Attachment 3.3 Fire Suppression (Wet Pipe).xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Facility Maintenance Services at Fort McCoy, WI
- Solicitation number
- W912ES22R0011
About this file
This document outlines annual maintenance tasks and inspection criteria for fire suppression systems at various buildings on a military base. Key tasks include visually inspecting control valves and fire department connections; checking water pressure, hangers, piping, sprinkler heads and spare parts; testing alarm devices, main drains, valves and fire pumps; and calibrating gauges. Inspections also cover internal piping obstructions. Additional requirements cover check valves, shutoff valves, electric motors, vertical turbine pumps and a jockey pump for the airfield fire suppression system. The related solicitation seeks maintenance, repair and preventive maintenance services for facilities, utilities, equipment and areas at Fort McCoy in Wisconsin. The contractor must enable all identified elements to function at full capacity and as intended.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annual
| ATTACHMENT 3.3 FIRE SUPPRESSION (WET PIPE) - ANNUAL | |||||||||||||
| Task | Control Valves | Visually Inspect - Hydraulic Nameplate | Check for proper water pressure | Fire Department Connections | Alarm Devices (water flow alarms, low pressure alarm) | Fire Pump Controller and Components B60, B495, B6062 (2-diesel, 2-electric) | Hangers/Seismic (all systems) | Visible Piping | Sprinklers/spare sprinkler heads /wrench | Alarm Devices | (TEST) | ||
| Main Drain | (TEST and Check) | ||||||||||||
| Valves (all types, Check, Double Check, Mixing, Pressure Reducing) | (TEST) | ||||||||||||
| Antifreeze Solution | (TEST) |
Fire Pumps B60, B495, B6062 (2-diesel, 2-electric) Criteria Pass = All valves in appropriate position, not leaking, free of defects Fail = Submit discrepancy to Govt Work Reception Ctr
| Pass = Is Present; Fail = Not Present | |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Appropriate lbs of water pressure |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Visible and accessible, undamaged, caps in place, gasket is good, check valve not leaking |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Free from any physical damage, test per manufacturer instructions |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Controllers operate as required to start pumps |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = No visible damage to hangers |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = No visible damage to piping and associated hardware |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = No damage to installed sprinkler heads, proper spare sprinkler heads and wrench are available |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Alarms operate at test, no physical damage |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Test annually to determine if there has been a change in the condition of the water supply piping and control valves. |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = All valves: Shall be checked for proper operation; Opened until torsion is felt in the rod, indicating that the rod has not separated from the valve |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Antifreeze solution is good to 30 below Zero |
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Correct Total Pump Output for the rated capacity on each pump |
Fail = Submit discrepancy to Govt Work Reception Ctr
| Building | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # |
| SPRINK-W-60-01 |
*Firepump-60-01 (diesel)
| SPRINK-W-200-01 |
| SPRINK-W-200-02 |
| SPRINK-W-200-03 |
| SPRINK-W-200-04 |
| SPRINK-W-200-05 |
| SPRINK-W-207-01 |
| SPRINK-W-220-01 |
| SPRINK-W-490-01 |
| SPRINK-W-495-01*Firepump-495-01 (elect) |
| SPRINK-W-1027-01 |
| SPRINK-W-1213-01 |
| SPRINK-W-1268-01 |
| SPRINK-W-1361-01 |
| SPRINK-W-1363-01 |
| SPRINK-W-1364-01 |
| SPRINK-W-1364-02 |
| SPRINK-W-1370-01 |
| SPRINK-W-1538-01 |
| SPRINK-W-1564-01 |
| SPRINK-W-1571-01 |
| SPRINK-W-1747-01 |
| SPRINK-W-1751-01 |
| SPRINK-W-1796-01 |
| SPRINK-W-2187-01 |
| SPRINK-W-2195-01 |
| SPRINK-W-2218-01 |
| SPRINK-W-2442-01 |
| SPRINK-W-2674-01 |
| SPRINK-W-2858-01 |
| SPRINK-W-2958-01 |
| SPRINK-W-3014-01 |
| SPRINK-W-3049-01 |
| SPRINK-W-6050-01 |
| SPRINK-W-6055-01 |
| SPRINK-W-6058-01 |
| FP-3014-01 (elect) |
| SPRINK-W-9005-01 |
| SPRINK-W-10000A-01 |
*B 61-Firepump is in Bldg. 61 and serves Bldg 60.
3 years
| ATTACHMENT 3.3 FIRE SUPPRESSION (WET PIPE) - ANNUAL | |
| Task | Full Flow Trip |
| Criteria | Pass = All parts are functioning properly and water flows at test station |
Fail = Submit discrepancy to Govt Work Reception Ctr
| Building | Pass | Fail | S O # |
| SPRINK-W-60-01 | |||
| SPRINK-W-200-01 | |||
| SPRINK-W-200-02 | |||
| SPRINK-W-200-03 | |||
| SPRINK-W-200-04 | |||
| SPRINK-W-200-05 | |||
| SPRINK-W-207-01 | |||
| SPRINK-W-220-01 | |||
| SPRINK-W-490-01 | |||
| SPRINK-W-495-01 | |||
| SPRINK-W-1027-01 | |||
| SPRINK-W-1213-01 | |||
| SPRINK-W-1268-01 | |||
| SPRINK-W-1361-01 | |||
| SPRINK-W-1363-01 | |||
| SPRINK-W-1364-01 | |||
| SPRINK-W-1364-02 | |||
| SPRINK-W-1370-01 | |||
| SPRINK-W-1538-01 | |||
| SPRINK-W-1564-01 | |||
| SPRINK-W-1571-01 | |||
| SPRINK-W-1747-01 | |||
| SPRINK-W-1751-01 | |||
| SPRINK-W-1796-01 | |||
| SPRINK-W-2187-01 | |||
| SPRINK-W-2195-01 | |||
| SPRINK-W-2218-01 | |||
| SPRINK-W-2442-01 | |||
| SPRINK-W-2674-01 | |||
| SPRINK-W-2858-01 | |||
| SPRINK-W-2958-01 | |||
| SPRINK-W-6050-01 | |||
| SPRINK-W-6055-01 | |||
| SPRINK-W-6058-01 | |||
| SPRINK-W-9005-01 | |||
| SPRINK-W-10000A-01 |
5 Years
| ATTACHMENT 3.3 FIRE SUPPRESSION (WET PIPE) - ANNUAL | ||||
| Task | All Gauges for Calibration | Obstruction, Internal Inspection of Piping | ||
| Criteria | Pass = All gauges are calibrated or replaced as needed | |||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Piping and branch line conditions are free of obstructions, organic and inorganic material |
Fail = Submit discrepancy to Govt Work Reception Ctr
| Building | Pass | Fail | S O # | Pass | Fail | S O # |
| SPRINK-W-51-01 | ||||||
| SPRINK-W-60-01 | ||||||
| SPRINK-W-90-01 | ||||||
| SPRINK-W-200-01 | ||||||
| SPRINK-W-200-02 | ||||||
| SPRINK-W-200-03 | ||||||
| SPRINK-W-200-04 | ||||||
| SPRINK-W-200-05 | ||||||
| SPRINK-W-207-01 | ||||||
| SPRINK-W-220-01 | ||||||
| SPRINK-W-490-01 | ||||||
| SPRINK-W-60-01 | ||||||
| SPRINK-W-200-01 | ||||||
| SPRINK-W-200-02 | ||||||
| SPRINK-W-200-03 | ||||||
| SPRINK-W-200-04 | ||||||
| SPRINK-W-200-05 | ||||||
| SPRINK-W-207-01 | ||||||
| SPRINK-W-220-01 | ||||||
| SPRINK-W-490-01 | ||||||
| SPRINK-W-495-01 | ||||||
| SPRINK-W-1027-01 | ||||||
| SPRINK-W-1213-01 | ||||||
| SPRINK-W-1268-01 | ||||||
| SPRINK-W-1361-01 | ||||||
| SPRINK-W-1363-01 | ||||||
| SPRINK-W-1364-01 | ||||||
| SPRINK-W-1364-02 | ||||||
| SPRINK-W-1370-01 | ||||||
| SPRINK-W-1538-01 | ||||||
| SPRINK-W-1564-01 | ||||||
| SPRINK-W-1571-01 | ||||||
| SPRINK-W-1747-01 | ||||||
| SPRINK-W-1751-01 | ||||||
| SPRINK-W-1796-01 | ||||||
| SPRINK-W-2187-01 | ||||||
| SPRINK-W-2195-01 | ||||||
| SPRINK-W-2218-01 | ||||||
| SPRINK-W-2442-01 | ||||||
| SPRINK-W-2674-01 | ||||||
| SPRINK-W-2858-01 | ||||||
| SPRINK-W-2958-01 | ||||||
| SPRINK-W-6050-01 | ||||||
| SPRINK-W-6055-01 | ||||||
| SPRINK-W-6058-01 | ||||||
| SPRINK-W-9005-01 | ||||||
| SPRINK-W-10000A-01 |
10+ Years
| ATTACHMENT 3.3 FIRE SUPPRESSION (WET PIPE) - ANNUAL | |
| Task | Sprinkler Heads |
| Criteria | Pass = sprinkler heads are replaced or representative samples are tested |
Fail = Submit discrepancy to Govt Work Reception Ctr
| Building | Pass | Fail | S O # |
| SPRINK-W-60-01 | |||
| SPRINK-W-200-01 | |||
| SPRINK-W-200-02 | |||
| SPRINK-W-200-03 | |||
| SPRINK-W-200-04 | |||
| SPRINK-W-200-05 | |||
| SPRINK-W-207-01 | |||
| SPRINK-W-220-01 | |||
| SPRINK-W-490-01 | |||
| SPRINK-W-495-01 | |||
| SPRINK-W-1027-01 | |||
| SPRINK-W-1213-01 | |||
| SPRINK-W-1268-01 | |||
| SPRINK-W-1361-01 | |||
| SPRINK-W-1363-01 | |||
| SPRINK-W-1364-01 | |||
| SPRINK-W-1364-02 | |||
| SPRINK-W-1370-01 | |||
| SPRINK-W-1538-01 | |||
| SPRINK-W-1564-01 | |||
| SPRINK-W-1571-01 | |||
| SPRINK-W-1747-01 | |||
| SPRINK-W-1751-01 | |||
| SPRINK-W-1796-01 | |||
| SPRINK-W-2187-01 | |||
| SPRINK-W-2195-01 | |||
| SPRINK-W-2218-01 | |||
| SPRINK-W-2442-01 | |||
| SPRINK-W-2674-01 | |||
| SPRINK-W-2858-01 | |||
| SPRINK-W-2958-01 | |||
| SPRINK-W-6050-01 | |||
| SPRINK-W-6055-01 | |||
| SPRINK-W-6058-01 | |||
| SPRINK-W-9005-01 | |||
| SPRINK-W-10000A-01 |
Airfield
| ATTACHMENT 3.3 FIRE SUPPRESSION (WET PIPE) - ANNUAL | |||||
| Task | 5 year | ||||
| Check Valves | Annual - OS&Y Valves | Annual - 150 hp Electric Motor | Annual - Vertical Turbine Pump | ||
| Annual - Jockey Pump | Annual - Electric Motor | Monthly - 1000 Gallon Chemical Tank | Annual - Deluge Well Pump | ||
| Criteria | Pass = All valves: Shall be opened, inspected and cleaned, check condition of gaskets, flappers, gauges and mechanical linkages. Perform operational check. | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Pass = All valves: Shall be opened, inspected and cleaned, check condition of gaskets, gauges and mechanical linkages. Perform operational check. | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Operate, inspect, change gear oil, check condition of mounting hardware, bearings and shafts for leaks. Perform operational check. | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = All pumps: Shall be operated and inspected, check condition of gaskets, mounting hardware, bearings and shafts for leaks. Perform operational check. | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = All pumps: Shall be operated and inspected, check condition of gaskets, mounting hardware, bearings and shafts for leaks. Perform operational check. | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = Operate, inspect, check condition of mounting hardware, bearings and shafts for leaks. Perform operational check. | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = inspect, check condition of associated plumbing valves for leaks. Verify and record tank contents (gallons). | ||||
| Fail = Submit discrepancy to Govt Work Reception Ctr | Pass = inspect, check operation and condition of pump and associated plumbing components for leaks. |
Fail = Submit discrepancy to Govt Work Reception Ctr
| BUILDING | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | |||
| 6062 | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # | Pass | Fail | S O # |
| M-1 150 HP Electric Motor | ||||||||||||||||||||||||
| VP-1 Vertical Pump (Main) | ||||||||||||||||||||||||
| VP-2 Vertical Pump (Diesel) | ||||||||||||||||||||||||
| VP-3 Vertical Pump (Diesel) | ||||||||||||||||||||||||
| CV-1 Check Valve 10" (Main) | ||||||||||||||||||||||||
| CV-2 Check Valve 10" (Diesel) | ||||||||||||||||||||||||
| CV-3 Check Valve 10" (Diesel) | ||||||||||||||||||||||||
| SO-1 Shut off Valve 10" (Main) | ||||||||||||||||||||||||
| SO-2 Shut off Valve 10" (Diesel) | ||||||||||||||||||||||||
| SO-3 Shut off Valve 10" (Diesel) | ||||||||||||||||||||||||
| SO-4 Shut off Valve 12" (Main level) | ||||||||||||||||||||||||
| SO-5 Shut off Valve 12" (Lower level) | ||||||||||||||||||||||||
| JP-1 Electric Jockey Pump | ||||||||||||||||||||||||
| 6058 Aqueous Foam System | ||||||||||||||||||||||||
| 20 hp Electric Fire Pump - 1 | ||||||||||||||||||||||||
| 20 hp Electric Fire Pump - 2 | ||||||||||||||||||||||||
| CV - 1 Check Valve 8" | ||||||||||||||||||||||||
| CV - 2 Check Valve 8" | ||||||||||||||||||||||||
| SO - 1 Shut off Valve 8" | ||||||||||||||||||||||||
| SO - 2 Shut off Valve 8" | ||||||||||||||||||||||||
| SO - 3 Shut off Valve 4" | ||||||||||||||||||||||||
| SO - 4 Shut off Valve 4" | ||||||||||||||||||||||||
| SO - 5 Shut off Valve 4" | ||||||||||||||||||||||||
| SO - 6 Shut off Valve 4" | ||||||||||||||||||||||||
| SO - 7 Shut off Valve 1" | ||||||||||||||||||||||||
| SO - 8 Shut off Valve 1" | ||||||||||||||||||||||||
| SO - 9 Shut off Valve 1" | ||||||||||||||||||||||||
| 1000 gallon chemical tank (Ansulite 3% AFFF) | ||||||||||||||||||||||||
| 850 gallons (10-5-17) | ||||||||||||||||||||||||
| Hose Reel Ansul System | ||||||||||||||||||||||||
| Pressure tank | ||||||||||||||||||||||||
| Valves | ||||||||||||||||||||||||
| Solenoid | ||||||||||||||||||||||||
| Ansul chemical | ||||||||||||||||||||||||
| 6065 Well Pumphouse | ||||||||||||||||||||||||
| 75 GPM Pump |
| CV=check valve |
| FP=fire pump |
| B 6062-Firepumps are in Bldg. 6062 and serve Bldg. 6050 and Bldg. 6058. |
File details come from the government source that posted it. Updated .