Attachment 3.11 Water Meters Calibration.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Facility Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES22R0011
Issued by

About this file

This document contains an attachment listing water meters requiring calibration at Fort McCoy, Wisconsin and the related federal contract opportunity for facility maintenance services at the base. The attachment provides details on 52 water meters including location, size, manufacturer, model, serial number, and calibration dates. It outlines the process for meter testing, which can be done by removing the meter and sending it for off-site testing or using an in-line certified test meter. The federal contract opportunity is for maintenance, repairs, and preventive maintenance services to enable full operation of facilities, utilities, equipment, and areas identified in work orders or preventive maintenance schedules at Fort McCoy. The scope includes maintenance and repair of all building components, devices, equipment, and associated subsystems in accordance with manufacturer manuals. The contracting agency is the US Army Corps of Engineers Engineering District St Paul.

View the file

Other files

File Type Posted
Amendment 0003 .pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Site Visit List .pdf PDF
Amendment 0001.pdf PDF
CBA Fort McCoy July 1 2021 - June 30 2024 .pdf PDF
Attachment 9 Available Automation Equipment.xlsx XLSX spreadsheet
Attachment 3.7 Cathodic Protection.xlsx XLSX spreadsheet
Attachment 10 Form TR-WM-118.pdf PDF
Attachment 7 Government Furnished Facilities.xlsx XLSX spreadsheet
Attachment 3.3 Fire Suppression (Wet Pipe).xlsx XLSX spreadsheet
Attachment 3.1 Fire Suppression (Ansul-Chemical).xlsx XLSX spreadsheet
Attachment 6 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 8 Facility Maintenance Repair ATOPSEC Cover Sheet.pdf PDF
Attachment 3.8 Cathodic Protection WWTP.pdf PDF
Attachment 4 Ice Melt Monthly Report.xlsx XLSX spreadsheet
Attachment 13 Facility Activation.xlsx XLSX spreadsheet
Attachment 1 Performance Requirements Summary.docx DOCX document
Blank Price Schedule - FM Services 15 FEB 2022.xlsx XLSX spreadsheet
Attachment 15 DD Form 254.pdf PDF
Attachment 3.5 Fire Alarm System.docx DOCX document
Attachment 16 Wisconsin HVAC Qualifier Application.pdf PDF
Attachment 18 Water System Valves Lines and Hydrants.pdf PDF
Attachment 10.1 Aboveground Storage Tank Inspection Form 372.xlsx XLSX spreadsheet
Attachment 21 FMF452 Installation Access Pass Request .pdf PDF
Attachment 3.4 Fire Suppression (Dry Pipe).xlsx XLSX spreadsheet
Attachment 20 FMF451 Installation Access NCIC-III Check Request .pdf PDF
Attachment 3.10 Runway Lighting.pdf PDF
Attachment 3.2 Fire Suppression (Kitchen Hood Cleaning).xlsx XLSX spreadsheet
Attachment 2 Fort McCoy Base Data.xlsx XLSX spreadsheet
Solicitation Fort McCoy Fac Maint Services .pdf PDF
Attachment 12 Generator Log.xlsx XLSX spreadsheet
Attachment 3.6 Earth Bond Testing.xlsx XLSX spreadsheet
Attachment 3.9 Elevators and Lifts.xlsx XLSX spreadsheet
Attachment 14 Facility Deactivation.docx DOCX document
Attachment 3.7.1 TR-WM-141 UST Corrosion Protection Test Form.pdf PDF
Attachment 19 POL System Block Book.pdf PDF
Past Performance Questionnaire.pdf PDF
Attachment 6.1 Historical Workload Service Orders.xlsx XLSX spreadsheet
Attachment 11 Facility Standards.docx DOCX document
Attachment 3 PM Task and Frequency Chart.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Meters

Attachment 3.11 Water Meter Calibration
LocationMeter SizeMake / ModelSerial NumberCalibration DateTest Interval (Yrs)Repaired / AdjustedPass FailNote Number
502
512
512
602
902
952
2002
2422
11222
13642
15382
15682
15712
21712
21872
26742
30502
5009 Well6"Rosemount 8712 Mag176691
5010 Well6"Rosemount 8712 Mag176721
5020 Well2"Badger Turbine RCDL478086162
5021 Well4"Hersey 400 Disc97097591
5022 Well6"Rosemount 8712 Mag176671
5023 Well6"Rosemount 8712 Mag176681
5026 Well6"Badger M2000 Mag46984541
5029 Well6"Rosemount 8712176681
R002W1"Badger M70 Disc363998142
R006 Well1"Missing2
R031Well2
R032 Well2"ABB Piston989698012
R034 Well1"Badger M70 Disc363998122
R036 Well1"Badger M70 Disc363998102
MFT1 Well1"Badger M70 Disc482428012
MFT2 Well1"Missing2
R018 Well2"Badger RCDL Turbine446432342
R101 Well2"Badger Turbine RCDL446432352
R031 Well1"Badger M70 Disc456756952
CCTFW1"Hersey162760652
50501
60622
60702
80592
80692
100002
South Post Housing
62072
62082
62092
62102
62112
62262
62282
62302
62322
62342
62362
62382
62402
62412
62422
62432
62442
63312
63332
64072
64082
64092
64102
64112
64122
64132
64142
64152
64162
64172
64182
64192
64202
64212
64222
64232
64242
64252
64262
64272
64282
64302
64312
64322
64332
64342
64352
64362
64372
64382
64392
64402
64412
64422
64432
64442
65012
65022
65032
65042
65052
65062
64292
Meter Testing
1. Remove the meter and send it in for testing or test the meters in place using a certified test meter.
2. Connect a certified meter to a bypass line or strap an ultrasonic meter to the water line right before or after the meter being tested. Both are an approved method for testing all types of meters including mag and ultrasonic meters.

File details come from the government source that posted it. Updated .