P303 Final Volume 2 Specs.pdf
PDF 2 MB Posted
- Solicitation number
- N4008021R6986
About this file
This solicitation is for the construction of a new Marine Corps Reserve Center, vehicle maintenance facility, and organic storage shed at Camp Fretterd in Maryland. The Marine Corps Reserve Center will be a single-story building totaling 35,130 square feet, constructed with reinforced concrete slab foundation, concrete block and steel frame, brick masonry exterior, and sloped standing seam metal roof. It will include an armory, drill hall, lockers and showers, classrooms, fitness center, supply storage, offices, and a covered weapons cleaning area. The vehicle maintenance facility will be a single-story building of 10,968 square feet with similar construction and including vehicle bays, offices, and a carpentry shop, as well as an outdoor vehicle wash platform. The organic storage shed will be a single-story, 4,000 square foot building with concrete slab foundation, steel frame, metal siding exterior, and sloped standing seam metal roof. The solicitation is being conducted by the Naval Facilities Engineering Command of the Department of the Navy.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC MIDLANT
Submitted By: Dagoberto Portillo, PE Date: [DD MMM YYYY]
Gov. Design Manager
Project Manager: Zaman Nouri-Mesbahi, PE Date: [DD MMM YYYY]
(NAVFAC)
Project Manager: Steve Andresen, PE Date: [DD MMM YYYY] (A/E)
Approved By: David A. Wolfel, RA Date: [DD MMM YYYY]
Design & Engineering Director
UNCLASSIFIED/FOR OFFICIAL USE ONLY
WORK ORDER NO. 1624797
CONTRACT NO. N40080-17-D-0018
P303 Marine Corps Reserve Center
FINAL SPECIFICATIONS
Volume 2 of 4
At the Camp Fretterd
Reisterstown, Maryland
Site
PREPARED BY:
Jacobs
5701 Cleveland Street Virginia Beach, VA 23462
Task # N4008020F4322
Architectural: Pete Soukas Civil: Tirona Dominador Structural: Matthew Bretthauer Landscape Arch: Daniel Dieble Interior Design: Briana Ernsting Sustainability: Elizabeth Floyd
Mechanical: Darren Magley Electrical: Brian Mitarotonda Fire Protection: Robert Tabet Cyber Security: Steve Dodge Telecom/Security: Derrick Stoutamire
04-16-2021 dagoberto.portillo New Stamp
THIS PAGE INTENTIONALLY LEFT BLANK
NAVFAC MIDLANT
UNCLASSIFIED/FOR OFFICIAL USE ONLY
WORK ORDER NO. 1624797
CONTRACT NO. N40080-17-D-0018
P303 Marine Corps Reserve Center
FINAL SPECIFICATIONS
Volume 2 of 4
SEALS PAGE
At the Camp Fretterd
Reisterstown, Maryland
Site
PREPARED BY:
Jacobs
5701 Cleveland Street Virginia Beach, VA 23462
Task # N4008020F4322
Architectural: Pete Soukas Civil: Tirona Dominador Structural: Matthew Bretthauer Landscape Arch: Daniel Dieble Interior Design: Briana Ernsting Sustainability: Elizabeth Floyd
Mechanical: Darren Magley Electrical: Brian Mitarotonda Fire Protection: Robert Tabet Cyber Security: Steve Dodge Telecom/Security: Derrick Stoutamire
THIS PAGE INTENTIONALLY LEFT BLANK
MARINE CORPS RESERVE CENTER W.O. No. 1624807 Camp Fretterd, Reisterstown, MD Site
PROJECT TABLE OF CONTENTS
DI VI SI ON 05 - METALS
05 05 23.16 08/18 WELDING
DI VI SI ON 09 - FI NI SHES
09 97 13.16 05/11 INTERIOR COATING OF WELDED STEEL WATER
TANKS
09 97 13.27 10/16 EXTERIOR COATING OF STEEL STRUCTURES
DI VI SI ON 26 - ELECTRI CAL
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 00 12/20 GENERATOR 3-WAY MANUAL TRANSFER
SWITCHES
26 42 22.00 20 01/08 CATHODIC PROTECTION SYSTEM FOR STEEL
WATER TANKS
26 56 00 05/13 EXTERIOR LIGHTING
DI VI SI ON 31 - EARTHWORK
31 23 00.00 20 02/11 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 92 19 08/17 SEEDING
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 16 15 04/08 WATER STORAGE STEEL TANKS
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 F5Y673AJ Volume 2
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
SECTION 05 05 23.16
WELDING
08/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360 (2017) Specification for Structural Steel Buildings
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel
(ANSI/ASNT CP-105-2006)
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2020) Structural Welding Code - Steel
AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel
AWS D14.4/D14.4M (2019) Specification for Welded Joints for Machinery and Equipment
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Welding Quality Assurance Plan; G
SD-03 Product Data
Welding Procedure Qualification Records; G
SECTION 05 05 23.16 Page 1 W.O. No. 786924
Welder, Welding Operator, and Tacker Performance Qualifications; G
Welding Electrodes and Rods
Welding Procedure Specifications (WPS); G
Brazing Procedure Specifications (BPS)
Procedure Qualification Records (PQR)
Welder Performance Qualifications (WPQ)
Brazer Performance Qualifications (BPQ)
SD-06 Test Reports
Nondestructive Testing
Weld Inspection Log
SD-07 Certificates
Certified Welding Inspector
Nondestructive Testing Personnel
1.3 QUALITY ASSURANCE
Except for pre-qualified meeting AWS D1.1/D1.1M each Contractor performing welding must record in detail and qualify each welding procedure used for fabrication. Welding procedure qualification records shall conform to AWS D1.1/D1.1M and to the specifications in this section. Submit for approval copies of the welding procedure specification and the procedure qualification records for each type of welding being performed.
Submission of welder, welding operator, and tacker performance qualification test records is also required. Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the specified requirements.
Submit this information on the forms in Annex J of AWS D1.1/D1.1M .
Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings. In case of conflict between this specification and AWS D1.1/D1.1M , this specification governs.
1.3.1 General Requirements
Fabricate work in an AISC Certified Fabrication Plant, Category BU. Erect work by an AISC Certified Erector, Category CSE.
a. For Structural Projects, provide documentation of the following:
(1) Component Thickness 1/8 inch and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1/D1.1M .
(2) Component Thickness Less than 1/8 inch: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3/D1.3M .
b. For other applications, provide documentation of the following:
SECTION 05 05 23.16 Page 2 W.O. No. 786924
(1) Submit Welding Procedure Specifications (WPS), Brazing Procedure Specifications (BPS) and Procedure Qualification Records (PQR) to the Contracting Officer for approval.
(2) Submit Welder Performance Qualifications (WPQ) and Brazer Performance Qualifications (BPQ) to the Contracting Officer for approval within fifteen calendar days prior to any employee welding on the project material.
(3) Machinery: Qualification documents (WPS, PQR and WPQs) in accordance with AWS D14.4/D14.4M .
1.3.2 Previous Qualifications
Welding procedures previously qualified by the Contractor in accordance with AWS D1.1/D1.1M , may be accepted for this contract without re-qualification, upon receipt of the test results, if the following conditions are met:
a. Testing was performed on behalf of the Contractor at an approved testing laboratory, or by the Contractor's approved quality control organization.
b. PQR and WPS conform to the requirements of this specification and are applicable to the welding conditions that will be encountered under this contract.
c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract. Qualifications completed more than 6-months ago will require requalification unless the Contractor submits documentation in the form of a Welder Log verifying that the welder has been welding continuously with no lapse exceeding 6 months while employed by the Contractor, using the positions and welding processes for which he was originally qualified.
1.3.3 Pre-qualified Procedures
Welding procedures that meet all the requirements of AWS D1.1/D1.1M , Clause 5 will be accepted without further qualification. Submit for approval a listing or an annotated drawing indicating where each welding procedure will be used. Procedure qualification is mandatory for joints geometries that do not meet the requirements of AWS D1.1/D1.1M, Clause 5.
1.3.4 Welder, Welding Operator, and Tacker Performance Qualifications
Each welder, welding operator, and tacker assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used within the applicable essential variables for welder qualification.
1.3.4.1 Previous Personnel Qualifications
At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:
SECTION 05 05 23.16 Page 3 W.O. No. 786924
a. Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.
b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
d. che welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.3.4.2 Certificates
Before assigning any welder, welding operator, or tacker to work under this contract, submit the names and certification that each individual is qualified as specified. State in the certification the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current, on file, and furnish 3 copies.
1.3.4.3 Renewal of Qualification
Re-qualification of a welder or welding operator is required under any of the following conditions:
a. It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.
b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.
c. The welder or welding operator was qualified by an employer other than those firms performing work under this contract, and a qualification test has not been taken within the past 12 months.
Submit as evidence of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.
d. A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he/she is qualified, unless there is some specific reason to question the tacker's ability or there has been a gap greater than 6 months since he/she last used the process. In such a case, the tacker is required to pass the prescribed tack welding test.
1.3.5 Inspector Qualification
Submit certificates indicating that certified welding inspectors meet the requirements of AWS QC1. Submit qualifications for nondestructive testing personnel in accordance with the requirements of ANSI/ASNT CP-189 for Levels I or II in the applicable nondestructive testing method. Level I inspectors must have direct supervision of a Level II inspector.
SECTION 05 05 23.16 Page 4 W.O. No. 786924
1.3.6 Symbols and Safety
Use symbols in accordance with AWS A2.4 , unless otherwise indicated.
Follow safe welding practices and safety precautions during welding in conformance with AWS Z49.1 .
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Conform the design of welded connections to AISC 360 , unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and the submittals approved by the Contracting Officer. Perform all testing at or near the work site.
Maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.
2.1.1 Pre-erection Conference
Hold a pre-erection conference prior to the start of the field welding, to bring all affected parties together and to gain a naturally clear understanding of the project and the Welding Procedure Specifications (WPS) (submitted for all welding, including welding done using pre-qualified procedures). Mandatory attendance is required by all Contractor's welding production and inspection personnel and appropriate Government personnel. Include as items for discussion: responsibilities of various parties; welding procedures and processes to be followed;
welding sequence (both within a joint and joint sequence within the building); inspection requirements and procedures, both visual and nondestructive testing; welding schedule; and other items deemed necessary by the attendees.
2.2 WELDING EQUIPMENT AND MATERIALS
Provide all welding equipment, welding electrodes and rods, welding wire, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator. Use low hydrogen welding electrodes and matching filler metals that comply with AWS D1.1/D1.1M . Submit product data on welding electrodes and rods.
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements
Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M and AISC 360 . When AWS D1.1/D1.1M and the AISC 360 specification conflict, the requirements of AWS D1.1/D1.1M govern.
3.1.2 Identification
Identify all welds in one of the following ways:
SECTION 05 05 23.16 Page 5 W.O. No. 786924
a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.
b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal.
Place the identification mark for seam welds adjacent to the weld at 3 foot intervals. Identification with die stamps or electric etchers is not allowed.
3.2 QUALITY CONTROL
Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. An AWS QC1 Certified Welding Inspector must perform visual inspection on 100 percent of all welds.
Document this inspection in the Visual Weld Inspection Log.
Test 25 percent of CJP welds using radiographic testing per AWS D1.1/D1.1M , Clause 8, Part E and Part F, respectively.. The locations of tank shell weld radiographic tests shall comply with AWWA D100, Section 11. Randomly test 50 percent of all PJP and fillet welds or as indicated by magnetic particle or dye penetrant testing. Verify the welds conform to paragraph STANDARDS OF ACCEPTANCE. Conform procedures and techniques for inspection with applicable requirements of AWS D1.1/D1.1M . Submit a Welding Quality Assurance Plan and records of tests and inspections.
3.3 STANDARDS OF ACCEPTANCE
Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M and the contract drawings. Submit all records of nondestructive testing.
3.3.1 Nondestructive Testing
The welding is subject to inspection and tests in the mill, shop, and field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present. Submit all records of nondestructive testing in accordance with paragraph STANDARDS
OF ACCEPTANCE.
3.3.2 Destructive Tests
Make all repairs when metallographic specimens are removed from any part of a structure. Employ only qualified welders or welding operators, and use the proper joints and welding procedures, including peening or heat treatment if required, to develop the full strength of the members and joints cut and to relieve residual stress.
SECTION 05 05 23.16 Page 6 W.O. No. 786924
3.4 GOVERNMENT INSPECTION AND TESTING
In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.
3.5 CORRECTIONS AND REPAIRS
If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1/D1.1M and the specifications. Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds must meet the inspection requirements for the original welds.
-- End of Section --
SECTION 05 05 23.16 Page 7 W.O. No. 786924
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 05 05 23.16 Page 8 W.O. No. 786924
SECTION 09 97 13.16
INTERIOR COATING OF WELDED STEEL WATER TANKS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D3276 (2015; E 2016) Standard Guide for Painting Inspectors (Metal Substrates)
ASTM D3925 (2002; R 2015) Sampling Liquid Paints and Related Pigmented Coatings
ASTM D4285 (1983; R 2012) Indicating Oil or Water in Compressed Air
ASTM D7127 (2017) Standard Test Method for Measurement of Surface Roughness of Abrasive Blast Cleaned Metal Surfaces using a Portable Stylus Instrument
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 9001 (2008; Corr 1 2009) Quality Management Systems- Requirements
NACE INTERNATIONAL (NACE)
NACE SP0188 (1999; R 2006) Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
NSF INTERNATIONAL (NSF)
NSF/ANSI 61 (2019) Drinking Water System Components - Health Effects
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning
SSPC AB 2 (2015; E 2016) Cleanliness of Recycled Ferrous Metallic Abrasive
SSPC AB 3 (2003; E 2004) Ferrous Metallic Abrasive
SSPC Guide 12 (1998; E 2004) Guide for Illumination of Industrial Painting Projects
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SECTION 09 97 13.16 Page 1 W.O. No. 786924
SSPC PA 2 (2015; E 2018) Procedure for Determining Conformance to Dry Coating Thickness Requirements
SSPC QP 1 (2019) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
SSPC QP 5 (2012) Standard Procedure for Evaluating the Qualifications of Coating and Lining Inspection Companies
SSPC QS 1 (2015) Standard Procedure for Evaluating a Contractor's Advanced Quality Management System
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP COM (2016; E 2017) Surface Preparation Commentary for Steel and Concrete Substrates
SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE AMS-STD-595A (2017) Colors used in Government Procurement
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-A-22262 (1993; Rev B; Am 2 1996) Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-24441 (2009; Rev D) Paint, Epoxy-Polyamide, General Specification for
MIL-DTL-24441/20 (2009; Rev B) Paint, Epoxy-Polyamide, Green Primer, Formula 150, Type III
MIL-DTL-24441/22 (2009; Rev B) Paint, Epoxy-Polyamide, White Formula 152, Type III
MIL-DTL-24441/29 (2009; Rev B) Paint, Epoxy-Polyamide, Green Primer, Formula 150, Type IV
MIL-DTL-24441/31 (2009; Rev B) Paint, Epoxy-Polyamide, White, Formula 152, Type IV
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910-SUBPART Z Toxic and Hazardous Substances
29 CFR 1910.134 Respiratory Protection
29 CFR 1910.1000 Air Contaminants
29 CFR 1926.59 Hazard Communication
SECTION 09 97 13.16 Page 2 W.O. No. 786924
1.2 DEFINITIONS
Definitions are provided throughout this Section, generally in the paragraph where used, and denoted by capital letters. The following definitions are used throughout this Section:
a. CEILING - interior tank surfaces that extend from the horizontal plane at the designated maximum water line upward, including the upper portion of the tank shell (walls), columns, structural steel, the underside of the roof plates and other steel components in this area.
b. BOWL - interior tank surfaces that extend from the horizontal plane at the designated maximum water line downward, including the tank walls, columns, piping, pipe supports, bottom plates, and other steel components in this area.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-05, Design Data
Environmental Control System
SD-06 Test Reports
Metallic Abrasive Qualification Test Reports
Coating Sample Test Reports
Abrasive Sample Test Reports
Inspection Report Forms
Daily Inspection Reports
Recycled Metallic Abrasive Field Test Reports (Daily and Weekly)
SD-07 Certificates
Contract Errors, Omissions, and Other Discrepancies
Corrective Action Procedures
Coating Work Plan
Qualifications of Certified Industrial Hygienist (CIH)
Qualifications Of Individuals Performing Abrasive Blasting
Qualifications of Certified Protective Coatings Specialist (PCS)
SECTION 09 97 13.16 Page 3 W.O. No. 786924
Qualifications of Coating Inspection Company
Qualifications of QC Specialist Coating Inspector
Qualifications of Testing Laboratory for Coatings
Qualifications of Testing Laboratory for Abrasive
Qualifications of Coating Contractors
Roof Joint Sealant Materials
Roof Joint Sealant Compatibility
Epoxy Coating Materials
Non-metallic Abrasive
Metallic Abrasive
SD-08 Manufacturer's Instructions
Roof Joint Sealant Instructions
Coating System Instructions
SD-11 Closeout Submittals
Disposal of Used Abrasive; G
Inspection Logbook; G
1.4 QUALITY ASSURANCE
1.4.1 Contract Errors, Omissions, and Other Discrepancies
Submit all errors, omissions, and other discrepancies in contract documents the Contracting Officer within 30 days of contract award for all work covered in this Section, other than the work that will not be uncovered until a later date. All such discrepancies shall be addressed and resolved, and the Coating Work Plan modified, prior to beginning the Initial and Follow-Up phases of work. Discrepancies that become apparent only after work is uncovered shall be identified at the earliest discoverable time and submitted for resolution. Schedule time (Float) should be built into the project schedule at those points where old work is to be uncovered or where access is not available during the first 30 days after award, to allow for resolution of contract discrepancies.
1.4.2 Corrective Action (CA)
CA shall be included in the Quality Control Plan.
1.4.2.1 Corrective Action Procedures
Develop procedures for determining the root cause of each non-compliance, developing a plan to eliminate the root cause so that the non-compliance does not recur, and following up to ensure that the root cause was eliminated. Develop Corrective Action Request (CAR) forms for initiating CA, and for tracking and documenting each step.
SECTION 09 97 13.16 Page 4 W.O. No. 786924
1.4.2.2 Implement Corrective Action
The Contractor shall take action to identify and eliminate the root cause of each non-compliance so as to prevent recurrence. These procedures shall apply to non-compliance in the work, and to non-compliance in the QC System. Corrective actions shall be appropriate to the effects of the non-compliance encountered. Each CAR shall be serialized, tracked in a Log to completion and acceptance by the Contracting Officer, and retained in project records. The Corrective Action Log, showing status of each CAR, shall be submitted to the Contracting Officer monthly. A CAR may be initiated by either the Contractor or the Contracting Officer. The Contracting Officer must approve each CAR at the root cause identification stage, the plan for elimination stage, and the close out stage after verification that the root cause has been eliminated.
1.4.3 Coating Work Plan
This work plan shall be considered as part of the Quality Control Plan.
Provide procedures for reviewing contract documents immediately after award to identify errors, omissions, and discrepancies so that any such issues can be resolved prior to project planning and development of detailed procedures.
Provide procedures for verification of key processes during Initial Phase to ensure that contract requirements can be met. Key processes shall include surface preparation, coating application and curing, inspection, and documentation, and any other process that might adversely impact orderly progression of work.
Provide procedures for all phases of coating operations, including planned work, rework, repair, inspection, and documentation. Address mobilization and setup, surface preparation, coating application, coating initial cure, tracking and correction of non-compliant work, and demobilization.
Coordinate work processes with health and safety plans and confined space entry plans. For each process, provide procedures that include appropriate work instructions, material and equipment requirements, personnel qualifications, controls, and process verification procedures.
Provide procedures for inspecting work to verify and document compliance with contract requirements, including inspection forms and checklists, and acceptance and rejection criteria.
Provide procedures for determining the existing surface profile under paint, and procedures for ensuring that the profile is not increased beyond the maximum profile specified herein.
Provide procedures for correcting non-compliant work. Detailed procedures are required in advance to avoid delays in meeting overcoat windows as well as to avoid delays in production. Provide procedures for repairing defects in the coating film, such as runs, drips, sags, holidays, overspray, as well as how to correct coating thickness non-compliance, any other areas of repair or rework that might be adversely affected by delays in preparing and approving new procedures.
If a procedure is based on a proposed or approved request for deviation, the deviation shall be referenced. Changes to procedures shall be noted by submittal number and date approved, clearly delineating old requirements and new requirements, so that the records provide a
SECTION 09 97 13.16 Page 5 W.O. No. 786924 continuous log of requirements and procedures.
1.4.4 Design Data
1.4.4.1 Environmental Control System
Submit design details of the proposed environmental control system to include ventilation, humidity control, and temperature regulation.
Provide calculations for humidity control during separate surface preparation and coating application procedures, ventilation requirements during coating application, and maximum allowable coating application rates to coincide with ventilation. Include basis of design data on local conditions. Provide equipment layout sketches and procedures showing function of each piece of equipment and fail-safe measures. A Certified Industrial Hygienist shall approve calculations, work procedures and personal protective equipment.
1.4.5 Test Reports
1.4.5.1 Metallic Abrasive Qualification Test Reports
Submit results for abrasive as required in paragraph 4 REQUIREMENTS of SSPC AB 3 . Submit test results from independent laboratory of representative samples of each abrasive to be used on the jobsite.
Samples must have been tested within the last three years. Note that this testing is for the purpose of prequalifying the abrasive.
1.4.5.2 Recycled Metallic Abrasive Field Test Reports (Daily and Weekly)
Submit test results from independent laboratory of daily and weekly Quality Control testing required by SSPC AB 2 , as modified in paragraph
ABRASIVE.
1.4.6 Qualifications
1.4.6.1 Qualifications of Certified Industrial Hygienist (CIH)
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party CIH. Submit documentation that hygienist is certified by the American Board of Industrial Hygiene in comprehensive practice, including certification number and date of certification/recertification. Provide evidence of experience with hazards involved in industrial coating application work.
1.4.6.2 Qualifications of Certified Protective Coatings Specialist (PCS)
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party PCS. Submit documentation that specialist is certified by SSPC: The Society for Protective Coatings (SSPC) as a PCS, including certification number and date of certification/recertification.
If the PCS is employed by the same coating inspection company to which the coating inspector is employed, this does not violate the independent third-party requirements. The PCS shall remain certified during the entire project, and the Contracting Officer shall be notified of any change in certification status within 10 days of the change. The PCS shall not be the designated coating inspector.
SECTION 09 97 13.16 Page 6 W.O. No. 786924
1.4.6.3 Qualifications of Coating Inspection Company
Submit documentation that the coating inspection company that will be performing all coating inspection functions is certified by SSPC to the requirements of SSPC QP 5 prior to contract award, and shall remain certified while accomplishing any coating inspection functions. The coating inspection company must remain so certified for the duration of the project. If a coating inspection company's certification expires, the firm will not be allowed to perform any inspection functions, and all surface preparation and coating application work must stop, until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in coating inspection company certification status.
1.4.6.4 Qualifications of QC Specialist Coating Inspector
Submit documentation that each coating inspector is employed, and qualified to SSPC QP 5 , Level III, by the selected coating inspection company. Each inspector shall remain employed by the coating inspection company while performing any coating inspection functions.
1.4.6.5 Qualifications Of Individuals Performing Abrasive Blasting
Submit name, address, and telephone number of each person that will be performing abrasive blasting. Submit documentation that each blaster is qualified by SSPC to the SSPC C-7 Dry Abrasive Blaster Qualification Program. Each blaster shall remain qualified during the entire period of abrasive blasting, and the Contracting Officer shall be notified of any change in qualification status.
1.4.6.6 Qualifications of Testing Laboratory for Coatings
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified.
1.4.6.7 Qualifications of Testing Laboratory for Abrasive
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of abrasive for compliance with specification requirements. Submit documentation that laboratory has experience in testing samples of abrasive for conformance with specifications, and that employees performing testing are qualified.
1.4.6.8 Qualifications of Coating Contractors
All Contractors and Subcontractors that perform surface preparation or coating application shall be certified to either ISO 9001 or SSPC QP 1 and SSPC QS 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application. The painting Contractors and painting Subcontractors must remain so certified for the duration of the project. If a Contractor's or Subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for
SECTION 09 97 13.16 Page 7 W.O. No. 786924 any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply.
Notify the Contracting Officer of any change in Contractor certification status.
1.4.6.9 Roof Joint Sealant Materials
Provide manufacturer's certification of conformance to contract requirements, and is certified in accordance with NSF/ANSI 61 .
1.4.6.10 Roof Joint Sealant Compatibility
Provide manufacturer's certification that the selected joint sealant is compatible with the epoxy primer and is suitable for application directly to prepared steel surfaces.
1.4.6.11 Epoxy Coating Materials
Provide manufacturer's certification that the epoxy lining materials are currently approved by the Naval Sea Systems Command and listed on the Qualified Products Lists (QPL) for the specified materials certified in accordance with NSF/ANSI 61 for tanks of the size being coated.
1.4.6.12 Non-metallic Abrasive
Provide manufacturer's certification that the materials are currently approved by the Naval Sea Systems Command and listed on the Qualified Products Lists (QPL) for the specified materials.
1.4.6.13 Metallic Abrasive
Provide manufacturer's certification of conformance to contract requirements and provide copies of test results.
1.4.7 Protective Coating Specialist (PCS)
The PCS shall be considered a QC Specialist and shall report to the QC Manager, as specified in Section 01 45 00.00 20 QUALITY CONTROL. The PCS shall approve all submittals prior to submission to the QC Manager for approval or submission to the government for approval.
1.4.8 Pre-Application Meeting
After approval of submittals but prior to the initiation of coating work, Contractor representatives, including at a minimum, project superintendent and QC manager, paint foreman, coating inspector, and PCS shall have a pre-application coating preparatory meeting. This meeting shall be in addition to the pre-construction conference. Specific items addressed shall include: corrective action requirements and procedures, coating work plan, safety plan, coordination with other Sections, inspection standards, inspection requirements and tools, test procedures, environmental control system, safety plan, and test logs. Notify Contracting Officer at least ten days prior to meeting.
1.5 PRODUCT DATA
1.5.1 Roof Joint Sealant Instructions
Submit manufacturer's printed instructions including detailed mixing and
SECTION 09 97 13.16 Page 8 W.O. No. 786924 application procedures, minimum and maximum application temperatures, and curing procedures. Include Safety Data Sheets (SDS) for materials to be used at the job site in accordance with 29 CFR 1926.59 .
1.5.2 Coating System Instructions
Submit manufacturer's printed instructions including detailed mixing and application procedures, number and types of coats required, minimum and maximum application temperatures, and curing procedures. Include Safety Data Sheets (SDS) for materials to be used at the job site in accordance with 29 CFR 1926.59 .
1.6 DELIVERY AND STORAGE
Ship, store, and handle materials in accordance with SSPC PA 1 , and as modified in this Section. Maintain temperature in storage spaces between 40 and 75 degrees F, and air temperature more than 5 degrees F above the dew-point at all times. Inspect materials for damage and return non-compliant materials to manufacturer. Remove materials with expired shelf life from government property immediately and notify the Contracting Officer. Expired materials may be returned to manufacturer, tested, and if compliant, issued a shelf life extension.
If materials are approaching shelf life expiration and an extension is desired, samples may be sent to the manufacturer, along with complete records of storage conditions, with a request for shelf life extension.
If the manufacturer finds the samples and storage data suitable for shelf life extension, the manufacturer may issue an extension, referencing the product evaluation and the review of storage records. Products may not be extended longer than allowed in the product specification.
1.7 COATING HAZARDS
Ensure that employees are trained in all aspects of the safety plan.
Specified coatings may have potential health hazards if ingested or improperly handled. The coating manufacturer's written safety precautions shall be followed throughout mixing, application, and curing of the coatings. During tank cleaning, cleanup, surface preparation, and paint application phases, ensure that employees are protected from toxic and hazardous chemical agents which exceed concentrations in 29 CFR 1910.1000 .
Comply with respiratory protection requirements in 29 CFR 1910.134 . The CIH shall approve work procedures and personal protective equipment.
1.8 WORK SEQUENCE
Coat tank interior following leak testing.
1.9 JOB SITE REFERENCES
Make available to the Contracting Officer at least one copy each of
ASTM D3276, ASTM D3925, ASTM D4285, ASTM D7127, NACE SP0188, SSPC SP COM,
SSPC SP 1 , SSPC 7/NACE No.4 , SSPC SP 10/NACE No. 2 , SSPC PA 1 , SSPC PA 2 , SSPC Guide 12 , SSPC VIS 1 , , SSPC QP 1 , SSPC QS 1 , and an SSPC Certified Contractor Evaluation Form at the job site.
SECTION 09 97 13.16 Page 9 W.O. No. 786924
PART 2 PRODUCTS
2.1 ROOF JOINT SEALANT
Industrial grade, two component, minimum 95 percent solids by volume, polysulfide type caulking material that has a minimum history of 10 years acceptable service in water tanks. Sealant shall be compatible with the epoxy primer and suitable for direct application to prepared steel surfaces. Sealant shall contain no more than 0.06 percent by dry weight Lead, no more than 0.06 percent by dry weight Cadmium, and no more than
0.00 percent by dry weight Chromium. Sealant shall be certified in accordance with NSF/ANSI 61 .
2.2 COATING SYSTEM
Alternate systems or products will not be considered. All primer, intermediate, and topcoat materials shall be manufactured by one manufacturer. The entire coating system is intended to be applied in the field. Alternatively, surface preparation may be accomplished in the shop, following all temperature, humidity, and testing requirements listed herein, followed by an application of a hold-primer. Upon completion of field fabrication, all shop-applied coatings shall be removed, surfaces prepared to SSPC SP 10/NACE No. 2 , and the specified coating system applied. Adjust all shop preparation to avoid conflicts with final surface preparation requirements.
2.2.1 NSF Certified Polyamide Epoxy Coating System
Select a commercially available, three coat polyamide epoxy coating system that is certified in accordance with NSF/ANSI 61 for contact with potable water in water storage tanks of the size being coated. The coating system shall be suitable for application in three even coats of 3-5 mils dry film thickness (DFT), for a total minimum of 9 mils DFT.
2.2.2 MIL-DTL-24441 Epoxy System for Potable Water Tanks
The epoxy coating materials shall be approved by the Naval Sea Systems Command and listed on their current Qualified Products List (QPL) for the specified materials.
2.2.2.1 Epoxy Primer Coat
Epoxy polyamide, MIL-DTL-24441 /20 (Formula 150, Type III, Green).
2.2.2.2 Epoxy Intermediate Coat
Epoxy polyamide, MIL-DTL-24441 /22 (Formula 152, Type III, White (Tinted)). Tint to approximately SAE AMS-STD-595A color number 27778 parchment using pigment dispersions prepared for epoxy paint tinting.
Manufacturer shall tint material and appropriately label. All other requirements of this Military Specification apply.
2.2.2.3 Epoxy Topcoat
Epoxy polyamide, MIL-DTL-24441 /22 (Formula 152, Type III, White).
2.2.3 MIL-DTL-24441 Epoxy System for Non-potable Water Tanks
The epoxy coating materials shall be approved by the Naval Sea Systems
SECTION 09 97 13.16 Page 10 W.O. No. 786924
Command and listed on their current Qualified Products List (QPL) for the specified materials.
2.2.3.1 Epoxy Primer Coat
Epoxy polyamide, MIL-DTL-24441 /29 (Formula 150, Type IV, Green).
2.2.3.2 Epoxy Intermediate Coat
Epoxy polyamide, MIL-DTL-24441 /31 (Formula 152, Type IV, White (Tinted)).
Tint to approximately SAE AMS-STD-595A color number 27778 parchment using pigment dispersions prepared for epoxy paint tinting. Manufacturer shall tint material and appropriately label. All other requirements of this Military Specification apply.
2.2.3.3 Epoxy Topcoat
Epoxy polyamide, MIL-DTL-24441 /31 (Formula 152, Type IV, White). All other requirements of this Military Specification apply.
2.3 COATING SAMPLE COLLECTION AND SHIPPING KIT
Provide a kit that contains one quart can for the base of each coating material, an appropriately sized can for each activator, dipping cups for each component to be sampled, a shipping box sized for the samples to to be shipped, and packing material. Mark cans for the appropriate component. Provide shipping documents, including either pre-paid shipping or a shipper number that can be used by the QC Manager to arrange pickup, addressed to the approved coating testing laboratory.
2.4 ABRASIVE SAMPLE COLLECTION AND SHIPPING KIT
Provide a kit that contains one suitable plastic bag or container for each sample to be collected. Mark containers for the appropriate component.
Provide shipping documents, including either pre-paid shipping or a shipper number that can be used by the QC Manager to arrange pickup, addressed to the approved coating testing laboratory.
2.5 TEST KITS
2.5.1 Test Kit for Measuring Chloride, Sulfate and Nitrate Ions on Steel and Coated Surfaces
Provide test kits called CHLOR*TEST CSN Salts, as manufactured by CHLOR*RID International Inc. of Chandler, Arizona ( www.chlor-rid.com ) or equal. An "equal" test kit shall meet the following requirements:
a. Kit contains all materials, supplies, tools and instructions for field testing and on-site quantitative evaluation of chloride, sulfate and nitrate ions;
b. Kit extract solution is acidic, factory pre-measured, pre-packaged, and of uniform concentration;
c. Kit components and solutions are mercury free and environmentally friendly;
d. Kit contains new materials and solutions for each test extraction;
SECTION 09 97 13.16 Page 11 W.O. No. 786924
e. Extraction test container (vessel, sleeve, cell. etc.) creates a sealed, encapsulated environment during salt ion extraction;
f. Test extract container is suitable for testing the following steel surfaces: horizontal (up/down configuration), vertical, flat, curved, smooth, pitted, and rough;
g. All salt ion concentrations are directly measured in micrograms per square centimeter.
2.5.2 Test Kit for Identifying Amine Blush on Epoxy Surfaces
After coating and/or primer has hardened and prior to applying the next coat, test for unreacted amines using the AMINE BLUSH CHECK, manufactured by Elcometer, Rochester Hills, Michigan, or equal. To be considered for approval as an "equal" test kit it shall meet the following requirements:
a. Be a completely self-contained field test kit with all materials, supplies, tools and instructions to perform tests and indicate the presence of unreacted amines;
b. Use an identifiable, consistent, uniform, pre-packaged, factory pre-measured indicating solution;
c. Kit contains no mercury or lead and is environmentally friendly;
d. Kit contains a solution of an unreacted amine for the purpose of "self checking" the indicator solution;
2.6 ABRASIVE
The referenced abrasive specifications have maximum limits for soluble salts contamination, however, this maximum level of contamination does not guarantee that contamination will not be transferred to the steel surface during abrasive blasting. Other factors such as on-site handling and recycling can allow contamination of abrasive. Contractors are cautioned to verify that the chosen abrasive, along with work and storage processes, allow the final surface cleanliness requirements to be achieved.
Successful testing of chlorides in abrasive does not negate the final acceptance testing of steel surfaces.
Interpret MIL-A-22262 to include the meaning that abrasive material contains a maximum one percent by weight of any toxic substance listed in either Table Z-1, Z-2, or Z-3 or 29 CFR 1910-SUBPART Z , with the exception of inert or nuisance dust materials, arsenic, beryllium, cadmium, cobalt, lead, mercury, rhodium, silver, tellurium, thallium, and uranium.
2.6.1 Non-metallic Abrasive
Conform to MIL-A-22262 , Type I (Inorganic materials) except that the gross gamma radioactivity shall not exceed 5 picocuries per gram. Abrasive shall be approved by the Naval Sea Systems Command and listed on the appropriate Qualified Products List (QPL) for the specified materials.
Use sampling procedures and testing frequencies as prescribed in MIL-A-22262 . Use abrasive that is specifically selected and graded to provide a sharp, angular profile to the specified depth. Do not use ungraded abrasive. Make adjustments to processes or abrasive gradation to achieve specified surface profile. Recycled non-metallic abrasive shall meet all requirements of the specification each time that it is placed in
SECTION 09 97 13.16 Page 12 W.O. No. 786924 the blast pot.
2.6.2 Metallic Abrasive
2.6.2.1 New and Remanufactured Steel Grit
Conform to the chemical and physical properties of SSPC AB 3 Class 1 (Steel) only, except that the gross gamma radioactivity shall not exceed 5 picocuries per gram. Class 2 (Iron) abrasive shall not be used.
To develop a suitable work mix from new steel abrasive, a minimum of 200 - 400 recycles is required, therefore, it is advantageous for a Contractor to use remanufactured steel grit or grit reclaimed from a previous project. Such grit shall be considered to conform if it can be traced to new grit conforming to SSPC AB 3 Class 1 and it meets all cleanliness requirements of SSPC AB 3 Class 1 when brought to the current jobsite.
Submit one representative sample of this work mix to the laboratory for testing, along with samples of new material. Acceptance and use of this work mix shall not be used to justify any deviation from surface preparation requirements.
2.6.2.2 Recycled Steel Grit
Conform to the chemical and physical properties of SSPC AB 2
PART 3 EXECUTION
Perform all work, rework, and repair in accordance with approved procedures in the Coating Work Plan.
3.1 REMOVAL OF COATINGS CONTAINING HAZARDOUS MATERIALS
Coatings containing hazardous materials and identified for disturbance during surface preparation, including removal, shall be handled in accordance with Section 02 83 00 LEAD REMEDIATION. Coordinate surface preparation requirements from Section 02 83 00 LEAD REMEDIATION with this Section.
3.2 COATING AND ABRASIVE SAMPLE COLLECTION AND TESTING
Sample and test materials delivered to the jobsite. Notify Contracting Officer three days in advance of sampling.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .