P303 Final Volume 1 Specs.pdf
PDF 8 MB Posted
- Solicitation number
- N4008021R6986
About this file
This solicitation is for the design and construction of a new Marine Corps Reserve Center, vehicle maintenance facility, and organic storage shed at Camp Fretterd in Maryland. The project includes construction of a single-story 35,130 square foot reserve center with an armory, drill hall, locker rooms, classrooms, fitness center, offices, and covered weapons cleaning area. A single-story 10,968 square foot vehicle maintenance facility will be built with vehicle bays, offices, and a carpentry shop along with an outdoor vehicle wash platform. A single-story 4,000 square foot organic storage shed is also part of the project. The facilities will have reinforced concrete foundations and slabs with concrete masonry, steel framing, brick exteriors, and standing seam metal roofs. The solicitation was issued by the Naval Facilities Engineering Command for design-bid-build of the facilities at Camp Fretterd.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO. 1624797
Contract NO. N40080-21-R-6986
Installation Project No. P303
IFC SPECIFICATIONS
VOLUME 1 DIVISION 00 AND 01
P303 Marine Corps Reserve Center Camp Fretterd, Reisterstown, MD
PREPARED BY:
NAVFAC Washington Capital Improvements
1314 Harwood St. SE Washington Navy Yard Washington, DC 20374
Architectural: Edward Monroe, RA Mechanical: Robert Sloan, PE Interior: Casey Kim, NCIDQ LID Plumbing: Michael W. Wingo, PE Civil: Robert E. Williams, PE Electrical: Eu H. Chua, PE Structural: Edward Chang, PE Geotechnical: Karl Hren, PE Fire Protection: Shay Wu, PE ATFP: Coy Burney, RA Specifications: Eugenio Fernandez, AIA
Submitted By: Dagoberto Portillo, PE Date: [DD MMM YYYY]
Gov. Design Manager
Project Manager: Zaman Nouri-Mesbahi, PE Date: [DD MMM YYYY]
Approved By: Date: [DD MMM YYYY] Robert Brandon Tobias, RA
Design & Engineering Director
UNCLASSIFIED / FOR OFFICIAL USE ONLY (U/FOUO)
9/2/2021
9/2/2021
9/2/2021 dagoberto.portillo New Stamp
P-303 Marine Corps Reserve Center W.O. No. 1624797 Camp Fretterd, Reisterstown, MD IFC Submission
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 23 DESIGN, PROCUREMENT, AND INSTALLATION OF FURNITURE,
FIXTURES, AND EQUIPMENT
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 78 30.00 23 CADD DATA FOR GIS DELIVERABLES
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 11 13 BITUMINOUS DAMPPROOFING
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
PROJECT TABLE OF CONTENTS Page 1
UNCLASSIFIED//FOR OFFICIAL USE ONLY (FOUO)
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 35 23 ELECTRICALLY OPERATED FOUR FOLD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALLCOVERINGS
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
09 97 13.00 40 STEEL COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 13 STEEL SHELVING
DI VI SI ON 11 - EQUI PMENT
PROJECT TABLE OF CONTENTS Page 2
11 31 13 ELECTRIC KITCHEN EQUIPMENT
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 16.00 20 DRY-PIPE FIRE SPRINKLER SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 47 WATER-LOOP HEAT PUMP SYSTEMS
23 82 00.00 20 TERMINAL HEATING UNITS
23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
AND LIFE SAFETY INCLUDING MASS NOTIFICATION SYSTEM
25 05 11.23 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
UTILITY MONITORING CONTROL SYSTEM (UMCS) TO INCLUDE HVAC
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
PROJECT TABLE OF CONTENTS Page 3
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 21 13 RADON MITIGATION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
GENERAL
G001 13133593 COVER & SIGNATURE SHEET
G002 13133594 DRAWING SHEET INDEX (GENERAL NOTES &
ABBREVIATIONS
G010 13133595 BUILDING CODE SITE PLAN
C001 13133596 GENERAL & SURVEY NOTES, LEGENDS,
ABBREVIATIONS (GEOTECHNICAL)
VF101 13133597 TOPOGRAPHIC SURVEY - A
VF102 13133598 TOPOGRAPHIC SURVEY - B
C100 13133599 SITE DEMOLITION PLAN
CS100 13133600 SITE LAYOUT PLAN - OVERALL
CS101 13133601 SITE LAYOUT PLAN - A
CS102 13133602 SITE LAYOUT PLAN - B
CS103 13133603 SITE LAYOUT PLAN - C
CS111 13133604 SITE DIMENSIONING PLAN - A
CS112 13133605 SITE DIMENSIONING PLAN - B
CS113 13133606 SITE DIMENSIONING PLAN - C
CS400 13133607 SITE PAVEMENT PLAN
CS410 13133608 JOINT LAYOUT PLAN
DOCUMENT 00 01 15 Page 1
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
CG100 13133609 GRADING PLAN - OVERALL
CG101 13133610 GRADING PLAN - A
CG102 13133611 GRADING PLAN - B
CG103 13133612 GRADING PLAN - C
CG201 13133613 STORM SEWER PROFILES
CG202 13133614 STORM SEWER PROFILES
CG203 13133615 STORM SEWER PROFILES
CG204 13133616 STORM SEWER PROFILES
CG401 13133617 STORMWATER FACILITY - A
CG402 13133618 STORMWATER FACILITY - B
CG501 13133619 STORMWATER FACILITY DETAILS
CG511 13133620 STORM SEWER DETAILS
CG512 13133621 STORM SEWER DETAILS
CG-513 13133622 STORM SEWER DETAILS AND COMPUTATIONS
CE100 13133623 EROSION & SEDIMENT CONTROL PLAN - OVERALL
CE101 13133624 EROSION & SEDIMENT CONTROL PLAN PH 1 - A
CE102 13133625 EROSION & SEDIMENT CONTROL PLAN PH 1 - B
CE103 13133626 EROSION & SEDIMENT CONTROL PLAN PH 1 - C
CE111 13133627 EROSION & SEDIMENT CONTROL PLAN PH 2 - A
CE112 13133628 EROSION & SEDIMENT CONTROL PLAN PH 2 - B
CE113 13133629 EROSION & SEDIMENT CONTROL PLAN PH 2 - C
CE114 13133630 EROSION & SEDIMENT CONTROL PLAN PH 1&2 - D
CE501 13133631 EROSION & SEDIMENT CONTROL NOTES
CE502 13133632 EROSION & SEDIMENT CONTROL NOTES
CE503 13133633 EROSION & SEDIMENT CONTROL NOTES
CE504 13133634 EROSION & SEDIMENT CONTROL NOTES
DOCUMENT 00 01 15 Page 2
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
CE505 13133635 EROSION & SEDIMENT CONTROL NOTES
CE506 13133636 EROSION & SEDIMENT CONTROL DETAILS
CE507 13133637 EROSION & SEDIMENT CONTROL DETAILS
CU100 13133638 SITE UTILITY PLAN - OVERALL
CU101 13133639 SITE UTILITY PLAN - A
CU102 13133640 SITE UTILITY PLAN - B
CU103 13133641 SITE UTILITY PLAN - C
CU104 13133642 SITE UTILITY PLAN - D
CU201 13133643 SITE UTILITY PROFILES
CU202 13133644 SITE UTILITY PROFILES
CU203 13133645 SITE UTILITY PROFILES
CU204 13133646 SITE UTILITY PROFILES
CU205 13133647 SITE UTILITY PROFILES
CU206 13133648 SITE UTILITY PROFILES
CU207 13133649 SITE UTILITY PROFILES
CU501 13133650 SITE UTILITY DETAILS
CU502 13133651 SITE UTILITY DETAILS
CU503 13133652 SITE UTILITY DETAILS
CU504 13133653 SITE UTILITY DETAILS
CU505 13133654 SITE UTILITY DETAILS
CU506 13133655 SITE UTILITY DETAILS
CU507 13133656 SITE UTILITY DETAILS
C501 13133657 SITE DETAILS
C502 13133658 SITE DETAILS
C503 13133659 SITE DETAILS
C504 13133660 SITE DETAILS
DOCUMENT 00 01 15 Page 3
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
C505 13133661 SITE DETAILS
C506 13133662 SITE DETAILS
C507 13133663 SITE DETAILS
C508 13133664 SITE DETAILS
C509 13133665 SITE DETAILS
C510 13133666 SITE DETAILS
B601 13133667 GEOTECHNICAL BORING MAP & LOGS
B602 13133668 GEOTECHNICAL BORING LOGS
B603 13133669 GEOTECHNICAL BORING LOGS
LANDSCAPE
L100 13133670 LANDSCAPE PLAN - OVERALL
L101 13133671 LANDSCAPE PLAN - A
L102 13133672 LANDSCAPE PLAN - B
L103 13133673 LANDSCAPE PLAN - C
L501 13133674 LANDSCAPE DETAILS
L502 13133675 LANDSCAPE DETAILS
L503 13133676 LANDSCAPE DETAILS
VL101 13133677 EXISTING VEGETATION PLAN
VL102 13133678 EXISTING VEGETATION PLAN - TREE INVENTORY
ST001 13133679 STRUCTURAL NOTES AND DESIGN CRITERIA
ST101 13133680 TANK PLAN ELEVATION AND NOTES
ST102 13133681 SECTIONS AND DETAILS
ST301 13133682 SECTIONS
ST501 13133683 DETAILS
ST502 13133684 DETAILS
ST503 13133685 DETAILS
DOCUMENT 00 01 15 Page 4
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
ST504 13133686 PIPE ENCASEMENT DETAIL
BUILDING A
A_G001 13133712 BLDG A - COVER SHEET
A_G002 13133713 BLDG A - GENERAL INFORMATION
A_G030 13133714 BLDG A - BUILDING CODE & LIFE SAFETY CODE
ANALYSIS
A_G031 13133715 BUILDING CODE SITE PLAN
A_G032 13133716 LIFE SAFETY PLAN
A_S-001 13133717 BLDG A - GENERAL NOTES
A_S-002 13133718 BLDG A - GENERAL NOTES
A_S-100 13133719 BLDG A - OVERALL FOUNDATION PLAN
A_S-101 13133720 BLDG A - FOUNDATION PLAN - SECTOR A
A_S-102 13133721 BLDG A - FOUNDATION PLAN - SECTOR B
A_S-103 13133722 BLDG A - FOUNDATION PLAN - SECTOR C
A_S-104 13133723 BLDG A - FOUNDATION PLAN - SECTOR D
A_S-120 13133724 BLDG A - OVERALL ROOF FRAMING PLAN
A_S-121 13133725 BLDG A - ROOF FRAMING PLAN - SECTOR A
A_S-122 13133726 BLDG A - ROOF FRAMING PLAN - SECTOR B
A_S-123 13133727 BLDG A - ROOF FRAMING PLAN - SECTOR C
A_S-124 13133728 BLDG A - ROOF FRAMING PLAN - SECTOR D
A_S-201 13133729 BLDG A - MASONRY ELEVATIIONS
A_S-211 13133730 BLDG A - MASONRY ELEVATIIONS
A_S-501 13133731 BLDG A - FOUNDATION DETAILS
A_S-502 13133732 BLDG A - FOUNDATION DETAILS
A_S-503 13133733 BLDG A - FOUNDATION DETAILS
A_S-511 13133734 BLDG A - MASONRY DETAILS
DOCUMENT 00 01 15 Page 5
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_S-512 13133735 BLDG A - MASONRY DETAILS
A_S-513 13133736 BLDG A - MASONRY DETAILS
A_S-521 13133737 BLDG A - FRAMING DETAILS
A_S-522 13133738 BLDG A - FRAMING DETAILS
A_S-523 13133739 BLDG A - FRAMING DETAILS
A_S-524 13133740 BLDG A - FRAMING DETAILS
A_S-525 13133741 BLDG A - FRAMING DETAILS
A_S-526 13133742 BLDG A - FRAMING DETAILS
A_S-601 13133743 BLDG A - SCHEDULES AND DIAGRAMS
A_S-900 13133744 BLDG A - ISOPARAMETRIC VIEW - FOR
INFORMATION ONLY
ARCHITECTURE
A_A-001 13133747 BLDG A - ARCHITECTURAL SYMBOLS,
ABBREVIATIONS & GENERAL NOTES
A_A-002 13133748 BLDG A - ACCESSIBILITY STANDARDS & MOUNTING
HEIGHTS
A_A100 13133749 BLDG A - OVERALL FLOOR PLAN
A_A-101 13133750 BLDG A - PARTIAL FLOOR PLAN - SECTOR A
A_A-102 13133751 BLDG A - PARTIAL FLOOR PLAN - SECTOR B
A_A-103 13133752 BLDG A - PARTIAL FLOOR PLAN - SECTOR C
A_A-104 13133753 BLDG A - PARTIAL FLOOR PLAN - SECTOR D
A_A-110 13133754 BLDG A - OVERALL REFLECTED CEILING PLAN
A_A-111 13133755 BLDG A - PARTIAL REFLECTED CEILING PLAN -
SECTOR A
A_A-112 13133756 BLDG A - PARTIAL REFLECTED CEILING PLAN -
SECTOR B
A_A-113 13133757 BLDG A - PARTIAL REFLECTED CEILING PLAN -
SECTOR C
A_A-114 13133758 BLDG A - PARTIAL REFLECTED CEILING PLAN -
SECTOR D
A_A-120 13133759 BLDG A - OVERALL ROOF PLAN
A_A-121 13133760 BLDG A - PARTIAL ROOF PLAN - SECTOR A
DOCUMENT 00 01 15 Page 6
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_A-122 13133761 BLDG A - PARTIAL ROOF PLAN - SECTOR B
A_A-123 13133762 BLDG A - PARTIAL ROOF PLAN - SECTOR C
A_A-124 13133763 BLDG A - PARTIAL ROOF PLAN - SECTOR D
A_A-211 13133764 BLDG A - PARTIAL ELEVATIONS
A_A-212 13133765 BLDG A - PARTIAL ELEVATIONS
A_A-213 13133766 BLDG A - PARTIAL ELEVATIONS
A_A-301 13133767 BLDG A - TRANSVERSE BUILDING SECTION
A_A-302 13133768 BLDG A - TRANSVERSE BUILDING SECTION
A_A-303 13133769 BLDG A - TRANSVERSE BUILDING SECTION
A_A-304 13133770 BLDG A - TRANSVERSE BUILDING SECTION
A_A-311 13133771 BLDG A - WALL SECTION
A_A-312 13133772 BLDG A - WALL SECTION
A_A-313 13133773 BLDG A - WALL SECTION
A_A-314 13133774 BLDG A - WALL SECTION
A_A-315 13133775 BLDG A - WALL SECTION
A_A-401 13133776 BLDG A - ENLARGED FLOOR PLANS
A_A-501 13133777 BLDG A - WALL SECTION DETAILS
A_A-502 13133778 BLDG A - WALL SECTION DETAILS
A_A-503 13133779 BLDG A - WALL SECTION DETAILS
A_A-504 13133780 BLDG A - WALL SECTION DETAILS
A_A-511 13133781 BLDG A - PLAN & COLUMN DETAILS
A_A-551 13133782 BLDG A - ARMORY DETAILS
A_A-601 13133783 BLDG A - DOOR SCHEDULE
A_A-602 13133784 BLDG A - DOOR & FRAME TYPES
A_A-603 13133785 BLDG A - DOOR & FRAME DETAILS
A_A-611 13133786 BLDG A - STOREFRONT TYPES & DETAILS
DOCUMENT 00 01 15 Page 7
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_A-612 13133787 BLDG A - INTERIOR OPENING TYPES & DETAILS
A_A-621 13133788 BLDG A - PARTITION TYPES
A_A-631 13133789 BLDG A - PARTITION DETAILS
A_A-632 13133790 BLDG A - CEILING DETAILS
A_A-633 13133791 BLDG A - RAISED ACCESS FLOOR DETAILS
INTERIORS
A_I-100 13133792 BLDG A - OVERALL FINISH PLAN
A_I-101 13133793 BLDG A - PARTIAL FINISH PLAN - SECTOR A
A_I-102 13133794 BLDG A - PARTIAL FINISH PLAN - SECTOR B
A_I-103 13133795 BLDG A - PARTIAL FINISH PLAN - SECTOR C
A_I-104 13133796 BLDG A - PARTIAL FINISH PLAN - SECTOR D
A_I-110 13133797 BLDG A - OVERALL FURNITURE PLAN
A_I-111 13133798 BLDG A - PARTIAL FURNITURE PLAN - SECTOR A
A_I-112 13133799 BLDG A - PARTIAL FURNITURE PLAN - SECTOR B
A_I-113 13133800 BLDG A - PARTIAL FURNITURE PLAN - SECTOR C
A_I-114 13133801 BLDG A - PARTIAL FURNITURE PLAN - SECTOR D
A_I-201 13133802 BLDG A - INT. ELEVATIONS
A_I-202 13133803 BLDG A - INT. ELEVATIONS
A_I-203 13133804 BLDG A - INT. ELEVATIONS
A_I-204 13133805 BLDG A - INT. ELEVATIONS
A_I-205 13133806 BLDG A - INT. ELEVATIONS
A_I-206 13133807 BLDG A - INT. ELEVATIONS
A_I-207 13133808 BLDG A - INT. ELEVATIONS
A_I-208 13133809 BLDG A - INT. ELEVATIONS
A_I-209 13133810 BLDG A - INT. ELEVATIONS
A_I-401 13133811 BLDG A - ENLARGED RESTROOM PLANS
DOCUMENT 00 01 15 Page 8
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_I-402 13133812 BLDG A - ENDLARGED PLANS & TBA
SCHEDULE
A_I-501 13133813 BLDG A - INT. DETAILS
A_I-502 13133814 BLDG A - INT DETAILS
A_I-601 13133815 BLDG A - FINISH LEGEND
A_I-602 13133816 BLDG A - ROOM SCHEDULE
A_I-603 13133817 BLDG A - SIGNAGE SCHEDULE
A_I-604 13133818 BLDG A - SIGNAGE DETAILS
FIRE ALARM
A_FA-001 13133819 BLDG A - FIRE ALARM GEN. NOTES, SYM. & ABREV.
A_FA-100 13133820 BLDG A - OVEALL FIRE ALARM PLAN
A_FA-101 13133821 BLDG A - FIRE ALARM PLAN - SECTOR A
A_FA-102 13133822 BLDG A - FIRE ALARM PLAN - SECTOR B
A_FA-103 13133823 BLDG A - FIRE ALARM PLAN - SECTOR C
A_FA-104 13133824 BLDG A - FIRE ALARM PLAN - SECTOR D
A_FA-501 13133825 BLDG A - FIRE ALARM SEQ. OF OPS. & RISER
DIAGRAM
A_FA-502 13133826 BLDG A - FIRE ALARM DETAILS
FIRE SPRINKLER
A_FX-001 13133827 BLDG A - FIRE SPRINKLER GEN. NOTES, SYM. &
ABREV.
A_FX-100 13133828 BLDG A - OVERALL FIRE SPRINKLER PLAN
A_FX-101 13133829 BLDG A - FIRE SPRINKLER PLAN - SECTOR A
A_FX-102 13133830 BLDG A - FIRE SPRINKLER PLAN - SECTOR B
A_FX-103 13133831 BLDG A - FIRE SPRINKLER PLAN - SECTOR C
A_FX-104 13133832 BLDG A - FIRE SPRINKLER PLAN - SECTOR D
A_FX-501 13133833 BLDG A - FIRE SPRINKLER DETAILS
A_FX-502 13133834 BLDG A - FIRE SPRINKLER DETAILS
PLUMBING
DOCUMENT 00 01 15 Page 9
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_P-001 13133835 BLDG A - PLUMBING GEN. NOTES, SYM. & ABREV.
A_P-110 13133836 BLDG A - PLUMB. BEL SLAB RADON MITIGATION -
OVERALL
A_P-111 13133837 BLDG A - PLUMB. BEL SLAB RADON MITIGATION -
SECTOR A
A_P-112 13133838 BLDG A - PLUMB. BEL SLAB RADON MITIGATION -
SECTOR B
A_P-113 13133839 BLDG A - PLUMB. BEL SLAB RADON MITIGATION -
SECTOR C
A_P-114 13133840 BLDG A - PLUMB. BEL SLAB RADON MITIGATION -
SECTOR D
A_P-120 13133841 BLDG A - SANITARY PIPING PLAN - OVERALL
A_P-121 13133842 BLDG A - SANITARY PIPING PLAN - SECTOR A
A_P-122 13133843 BLDG A - SANITARY PIPING PLAN - SECTOR B
A_P-123 13133844 BLDG A - SANITARY PIPING PLAN - SECTOR C
A_P-124 13133845 BLDG A - SANITARY PIPING PLAN - SECTOR D
A_P-130 13133846 BLDG A - DOMESTIC PIPING PLAN - OVERALL
A_P-131 13133847 BLDG A - DOMESTIC PIPING PLAN - SECTOR A
A_P-132 13133848 BLDG A - DOMESTIC PIPING PLAN - SECTOR B
A_P-133 13133849 BLDG A - DOMESTIC PIPING PLAN - SECTOR C
A_P-134 13133850 BLDG A - DOMESTIC PIPING PLAN - SECTOR D
A_P-401 13133851 BLDG A - ENLARGED PLANS
A_P-402 13133852 BLDG A - ENLARGED PLANS
A_P-403 13133853 BLDG A - ENLARGED PLANS
A_P-501 13133854 BLDG A - PLUMBING DETAILS
A_P-502 13133855 BLDG A - PLUMBING DETAILS
A_P-503 13133856 BLDG A - PLUMBING DETAILS
A_P-504 13133857 BLDG A - PLUMBING DETAILS
A_P-601 13133858 BLDG A - PLUMBING SCHEDULES
A_P-701 13133859 BLDG A - SANITARY RISER DIAGRAM
A_P-702 13133860 BLDG A - DOMESTIC AND GAS RISER DIAGRAM
DOCUMENT 00 01 15 Page 10
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
MECHANICAL
A_M-001 13133861 BLDG A - MECHANICAL SYM., ABBREV. & GEN.
NOTES
A_MH-100 13133862 BLDG A - DUCTWORK PLAN - OVERALL
A_MH-101 13133863 BLDG A - DUCTWORK PLAN - SECTOR A
A_MH-102 13133864 BLDG A - DUCTWORK PLAN - SECTOR B
A_MH-103 13133865 BLDG A - DUCTWORK PLAN - SECTOR C
A_MH-104 13133866 BLDG A - DUCTWORK PLAN - SECTOR D
A_MP-100 13133867 BLDG A - PIPING PLAN - OVERALL
A_MP-101 13133868 BLDG A - PIPING PLAN - SECTOR A
A_MP-102 13133869 BLDG A - PIPING PLAN - SECTOR B
A_MP-103 13133870 BLDG A - PIPING PLAN - SECTOR C
A_MP-104 13133871 BLDG A - PIPING PLAN - SECTOR D
A_MP-301 13133872 BLDG A - MECHANICAL SECTIONS
A_MP-302 13133873 BLDG A - MECHANICAL SECTIONS
A_M-401 13133874 BLDG A - MECHANICAL ENLARGED PLANS
A_M-501 13133875 BLDG A - MECHANICAL DETAILS
A_M-502 13133876 BLDG A - MECHANICAL DETAILS
A_M-503 13133877 BLDG A - MECHANICAL DETAILS
A_M-504 13133878 BLDG A - MECHANICAL DETAILS
A_M-505 13133879 BLDG A - MECHANICAL DETAILS
A_M-506 13135425 BLDG A - MECHANICAL DETAILS
A_M-601 13133880 BLDG A - MECHANICAL SCHEDULES
A_M-602 13133881 BLDG A - MECHANICAL SCHEDULES
A_M-603 13133882 BLDG A - MECHANICAL SCHEDULES
A_M-604 13133883 BLDG A - MECHANICAL SCHEDULES
A_M-701 13133884 BLDG A - SCHEMATIC DIAGRAM
DOCUMENT 00 01 15 Page 11
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_M-702 13135426 BLDG A - SCHEMATIC DIAGRAM
A_M-801 13133885 BLDG A - MECHANICAL CONTROLS
A_M-802 13133886 BLDG A - MECHANICAL CONTROLS
A_M-803 13133887 BLDG A - MECHANICAL CONTROLS
A_M-804 13133888 BLDG A - MECHANICAL CONTROLS
A_M-805 13135427 BLDG A - MECHANICAL CONTROLS
A_M-806 13135428 BLDG A - MECHANICAL CONTROLS
ELECTRICAL - GENERAL
A_E-001 13133889 BLDG A - ELECTRICAL LEGENDS & ABBREVS
A_E-401 13133890 BLDG A - ENLARGED PLANS - POWER AND COMM.
A_E-601 13133891 BLDG A - ELECTRICAL POWER RISER DIAGRAM
A_E-602 13133892 BLDG A - SWITCHGEAR SCHEDULE
A_E-603 13133893 BLDG A - MECHANICAL EQUIPMENT SCHEDULES
A_E-701 13133894 BLDG A - ELECTRICAL PANELBOARD SCHEDULES
A_E-702 13133895 BLDG A - ELECTRICAL PANELBOARD SCHEDULES
A_E-703 13133896 BLDG A - ELECTRICAL PANELBOARD SCHEDULES
A_E-704 13133897 BLDG A - ELECTRICAL PANELBOARD SCHEDULES
A_E-705 13133898 BLDG A - ELECTRICAL PANELBOARD SCHEDULES
A_E-706 13133899 BLDG A - ELECTRICAL PANELBOARD SCHEDULES
A_EL-101 13133900 BLDG A - ELECTRICAL LIGHTING PLAN - SECTOR A
A_EL-102 13133901 BLDG A - ELECTRICAL LIGHTING PLAN - SECTOR B
A_EL-103 13133902 BLDG A - ELECTRICAL LIGHTING PLAN - SECTOR C
A_EL-104 13133903 BLDG A - ELECTRICAL LIGHTING PLAN - SECTOR D
A_EL-501 13133904 BLDG A - ELECTRICAL DETAILS
A_EL-502 13133905 BLDG A - ELECTRICAL DETAILS
A_EL-503 13133906 BLDG A - ELECTRICAL DETAILS
DOCUMENT 00 01 15 Page 12
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_EL-601 13133907 BLDG A - ELECTRICAL LIGHTING FIXTURE SCHEDULE
A_EL-602 13133908 BLDG A - ELECTRICAL LIGHTING FIXTURE SCHEDULE
A_EL-603 13133909 BLDG A - LIGHTING CONTROL DETAILS
A_EL-604 13133910 BLDG A - LIGHTING CONTROL DETAILS
A_ELP-101 13133911 BLDG A - ELECTRICAL LIGHTING PROTECTION PLAN
A_EM-101 13133912 BLDG A - ELECTRICAL FL PLAN - SECTOR A
A_EM-102 13133913 BLDG A - ELECTRICAL FL PLAN - SECTOR B
A_EM-103 13133914 BLDG A - ELECTRICAL FL PLAN - SECTOR C
A_EM-104 13133915 BLDG A - ELECTRICAL FL PLAN - SECTOR D
A_EP-101 13133916 BLDG A - ELECTRICAL POWER PLAN - SECTOR A
A_EP-102 13133917 BLDG A - ELECTRICAL POWER PLAN - SECTOR B
A_EP-103 13133918 BLDG A - ELECTRICAL POWER PLAN - SECTOR C
A_EP-104 13133919 BLDG A - ELECTRICAL POWER PLAN - SECTOR D
A_EP-501 13133920 BLDG A - ELECTRICAL DETAILS
A_EP-502 13133921 BLDG A - ELECTRICAL DETAILS
A_EP-503 13133922 BLDG A - ELECTRICAL DETAILS
A_EP-504 13133923 BLDG A - ELECTRICAL DETAILS
A_EP-505 13133924 BLDG A - ELECTRICAL DETAILS
A_EP-506 13133925 BLDG A - ELECTRICAL DETAILS
TELECOMMUNICATIONS
A_T-001 13133926 BLDG A - TELECOMM LEGENDS, SCHEDULES &
ABBREVIATIONS
A_T-100 13133927 BLDG A - OVERALL TELECOM PLAN
A_T-101 13133928 BLDG A - OVERALL CABLE TRAY PLAN
A_T-401 13133929 BLDG A - TELECOM ROOM DETAILS
A_T-501 13133930 BLDG A - TELECOM DETAILS
A_T-502 13133931 BLDG A - TELECOM DETAILS
DOCUMENT 00 01 15 Page 13
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
A_T-503 13133932 BLDG A - TELECOM DETAILS
A_T-601 13133933 BLDG A - VOICE TERMINATION DETAILS
A_T-602 13133934 BLDG A - VOICE TERMINATION DETAILS
A_TY-001 13133935 BLDG A - SECURITY SYSTEMS LEGEND AND
ABBREVIATIONS
A_TY-101 13133936 BLDG A - OVERALL SECURITY SYSTEMS
A_TY-501 13133937 BLDG A - SECURITY SYSTEMS DETAILS
AUDIOVISUAL
A_AV-001 13135424 BLDG A - AUDIOVISUAL COVER SHEET
A_AV-002 13135425 BLDG A - AUDIOVISUAL SPECIFICATIONS
A_AV-003 13135426 BLDG A - AUDIOVISUAL SPECIFICATIONS
A_AV-101 13135427 BLDG A - AUDIOVISUAL FLOOR PLAN
A_AV-401 13135428 BLDG A - AUDIOVISUAL ENLARGED PLANS &
ELEVATIONS CLASSROOM 134 A & B
A_AV-402 13135429 BLDG A - AUDIOVISUAL SCHEMATICS & DETAILS
CLASSROOM 134 A & B
A_AV-411 13135430 BLDG A - AUDIOVISUAL ENLARGED PLANS &
ELEVATIONS CONF ROOM 148
A_AV-412 13135431 BLDG A - AUDIOVISUAL SCHEMATICS & DETAILS
CONF ROOM 148
A_AV-421 13135432 BLDG A - AUDIOVISUAL ENLARGED PLANS &
ELEVAITONS S-3 OPS 149 & PR SRV RCT 6
A_AV-422 13135433 BLDG A - AUDIOVISUAL SCHEMATICS & DETAILS
S-3 OPS 149 & PR SRV RCT 6
A_AV-431 13135434 BLDG A - AUDIOVISUAL ENLARGED PLANS &
ELEVAITONS DRILL HALL 127
A_AV-432 13135435 BLDG A - AUDIOVISUAL ENLARGED REFLECTED
CEILING PLAN - DRILL HALL 127
A_AV-433 13135436 BLDG A - AUDIOVISUAL ELEVATIONS -DRILL HALL
A_AV-434 13135437 BLDG A - AUDIOVISUAL SCHEMATICS & DETAILS -
DRILL HALL 127
BUILDING B
GENERAL
G-001 13133938 COVER SHEET
B_G-002 13133939 SHEET INDEX
B_G-010 13133940 BUILDING CODE & LIFE SAFETY CODE ANALYSIS
DOCUMENT 00 01 15 Page 14
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
B_G-011 13133941 BUILDING CODE SITE PLAN
B_G-012 13133942 LIFE SAFETY PLAN
STRUCTURAL
B_S-001 13133943 GENERAL NOTES
B_S-002 13133944 GENERAL NOTES, ABBREVIATIONS & LEGEND
B_S-003 13133945 LOAD DIAGRAMS
B_S-101 13133946 FOUNDATION PLAN
B_S-102 13133947 LOW ROOF FRAMING PLAN
B_S-103 13133948 HIGH ROOF FRAMING PLAN
B_S-201 13133949 ELEVATIONS
B_S-202 13133950 ELEVATIONS
B_S-203 13133951 ELEVATIONS
B_S-301 13133952 SECTIONS
B_S-401 13133953 WALL REINFORCEMENT ELEVATIONS
B_S-402 13133954 WALL REINFORCEMENT ELEVATIONS
B_S-403 13133955 WALL REINFORCEMENT ELEVATIONS
B_S-501 13133956 TYPICAL DETAILS
B_S-502 13133957 TYPICAL DETAILS
B_S-503 13133958 TYPICAL DETAILS
B_S-504 13133959 TYPICAL DETAILS
B_S-505 13133960 TYPICAL DETAILS
B_S-901 13133961 3D REPRESENTATION
ARCHITECTURE
B_A-001 13133962 GENERAL NOTES, ABBREVIATIONS
B_A-002 13133963 ACCESSIBILITY STANDARDS & MOUNTING HEIGHTS
B_A-101 13133964 FLOOR PLAN
DOCUMENT 00 01 15 Page 15
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
B_A-102 13133965 REFLECTED CEILING PLAN
B_A-103 13133966 ROOF PLAN
B_A-201 13133967 NORTH AND SOUTH ELEVATIONS
B_A-202 13133968 EAST AND WEST ELEVATIONS
B_A-301 13133969 BUILDING SECTIONS
B_A-310 13133970 WALL SECTIONS
B_A-311 13133971 WALL SECTIONS
B_A-312 13133972 WALL SECTIONS
B_A-401 13133973 ENLARGED TOILET ROOMS
B_A-403 13133974 MECHANICAL SCREEN ENLARGED PLANS, ELEVATIONS
AND SECTIONS
B_A-500 13133975 EXTERIOR WALL AND ROOF ASSEMBLIES
B_A-501 13133976 WALL DETAILS
B_A-502 13133977 WALL DETAILS
B_A-503 13133978 OPENING DETAILS
B_A-504 13133979 OPENING DETAILS
B_A-505 13133980 MISC. DETAILS
B_A-506 13133981 MISC. DETAILS
B_A-510 13133982 SECTION DETAILS
B_A-511 13133983 SECTION DETAILS
B_A-601 13133984 PARTITION TYPES
B_A-602 13133985 DOOR SCHEDULE AND DIAGRAMS
B_A-603 13133986 WINDOW AND LOUVER TYPES
B_A-604 13133987 EXTERIOR FINISH SCHEDULE
INTERIORS
B_I-101 13133988 FINISH PLAN
B_I-201 13133989 INTERIOR ELEVATIONS
DOCUMENT 00 01 15 Page 16
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
B_I-501 13133990 INTERIOR DETAILS
B_I-502 13133991 INTERIOR DETAILS
B_I-601 13133992 FINISH SCHEDULE AND COLOR LEGEND
B_IF101 13133993 FURNITURE FLOOR PLAN
B_IG101 13133994 SIGNAGE PLAN
B_IG102 13133995 SIGNAGE DETAILS
FIRE PROTECTION
B_FX001 13133996 FIRE SPRINKLER GENERAL NOTES/LEGEND
B_FX101 13133997 FIRE SPRINKLER PLAN - VMF
B_FX501 13133998 FIRE SPRINKLER DETAILS
FIRE ALARM
B_FA001 13133999 FIRE ALARM GENERAL NOTES AND LEDGEND
B_FA101 13134000 FIRE ALARM PLAN
B_FA501 13134001 FIRE ALARM DETAILS
PLUMBING
B_P-001 13134002 PLUMBING LEGEND
B_P-101 13134003 PLUMBING SANITARY & VENTING FLOOR PLAN
B_P-102 13134004 PLUMBING DOMESTIC WATER & GAS PIPING FLOOR
PLAN
B_P-301 13134005 LUBRICATION/FLUID DISTRIBUTION SYSTEM
SECTIONS
B_P-401 13134006 PLUMBING ENLARGED PLANS
B_P-402 13134007 LUBRICATION/FLUID DISTRIBUTION SYETEM
ENLARGED PLAN
B_P-501 13134008 PLUMBING DETAILS
B_P-502 13134009 PLUMBING DETAILS
B_P-503 13134010 PLUMBING DETAILS
B_P-601 13134011 PLUMBING SCHEDULES
B_P-602 13134012 PLUMBING SCHEDULES
DOCUMENT 00 01 15 Page 17
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
B_P-901 13134013 PLUMBING SANITARY & VENTING RISER DIAGRAM
B_P-902 13134014 PLUMBING DOMESTIC WATER & GAS PIPE RISER
DIAGRAM
B_P-903 13134015 PLUMBING DOMESTIC WATER & GAS PIPE RISER
DIAGRAM
MECHANICAL
B_M-001 13134016 GENERAL NOTES, SYMBOLS, ABBREVIATIONS
B_M-101 13134017 MECHANICAL HVAC GROUND FLOOR PLAN
B_M-102 13134018 MECHANICAL HVAC UPPER LEVEL FLOOR PLAN
B_M-103 13134019 MECHANICAL HVAC ROOF PLAN
B_M-301 13134020 HVAC SECTIONS
B_M-302 13134021 HVAC SECTIONS
B_M-401 13134022 ENLARGED MECHANICAL PLANS
B_M-402 13134023 ENLARGED MECHANICAL PLANS
B_M-501 13134024 MECHANICAL DETAILS
B_M-502 13134025 MECHANICAL DETAILS
B_M-503 13134026 MECHANICAL DETAILS
B_M-504 13134027 MECHANICAL DETAILS
B_M-601 13134028 MECHANICAL SCHEDULES
B_M-602 13134029 MECHANICAL SCHEDULES
B_M-603 13134030 MECHANICAL SCHEDULES
B_M-604 13134031 MECHANICAL SCHEDULES
B_M-701 13134032 CONTROLS
B_M-702 13134033 CONTROLS
B_M-703 13134034 CONTROLS
B_M-704 13134035 CONTROLS
B_M-705 13134036 CONTROLS
B_M-706 13134037 CONTROLS
DOCUMENT 00 01 15 Page 18
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
ELECTRICAL
B_E-001 13134038 ELECTRICAL LEGEND AND ABBREVIATIONS
B_E-101 13134039 ELECTRICAL LIGHTING PLAN - FIRST FLOOR
B_E-111 13134040 ELECTRICAL POWER PLAN - FIRST FLOOR
B_E-112 13134041 ELECTRICAL LIGHTING PLAN - ROOF
B_E-122 13134042 ELECTRICAL LIGHTNING PROTECTION PLAN - ROOF
B_E-400 13134043 ELECTRICAL ENLARGED PLANS
B_E-401 13134044 ELECTRICAL ENLARGED PLANS
B_E-501 13134045 ELECTRICAL LIGHTING DETAILS
B_E-502 13134046 ELECTRICAL LIGHTING DETAILS
B_E-503 13134047 ELECTRICAL LIGHTING DETAILS
B_E-504 13134048 ELECTRICAL DETAILS
B_E-510 13134049 ELECTRICAL LIGHTING PHOTOMETRICS
B_E-511 13134050 ELECTRICAL LIGHTING PHOTOMETRICS
B_E-512 13134051 ELECTRICAL LIGHTING PHOTOMETRICS
B_E-513 13134052 ELECTRICAL LIGHTING PHOTOMETRICS
B_E-514 13134053 ELECTRICAL LIGHTING PHOTOMETRICS
B_E-520 13134054 ELECTRICAL LIGHTNING PROTECTION DETAILS
B_E-521 13134055 ELECTRICAL LIGHTNING PROTECTION DETAILS
B_E-601 13134057 ELECTRICAL GROUNDING DIAGRAM
B_E-602 13134058 ELECTRICAL POWER RISER DIAGRAM
B_E-603 13134056 ELECTRICAL LIGHTING CONTROL PANEL SYSTEM
DIAGRAM
B_E-611 13134059 ELECTRICAL LUMINAIRE SCHEDULE
B_E-612 13134060 ELECTRICAL LIGHTING CONTROL SCHEDULES
B_E-613 13134061 ELECTRICAL MECHANICAL EQUIPMENT CONNECTION
SCHEDULE
B_E-621 13134062 ELECTRICAL PANEL SCHEDULES
DOCUMENT 00 01 15 Page 19
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
B_E-622 13134063 ELECTRICAL PANEL SCHEDULES
TELECOMMUNICATIONS
B_T-001 13134064 BLDG B - SYSTEMS LEGEND
B_T-101 13134065 BLDG B - SYSTEMS PLAN
B_T-401 13134066 BLDG B - SYSTEMS ENLARGED PLAN
B_T-501 13134067 BLDG B - SYSTEMS DETAILS
B_T-502 13134068 BLDG B - SYSTEMS DETAILS
B_T-503 13134069 BLDG B - SYSTEMS DETAILS
B_T-601 13134070 BLDG B - SYSTEMS RISER - DATA
B_T-602 13134071 BLDG B - SYSTEMS RISER - VOICE
SECURITY
B_TY001 13134072 BLDG B - SECURITY SYSTEMS LEGEND NOTES AND
ABBREVIATIONS
B_TY101 13134073 BLDG B - OVERALL SECURITY PLAN
B_TY501 13134074 SECURITY SYSTEMS DETAILS
AUDIOVISUAL
B_AV001 13135430 AUDIOVISUAL COVER SHEET
B_AV002 13135431 AUDIOVISUAL SPECIFICATIONS
B_AV003 13135432 AUDIOVISUAL SPECIFICATIONS
B_AV101 13135433 AUDIOVISUAL FLOOR PLAN
B_AV401 13135434 AUDIOVISUAL ENLARGED PLANS & ELEVATIONS
CLASSROOM 103
B_AV402 13135435 AUDIOVISUAL SCHEMATICS & DETAILS CLASSROOM
BUILDING C
GENERAL
C_G001 13134076 BLDG C - COVER SHEET
C_G002 13134077 BLDG C - SHEET INDEX
C_G030 13134078 BLDG C - LIFE AND SAFETY CODE ANALYSIS
DOCUMENT 00 01 15 Page 20
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
C_G031 13134079 BLDG C - BUILDING CODE SITE PLAN
C_G032 13134080 BLDG C - LIFE SAFETY PLAN
STRUCTURAL
C_S-001 13134081 BLDG C - GENERAL NOTES
C_S-002 13134082 BLDG C - GENERAL NOTES
C_S-101 13134083 BLDG C - FOUNDATION AND ROOF FRAMING PLAN
C_S-201 13134084 BLDG C - BRACED FRAME ELEVATIONS AND DETAILS
C_S-301 13134085 BLDG C - SECTIONS AND ISOPARAMETRIC VIEW
C_S-501 13134086 BLDG C - STRUCUTRAL DETAILS
C_S-502 13134087 BLDG C - STRUCUTRAL DETAILS
ARCHITECTURAL
C_A-001 13134088 BLDG C - ARCH SYMB, ABBREV, & GEN NOTES
C_A-002 13134089 BLDG C - ACCESSIBILITY DTDS & MOINTING HGTS
C_A-100 13134090 BLDG C - FLOOR PLAN
C_A-110 13134091 BLDG C - REFLECTED CEILING PLAN
C_A-120 13134092 BLDG C - ROOF PLAN
C_A-200 13134093 BLDG C - OVERALL BUILDING ELEVATIONS
C_A-300 13134094 BLDG C - OVERALL BUILDING SECTIONS
C_A-311 13134095 BLDG C - TYPICAL WALL SECTIONS
C_A-501 13134096 BLDG C - DETAILS
ELECTRICAL
C_EL101 13134097 BLDG C - ELECTRICAL LIGHTING FLOOR PLAN
C_EP-101 13134098 BLDG C - ELECTRICAL LIGTNING PROTECTION PLAN
C_ELP101 13134099 BLDG C - ELECTRICAL POWER FLOOR PLAN
BUILDING D
GENERAL
D_G-001 13134100 COVER SHEET
DOCUMENT 00 01 15 Page 21
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
D_G-002 13134101 SHEET INDEX
STRUCTURAL
D_S-001 13134102 GENERAL NOTES
D_S-002 13134103 ABBREVIATIONS, LEGEND, AND LOAD DIAGRAM
D_S-101 13134104 STRUCTURAL PLANS, ELEVATIONS, AND SECTIONS
D_S-501 13134105 TYPICAL DETAILS
D_S-502 13134106 TYPICAL DETAILS
ARCHITECTURE
D_A-001 13134107 GENERAL NOTES, ABBREVIATIONS
D_A-101 13134108 PLANS
D_A-201 13134109 ELEVATIONS
D_A-301 13134110 BUILDING AND WALL SECTIONS
D_A-501 13134111 WALL DETAILS
D_A-601 13134112 SCHEDULES AND DIAGRAMS
FIRE PROTECTION
D_F-001 13134113 GENERAL NOTES
D_F-101 13134114 FIRE PUMP PLAN
D_F-501 13134115 DETAILS SHEET
D_F-502 13134116 FIRE MATRIX
PLUMBING
D_P-101 13134117 PLUMBING FLOOR PLAN, RISER & DETAILS
MECHANICAL
D_MH001 13134118 HVAC LEGEND
D_MH101 13134119 HVAC FLOOR PLAN
D_MH501 13134120 HVAC DETAILS
D_MH601 13134121 HVAC SCHEDULES
DOCUMENT 00 01 15 Page 22
DRAWING
NO.
REVISION
NO.
NAVFAC
DWG NO.
TITLE
D_MH701 13134122 HVAC CONTROLS
D_MP001 13134123 MECHANICAL PROCESS LEGEND
D_MP101 13134124 MECHANICAL FLOOR PLAN
D_MP301 13134125 MECHANICAL PROCESS SECTIONS
D_MP302 13134126 MECHANICAL PROCESS SECTION AND SCHEDULES
D_MP501 13134127 MECHANICAL PROCESS DETAILS
D_MP901 13134128 MECHANICAL PROCESS ISOMETRIC VIEWS
D_M1001 13134129 INSTRUMENTATION LEGEND AND ABBREVIATIONS
D_M1002 13134130 P&ID FIRE SUPPLY STORAGE TANK
D_M1003 13134131 P&ID MECHANICAL PROCESS PUMP ENCLOSURE
ELECTRICAL
D_E-001 13134132 ELECTRICAL LEGEND AND ABBREVIATIONS
D_E-101 13134133 ELECTRICAL LIGHTING AND POWER FLOOR PLANS
D_E-112 13134134 LIGHTNING PROTECTION PLAN
D_E-501 13134135 ELECTRICAL LIGHTING DETAILS
D_E-502 13134136 ELECTRICAL LIGHTING PHOTOMETRICS
D_E-503 13134137 LIGHTNING PROTECTION DETAILS
D_E-504 13134138 ELECTRICAL DETAILS
D_E-505 13134139 ELECTRICAL DETAILS
D_E-506 13134140 ELECTRICAL DETAILS
D_E-601 13134141 ELECTRICAL POWER RISER DIAGRAM
D_E-602 13134142 ELECTRICAL GROUNDING DIAGRAM
D_E-611 13135420 ELECTRICAL SCHEDULES
D_E-621 13135421 ELECTRICAL PANEL SCHEDULES
-- End of Document --
DOCUMENT 00 01 15 Page 23
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the construction of three (3) structures for the Marine Corps Reserve Center (MCRC), including a Training Facility, Vehicle Maintenance Facility and Organic storage Shed), including site improvements, parking facilities and incidental related work.
1.2.2 Location
The work is located at the Camp Fretterd, Liberty Reservoir on Rt.
30, Hanover Pike, in Baltimore County, Maryland, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
The project land lot is empty and Contractor will have full control of the project premises within the Contract Limits as shown on the drawings, as limited by the Contracting Officer.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
SECTION 01 11 00 Page 1
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.6 GOVERNMENT-INSTALLED WORK
The Government will install surveillance and communication equipment, and other items. Coordinate with Government these efforts.
1.7 GOVERNMENT COORDINATION REQUIREMENTS
1.7.1 Government Contractor Access
Allow the Government's personnel and/or Government's Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the building spaces and site, and make final connections. Coordinate efforts with the Government and Government's Contractor to facilitate joint use of building spaces and site during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the Government and the contractor, within one week, incorporate the effort of additional coordination with the Government's personnel and/or Government's Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within the construction site.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials
SECTION 01 11 00 Page 2 and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Personnel List
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. The Maryland Army National Guard (MDARNG) installation will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
d. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency 15 days prior allowing personnel on the preservation. As changes occur and additional information becomes available, correct and change the information contained in previous lists. Provide this information to the
SECTION 01 14 00 Page 1 reservation manager.
1.3.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.3.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.3.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.3.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
SECTION 01 14 00 Page 2
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.3.1.2.4 One-Day Passes
One day pass information/list must be submitted NLT 72 hours prior to project access to the Reservation Manager as a minimum. Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period, or as established by the Contracting Officer, between 7:30 and 16:30, Monday through Friday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval and special arrangements must be requested to the Reservation Manager and MDARNG. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.
During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Installation in-use and Occupied Existing Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.4 UTILITY CUTOVERS AND INTERRUPTIONS
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures
SECTION 01 14 00 Page 3 required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete and tested, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and gas are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four (4) hours. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection verification 15 days prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.
f. All areas disturbed must be restored to the satisfaction of the Reservation Manager and all temporary disturbances to the Reservation property must be coordinated with the Reservation Manager at least 15 days prior.
1.5 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
a. Comply with all Camp Frettered security requirements. A copy of the security regulations may be obtained from the security office of the station.
b. Contractor Responsibility for Employees - The Contractor is responsible for employees under his employment. Ensure that employees are familiar with and obey station traffic, safety, and security regulations.
c. Motor Vehicle Operation - Ingress and egress of personnel will be subject to the security regulations of the Station.Contractor's vehicles must have current validation stickers on license plates, and must fit through the main gate both width and height. CFMR will buy windshield stickers (front and rear windshields) and will provide them to the General Contractor at the beginning of the project. All vehicles will be properly identified before entering the Reservation.
(1) All personnel entering the installation are subject to random vehicle inspections. All vehicles are limited to the road from main gate to the project site only. Vehicles that are detected roaming the Reservation will be escorted off by the Security Force and will be denied access to the Reservation.
SECTION 01 14 00 Page 4
(2) All personnel must be made aware of the base speed limits.
(3) Contractor's parking spaces must be limited to inside project's area of disturbances. Contractor is not allowed to use the current paved parking spaces in the installation outside the project's limits of disturbances.
(4) Traffic accidents should be reported immediately to the Installation Security Police Law Enforcement Desk.
(5) Provide lockable temporary fencing around the project's limits of disturbances, and lock all temporary storage and office facilities and containers.
(6) Providing Information to Subcontractors - Prime Contractors are responsible for ensuring that subcontractors receive security information. Failure to comply with the specified requirements will result in prime contractors and subcontractors being denied access to the construction site.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 14 00 Page 5
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .