MOMENT FRAME SCHEDULE
MARK H
12'-3"
12'-3"
12'-3"
17'-2 5/8"
12'-3"
19'-2"
COL
SIZE
W8x48
W8x48
W8x48
W10x30
W10x30
W10x30
L
20'-3"
21'-8"
BEAM
SIZE
W8x28
W8x28
W8x28
W10x22
W10x22
W10x26
BEAM-COL
CONN
3/S4.2
3/S4.2
4/S4.2
6/S4.2
6/S4.2
6/S4.2
20'-3"
20'-3"
17'-2"
13'-6"
BASE
CONN
16/S4.2
16/S4.2
16/S4.2
13/S4.2
13/S4.2
13/S4.2
NOTES:
1. ALL SIZES TO BE FIELD VERIFIED PER EXISTING CONDITIONS AND ARCH
REQUIREMENTS
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -1
R E
V
IS
IO
N
N.T.S.
1 MOMENT FRAME SCHEDULE
S4.2 : SSK-1
5 6
CC
DD
EE
TOF 101' - 0"
TO GRADE 105' - 0" (V)
S5.1
S5.1
S5.1
S J
S J
UPGRADE (E) FND WALL W/
(N) FTG, TYP TO GRID '2'-
SEE 8/S5.1
TOF 101' - 0"
TYP
2' - 6"
8' - 0"
/4
20 TOF = BOW (E)
TOP = TOW (E)
UPGRADE TO (E) FTG/ COL CONN PER 6/S5.1;
TYP @ ALL (E) COL LOCATIONS IN PHASE 1
WORK; REF A0.3 FOR WORK EXTENTS
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -2
R E
V
IS
IO
N
: 1/8" = 1'-0"SSK-2
14 FOUNDATION PLAN - (N) WORK
S1.1
KEYNOTES (CONT)#
14 (N) 8" CONC MAT SLAB, SEE S1.1
(E) DIAGONAL PLANKING TO REMAIN, NAILING TO BE INCREASED
OR VERIFIED TO 2-8d @ INTERMEDIATE AND END BEARING SUPPORTS AND 3-8d @ BOUNDARY MEMBERS
(N) OPENING IN (E) CONC WALL BELOW; REMOVE CONC FOR
OPENING AFTER UNDERPINNING IS COMPLETE- SEE 14/S5.2
(N) 4-1 3/4x14 LVL SISTERED TO (E) 3-2x10, SEE 7/S5.7 & 18/S5.7
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M A
M M
O T
H H
O T
S P
R
IN
G S
H O
T E
L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -3
R E
V
IS
IO
N
N.T.S.
KEYNOTES: 1ST FLR FRMG PLAN (N) WORK
S2.1 : SSK-3
(N) HSS COL, SEE PLAN
(N) 1/4x8x2'-6"
BENT PL
BEAM SEAT
3/8x6x0'-8" PL
(N) HSS COL ABV,
SEE PLAN
4-1/2"ØX6" LAG
BOLTS
1/4
A
A
SECTION A-A
4" 2"
4-TIMBERLOK
TOE SCREWS,
MIN 3" EMBED
(N) 6x BLKG TO MATCH
(E) JOIST DEPTH,
SHIM AS REQ'D FOR
TIGHT FIT; MAX 1/2"
(E) JOIST,
SEE PLAN
REMOVE SHTHG AS REQ'D
FOR DIRECT BEARING OF
COL BASE PL TO BLKG
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -4
R E
V
IS
IO
N
: 3/4" = 1'-0"SSK-4
18 TYP (N) COL @ SISTERED BEAM
S5.7
WOOD HOLDOWN SCHEDULE
MARK HOLDOWN
ANCHOR ROD
SIZE EMBED
REQD
COL
REMARKS
(1,2,3)
'SIMPSON' HDU2 5/8" 1'-3" 2-2x
ADDITIONAL REMARKS:
1. INSTALL HOLDOWN PER MFR RECOMMENDATIONS
2. SEE DETAIL FOR TYPICAL HOLDOWN AT FOUNDATION
3. HILTI HY-200 EPOXY BOLTS W/ 5" MIN EMBED MAY BE UTILIZED FOR 'SIMPSON' HDU2,
HDU4, & HDU5 HOLDOWNS ONLY. ALL OTHER HOLDOWN ANCHORS SHALL BE CIP
ANCHOR RODS
4. WHERE HOLDOWN IS INDICATED AT THIS LEVEL, PROVIDE HOLDOWN TYPE '48' AT
FLOOR LEVELS ABOVE, SEE DETAIL FOR TYP HOLDOWN AT FLOORS ABOVE
5. SEE 2/S3.1 FOR ADDITIONAL INFO
'SIMPSON' HDU4 5/8" 1'-8" 2-2x4
'SIMPSON' HDU8 7/8" 2'-0" 2-2x8
'SIMPSON' HDU14 1" 3'-0" 4-2x14
'SIMPSON' MSTC28 NA NA 2-2x28
'SIMPSON' MSTC40 NA NA 2-2x40
'SIMPSON' HDU11 1" SEE DETAIL 6x811 SEE DETAIL 8/S5.7 & 10/S5.7
BB
CC
C
A
S5.7
S5.7
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -5
R E
V
IS
IO
N
N.T.S.
WOOD HOLDOWN SCHEDULE
: 3/32" = 1'-0"SSK-5
1 1ST FLOOR SHEAR WALL PLAN
S3.1 S3.1 : SSK-5
KEYNOTES (CONT)#
23 (N) 3/4" ROOF SHEATHING, SEE 7/S5.3
24 (N) 1/2" ROOF SHEATHING OVER (E) PLANKING, SEE 1/S5.8
25 (N) DRAG TRUSS, ALIGN W/ SHEAR WALLS
26 (N) 2x8 @ 12" OC
27 (N) L6x4x3/8 LLV W/ 1 3/4x14 FASCIA, SEE 2/S5.7
28 (N) HSS 4x4x1/4 COL TO SUPPORT ROOF FRAMING, SEE 13/S5.7 & 14/S5.7
(N) SHEATHING @ SHEARWALLS
WHERE OCCURS
'SIMPSON' FACE HANGER
(N) 2x12 BLOCKING BETWEEN JOISTS W/ 4-#10x6" SCREWS
@ EA (E) STUD
(E) PORTE-
COCHERE JOIST
(E) 1x DIAG
(N) ROOF SHTHG,
SEE PLAN
(N) EDGE NAILING
(E) 2x6 STUD WALL SEE 11/S5.4
(N) SHTHG, SEE PLAN
(N) FLOOR JOIST,
SEE PLAN
(E) 2x6 STUD WALL
(N) SOLID 6x12 BLKG
BETWEEN STUDS
SEE PLAN
JB
SECTION
4-#12 TOE SCREWS
D
SEE PLAN
SHTHG 2ND FLRTO
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -6
R E
V
IS
IO
N
N.T.S.
KEYNOTES: RF FRMG PLAN (N) WORK
: 3/4" = 1'-0"SSK-6
15 PORTE-COCHERE ROOF FRAMING
S5.5 S2.3 : SSK-6
6" 1' - 6"
EXCAVATE AS NEEDED TO
POUR FOOTING, REPLACE
W/ COMPACTED
STRUCTURAL FILL
(E) CONC FND WALL
(E) CRAWLSPACE
(N) 2-#4 CONT,
TOP & BOTT
#4 @ 18" OC W/ 5"
EPOXY EMBED INTO
(E) FND WALL
SEE PLAN
BOF
(N) CONC FTG, TO BE PLACED IN 6'-0" MAX
LENGTHS; CONTACT EOR IF SOIL
CONDITIONS DICTATE LONGER SECTIONS
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -7
R E
V
IS
IO
N
: 3/4" = 1'-0"SSK-7
8 LOCATIONS W/O UNDERPINNING
UPGRADE TO (E) FOOTING @
S5.1
(E ) R
AFTERS B
ELOW
, S
PACIN
G V
ARIE
S
16 GAx1 1/2" STAPLES @ 12" OC, FIELD, SEE NOTE #2
16 GAx1/2" STAPLES @ 6" OC, PANEL EDGES, SEE NOTE #2
SHEATHING OVERLAY ATTACHMENT REQUIREMENTS
PLY/OSB SHEATHING, SEE
PLAN FOR THICKNESS
NOTES:
1. (E) PLANKING NOT SHOWN FOR CLARITY
2. CONTRACTORS TO VERIFY STAPLES DO
NOT PENETRATE INTO BUILDING
3. PLY/OSB SHEATHING EDGES ARE NOT
REQUIRED TO ALIGN W/ (E) RAFTERS
PRENAILING REQUIREMENTS
(E) ROOF PLANKING
SUPPLEMENT (E) NAILING
MIN ADD 2-8d PER PLAN @
EACH RAFTER
Date
W Y O M I N G
(Ci v i l )
Engineer
Pr of es s iona l
H O
M
AS
R . BEAUDE
T
T T
E
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
DRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
N/A
N/A
/4
/2
:1
:1
P
M
BCE#13-744
REVISION 1
MAMMOTH HOTSPRINGS HOTEL
YELLOWSTONE NATIONAL PARK, WY
WCG
JML
08.04.2016
SSK-8
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
N/A
: 3/4" = 1'-0"SSK-8
1 (E) ROOF PLANKING NAILING & (N) SHEATHING NAILING
N/A
S5.8
DD
EE
F
8TOW 105' - 0"
44' - 1"
/2
/8
TOF 101' - 0"
TO GRADE 105' - 0" (V)
TOF 101' - 0"
S5.1
(E) TUNNEL LOCATION,
SEE SHEET SD1.1 FOR
MORE INFO
TYP
S5.1
S5.1
S5.1
S J S J
S J S J
S5.1
UPGRADE (E) FND WALL W/
(N) FTG, TYP TO GRID '2'-
SEE 8/S5.1
26' - 0 1/2" 26' - 0 1/2" 26' - 0 1/2"
TOF 101' - 0"
TOF 101' - 0"
TYP
TYP
6' - 0" 6' - 0" 2' - 6"
2' - 6"2' - 6"
1 1
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -9
.1 R
E V
IS
IO
N
: 1/8" = 1'-0"SSK-9.1
1 FOUNDATION PLAN - (N) WORK
S1.1
KEYNOTES#
(E) CONC FND TO BE UNDERPINNED BY (N) FULL-HEIGHT
BASEMENT WALL, SEE 18/S5.1, 4/S5.2 & 13/S5.2
2 (N) 8" CONC SLAB ON GRADE W/ #4 @ 12" OC EACH WAY
(N) OPENING IN CONC BASEMENT WALL, TO BE CUT AFTER
UNDERPINNING IS COMPLETE, SEE 14/S5.2
(N) CONC FOOTING & 18"SQ CONC PIER @ EXTERIOR MOMENT
FRAME, SEE S3.1 & S4.2
5 (E) FND WALL TO BE UNDERPINNED FOR (N) CRAWLSPACE, SEE 16/S5.1
6 (E) CONC FND WALL TO REMAIN W/ UPGRADES TO FTG, SEE 8/S5.1
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M A
M M
O T
H H
O T
S P
R
IN
G S
H O
T E
L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -9
.2 R
E V
IS
IO
N
N.T.S.
KEYNOTES: FND PLAN (N) WORK
S1.1 : SSK-9.2
#5 @ 8" OC,
EA WAY
BASE PL 5/8x12x1'-3"
/2
/2
/2
1 1/2"
1' - 1"
1 1/2"
3/4"Ø HEAVY-HEX-
HEAD BOLT W/ 12"
MIN EMBED
1/4
SECTION A-A
SEE S1.1
C L
R
C L
R
2" CLR, TYP
18" SQ PIER
3-#3 TIES @ 3" OC
@ TOP OF PIER
4-#4 VERTS
#3 TIES @ 10" OC
OPTION TO PROVIDE
DOWELS TO MATCH
VERT REINF
#5 @ 8" OC
#5 @ 12" OC
18" SQ PIER
A A
6" CONC SLAB
ON GRADE,
SEE CIVIL
NOTE:
PROVIDE (N) FOUNDATION WALL AND
DOWEL TO (E) FOOTING AND
FOUNDATION WALL PER 13/S4.2 WHERE
OCCURS AT MOMENT FRAME '1', GRID 'D'
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E #1
3-
W C
G
JM
L
/0
4/
S S
K -1
R
E V
IS
IO
N
: 3/4" = 1'-0"SSK-10
1 MOMENT FRAME 1, 2, 3 BASE CONNECTION
S4.2
(N) FLOOR SHTHG,
ATTACHED TO (N)
JOISTS, SEE 7/S5.3
(E) CEILING, TO
REMAIN SUPPORTED
BY (E) JOISTS
(E) DEFLECTED
JOISTS TO REMAIN
(N) JOISTS
STAGGERED
BETWEEN (E) JOISTS,
SEE PLAN
ANY (E) BRIDGING OR
BLOCKING MAY BE CUT
OR REMOVED TO ALLOW
FOR LVL INSTALLATION
P R
O
JE
C T
TI
TL
E
IS
S
U E
D A
TE
D R
A W
N B
Y
C H
E C
K B
Y
P R
O
JE
C T
N O
S H
E E
T
ID
R E
V
IS
IO
N
M
A M
M O
T H
H O
T S
P R
IN
G
S H
O T
E L
B C
E
-7
W C
G
JM
L
0 8 /0
/2
S S
K -1
R
E V
IS
IO
N
: 3/4" = 1'-0"SSK-11
12 (N) FLOOR JOISTS @ 2ND FLOOR
S5.4
| SSK1-10 |
| Sheets |
| SSK-1 - REVISION 1 |
| SSK-2 - REVISION 1 |
| SSK-3 - REVISION 1 |
| SSK-4 - REVISION 1 |
| SSK-5 - REVISION 1 |
| SSK-6 - REVISION 1 |
| SSK-7 - REVISION 1 |
| SSK-9.1 - REVISION 1 |
| SSK-9.2 - REVISION 1 |
| SSK-10 - REVISION 1 |
| SSK-8 |
| Sheets |
| SSK-8 - REVISION 1 |
File details come from the government source that posted it. Updated .