| Bonding: | ||||||
| 1 - 2 | 2 - 3 | 3 - 4 | 5 - 6 | 6 - 7 | 8 - 9 | 9 - 10 |
Note:
AP-03 B 6050
Bond & Earth Testing – Airport
| Site: AP-03 | |
| Description of Site: Building 6050 Refueling Area | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| DISP1 | DISP1 | DISP1 | DISP2 | DISP2 | DISP2 | DISP3 | DISP3 | DISP3 | DISP4 | DISP4 | DISP4 |
| A-B | B-C | D-E | A-B | B-C | D-E | A-B | B-C | D-E | A-B | B-C | D-E |
Test Results
Ground Resistance (Point -GROUND): DISP1 DISP2 DISP3 DISP4
Notes:
AP-04 B6058
| Bond & Earth Testing – Airport | |
| Site: AP-04 | |
| Description of Site: Building 6058 Aircraft Hanger | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
R - Reference point connected to building steel near Point 1
| Test Results (ohms): | ||||||||
| R-1 | R-2 | R-3 | R-4 | R-5 | R-6 | R-7 | R-8 | R-9 |
R-10 R-11 R-12 R-13 R-14 R-15 R-16 R-17 R-18
Notes:
AP-05 U-fuel tank Bond & Earth Testing - Airport
| Site: AP-05 | |
| Description of Site: U-Fuel Tank | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 | |
| Test Results: |
1 2
Ground Resistance: Ω
Note:
AP-06 B6010
| Site: AP-06 | |
| Description of Site: Building #6010 Fuel/POL Building | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| NFPA 407 - <25 Ω | |
| Bond Testing DA PAM 385-64 ≤1.0Ω |
| Test Equipment: DET4TC2 | ||||||||
| Test Results: | ||||||||
| Building ground-1 | Building ground-2 | Building ground-3 | Building ground-4 | Building ground-5 | Building ground-6 | Building ground-7 | Building ground-8 | Building ground-9 |
Ground Resistance: Ω
Notes:
CF-01
Bond & Earth Testing – Central Fuels
| Site: CF-01 | |
| Description of Site: Fuel Dispensing Area | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 | |
| Test Results: |
| 1-2 | 1-3 | 4-5 | 4-6 | 7-8 | 7-9 | 10-22 | 11-12 | 11-1 | 16-17 | 16-18 | 19-20 | |
| NA | ||||||||||||
| 19-21 | 22-23 | 22-24 | 22-19 | 19-16 | 10-22 | 7-4 | 4-1 | 25-26 | 27-28 | 29-30 | 31-32 | |
| NA | ||||||||||||
| Ground Resistance (10 – Ground): | Ω | |||||||||||
| Ground Resistance (11 - Ground): | Ω |
Notes:
CF-02
Bond & Earth Testing – Central Fuels
| Site: CF-02 | |||
| Description of Site: Track Vehicle Refueling Site | |||
| Date: | |||
| Condition: | |||
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω | ||
| Bond Testing DA PAM 385-64 ≤1.0Ω | |||
| Test Equipment: DET4TC2 | |||
| Test Results: | |||
| 1-2 | 1-3 | 4-5 | 4-6 |
Ground Resistance: Ω
Notes:
CF-03
Bond & Earth Testing – Central Fuels
| Site: CF-03 | |
| Description of Site: Tank Farm Area | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 | |
| Test Results: | |
| 1-2 | 1-3 |
Ground Resistance: Ω
Notes:
NDB-01
Bond & Earth Testing – Nondirectional Beacon Site
| Site: NDB-01 | |
| Description of Site: Nondirectional Beacon Site | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| Test Results: |
| 1-2 |
Ground Resistance: Ω
Notes:
SPC-01
| Bond & Earth Testing – |
| South Post Communications Tower |
| Site: SPC-01 | ||
| Description of Site: Building CV001 | ||
| Date: | ||
| Condition: | ||
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω | |
| Bond Testing DA PAM 385-64 ≤1.0Ω | ||
| Test Equipment: DET4TC2 | ||
| Ground Resistance: | Ω |
Notes:
SPC-02
| Bond & Earth Testing – |
| South Post Communications Tower |
| Site: SPC-01 | |
| Description of Site: Building CV001-02 | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| Notes: | |
| Test Results (Ω): | |
| RefPt - 1 | RefPt - 2 |
Ground Resistance Ω
B200
| Bond & Earth Testing – B-200 | |
| Site: B200 | |
| Description of Site: Building 200 Maintenance Facility | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA70B, TM5-684 - Ground Resistance ≤25.0 Ω, |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Floor – TB 385-4 min 1 megohm/kilovolt | |
| Test Equipment: DET4TC2 |
| Room 145 Floor: |
| · Use a high-resistance measuring instrument. |
| · Connect one electrode of the measuring instrument to the facility ground. |
| · Connect the other electrode to a five-pound weight that has a contact |
surface of five square inches of good conducting material.
| · Attach a non-conductive strap or handle to the block. |
| · Apply voltage |
| · Pull the block along all points of the floor or work surface under test to verify |
that the complete surface meets the minimum resistance requirement of one megohm per kilovolt.
| Building Ground Resistance: |
| Locate and test one of the exterior grounding rods around the exterior of the building. |
| Test Results: |
| Room 145: ____Pass _____ Fail |
Ground Resistance: Ω Notes:
ASP-02
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-02 | |||
| Discription of Site: | Bunker #9006 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | |||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 | G - 10 |
Ground Resistance: Ω
Pass/Fail: Notes:
ASP-03-O
| Bond & Earth Testing - Ammo Supply Point | |||||||
| Site: | ASP-03 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | ||||
| Discription of Site: | Bldg 9005 - Outside | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||||
| Date: | Test Equipment: DET4TC2 | ||||||
| Weather: | |||||||
| Test Results (Ω): | |||||||
| 1 - 2 | 1 - 3 | 1 - 4 | 1 - 5 | 1 - 6 | 1 - 7 | ||
| Pass/Fail: | |||||||
| Notes: | |||||||
| Ground Resistance: | Ω |
ASP-03-I
| Bond & Earth Testing - Ammo Supply Point | ||||||||
| Site: | ASP-03 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |||||
| Discription of Site: | Bldg 9005 - Inside | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | ||||||
| Date: | Test Equipment: DET4TC2 | |||||||
| Weather: | ||||||||
| Test Results (Ω): | ||||||||
| RefPt - 1 | RefPt - 2 | RefPt - 3 | RefPt - 4 | RefPt - 5 | RefPt - 6 | RefPt - 7 | RefPt - 8 | |
| Pass/Fail: | ||||||||
| Notes: | ||||||||
| Ground Resistance | Ω |
ASP-04
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-04 | |||
| Discription of Site: | Bunker #9004 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | |||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 | G - 10 |
Ground Resistance: Ω
Pass/Fail: Notes:
ASP-05
Bond & Earth Testing – Ammo Supply Point
| Site: ASP-05 | |
| Description of Site: Ammo Storage Pad #9015 | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| Notes: |
| Test Results (Ω): |
| 1 - 2 |
Ground Resistance Ω
ASP-06
Bond & Earth Testing – Ammo Supply Point
| Site: ASP-06 | |
| Description of Site: Ammo Storage Pad #9018 | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
Notes:
| Notes: Point#1 = North pole Point#2 = South pole | |||
| Points# 3,4,5 have been removed when pad was renovated | |||
| Test Results (Ω): | |||
| 1 - 2 | 1 - 3 | 1 - 4 | 1 - 5 |
| NA | NA | NA | |
| Ground Resistance | Ω |
ASP-07
Bond & Earth Testing – Ammo Supply Point
| Site: ASP-07 | |
| Description of Site: Ammo Storage Pad #9016 | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| Notes: |
| Test Results (Ω): |
| 1 - 2 |
Ground Resistance Ω
ASP-08
Bond & Earth Testing – Ammo Supply Point
| Site: ASP-08 | |
| Description of Site: Ammo Storage Pad #9017 | |
| Date: | |
| Condition: | |
| Testing Criteria: | Per NFPA 780 - Ground Resistance ≤25.0 Ω |
| Bond Testing DA PAM 385-64 ≤1.0Ω | |
| Test Equipment: DET4TC2 |
| Notes: |
| Test Results (Ω): |
| 1 - 2 |
Ground Resistance Ω
ASP-09
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-09 | |||
| Discription of Site: | Bunker #9011 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-10
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-10 | |||
| Discription of Site: | Bunker #9024 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-11
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-11 | |||
| Discription of Site: | Bunker #9012 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-12
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-12 | |||
| Discription of Site: | Bunker #9025 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-13
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-13 | |||
| Discription of Site: | Bunker #9013 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-14
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-14 | |||
| Discription of Site: | Bunker #9026 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-15
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-15 | |||
| Discription of Site: | Bunker #9014 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | ||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
ASP-16
Bond & Earth Testing - Ammo Supply Point
| Site: | ASP-16 | |||
| Discription of Site: | Bunker #9007 | Testing Criteria: | NFPA 780 - Ground Resistance ≤ 25.0 Ω | |
| Date: | DA PAM 385-64 - Bond Testing ≤ 1.0 Ω | |||
| Weather: | Test Equipment: DET4TC2 |
| Test Results (Ω): | |||||||||
| G - 1 | G - 2 | G - 3 | G - 4 | G - 5 | G - 6 | G - 7 | G - 8 | G - 9 | G - 10 |
Ground Resistance: Ω
| Pass/Fail: |
| Notes: |
image1.png image2.png image3.png image4.jpg image5.png image6.png image7.png image8.tiff image9.tiff image10.png image11.tiff image12.tiff image13.tiff image14.tiff image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.jpeg image23.tiff image24.tiff image25.tiff image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png