This document outlines facility activation tasks and details for Fort McCoy in Wisconsin. The contractor shall perform various activation tasks for different facility types on the base, including wood framed structures, permanent construction buildings, laundry facilities, dining facilities, arms vaults, shower trailers, and irrigation systems. Tasks include turning on utilities, setting thermostats, flushing water systems, activating fire alarms and suppressions systems, starting equipment, and ensuring operations. The related federal contract opportunity is for facility maintenance services at Fort McCoy and requires the contractor to maintain, repair, and perform preventative maintenance to enable facilities, utilities, equipment, and areas to function at full capacity per service orders or schedules. The solicitation was issued by the U.S. Army Corps of Engineers District St. Paul for an indefinite delivery/indefinite quantity contract.

View the file

Other files

File Type Posted
Amendment 0003 .pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Site Visit List .pdf PDF
Amendment 0001.pdf PDF
CBA Fort McCoy July 1 2021 - June 30 2024 .pdf PDF
Attachment 9 Available Automation Equipment.xlsx XLSX spreadsheet
Attachment 3.7 Cathodic Protection.xlsx XLSX spreadsheet
Attachment 10 Form TR-WM-118.pdf PDF
Attachment 7 Government Furnished Facilities.xlsx XLSX spreadsheet
Attachment 3.3 Fire Suppression (Wet Pipe).xlsx XLSX spreadsheet
Attachment 3.1 Fire Suppression (Ansul-Chemical).xlsx XLSX spreadsheet
Attachment 6 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 8 Facility Maintenance Repair ATOPSEC Cover Sheet.pdf PDF
Attachment 3.8 Cathodic Protection WWTP.pdf PDF
Attachment 4 Ice Melt Monthly Report.xlsx XLSX spreadsheet
Attachment 3.11 Water Meters Calibration.xlsx XLSX spreadsheet
Attachment 1 Performance Requirements Summary.docx DOCX document
Blank Price Schedule - FM Services 15 FEB 2022.xlsx XLSX spreadsheet
Attachment 15 DD Form 254.pdf PDF
Attachment 3.5 Fire Alarm System.docx DOCX document
Attachment 16 Wisconsin HVAC Qualifier Application.pdf PDF
Attachment 18 Water System Valves Lines and Hydrants.pdf PDF
Attachment 10.1 Aboveground Storage Tank Inspection Form 372.xlsx XLSX spreadsheet
Attachment 21 FMF452 Installation Access Pass Request .pdf PDF
Attachment 3.4 Fire Suppression (Dry Pipe).xlsx XLSX spreadsheet
Attachment 20 FMF451 Installation Access NCIC-III Check Request .pdf PDF
Attachment 3.10 Runway Lighting.pdf PDF
Attachment 3.2 Fire Suppression (Kitchen Hood Cleaning).xlsx XLSX spreadsheet
Attachment 2 Fort McCoy Base Data.xlsx XLSX spreadsheet
Solicitation Fort McCoy Fac Maint Services .pdf PDF
Attachment 12 Generator Log.xlsx XLSX spreadsheet
Attachment 3.6 Earth Bond Testing.xlsx XLSX spreadsheet
Attachment 3.9 Elevators and Lifts.xlsx XLSX spreadsheet
Attachment 14 Facility Deactivation.docx DOCX document
Attachment 3.7.1 TR-WM-141 UST Corrosion Protection Test Form.pdf PDF
Attachment 19 POL System Block Book.pdf PDF
Past Performance Questionnaire.pdf PDF
Attachment 6.1 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 11 Facility Standards.docx DOCX document
Attachment 3 PM Task and Frequency Chart.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DPW FACILITY MAINTENANCE & REPAIR CONTRACT
Attachment 13 FACILITY ACTIVATION
TASK LIST – FORT MCCOY REAL PROPERTY
The following tasks pertain to activation of Fort McCoy Facilities. The Contractor is responsible for appropriate measures which will allow the facility and its components to be used for its complete and intended purpose or to conserve energy and to protect facilities and components. The Contractor shall report any deficiencies (in written format) to the Government Work Reception Center. Any work in addition to activation will be considered maintenance and repair.
Not all tasks will be required for every building. Contractor shall perform all tasks which apply for buildings issued on activation orders. Contractor shall refer to manufacturer recommendations for additional detail on activation of equipment.
A- NO ANTI-FREEZE/GLYCOL TYPE SOLUTIONS WILL BE USED IN THE POTABLE WATER SUPPLY LINES, FIXTURES, OR EQUIPMENT AT ANY TIME.
B- THERMOSTATS- Thermostats for mechanical rooms will be set at 55 degrees F. Thermostats in mechanical rooms that control areas outside the mechanical room will be set at 70 degrees F Thermostats in common areas will be set at 55 degrees F. Thermostats with batteries, replace thermostat batteries with each annual activation.

1. Wood Framed structures, including barracks, classrooms, administration, and BOQ facilities. Type 1.

a. Turn on gas supply valves. Activate building heat, including mechanical room.
b. Turn on water supply, and power to water heater(s), including tankless water heaters.
c. Activate fire suppression system and compressor. Activation includes inspection and testing IAW NFPA.
d. Flush building water systems. Completely flush all supply, waste lines and appliances.
e. Enable fire alarm zones in the fire alarm control panel (FACP). Check batteries in fire alarm system. Reprogram the Sig Com Panel to look for the voice evacuation panel (VEP).
f. In barracks buildings, turn on the breaker for the bathroom exhaust fans.
g. Connect the freeze alarm to the Sig Com panel. Test sensors for functionality.
h. Set thermostats; Mechanical room 55 F, Common areas where thermostat is accessible 55 F, Thermostats that control common areas, and are located in a mechanical room 70 F.
i. Clean work area of spills, debris, and dirt.
2. Permanent Construction Buildings - Block, Brick & Mortar buildings – which are not fully deactivated. Includes Building 2674. Type 2.
a. Turn on water supply.
b. Set thermostats; Mechanical room 55 F, Common areas where thermostat is accessible 55 F, Thermostats that control common areas, and are located in a mechanical room 70 F
c. Turn on electrical breakers to exterior parking lot or sidewalk lighting (i.e. Building 2674).
d. Turn on interior security lighting breaker.
e. Turn on gas to cooking equipment. Light pilot lights to cooking equipment.
f. Sanitize ice making machine systems. Turn on ice makers to ensure operation.
g. Turn on all refrigeration (include outside stand-alones) to ensure operation.
h. Clean work area of spills, debris, and dirt.
3. Laundry facility. Type 3.
a. Turn on water supply, and power to water heater(s).
b. Unseal combustion air supply for dryers and remove insulation.
c. Ensure thermostats are set to 55 degrees F.
d. Clean work area of spills, debris, and dirt.
4. Wood framed dining facilities. Type 4.
a. Turn on water supply, and power to water heater(s).
b. Set thermostat to 55 degrees F.
c. Activate fire suppression system and compressor. Activation includes inspection and testing
d. Sanitize ice making machine systems. Turn on ice makers to ensure operation.
e. Light all pilot lights to gas-operated cooking equipment.
f. Turn on all refrigeration to ensure operation.
g. Clean work area of spills, debris, and dirt.
5. Permanent Construction Buildings - Block, Brick & Mortar buildings; Metal buildings – which are fully deactivated. Includes Buildings 2643, 2776, 2792, 2793, 2840; Unit Maintenance facilities; and COL Dining Facilities. Type 5.
a. Turn on gas supply valves. Activate building heat, including mechanical room.
b. Turn on water supply, and power to water heater(s).
c. Flush building water systems. Completely flush all supply, waste lines and fixtures.
d. Completely flush all eyewash showers and eyewash stations. Ensure proper operation and water temperature.
e. Activate fire suppression system and compressor, When applicable. Activation includes inspection and testing IAW NFPA.
f. Enable fire alarm zones in the fire alarm control panel (FACP). Check batteries in fire alarm panels. Reprogram the Sig Com Panel to look for the voice evacuation panel (VEP).
g. Connect the freeze alarm to the Sig Com Panel. Test sensors for functionality.
h. Set thermostats; Mechanical room 55 F, Common areas where thermostat is accessible 55 F, Thermostats that control common areas, and are located in a mechanical room 70 F.
i. Light all pilot lights on cooking equipment.
j. Sanitize ice making machine systems. Turn on ice makers to ensure operation.
k. Turn on coffee urns to ensure operation. Turn urns off upon verification of operation.
l. Turn on all refrigeration (including outside refrigeration) to ensure operation.
m. Clean work area of spills, debris, and dirt.
6. Arms Vaults. Type 6.
a. Activate all building heat, ensure thermostats are set to 55 degrees F.
b. Enable fire alarm zones in the fire alarm control panel (FACP). Check batteries in fire alarm panels. Reprogram the Sig Com Panel to look for the voice evacuation panel (VEP).
c. Clean work area of spills, debris, and dirt.
7. COL Shower Trailers. Type 7.
a. Turn on gas supply valves. Activate building heat. Set all thermostats to 55 F.
b. Turn on water supply to the facility, and power to water heater(s).
c. Flush building water systems. Completely flush all supply, waste lines and fixtures.
d. Enable fire alarm zones in the fire alarm control panel (FACP). Check batteries in fire alarm panels. Reprogram the Sig Com Panel to look for the voice evacuation panel (VEP).
e. Connect freeze alarm to the Sig Com Panel. Test sensors for functionality.
f. Clean work area of spills, debris, and dirt.
8. Building 204. Type 8.
a. Gas supply valves OFF.
b. Turn on water supply.
c. Flush building water systems. Completely flush all supply, waste lines and fixtures.
d. Activate fire suppression system and compressor. Activation includes inspection and testing IAW NFPA.
e. Activate compressors.
f. Enable fire alarm zones in the fire alarm control panel (FACP). Check batteries in fire alarm panels. Reprogram the Sig Com Panel to look for the voice evacuation panel (VEP).
g. Connect freeze alarm sensors in previously unheated areas. Test sensors for functionality.
h. Clean work area of spills, debris, and dirt.
9. Contingency Operation Locations (COL)
a. Turn on water supply to the COL, and power to water heater(s).
b. Flush building water systems. Completely flush all supply, waste lines and fixtures.
c. Enable fire alarm zones in the fire alarm control panel (FACP) of any facility not covered by previous activation. Check batteries in fire alarm panels. Reprogram the Sig Com Panel to look for the voice evacuation panel (VEP).
d. Connect freeze alarm to the Sig Com Panel. Test sensors for functionality.
e. Clean work area of spills, debris, and dirt.
10. TTB-Justice, Independence-Range 8
a. Reconnect UV solenoid valve at water supply piping.
b. Reconnect water supply connections from UV unit to main supply piping.
c. Reinstall water meter.
d. Reinstall supply and drain piping from pressure tank to main supply.
e. Turn on electric power, Range 8 and Independence. (Justice provide temporary power to test system).
11. Water Fill Points (Freedom and Liberty)
a. Close all drain ports
b. Turn water on at curb stop
c. Verify system for water flow and leaks
d. If equipped with a heater, during cold weather set T stat to 55 degrees
Post Irrigation Systems
12. South Post Garden Plot
a. Turn water on at curb stop
b. Close all faucets except farthest faucet from the riser, pressurize water lines
c. Once all air is removed from the system, close open faucet.
d. Verify system operation, check for leaks
13. Building 60, 1792 daycare and 1796 daycare
a. Turn water valve on in mechanical room that supplies the yard sprinkler system
b. Open each yard zone separately until all air is evacuated
c. Pressurize water lines, verify system operation, check system for leaks
14. Campground Mini-Golf Pond
a. Install pumps in pond
b. Connect electrical to pumps
c. Turn on water fill valve
d. Verify system operation, check for leaks