Attachment 3.10 Runway Lighting.pdf

PDF 275 KB Posted

Attached to
Facility Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES22R0011
Issued by

About this file

This document outlines facility maintenance services requirements at Fort McCoy in Wisconsin. The contractor shall provide maintenance, repairs, and preventive maintenance to enable facilities, utilities, equipment, and areas identified by service orders or preventive maintenance schedules to function at full capacity for their intended use. Work includes maintenance, repair, and installation of all facility and building components, devices, equipment, and associated subsystems in accordance with manufacturer manuals. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District St Paul for maintenance services at Fort McCoy.

View the file

Other files

File Type Posted
Amendment 0003 .pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Site Visit List .pdf PDF
Amendment 0001.pdf PDF
CBA Fort McCoy July 1 2021 - June 30 2024 .pdf PDF
Attachment 9 Available Automation Equipment.xlsx XLSX spreadsheet
Attachment 3.7 Cathodic Protection.xlsx XLSX spreadsheet
Attachment 10 Form TR-WM-118.pdf PDF
Attachment 7 Government Furnished Facilities.xlsx XLSX spreadsheet
Attachment 3.3 Fire Suppression (Wet Pipe).xlsx XLSX spreadsheet
Attachment 3.1 Fire Suppression (Ansul-Chemical).xlsx XLSX spreadsheet
Attachment 6 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 8 Facility Maintenance Repair ATOPSEC Cover Sheet.pdf PDF
Attachment 3.8 Cathodic Protection WWTP.pdf PDF
Attachment 4 Ice Melt Monthly Report.xlsx XLSX spreadsheet
Attachment 3.11 Water Meters Calibration.xlsx XLSX spreadsheet
Attachment 13 Facility Activation.xlsx XLSX spreadsheet
Attachment 1 Performance Requirements Summary.docx DOCX document
Blank Price Schedule - FM Services 15 FEB 2022.xlsx XLSX spreadsheet
Attachment 15 DD Form 254.pdf PDF
Attachment 3.5 Fire Alarm System.docx DOCX document
Attachment 16 Wisconsin HVAC Qualifier Application.pdf PDF
Attachment 18 Water System Valves Lines and Hydrants.pdf PDF
Attachment 10.1 Aboveground Storage Tank Inspection Form 372.xlsx XLSX spreadsheet
Attachment 21 FMF452 Installation Access Pass Request .pdf PDF
Attachment 3.4 Fire Suppression (Dry Pipe).xlsx XLSX spreadsheet
Attachment 20 FMF451 Installation Access NCIC-III Check Request .pdf PDF
Attachment 3.2 Fire Suppression (Kitchen Hood Cleaning).xlsx XLSX spreadsheet
Attachment 2 Fort McCoy Base Data.xlsx XLSX spreadsheet
Solicitation Fort McCoy Fac Maint Services .pdf PDF
Attachment 12 Generator Log.xlsx XLSX spreadsheet
Attachment 3.6 Earth Bond Testing.xlsx XLSX spreadsheet
Attachment 3.9 Elevators and Lifts.xlsx XLSX spreadsheet
Attachment 14 Facility Deactivation.docx DOCX document
Attachment 3.7.1 TR-WM-141 UST Corrosion Protection Test Form.pdf PDF
Attachment 19 POL System Block Book.pdf PDF
Past Performance Questionnaire.pdf PDF
Attachment 6.1 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 11 Facility Standards.docx DOCX document
Attachment 3 PM Task and Frequency Chart.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sparta Ramp

Reserve Ramp

Base Ops

¼

¼

H

Æ

Æ

Æ

Æ

Alpha Taxiway

Alpha Taxiway Alpha Ramp

Delta 1 Taxiway

Delta Taxiway

B T wy C T wy

1 )

Fire Station

Refuel Ramp

¼

"50 0'

"50 0'

"4697'

"24

"41

"4265'

"36 7'

"13

"432'

Northwest Sod

Northeast Sod

West Sod

East Sod

East Center Sod

Southeast Sod

Southwest Sod

AWOS

Hangar

Hazardous Cargo Area

PAPI

PAPI

PAPI

PAPI

REIL

REIL

REIL

REIL

Fire Training Area

Airfield Lighting Vault

Bulk Fuel Storage Area

Rotating Beacon

MAGNETIC HEADING

RWY 1 - 015

RWY 11 - 112

RWY 19 - 195

RWY 29 - 292

PREFERRED RUNWAY - 29

CALM WIND RUNWAY - 29

AIRFIELD ELEVATION - 838

SPARTA - FORT MCCOY

AIRPORT DIAGRAM

SURVEY DATE: 07/29/2015

LAST REVIEW:

James L. Hubbard Jr.

Chief, Airfield Division

18 Jan 2017

APPENDIX A

james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval

Precision Approach Path Indicators (PAPI) - FAA Joint Order 6850.5C

Performance Checks Responsibility Airfield DPW

Monthly Visually check operation of all lights and lamp box alignment X

Quarterly Check vertical and horizontal alignment of all light boxes X Check lamps and filters for cleanliness and the lamp box for structural defects such as chipping, cracking, or bending.

X

Check for water or signs of water damage and broken or missing screens in the lamp box.

X

Check approach slope line-of-sight clearance for vegetation and other obstructions.

X

Semiannually Record meter readings X X Check PAPI tilt switches X X

Annually Check remote control functions X Check wiring X X Check fused cutout switch X X Check system grounding X

Every 3 Years Check conductor and insulation resistance of all power and control cables.

Record all measurements and compare them with previous readings.

X X

Runway End Identifier Lights (REIL) - FAA Joint Order 6850.5C

Performance Checks Responsibility Airfield DPW

Quarterly Make visual operation checks of all lights. Check and clean exterior as required

X

Check both fixtures for damaged or misaligned lights X Record input voltage at power control cabinet X X Check flasher rate X

Annually Check ground connections at terminal pole and at each light fixture X X Clean interiors of both the control panel and the flasher cabinets X X Check safety devices X X Check light supports and control cabinet for rigidity X Inspect all power distribution equipment and protective devices at terminal pole and at the lights

X X

Inspect relays X X Service timer motor and contacts X X

Every 3 Years Check conductor and insulation resistance of all power and control cables.

Record all measurements and compare them with previous readings.

X X

Airfield Diagram 2017
PAPI-REIL Certification Requirement Responsibility

File details come from the government source that posted it. Updated .