Attachment 3.7.1 TR-WM-141 UST Corrosion Protection Test Form.pdf

PDF 244 KB Posted

Attached to
Facility Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES22R0011
Issued by

About this file

This document contains a form for testing underground storage tank corrosion protection in Wisconsin. The form requires information on the tank owner and facility, the tester, and test results including voltage readings and pass/fail for each tank and pipe. Test criteria include -0.850 volts for galvanic or 100 mV polarization for impressed current systems. If tests are inconclusive, a corrosion expert evaluation is required within 30 days. Testers must note rectifier settings if applicable and include a diagram showing tank and pipe locations and test point numbers. Repairs are required if protection is inadequate and must be completed by the noted date.

This solicitation is for facility maintenance services at Fort McCoy, Wisconsin. The contractor shall provide maintenance, repairs, and preventive maintenance for facilities, utilities, equipment and areas identified by service orders or preventive maintenance schedules to keep them fully functional for their intended use. Work includes maintaining all facility and building components, devices, equipment and subsystems in accordance with manufacturer manuals. The soliciting agency is the Department of the Army Corps of Engineers Engineering District St Paul.

View the file

Other files

File Type Posted
Amendment 0003 .pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Site Visit List .pdf PDF
Amendment 0001.pdf PDF
CBA Fort McCoy July 1 2021 - June 30 2024 .pdf PDF
Attachment 9 Available Automation Equipment.xlsx XLSX spreadsheet
Attachment 3.7 Cathodic Protection.xlsx XLSX spreadsheet
Attachment 10 Form TR-WM-118.pdf PDF
Attachment 7 Government Furnished Facilities.xlsx XLSX spreadsheet
Attachment 3.3 Fire Suppression (Wet Pipe).xlsx XLSX spreadsheet
Attachment 3.1 Fire Suppression (Ansul-Chemical).xlsx XLSX spreadsheet
Attachment 6 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 8 Facility Maintenance Repair ATOPSEC Cover Sheet.pdf PDF
Attachment 3.8 Cathodic Protection WWTP.pdf PDF
Attachment 4 Ice Melt Monthly Report.xlsx XLSX spreadsheet
Attachment 3.11 Water Meters Calibration.xlsx XLSX spreadsheet
Attachment 13 Facility Activation.xlsx XLSX spreadsheet
Attachment 1 Performance Requirements Summary.docx DOCX document
Blank Price Schedule - FM Services 15 FEB 2022.xlsx XLSX spreadsheet
Attachment 15 DD Form 254.pdf PDF
Attachment 3.5 Fire Alarm System.docx DOCX document
Attachment 16 Wisconsin HVAC Qualifier Application.pdf PDF
Attachment 18 Water System Valves Lines and Hydrants.pdf PDF
Attachment 10.1 Aboveground Storage Tank Inspection Form 372.xlsx XLSX spreadsheet
Attachment 21 FMF452 Installation Access Pass Request .pdf PDF
Attachment 3.4 Fire Suppression (Dry Pipe).xlsx XLSX spreadsheet
Attachment 20 FMF451 Installation Access NCIC-III Check Request .pdf PDF
Attachment 3.10 Runway Lighting.pdf PDF
Attachment 3.2 Fire Suppression (Kitchen Hood Cleaning).xlsx XLSX spreadsheet
Attachment 2 Fort McCoy Base Data.xlsx XLSX spreadsheet
Solicitation Fort McCoy Fac Maint Services .pdf PDF
Attachment 12 Generator Log.xlsx XLSX spreadsheet
Attachment 3.6 Earth Bond Testing.xlsx XLSX spreadsheet
Attachment 3.9 Elevators and Lifts.xlsx XLSX spreadsheet
Attachment 14 Facility Deactivation.docx DOCX document
Attachment 19 POL System Block Book.pdf PDF
Past Performance Questionnaire.pdf PDF
Attachment 6.1 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 11 Facility Standards.docx DOCX document
Attachment 3 PM Task and Frequency Chart.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TR-WM-141 (2/17) Formerly ERS-10785 FOR OFFICE USE ONLY

Wisconsin Department of Agriculture, Trade and Consumer Protection

Bureau of Weights and Measures

P.O. Box 7837, Madison, WI 53707-7837

(608) 224-4942

UST CORROSION PROTECTION TEST/SURVEY REPORT

Wis. Admin. Code §ATCP 93.100

Personal information you provide may be used for purposes other than that for which it was originally collected (s. 15.04(1)(m) Wis. Stats.).

OWNER INFORMATION

CUSTOMER NAME:

COMPANY NAME:

TELEPHONE:

E-MAIL:

STREET ADDRESS:

CITY VILLAGE TOWN

STATE

ZIP

SITE INFORMATION

FACILITY NAME:

FACIILITY ID#:

ASSIGNED ANNIVERSARY MONTH

DATE OF TESTING/SERVICING

CITY VILLAGE TOWN

TESTER INFORMATION

SUBMITTING PARTY:

CONTACT PERSON

WORK ORDER #:

TELEPHONE:

CELL PHONE:

E-MAIL:

TESTER NAME: SURVEY TYPE:

Wisconsin Certification Type: Routine Re-Survey Post-Repair or Modification Post-Installation

Wisconsin Certification #: TYPE OF SYSTEM: Impressed Current Galvanic

CP CRITERION APPLIED: -0.850 volts “ON” (Galvanic) 100 mV Polarization (Impressed) -0.850 volts “INSTANT-OFF” (Impressed)

SECTION I: Tester’s evaluation (mark only one)

PASS

All protected structures at this site pass the cathodic protection survey and it is judged that adequate cathodic protection has been provided to the UST system. Complete Section III.

FAIL

One or more protected structures at this site fail the cathodic protection survey and it is judged that adequate cathodic protection has not been provided to the UST system. Complete Section III.

INCONCLUSIVE

If the remote and the local do not both indicate the same test result on all protected structures (both pass or both fail), inconclusive is indicated and the survey must be evaluated and/or conducted by a corrosion expert. Go to Section II.

CP TESTER (Print): CP TESTER’S SIGNATURE:

SECTION II: Corrosion expert’s evaluation (mark only one)

The survey must be conducted and/or evaluated by a corrosion expert when: a) supplemental anodes or other changes in the cathodic protection system are made; b) stray current may be affecting buried metallic structures or c) an inconclusive result was indicated.

PASS

All protected structures at this site pass the cathodic protection survey and it is judged that adequate cathodic protection has been provided to the UST system. Complete Section III.

FAIL

One or more protected structures at this site fail the cathodic protection survey and it is judged that adequate cathodic protection has not been provided to the UST system. Complete Section III.

COMMENT:

CORROSION EXPERT’S NAME (Print): CORROSION EXPERT’S NAME

COMPANY NAME:

WISCONSIN CORROSION EXPERT CERTIFICATION #:

REVIEW DATE:

CITY

SECTION III: Action required as a result of this evaluation (mark only one)

NONE Cathodic protection is adequate. Test again within regulatory window or by: (DATE):

REPAIR & RETEST

Cathodic protection is not adequate. (Corrosion Expert evaluation in Section II is required if adding supplemental anodes, impressed current, or if stray current is suspected.) Repair/modification is necessary by:

(DATE):

TESTING INDICATES INCONCLUSIVE Wisconsin Corrosion Expert evaluation required within 30 days : (DATE):

TR-WM-141 (2/17)

Formerly ERS-10785

FACILITY NAME: DATE:

Rectifier Info: VOLTS AMPS: SETTINGS COARSE: FINE:

Anode Output: TOTAL:

POTENTIAL MEASUREMENTS

TEST

LOCATION

NUMBER

DESCRIPTION

(i.e. Tank A–White (REG) Fill End)

CONTACT POINT

(i.e. Tank Bottom or Test Lead)

HALF CELL

PLACEMENT

(i.e. Soil over Tank)

ON

READING

(VOLTS)

INSTANT-

OFF

(VOLTS)

DEPOL NATIVE

DATE:

mV Polarized

(100mV

Criteria)

STRUCTURE to

CONDUIT or REC

NEGATIVE

(VOLTS)

Pass/

Fail

Formerly ERS-10785 FACILITY NAME: DATE:

Rectifier Info: VOLTS AMPS: SETTINGS COARSE: FINE:

Anode Output: TOTAL:

POTENTIAL MEASUREMENTS

TEST

LOCATION

NUMBER

DESCRIPTION

(i.e. Tank A–White (REG) Fill End)

CONTACT POINT

(i.e. Tank Bottom or Test Lead)

HALF CELL

PLACEMENT

(i.e. Soil over Tank)

ON

READING

(VOLTS)

INSTANT-

OFF

(VOLTS)

DEPOL NATIVE

DATE:

mV Polarized

(100mV

Criteria)

STRUCTURE to

CONDUIT or REC

NEGATIVE

(VOLTS)

Pass/

Fail

Formerly ERS-10785 FACILITY NAME: DATE:

Provide a drawing or use the space below:

NOTES: 1) Measurements shall be taken over tank(s); Minimum 3 tank top/ 1 remote.

2) One measurement shall be taken for every 10 feet of piping length.

Include Service Station Diagram that shows all Tanks and Dispensers in relation to Buildings and Streets. Include on the drawing the location of the Submersible Pumps, Fills, ATGs, Risers, and Vents. If this is an Impressed Current System, show Rectifier location.

Clearly indicate on diagram where all Test Readings were taken by identifying each structure being tested (UST by Product Stored or

Product Piping by Tank/Dispenser) and numbering each individual test location. Show on drawing if corrosion test leads and/or test stations exist for the USTs or product piping and their location. Show locations of all reference electrodes. Indicate North on the drawing.