P303 Amendment 0004.pdf

PDF 259 KB Posted

Attached to
P303, DESIGN-BID-BUILD, MARINE CORPS RESERVE CENTER, CAMP FRETTERD MD
Solicitation number
N4008021R6986
Issued by

About this file

This is a solicitation for a design-bid-build construction project to build a new Marine Corps Reserve Center, vehicle maintenance facility, and organic storage shed at Camp Fretterd in Maryland. The project includes construction of a 35,130 square foot single-story reserve center with classrooms, fitness center, offices, and covered weapons cleaning area. A 10,968 square foot single-story vehicle maintenance facility will be built with vehicle bays, offices and a vehicle wash platform. A 4,000 square foot single-story organic storage shed is also part of the project. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command. The response due date is November 14, 2021. The work includes site work, concrete, masonry, structural steel, doors and windows, roofing, and mechanical, electrical and plumbing systems.

View the file

Other files

File Type Posted
P303 AMENDMENT 0007.pdf PDF
10 51 13.pdf PDF
P303 AMENDMENT 0006.pdf PDF
P303 Amendment 0005.pdf PDF
BLDG-P303-1624797_C_A-002.pdf PDF
P303 Revised Price Schedule 1NOV2021.doc DOC document
BLDG-P303-1624797_C_A-200.pdf PDF
1624807Amendment4SPECS.pdf PDF
08 71 00.pdf PDF
BLDG-P303-1624797_A_A-601 Revised.pdf PDF
BLDG-P303-1624797_A_A-303.pdf PDF
32 31 13.pdf PDF
1624807Amendment4DWG.pdf PDF
1624807Amendment4.docx DOCX document
BLDG-P303-1624797_A_A-631.pdf PDF
07 05 23.pdf PDF
08 71 00C.pdf PDF
Revision Description (10-26-2021).docx DOCX document
P303-AMENDMENT 0003.pdf PDF
FFE FINAL - Building A.pdf PDF
SID Package - Building B.pdf PDF
SID Package - Building A.pdf PDF
BLDG-P303-1624797_A_A-601.pdf PDF
P303 Amendment 0002.pdf PDF
P303 Site Visit Sign-In Sheet.pdf PDF
C-508.pdf PDF
C-501.pdf PDF
E-601.pdf PDF
ST101.pdf PDF
CS400.pdf PDF
26 20 00.pdf PDF
32 15 00.pdf PDF
P303 Amendment 0001.pdf PDF
40 95 00.pdf PDF
CS410.pdf PDF
COMBINED CIVIL DRAWINGS 2 of 2.pdf PDF
COMBINED CIVIL DRAWINGS 1 of 2.pdf PDF
ATTACHMENT E - SAFETY DATA SHEET.docx DOCX document
BLDG A COMBINED DRAWING.pdf PDF
P303 Final Volume 3 Specs.pdf PDF
1624807DWGBLDGC1of1.pdf PDF
SF1442 - N40080-21-R-6986.pdf PDF
ATTACHMENT D - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.docx DOCX document
Visitor Access Request List.xlsx XLSX spreadsheet
Small Business Subcontracting Plan.doc DOC document
P303 Final Volume 1 Specs.pdf PDF
BLDG B Combined Drawings.pdf PDF
SITE-VISIT PARKING AREA.png PNG image
ATTACHMENT F - SMALL BUSINESS PAST PERFORMANCE.docx DOCX document
P303 Final Volume 2 Specs.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N40080-21-R-6986, P303, DESIGN-BID-BUILD, MARINE CORPS RESERVE CENTER, CAMP FRETTERD MARYLAND

SEE SF 30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 37

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Nov-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008021R6986

X 9B. DATED (SEE ITEM 11)

16-Sep-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Nov-2021

CODE

NAVAL FACILITIES ENGINEERING SYS COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008021R6986

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE THE FOLLOWING:

1. Extend the Proposal Due Date to 14 November 2021 at 2:00 PM EST

2. Provide RFI Responses

3. Attachments

4. Revise Wage Determination

All other terms and conditions remain unchanged.

1. PROPOSAL DUE DATE INFORMATION

The proposal due date has been extended to 14 NOVEMEBR 2021 at 2:00 PM EST. The submission and delivery requirements remain unchange.

2. RFI RESPONSES

41. There is a Solicitation Contract Form attached to the SF 1442. Are we required to submit this form along with our Price Schedule or only submit the Price Schedule?

GOVERNMENT RESPONSE: Offerors are required to complete and submit page 2 of the SF1442, along with a completed Price Schedule.

43. Specification Section 015000 references prevailing rates that the contractor will be charged for temporary utility usage but does not provide the rates. Please clarify if the contractor or owner is responsible for temporary utility usage fees.

GOVERNMENT RESPONSE: Contractor is responsible to pay the fees on used temporary utilities, as stated in article 3.3, Availability and Use of Utility Services, on section 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS. Contractor must coordinate with Reservation Manager, utility companies and NAVFAC CM the available utilities, capacities and flow to determine no interruption to Reservation operations. Before bidding, offerors must confirm with Installation and / or the utility companies the prevailing rates for each of the available type of utility, and include those cost in the Bid.

47. Drawing A_A-601 door schedule is missing head, jamb & sill details and hardware set designations. Please provide this information for these doors.

GOVERNMENT RESPONSE: Door schedule has been updated to include hardware set numbers and door jamb detail designations. Revised door schedule on sheet A_A-601 is provided with RFI responses.

50. Specification Section 34 400.00 paragraph 2.6 requires Resilient Joint Pipe gaskets for storm sewer pipe to manhole or inlet connections. Resilient joint pipe connections will not provide watertight connection with concrete or HDPE storm sewer pipe. Resilient gaskets will not work if pipe enters structure at an angle. We propose to use non-shrink grout to make a watertight connection to inlets and manholes. This specification has been changed in all other Corps of Engineer projects we have done in the past. Please advise if this is acceptable.

GOVERNMENT RESPONSE: Please propose in accordance with the plans and specs.

51. How much time should we anticipate for inspection of delivery trucks to the site? What gate will be used for deliveries? Please advise.

GOVERNMENT RESPONSE: Inspection for delivery truck to the site are approximately 4 to 6 minutes; however, times are subject to change.

52. Drawing Number B-P-101, Note 2, illustrates, and identifies roof drain piping being installed to connect to a “RD” assembly. Plumbing Equipment Schedule drawing B-P-601 does not list a “RD” fixture/drain. Can we assume this “RD” fixture/drain will be furnished and installed by others? Or does the designer/engineer want the Division 22 contractor to furnish and install this drain in cooperation with the roofing assembly contractor? If the designer/engineer wants the Division 22 contractor to furnish and install this “RD” fixture, please provide an equipment schedule complete with Division 22 specification for this fixture. Please advise.

GOVERNMENT RESPONSE: There are no roof drains. There is an internal gutter system provided under Architecture as noted on the drawing. The gutters will be provided with a sleeve for connection to the rain leaders. Final connections per gutter manufacturer instructions.

53. Specification section 22 05 48.00 20, lists vibration isolation and seismic requirements for mechanical equipment, i.e., boilers, cooling towers as well as plumbing equipment. Specification section 23 05 48.19 lists requirements for Bracing of HVAC Systems, and notes water source heat pumps and split system heat pumps as the mechanical equipment we are to consider for “bracing” under Division 23 work. Where mechanical equipment is listed in Division 22 specification section 22 05 48.00 for vibration isolation, should that Division Specification section also be utilized for furnish and installation of vibration isolation and seismic isolation in addition to what is noted under Specification Section 23 05 48.19?

GOVERNMENT RESPONSE: 23 05 48.19 applies to the AT/FP bracing requirements for overhead utilities and other fixtures weighing 31 pounds (14 kilograms) or more (excluding distributed systems such as piping networks that collectively exceed that weight). Use 23 05

48.19 and 22 05 48.00 to select vibration isolators for water source heat pumps, split system heat pumps, and air circulation units. Vibration isolators are required at the two air circulation units in Bldg A. Use 22 05 48.00 20 for all other equipment as indicated.

54. Please indicate the design condition requirements for each pump unit to be provided in Section 333216: Packaged Utility Wastewater Pumping Stations as we cannot size the pump unless we know what the following requirements are: GPM = Gallons Per Minute and Ft. and TDH = Feet of Total Dynamic Head (Static Head + Friction Loss). Please advise.

GOVERNMENT RESPONSE:

Operating Conditions and Performance Requirements:

Description Design Point

(1 pump operating)

Reference

Number of pumps 2 Drawings – CU503 Type Submersible Drawings – CU503

Specs - Section 33 32 16 Suction condition Submerged Drawings – CU503

Specs - Section 33 32 16 Individual design capacity 80 gpm Specs - Section 33 32 16 Total dynamic head (ft.) 42.3 ft. Specs - Section 33 32 16 Max motor horsepower 5.5 hp Drawings – E610 Maximum pump speed (rpm) 3310 rpm Specs - Section 33 32 16 Operating speed Constant Specs - Section 33 32 16 Temperature of liquid pumped ambient Specs - Section 33 32 16 Minimum Size of a non-compressing Solid to pass through the pump (spherical diameter, inch)

3” Specs - Section 33 32 16

Cooling system Direct cooling Specs - Section 33 32 16

55. For Stormwater management Bio-1 on the Marine Corps project, it calls for a "minimum" of 8” of 57 aggregate but all the other facilities receive 20”-24” of 57 stone in the aggregate layer, please confirm that only 8” of #57 is required for Bio-1?

GOVERNMENT RESPONSE: Confirmed 8” of #57 stone is required for Bio-1 as shown on the documents.

56. The detail for SWM Bioretention -MBR 1-5 shows Class 0 rip rap on the slopes from the toe to the pavement (not shown on plan view) Is there a depth we should figure for this stone? Please advise.

GOVERNMENT RESPONSE: 6-inch depth of Class 0 riprap is required.

57. The louver specifications (08 91 00, section 2.2) direct all louvers to be wind driven rain resistant (chevron bladed) while many of the details show typical, horizontal bladed louvers:

Bldg. A, C5/A-501; Bldg. B, B4/A-504 & B4/A-505. Which should we provide?

GOVERNMENT RESPONSE: All louvers shall be chevron bladed as specified.

58. Details C1 & C3 on D_A-501 indicate a continuous bent plate along the North and South sides of the Pump Enclosure, with Detail B2 on D_S-502 confirming and defining this continuous bent plate.

Detail A1 on D_A-501 does not indicate a continuous bent plate along the East and West sides of the Pump Enclosure.

Please confirm whether a continuous bent plate is required along the East and West sides of the Pump Enclosure. If so, please confirm the dimensions of the bent plate.

GOVERNMENT RESPONSE: A bent plate is not required on the east and west ends of the building. Detail A1/D_A-501 is correct as shown. Refer to structural for size of plate.

59. Organic Storage Building C plans illustrate toilet room fixture and accessories elevations on drawing C-A-002. The drawing plans we received for this building do not identify any requirement on the floor plans for features of work such as domestic water, sanitary sewer, HVAC, etc., required to install a toilet room or toilet room facilities. Does the Organic Storage Building C require restroom facilities to be installed? If it does, please provide revised drawings illustrating this requirement complete with full design.

GOVERNMENT RESPONSE: Organic Storage Building C does not require restroom facilities. Accessible details deleted. See revised sheet C_A-002.

60. Reference Sheet CS101 and L-503. Sheet CS101 shows two retaining walls identified by Key Notes #13. Keynote #13 states "Retaining Wall, Detail L-503," however sheet L-503 has two retaining wall details (Concrete & Segmental). Please advise what types of retaining walls are to be installed.

GOVERNMENT RESPONSE: The retaining wall adjacent to the main entrance references details C1 & D1/L-503. The retaining wall adjacent to the pump house references detail C4/L-503.

61. Page 2 Price Schedule CLIN 0004 Option 3 Pricing for asphalt or concrete pavement can differ drastically. Please consider breaking this option into two different options, one for asphalt pavement or one for concrete pavement.

GOVERNMENT RESPONSE: CLIN 0004 is to change all tactical parking from concrete pavement detail (D3 on C501) to gravel (or similar). Concrete curbs and gutters to remain.

Please refer to the revised price schedule.

62. Page 2 Price Schedule CLIN 0004 Option 3 Please specify which typical sections are to be used for the asphalt parking and for the concrete parking.

GOVERNMENT RESPONSE: This option is to install gravel D3 on C501 of revision 1 instead of concrete pavement detail D3 on C501 of original plans.

63. Page 5 31 23 00.00 20 2.1.1 Can existing soils classified as CL or ML and listed as satisfactory materials per section 2.1.1 be used in fill areas if it does not meet the requirements of section 2.1.7 Select Materials?

GOVERNMENT RESPONSE: Yes, existing soils classified as CL and ML per 2.1.1 can be used in fill areas but must meet criteria under 3.8.1 general site compaction outside paved areas and structures.

64. Page 5 31 23 00.00 20 2.1.7 Can existing site soils be used in fill areas if they do not meet the Bearing Ratio or gradation listed in section 2.1.7?

GOVERNMENT RESPONSE: Yes, green fill areas outside paved areas and structures are not required to meet CBR requirements but must meet requirements under 3.8.1 for compaction in general site areas.

65. 33 32 16 "Please indicate the design condition requirements for each pump unit to be provided in Section 333216: Packaged Utility Wastewater Pumping Stations as we cannot size the pump unless we know what it is required to produce: GPM = Gallons Per Minute Ft. TDH = Feet of Total Dynamic Head (Static Head + Friction Loss)"

GOVERNMENT RESPONSE

Operating Conditions and Performance Requirements:

Description Design Point

(1 pump operating)

Reference

Number of pumps 2 Drawings – CU503 Type Submersible Drawings – CU503

Specs - Section 33 32 16 Suction condition Submerged Drawings – CU503

Specs - Section 33 32 16 Individual design capacity 80 gpm Specs - Section 33 32 16 Total dynamic head (ft.) 42.3 ft. Specs - Section 33 32 16 Max motor horsepower 5.5 hp Drawings – E610 Maximum pump speed (rpm) 3310 rpm Specs - Section 33 32 16 Operating speed Constant Specs - Section 33 32 16 Temperature of liquid pumped ambient Specs - Section 33 32 16 Minimum Size of a non-compressing Solid to pass through the pump (spherical diameter, inch)

3” Specs - Section 33 32 16

Cooling system Direct cooling Specs - Section 33 32 16

66. CG501 Bioretention profile depicts 8" minimum of 57 aggregate around 6" underdrain with a note saying that only Bio#2 receives 12" additional aggregate below the underdrain.

Please verify that Bio#1 only has 8" of aggregate at the bottom.

GOVERNMENT RESPONSE: Confirmed 8” of #57 stone is required for Bio-1 as shown on the documents.

67. CG501 What is the required thickness of Class 0 RipRap depicted in the Linear Micro- Bioretention Section (Type) on sheet CG501?

GOVERNMENT RESPONSE: 6-inch depth of Class 0 riprap is required.

68. Please indicate the design condition requirements for each pump unit to be provided in Section 333216: Packaged Utility Wastewater Pumping Stations. There was no indication in the Specification Section nor on the Equipment Schedule found on Drawing E-610?

GOVERNMENT RESPONSE

Operating Conditions and Performance Requirements:

Description Design Point

(1 pump operating)

Reference

Number of pumps 2 Drawings – CU503 Type Submersible Drawings – CU503

Specs - Section 33 32 16 Suction condition Submerged Drawings – CU503

Specs - Section 33 32 16 Individual design capacity 80 gpm Specs - Section 33 32 16 Total dynamic head (ft.) 42.3 ft. Specs - Section 33 32 16 Max motor horsepower 5.5 hp Drawings – E610 Maximum pump speed (rpm) 3310 rpm Specs - Section 33 32 16 Operating speed Constant Specs - Section 33 32 16 Temperature of liquid pumped ambient Specs - Section 33 32 16 Minimum Size of a non-compressing Solid to pass through the pump (spherical diameter, inch)

3” Specs - Section 33 32 16

Cooling system Direct cooling Specs - Section 33 32 16

69. For Bio-1 it calls for a "minimum" of 8” of 57 aggregates in the stone layer, leaving only 1” of bedding material and 1” to cover the 6” underdrain. Please confirm 8” of stone is the design intent, typically 20”-24” of 57 stone is provided in the aggregate layer.

GOVERNMENT RESPONSE: Confirmed 8” of #57 stone is required for Bio-1 as shown on the documents.

70. Will a stockpile location be available within the Camp Fretterd installation or are all excavated soils to be hauled offsite?

GOVERNMENT RESPONSE: Sheet CE101 shows an approximate area for stockpile within the project limits. If additional area is required outside the project area, Contractor to coordinate with COR/NAVFAC.

71. Is there a Geotechnical Report available that corresponds with the provided boring logs? If so, please provide.

GOVERNMENT RESPONSE: The Geotechnical borings are provided with in the civil site plan, the geotechnical report will not be provided.

72. The detail for SWM Bioretention -MBR 1-5 shows Class 0 rip rap on the slopes from the toe to the pavement (not shown on plan view) Is there a depth we should figure for this stone?

GOVERNMENT RESPONSE: 6-inch depth of Class 0 riprap is required.

73. CLIN 0004 – OPTION 3 is to provide pricing to change all tactical parking from gravel (or similar) to pavement (concrete/asphalt). Please provide section cut or reference detail on the new work associated with this CLIN.

GOVERNMENT RESPONSE: This option is to install gravel D3 on C501 of revision 1 instead of concrete pavement detail D3 on C501 of original plans. Please refer to the revised Price Schedule.

74. Utility profiles indicate “Engineering Fill Material” under the proposed utilities in fill areas? Please clarify specification requirement for this fill material type. Is this indicating compacted Satisfactory Material or is this something different?

GOVERNMENT RESPONSE: “Engineering Fill Material” refers to compacted satisfactory material as specified in 31 23 00.00 20 EXCAVATION AND FILL.

75. Please confirm door type & material for following doors; there is conflicting information between the schedules and types on A-602:

100A 100B 100C 133C

100AA

100AB

GOVERNMENT RESPONSE: A revised door schedule is provided on sheet A_A-601.

76. Please confirm frame type & material for the following doors; there is conflicting information between the schedules and types on A-602:

100A 100B 100C 133C

100AA

100AB

GOVERNMENT RESPONSE: A revised door schedule is provided on sheet A_A-601.

77. Please confirm Frame Type for the following doors: 100E, 120A, 122, 123A, 125B, 126B, 127B, 127C there is conflicting information between the schedules and types on A-602.

GOVERNMENT RESPONSE: A revised door schedule is provided on sheet A_A-601.

78. Door type 50 is called out as an acoustic wood door, but does not provide the STC rating.

Please confirm STC rating for door type 50.

GOVERNMENT RESPONSE: STC rating 50, see revised door schedule on sheet A_A-601.

79. Are doors 100A, B, C to be aluminum instead of metal?

GOVERNMENT RESPONSE: Aluminum, see revised door schedule on sheet A_A-601.

80. What hardware for doors 100A, B, C and 100AA and AB doors?

GOVERNMENT RESPONSE: See revised door schedule on sheet A_A-601.

81. Please provide location of door 163B. It is shown on the door schedule but does not seem to be in the plans.

GOVERNMENT RESPONSE: Door 163B is located in the Organic Storage Building C.

See revised door schedule on sheet C_A-200.

82. Please provide hardware sets for MCRC.

GOVERNMENT RESPONSE: See revised door schedule on sheet A_A-601.

83. Please confirm that “W1” storefront window shall be located on either side of storefront door 100AB. It is unclear based on the door schedule and A-103.

GOVERNMENT RESPONSE: Yes, Building A W-1 storefront located on each side of door

100AB.

84. Please confirm door hardware sets for the Reserve Center and Vehicle Maintenance Facility.

Spec Section 08 71 00 for the Reserve Center includes hardware schedule for the Vehicle Maintenance Facility but does not include the Reserve Center hardware schedule.

GOVERNMENT RESPONSE: See revised door schedule on sheet A_A-601 and revised Building A specifications section Hardware 08 71 00.

85. Door hardware section 087100 for the Reserve Center building "A" includes hardware sets for the VMF building "B". Please clarify what hardware sets are to be included for Reserve Center building “A”?

GOVERNMENT RESPONSE: See revised door schedule on sheet A_A-601 and revised Building A specifications section Hardware 08 71 00.

86. The lighting schedules (A-EL-601, B_E-611, D_E-611), specifications and lighting plates/details do not indicate which manufacturers or lighting models to use. Please provide acceptable lighting manufacturers and model numbers.

GOVERNMENT RESPONSE: Proposed in accordance with the plans and specifications.

Selection of manufacturer must meet the requirements of the contract documents.

87. Please provide the acceptable manufacturers for fire alarm.

GOVERNMENT RESPONSE: Proposed in accordance with the plans and specifications.

Selection of manufacturer must meet the requirements of the contract documents.

88. Drawings B_E-601 and ES102 indicate power provisions for the Hazardous Materials Shed.

The drawings do not indicate if the equipment being provided needs to be classified for hazardous areas. Please indicate what classification and division the distribution equipment mounted at the Hazardous Materials Shed needs to be, if any.

GOVERNMENT RESPONSE: Class 1 division 1 Hazardous Materials will be stored in the lockers, power requirement 240V/3 phase

89. Drawings D_E-601 shows a 4” concrete encased conduit going from the generator 300A/3 P LSIG breaker to the MTS. ES102 and ES401 not indicate this conduit. Please confirm that it is a single 4” concrete encased duct and that no spare conduit is required.

GOVERNMENT RESPONSE: Duct bank between the generator and the MTS is incorrectly marked. Provide (1) 4” spare conduit in the generator feeder concrete encased duct bank, matching the construction of duct bank section C-C, Detail A1/E-501.

Terminate conduits in duct bank section D-D not at the MTS, but at the panels as indicated by the branch circuit home runs on A1/E-101.

90. Drawing D_E-101 keynote 6 refers to the site/civil package for the location of the Tank Level and temperature element. This is not shown on the site electrical drawings and no indication as to what electrical requirements are needed is shown on D-E-101. Please provide the location of these items and what is required electrically (conduit, wire, etc.).

GOVERNMENT RESPONSE: Coordinate location and requirements with tank provider and Detail A1/D_E-506.

91. Drawing D_E-101 keynotes 10, 11 & 12 says to refer to the site/civil package for heater location. The heaters cannot be located on the site/civil drawings. They are shown at the tank on Civil drawing E-601. Are the tank heaters located in the same point at the tank or are they in different positions around the tank? Please indicate where at the tank the heaters are positioned.

GOVERNMENT RESPONSE: Heater locations are indicated on ST101. Coordinate final heater locations with tank provider.

92. Which trade is responsible for providing cathodic protection for the water tank per specification 26 42 22.00 20? Please provide a drawing indicating electrical requirements.

GOVERNMENT RESPONSE: The contractor is responsible for all work in the contract documents. Cathodic protection is a required by specification 26 42 22.00 20.

93. Drawing ES101 shows branch power and lighting for the guard booth. Is there a detail or layout available of the guard booth?

GOVERNMENT RESPONSE: There is no guard booth in the project. No circuits for a guard booth shown on either ES101 or ES102 dated 4/16/2021.

94. Drawing A_EM104, shows a piece of equipment labeled ‘C-1’ in room 121A. This is not listed on drawing A_E-603 and cannot be found on the panel schedules or mechanical schedules.

Please provide information for the electrical provisions required.

GOVERNMENT RESPONSE: Yes, it is an error and there is no C-1 equipment.

Mechanical drawing MH104 does not show the C-1 equipment.

95. Site set drawing E-502 detail A1 note 5 refers us to spec 32 31 13.53 for grounding requirements. Spec 323113.53 refers to spec 337102. Please confirm that the fence is grounded at each gate or end post and at each corner and that no further grounding is required along the fence line.

GOVERNMENT RESPONSE: Ground fencing as shown in detail A1/E-501 and as described in referenced specification sections 32 31 13.53 and 33 71 02.

96. Are there any concrete piers/encasements for the columns/baseplates?

GOVERNMENT RESPONSE: Yes, provide isolation piers per B1/A_S-501, A1/A_S-502, and B1/C_S-501. Provide non-keyed isolation pier (turn down SOG to top of footing) w/ joint filler around perimeter of pier.

97. The VMF overhead doors, shown on B_A-201, are marked as four fold doors. There is a spec for coiling and four fold doors. They are drawn as coiling doors on these elevations, the door schedule as well as head and jamb details. Please clarify what type of doors should be used.

GOVERNMENT RESPONSE: The base bid should include the overhead coiling doors, per CLIN 0001B. Provide a bid option for overhead coiling doors per CLIN 0003 and per general sheets notes A, on B_A-602.

98. Confirm lockers shown in Building A Room 133 are not included in the FFE CLIN and should be priced as contractor furnish contractor install as part of the base price.

GOVERNMENT RESPONSE: Confirmed. Lockers in room 133 are contractor furnished contractor installed, NOT FF&E

99. On the Reflected Ceiling Plan it lists cementitious backerboard ceilings and soffits in the legend, but I don't see any shown. Are these being used?

GOVERNMENT RESPONSE: Building A has no cementitious backer-board ceilings or soffits.

100. The details on A_A-631 show fireproofing on steel beams and joists. Is this for all steel beams and joists or only exposed?

GOVERNMENT RESPONSE: No fireproofing required on Building A steel beams or bar-joists. See revised details on sheet A_A-631

101. On B_A-101 the following wall types for Women's Shower 108, Women's Toilet 107, Men’s Toilet 105, Men's Shower, JC 104 are not identified. Please clarify.

GOVERNMENT RESPONSE: Refer to the enlarged toilet plans on B_A-401 for additional partition types.

102. On B_A-102 the following ceiling types for rooms Telecom 109, Electrical 110, Mechanical 111 are not identified. Please clarify.

GOVERNMENT RESPONSE: Telecom 109, Electrical 110, and Mechanical 111 do not have a ceiling.

103. Building B, Vehicle Maintenance Facility illustrates on plumbing P series drawings a vehicle lubrication system to be furnished and installed as a part of this project. Division 22 and 23 specifications for this installation are not included. Please provide a specification for this lubrication work and system? Please clarify if this is also CLIN 06 – Option 05?

GOVERNMENT RESPONSE: Layout and requirements for lubrication/fluid system are shown on the drawings. Contractor must engage a Manufacturer of these types of systems for further design and installation details per General Sheet Notes on B_P-402. Yes, provide as an option per CLIN 0006.

104. Division 23 specification sections for automatic temperature controls do not indicate what specific manufacturers or product systems will be acceptable to the Government, i.e., Johnson Metasys, Siemens, Honeywell, to name a few, for installation. Is there specific automatic temperature control/energy management control systems the Government will need the new work to tie into and be compatible?

GOVERNMENT RESPONSE: Propose in accordance with the plans and specifications.

Selection of manufacturer must meet the requirements of the contract documents. The contract documents do not identify a DDC manufacturer or vendor for this project. The automatic temperature control system must use BACnet protocol at the field level and supervisory level controllers, except for approved packaged control systems with BACnet interface. The building A (MCRC) and building B (VMF) equipment will be considered one control system and meet the requirements of a stand-alone system. Refer to the 23 09 series specifications, 25 05 11.23, and the mechanical drawings for more information.

105. Will the Government require the test and balance subcontractor be first tier to the prime contractor? Or will the Government allow the mechanical subcontractor to direct contract with a test and balance subcontractor?

GOVERNMENT RESPONSE: The TAB contractor must be a first tier sub in accordance with 23 05 93.

106. Is the contractor responsible for the commissioning agent and systems commissioning?

GOVERNMENT RESPONSE: Refer to the government response to RFI #6.

107. Please confirm there are no LEED requirements.

GOVERNMENT RESPONSE: LEED is not required. Third Party Certification is required as specified per 01 33 29.

108. Please confirm the Executive Order on Ensuring Adequate COVID Safety Protocols taking effect October 15th will require proof of vaccinations for all personnel on the project and weekly testing with proof of negative results for any individuals not vaccinated.

GOVERNMENT RESPONSE: Confirmed, contractor will be required to comply with executive order. Please refer to DFARS 252.223-7999 ADEQUATE COVID-19 SAFETY

PROTOCOLS FOR FEDERAL CONTRACTORS

109. Please clarify the storefront entrance glazing. Material schedules on elevations call out GL-3 but the door schedule and glazing schedule call out GL-1. Please coordinate and clarify.

GOVERNMENT RESPONSE: All glazing in Building A interior doors shall be GL-4 tempered glass.

110. Please clarify if GL-3 is used in this project?

GOVERNMENT RESPONSE: GL-3 glazing is included in the typical Building A “Glazing Type” list, but may not be specified for any window or door units in the project.

111. Please clarify the glazing for the exterior doors. The GL-4 is noted at the exterior doors but the specs also reference door glass being GL-5.

GOVERNMENT RESPONSE: GL-5 glazing is not required for any Building A exterior door applications.

112. Is the glass in the in the doors to be reflective one way vision glass?

GOVERNMENT RESPONSE: No one-way vision glass is required in the Building A project.

113. GL-4 is noted to have a STDC rating of 50. Please clarify what STDC is?

GOVERNMENT RESPONSE: Volume 3 Spec 08 81 00 section 2.2.1-c and Volume 4 spec 08 81 00 section 2.3.2-c shall read "STC rating of 50"

114. Is GL-4 to have an STC rating?

GOVERNMENT RESPONSE: Glazing type GL-4 in Building A is not an STC rated glazing

115. Please confirm no doors have a STC rating.

GOVERNMENT RESPONSE: The only STC rated door in Building A is door 121. See revised door schedule on sheet A_A-601.

116. Restroom Doors 105 and 107 are Type D and have a lite. Please clarify if doors should be solid?

GOVERNMENT RESPONSE: The only STC rated door in Building A is door 121. See revised door schedule on sheet A_A-601.

117. What glass type should be used in the Type D doors and Type E doors?

GOVERNMENT RESPONSE: Per IBC chapter 24 – safety glazing is required at all doors.

Use tempered glass

118. A spandrel glass color does not seem to be listed in the specs or plans. What is the color of the spandrel glass?

GOVERNMENT RESPONSE: Spandrel glass color will be Subdued Bronze or Dark Gray.

Final color selection will be determined during shop drawing submittal process.

119. For the VMF building, B_A-602 Note 3 lists STC ratings for the door but the STC requirement are not listed in the glass specs.

GOVERNMENT RESPONSE: Door 114 – Does not require an STC rating. Comment #3 has been removed from this door. Door 119 does require the STC rating.

120. What glass type should be used in the door lites in the Organic Storage Shed?

GOVERNMENT RESPONSE: Organic Storage Building C doors 163A and 163D should have door lites with glazing type GL-4 tempered glass.

121. Structural drawings list the seismic design category as A, with a Site Classification of C.

Seismic requirements for a seismic design category A facility are minimal at best. Please confirm the seismic design classification we are to utilize for installation of mechanical equipment and related piping and ducted assemblies.

GOVERNMENT RESPONSE: Seismic design category is determined by regional seismic accelerations/site classification and is the criteria used to determine MEP requirements.

Use Seismic design category A per A_S-001 Design Loads #5, B_S-001 Design Loads #6, and C_S-001 Design Loads #5. Note that minimum bracing requirements per UFC 4-010- 01 (minimum Antiterrorism) as referenced in UFC 1-200-01 may be more stringent and may govern over seismic requirements.

122. Relating to the water storage tank, Specification’s state "Minimum plate thickness shall be 1/4", and as shown on drawings", drawings show 3/8" shell plate thickness for the bottom two rings and 1/4" for the other rings. There is also a statement in the specs that reads "no additional thickness for corrosion allowance will be required" Please clarify plate thicknesses.

GOVERNMENT RESPONSE: The minimum plate thickness is ¼”, except at locations where thicker plate is shown.

123. The Pump enclosure does not show painting of interior spaces or exterior hollow metal doors. Please clarify no painting is required for the Pump enclosure.

GOVERNMENT RESPONSE: Interior spaces do not require painting. See NAVFAC_DOOR SCHEDULE, D_A-601 for door painting requirements.

124. The Pump enclosure does not call for any finish of the concrete floor. Please confirm no finish is required.

GOVERNMENT RESPONSE: Confirmed.

125. The Storage shed only calls for the exterior doors/frames to be painted. Please clarify if the interior side of the door should be painted to match. Also, clarify if there is any interior painting required in the Storage shed.

GOVERNMENT RESPONSE: Exterior doors and their respective frames should be painted on their interior and exterior sides.

126. The Storage shed does not call for any finish of the concrete floor. Please confirm no finish is required.

GOVERNMENT RESPONSE: No floor finish required for concrete floor in the Organic Storage Building C.

127. The VMF Tools room #122 lists the slab on grade as “TYP”, what slab on grade is typical?

GOVERNMENT RESPONSE: The “TYP” stated in Room #122 should apply to the adjacent section call out B1/B_S-501.

128. Organic Storage Building C plans illustrate toilet room fixture and accessories’ elevations on drawing C-A-002. The drawing plans we received for this building do not identify any requirement on the floor plans for features of work such as domestic water, sanitary sewer, HVAC, etc., required to install a toilet room or toilet room facilities. Does the Organic Storage Building C require restroom facilities to be installed? If it does, please provide revised drawings illustrating this requirement complete with full design.

GOVERNMENT RESPONSE: Organic Storage Building C does not include restroom facilities.

129. B_A-510 detail C2 shows added steel that is not included in the structural details. Please clarify if the note #36, 3/16” steel plate is required and if the note # 9, bent plate is required.

GOVERNMENT RESPONSE: Refer to Detail B1/B_S-301 for structural details.

130. B_A-510 detail C2 at note 7, blocking there is no insulation and a thermal break. Please confirm the detail is accurate. Please consider the use of external gutters to maintain proper thermal insulation and avoid any future gutter maintenance issues.

GOVERNMENT RESPONSE: The detail is shown correctly. We understand there is no insulation, however the added gypsum board and spray on insulation on the underside of deck will mitigate the effects of thermal bridging.

131. Please confirm the owner requires the B_S-301 detail C1 trusses to support the cladding system.

GOVERNMENT RESPONSE: Propose in accordance with the plans and specifications.

132. The gutter system uses internal rain leaders. Please provide detail for the transition from the roof to the internal pipe.

GOVERNMENT RESPONSE: Refer to SMACNA Architectural Sheet Metal Manual 7th edition, for gutter accessories. The intent is to provide an outlet tube within the gutter to receive the internal rain leader. The outlet tube must be a compatible material and installed per 07 41 13 specifications. See detail B3, sheet B_A-510.

133. Bollards are shown on the civil plan at each building. Should the exterior bollards be included in the site price? Or should both interior and exterior bollards be included in the building price?

GOVERNMENT RESPONSE: Price for interior bollards for the Marine Corps Reserve Center (Building A) shall be included in CLIN 0001A. Price for interior bollards associated with the Vehicle Maintenance Facility shall be included in CLIN 0001B. Price for exterior bollards shall be included in CLIN 0001C.

134. The detail for MBR 1-5 shows Class 0 rip rap on the slopes from the toe to the pavement (not shown on plan view) What is the depth we should figure for this stone?

GOVERNMENT RESPONSE: 6-inch depth of Class 0 riprap is required.

135. Will the approximate 10,000 cubic yards of fill needed for the green area fill slopes be able to utilize the site excavation that is CL & ML material, if it doesn't meet the California Bearing Ratio of 4, as shown on all other subgrade areas : sheet C-501 of the plans. Even with the 85% compaction that is required in the green areas, it might not make that CBR, and we would have to haul in fill material for the slopes.

GOVERNMENT RESPONSE: Yes, green fill areas outside paved areas and structures are not required to meet CBR value of 4 but must meet requirements under 2.1.1 and 3.8.1 for compaction in general site areas.

136. If the Option 3 is used to change the stone into concrete or asphalt, please specify which asphalt thickness it will be, as well as the concrete thickness. Please also confirm what the subgrade elevations should be assumed.

GOVERNMENT RESPONSE: Base Bid is Asphalt pavement thickness are shown on details D1 and D2/C-501. The tactical parking lot pavement section is 8” Portland Cement concrete over 6” Aggregate Base Course. See D3 on C501. Basis of Bid for Item 0004 is to change all tactical parking from pavement (concrete/asphalt) to gravel (or similar).

Concrete curbs and gutters to remain. Please see revised Price Schedule.

137. Please confirm if the concrete/asphalt option is not selected then there will be a stone entrance on the side of the building for people to walk into the building.

GOVERNMENT RESPONSE The entry on the east side of the building is concrete sidewalk per detail C5/C-502.

138. Please clarify what the paving section is on the right side of the Training center on CS400. Is that entry to the utility rooms to follow a sidewalk section, heavy paving, or equipment pad section.

GOVERNMENT RESPONSE: The paving directly outside of the utility room entry and along the building is concrete sidewalk. See detail C5/C-502.

139. Please confirm the closed cell spray insulation with intumescent coating, detail A1 on A_A-504 is only required at the tower. Please provide specification and fire rating requires as none were found.

GOVERNMENT RESPONSE: Building A closed cell spray insulation with intumescent coating shown in tower detail A1 on A_A-504 is correct.

140. Please confirm the Prime Contractor is responsible for providing the commissioning agent. We are still getting questions that it is not clear in the Div 01 specs.

GOVERNMENT RESPONSE: Refer to government response to RFI #6.

141. Drawing A T-601 is depicting 3 new manholes and one existing in the pathway to Building 114. Can you please verify that there are no additional manholes between the existing manhole and building 114 (825 feet apart)?

GOVERNMENT RESPONSE: Propose in accordance with the plans and specifications.

Contractor to verify existing conditions at the time of construction.

142. Please verify that the existing Telecom duct banks contain innerducts and will not need additional innerducts added.

GOVERNMENT RESPONSE: Bid documents as specified. Contractor to verify existing conditions at the time of construction.

143. The specification include language for a manufacturer’s no-dollar limit 20-year warranty.

The no-dollar limit does not exist. Please remove the no-dollar limit and require only the manufacture standard 20-year warranty.

GOVERNMENT RESPONSE: Propose in accordance with the specifications.

144. Please provided additional clarification and detail for any of the audio visual systems that are to be included. There does not appear to be specification, equipment lists, or basis of design.

Please clarify.

GOVERNMENT RESPONSE: All required information is provided on the A_AV and B_AV series drawings. Propose in accordance with the plans and specifications.

145. Plan B_A-603 lists IP-1. Please clarify the specification requirement of IP-1 and where it is used

GOVERNMENT RESPONSE: IP-1 is an insulated infill panel to be installed in the bottom portion of window type W1. Refer to section callouts for window type W1 found on B_A-

603. The exterior color of the infill panel must match the window frame.

146. In Volume 2 of the specifications, Site, section 09 97 13.16, section 2.2.1 requires a three coat polyamide epoxy coating system. There exist widely used single and two coat systems for use in water tanks. Can a single or two-coat system be used in place of a three coat system?

Similarly, section 09 97 13.27, section 2.2 requires a three coat system. Can a single or two coat system be used in place of the three coat system?

GOVERNMENT RESPONSE: Propose in accordance with the plans and specifications.

147. Please confirm that the finishes for the exterior overhead and four fold doors are limited to standard powder-coated finish/colors.

GOVERNMENT RESPONSE: B_A-602 General Sheet Notes B indicates overhead doors (including four fold) to have a finish of PT-1. The color is indicated on B_A-604. Standard powder-coated finish is acceptable per specifications provided the color indicated on B_A- 604 can be achieved.

148. Per the louver specification 08 91 00, section 2.2 all louvers are to be wind driven rain resistant (chevron bladed), however many of the details show typical, horizontal bladed louvers:

Bldg. A, C5/A-501; Bldg. B, B4/A-504 & B4/A-505. Please confirm the louvers are to be provided in the wind driven rain resistant model.

GOVERNMENT RESPONSE: Louvers in Building A need to be wind driven rain resistant model types.

149. The water storage tank currently is specified to require welded seems. We have been asked if bolted connections would be considered. Please advise.

GOVERNMENT RESPONSE: Propose in accordance with the plans and specifications.

150. Building B, Vehicle Maintenance Facility illustrates on plumbing P series drawings a vehicle lubrication system to be furnished and installed as a part of this project. Please provide specification sections for the installation of these systems.

GOVERNMENT RESPONSE: Layout and requirements for lubrication/fluid system are shown on the drawings. Contractor must engage a Manufacturer of these types of systems for further design and installation details per General Sheet Notes on B_P-402.

151. Division 23 specification sections for automatic temperature controls do not indicate what specific manufacturers or product systems will be acceptable to the Government, i.e., Johnson Metasys, Siemens, Honeywell, to name a few, for installation. Are there specific automatic temperature control/energy management control systems the Government wants us to utilize for this project?

GOVERNMENT RESPONSE: Refer to response to RFI #104.

152. Will the Government require the test and balance subcontractor be first tier to the prime contractor? Or will the Government allow the mechanical subcontractor to direct contract with a test and balance subcontractor?

GOVERNMENT RESPONSE: Refer to response to RFI #105

153. Structural drawings list the seismic design category as A, with a Site Classification of C.

Seismic requirements for a seismic design category A facility are minimal at best. Please confirm the seismic design classification we are to utilize for installation of mechanical equipment and related piping and ducted assemblies.

GOVERNMENT RESPONSE: Refer to response to RFI #121.

154. Shower Seats are shown at showers on Sheets B_A-401 and B_I-201. Please confirm if shower seats are to be Contractor Furnished Contractor Installed (CFCI).

GOVERNMENT RESPONSE: Shower seats are Contractor Furnished Contractor Installed

155. Please confirm if Item #FE-1 on Furniture legends A_I-110 thru A_I-114, and, B_IF101 is included with budget for CLIN 0007 and CLIN 0008 respectively, or part of Base Bid CLIN 0001?

GOVERNMENT RESPONSE: Confirmed, FF&E are part of CLIN 0007 and CLIN 0008.

156. Please confirm that the Ice Maker specified in section 11 31 13 is the only Kitchen Equipment to be included in Base Bid CLIN 0001 and refrigerators, microwaves, coffee makers identified in Furniture Legend as items EQ-1 thru EQ-8 on A_I-110 thru A_I-114, and, B_IF101 are included with budgets for CLIN 0007 and CLIN 0008 respectively, and not part of Base Bid

CLIN 0001.

GOVERNMENT RESPONSE: Confirmed, Ice Maker is the only equipment to be included in Base Bid CLIN 0001.

157. Please confirm that the Steel Shelving at Food Service RM 126, Supply Room 113, and Janitor Closet 130 shown on A_I-201 and A_I-209; and specified in section 105613 are included in Base Bid CLIN 0001 and all other shelving identified in Furniture Legend as items S-01 thru S-10 on A_I-110 thru A_I-114, and, B_IF101 are included with budgets for CLIN 0007 and CLIN 0008 respectively, and not part of Base Bid CLIN 0001.

GOVERNMENT RESPONSE: Confirmed, steel shelving in Room 126, 113 & 130 are included in Base Bid. Other furniture shelving are part of CLIN 0007 & CLIN 0008.

158. Reference spec section 105113 part 2.1.1 calls for single-tier Gear Lockers but elevations show DBL - Are (2) tiered lockers acceptable if the openings are 36”W x 36”D x 36”H but one welded unit 72”H?

GOVERNMENT RESPONSE: Spec section 105113 part 2.1.1 Single-tier gear lockers are referring to lockers in Building A room 133 ICCE LOCKER and part 2.1.2 Double-tier lockers are referring to Women and men locker rooms shown on elevations. Coordinate all locker sizes with specified rooms.

159. Reference spec section 105113 part 2.1.2 - please confirm if double-tier lockers shown on sheets C1/A_I-202 and D4/A_I-203 for M/W Lockers Rooms, and, B_A-401 and B3/B_I-201 at Corridor 102 are steel or laminate?

GOVERNMENT RESPONSE: Per section 105113 part 2.2.1, all lockers will be galvanized steel sheet with powder coat finish. Color to be selected during shop drawing.

160. Vol 3 spec sections 07 27 19.01 part 3.4 refers to spec section 070523 Pressure Testing and Air Barrier System for Air Tightness. Please provide spec section 07 05 23 if it is required.

GOVERNMENT RESPONSE: This test is required for MCRC to comply with the commissionig requirements. See spec section 07 05 23 specification for building A. Building B footprint is less than 10,000 Sq. Ft.

161. Specification Section 22 00 00.3.1.6.2 references a separate specification section numbered 13 48 73 Seismic Control for Mechanical Equipment. This Division 13 specification section is not a part of the bid documents received. Please provide the referenced 13 48 73 Seismic Control for Mechanical Equipment if is required for the project.

GOVERNMENT RESPONSE: Mechanical systems are exempt from seismic requirements.

Refer to 23 05 48.19 and RFI response #53 for AT/FP bracing requirements.

162. Referencing drawing sheet A_E601, New Work Key Note 2 states an 8-way 4" ductbank is to be stubbed out 5’ beyond the building and capped by utility, while General Note 1 on A_E601 describes installing the entire duct bank. Site drawing ES_102 also shows the extent of this ductbank work to be provided by the general contractor. Please clarify if the 8-way 4" secondary ductbank is to be provided by the general contractor or the utility company.

GOVERNMENT RESPONSE: The contractor is required to provide the 8-way 4” secondary ductbank.

163. Referring to Drawing ES_102 Keynote 4, please confirm that we owe the referenced section of ductbank, “A-A,” for the primary service between the access pit and transformer which are noted to be provided by the utility company.

GOVERNMENT RESPONSE: Yes, duct bank section A-A is included in the contact as indicated by Keynote 4 on ES-102 and detail C1/E-501.

164. Referencing drawing sheet A_E601 is the 2000A incoming secondary feeders to be provided by the general contractor or the utility company?

GOVERNMENT RESPONSE: The concrete encased ductbank, PVC conduits, and wirings shall be provided by the contractor.

165. Per sheet A_EP501 details 1 and 5, both PVC Schedule 80 conduit with PVC Coated elbows / stub-ups are shown as compared to PVC Schedule 40 conduit and elbows / stub-ups. Is Detail 5 applicable to equipment located beyond the building (ex., generator pad)? Does Detail 1 apply to work within the building perimeter (ex., main switchboard)?

GOVERNMENT RESPONSE: Correct, the detail 1 is the typical stub-up for from the outcoming PVC entering the building equipment (switchboard) or per switchboard specification.

166. Drawing Number B_P-101, Note 2, illustrates, and identifies roof drain piping being installed to connect to a “RD” assembly. Plumbing Equipment Schedule drawing B_P-601 does not list a “RD” fixture/drain.