This document outlines facility maintenance services requirements at Fort McCoy in Wisconsin. The contractor shall provide maintenance, repairs, and preventive maintenance to enable facilities, utilities, equipment, and areas identified by service orders or preventive maintenance schedules to function at full capacity for their intended use. Work includes maintenance, repair, and installation of all facility and building components, devices, equipment, and associated subsystems in accordance with manufacturer manuals. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District St Paul for maintenance services at Fort McCoy.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sparta Ramp
Reserve Ramp
Base Ops
¼
¼
H
Æ
Æ
Æ
Æ
Alpha Taxiway
Alpha Taxiway Alpha Ramp
Delta 1 Taxiway
Delta Taxiway
B T wy C T wy
1 )
Fire Station
Refuel Ramp
¼
"50 0'
"50 0'
"4697'
"24
"41
"4265'
"36 7'
"13
"432'
Northwest Sod
Northeast Sod
West Sod
East Sod
East Center Sod
Southeast Sod
Southwest Sod
AWOS
Hangar
Hazardous Cargo Area
PAPI
PAPI
PAPI
PAPI
REIL
REIL
REIL
REIL
Fire Training Area
Airfield Lighting Vault
Bulk Fuel Storage Area
Rotating Beacon
MAGNETIC HEADING
RWY 1 - 015
RWY 11 - 112
RWY 19 - 195
RWY 29 - 292
PREFERRED RUNWAY - 29
CALM WIND RUNWAY - 29
AIRFIELD ELEVATION - 838
SPARTA - FORT MCCOY
AIRPORT DIAGRAM
SURVEY DATE: 07/29/2015
LAST REVIEW:
James L. Hubbard Jr.
Chief, Airfield Division
18 Jan 2017
APPENDIX A
james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval james.hubbardjr Oval
Precision Approach Path Indicators (PAPI) - FAA Joint Order 6850.5C
Performance Checks Responsibility Airfield DPW
Monthly Visually check operation of all lights and lamp box alignment X
Quarterly Check vertical and horizontal alignment of all light boxes X Check lamps and filters for cleanliness and the lamp box for structural defects such as chipping, cracking, or bending.
X
Check for water or signs of water damage and broken or missing screens in the lamp box.
X
Check approach slope line-of-sight clearance for vegetation and other obstructions.
X
Semiannually Record meter readings X X Check PAPI tilt switches X X
Annually Check remote control functions X Check wiring X X Check fused cutout switch X X Check system grounding X
Every 3 Years Check conductor and insulation resistance of all power and control cables.
Record all measurements and compare them with previous readings.
X X
Runway End Identifier Lights (REIL) - FAA Joint Order 6850.5C
Performance Checks Responsibility Airfield DPW
Quarterly Make visual operation checks of all lights. Check and clean exterior as required
X
Check both fixtures for damaged or misaligned lights X Record input voltage at power control cabinet X X Check flasher rate X
Annually Check ground connections at terminal pole and at each light fixture X X Clean interiors of both the control panel and the flasher cabinets X X Check safety devices X X Check light supports and control cabinet for rigidity X Inspect all power distribution equipment and protective devices at terminal pole and at the lights
X X
Inspect relays X X Service timer motor and contacts X X
Every 3 Years Check conductor and insulation resistance of all power and control cables.
Record all measurements and compare them with previous readings.
X X
| Airfield Diagram 2017 |
| PAPI-REIL Certification Requirement Responsibility |