Attachment_2_-_03_Drawings_AD2.0_-_A9.13.pdf
PDF 6 MB Posted
- Attached to
- Mammoth Hotel Seismic Stabilization Phase 1 Federal contract opportunity
- Solicitation number
- P16PS00611
About this file
Attachment 2 Drawings 03
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 72
D
B
A
3 4 5
C
E
F
8' - 10"
VERIFY
7' - 1"
9 9 910 1010
10 10
101010 999
14 14 14
14141414
10 10 10
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
EXCAVATE & REMOVE FOUNDATION WALL & FOOTING IN THEIR
ENTIRETY
DEMOLITION KEYNOTES:
REMOVE PORTION OF FOUNDATION WALL & FOOTING IN
PREPARATION FOR NEW OPENING. FIELD COORDINATE EXTENT
OF DEMOLITION.
UNDERPIN EXISTING FOUNDATION WALL IN PREPARATION FOR
NEW CONSTRUCTION. SEE STRUCTURAL
REMOVE PORTION OF FOUNDATION WALL & UNDERPIN
EXISTING FOUNDATION. SEE CONSTRUCTION PLANS FOR
EXTENT. COORDINATE WITH STRUCTURAL.
EXCAVATE (E) CRAWLSPACE FOR (N) ELEVATOR SHAFT ACCESS
& TUNNEL EXTENSION . COORDINATE EXTENT W/ NEW
CONSTRUCTION AND STRUCTURAL.
REMOVE (E) SYSTEMS SERVING PHASE I AREA IN THEIR
ENTIRETY. COORDINATE W/ MECH, ELEC., PLUMBING & FIRE
PROTECTION FOR ADDITIONAL INFORMATION.
PROTECT (E) UTILITIES IN TUNNEL SERVING PHASE II AREA
COORDINATE MODIFICATION WITH NEW WORK.
HATCH INDICATES AREA OF NEW ADDITION EXCAVATION FOR (N)
CONSTRUCTION. FIELD COORDINATE EXTENTS WITH (N) WORK.
REMOVE PORTION OF FOUNDATION WALL IN PREPARATION FOR
(N) STRUCTURAL UPGRADES. SEE STRUCTURAL FOR
ADDITIONAL INFORMATION. FIELD COORDINATE EXTENT OF
DEMOLITION.
HATCH INDICATES APROXIMATE LOCATION OF EXCAVATION
REQUIRED FOR STRUCTURAL UPGRADES. SEE STRUCTURAL.
PROTECT (E) UTILITIES SERVING PHASE II AREAS.
COORDINATE (N) UTILITIES TO ALLOW FUTURE REMOVAL.
COORDINATE UTILITIES MODIFICATION AND PROTECT ALL
PHASE II SYSTEMS AND CONSTRUCTION.
COORDINATE EXACT EXTENTS & LOCATIONS OF EXCAVATIONS
NECESSARY TO COMPLEATE NEW WORK. TYP.
COORDINATE EXCAVATION AND PREPERATION OF (N)
STRUCTUREAL WORK SEE STRUCTURAL.
FIELD COORDNITATE EXACT LOCATION OF UTILITY TUNNEL
SERVING BUILDING . PROTECT TUNNEL & UTILITIES TO
REMAIN.
HATCH INDICATES APPROXIMATE AREA OF EXCIVATION FOR (N)
MECHANICAL UNIT ACCESS. FIELD COORDINATE WITH (E) PIERS.
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:0
A M
15021.00 6.10.2016
BASEMENT DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AD2.0
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD2.0A5.1
16 DEMO BASEMENT FLOOR PLAN NORTH
UP
UP
6 72
D
B
A
3 4 5
C
E
F
5'
1"
7 7 7 755
18 18
10 10
10 10
11 4 11
8 8 8 8
9 9
6 66
6 8 8 8 8
17' - 10" 28' - 3" 26' - 0" 32' - 0" 45' - 4"
149' - 5"
6 6 631
12 12
16 16
292929
20 20
12 12
12 21
262626
26 26 26 26
5 5 5 5
30 30
30 30 30 30
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
(E) RAMP
21 21 21 21 21
32 3226
32 32
12 12
29 29 2929
6 42 42 42 42 42
35 TYP.
35 TYP.
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
REMOVE CONC. SLAB AND EXCAVATE FOR NEW FOUNDATION.
COORDINATE WITH (N) WORK FOR EXTENT.
DEMOLITION KEYNOTES:
REMOVE (E) FLOORING, SUBSTRATE, AND STRUCUTRE FOR (N)
ELEVATOR. COORDINATE EXTENT AND LOCATION WITH NEW
CONSTRUCTION & REQUIRMENTS OF ELEVATOR.
CARE FULLY REMOVE AND SALVAGE EXTERIOR TRIM TO
EXTENT REQUIRED FOR (N) STRUCTURAL MOMENT FRAME.
STAIN, REPAIR AND PREPARE FOR RE-INSTALLATION.
REMOVE AND SALVAGE (E) WOOD TRIM. REMOVE (E) WALL
FINISHES AS NECESSARY FOR (N) STRUCTURAL WORK. FIELD
COORDINATE EXTENTS. STRIP, REPAIR AND PREFAIR FOR RE-
INSTALLATION.
CREFULLY REMOVE AND SALVAGE HISTORIC DRINKING
FOUNTAIN.
CAREFULLY REMOVE WALL FINISH AND STRUCTURE FOR NEW
OPENING. SALVAGE TRIM & PANELING. COORDINATE LOCATION
AND EXTENT WITH (N) WORK.
REMOVE (E) WALL FINISH, INSULATION AND TRIM IN THEIR
ENTIRITY TO SOUND STRUCTURE. COORDINATE AND PREPARE
FOR (N) WORK.
REMOVE (E) WINDOW, SASH, FRAME, AND TRIM IN THEIR
ENTIRETY. SALVAGE SASH & GLASS TO OWNER.
CAREFULLY REMOVE AND SALVAGE (E) WINODW, FRAME AND
TRIM FOR RESTORATION AND RE-INSTALLATION.
REMOVE (E) DOOR, FRAME, TRIM AND HARDWARE IN THEIR
ENTIRETY. SALVAGE TO OWNER.
REMOVE AND SALVAGE (E) PLUMBING FIXTURE. PREPARE FOR
RE-INSTALLATION. SEE PLUMBING.
REMOVE (E) CASEWORK IN ITS ENTIRITY.
REMOVE (E) FLOOR FINISH TO SOUND SUBSTRATE.
COORDINATE WITH STRUCTURAL UPGRADES. PREPARE FOR
(N) FINISH.
PROTECT (E) STAIR, HANDRAILS, WALLS, PANELING, TRIM.
REMOVE (E) TILE FLOOR FINISH AND UNDERLAYMENT TO
SOUND STRUCTURE. PREPARE FOR (N) WORK.
REMOVE (E) STAIR, HANDRAILS, FINISHES AND ENCLOSURE IN
ITS ENTIRETY. PREPARE FOR (N) WORK.
REMOVE (E) VESTIBULE, IN ITS ENTIRETY. PREPARE FOR (N)
WORK.
LOCATION OF HISTORIC WOOD MAP TO BE REMOVED PRIOR
TO START OF PROJECT. PROTECT LOCATION AND RAILING
FOR RE-INSTALLATION FOLLOWING RESTORATION.
REMOVE (E) TOILET PARTITIONS, COUNTERTOPS AND
FAUCETS IN THEIR ENTIRETY.
REMOVE (E) WALL IN ITS ENTIRETY TO ACCOMMODATE (N)
WORK. SALVAGE TRIM. COORDINATE WITH STRUCTURAL.
REMOVE AND SALVAGE (E) DOORS, FRAMES, TRIM AND
HARDWARE. RESTORE AND PREPARE FOR RE-INSTALLATION.
REMOVE AND/OR PROTECT IN PLACE (E) DOOR, FRAME, TRIM,
AND GLASS AT HISTORIC ASSEMBLIES AND WINDOWS. CLEAN,
REPAIR & REFINISH.
PROTECT (E) FIREPLACE. PREPARE VENTING FOR
MODIFICATION.
REMOVE (E) SIDEWALL AND CURB IN ITS ENTIRETY. FIELD
COORDINATE EXTENTS.
REMOVE (E) TELEPHONE BOOTHS IN THEIR ENTIRITY.
REMOVE (E) ASPHALT IN ITS ENTIRETY. FIELD COORDINATE
EXTENT. SEE CIVIL FOR ADDITIONAL INFORMATION.
REMOVE (E) COLUMN FINISH IN ITS ENTIRITY. PREPARE FOR (N)
FINISH TO MATCH (E) "IN-KIND"
REMOVE (E) CONCRETE ISLAND AND CURB FOR (N)
FOUNDATION WORK.
PROTECT (E) RAMP, STAIR AND RAILINGS THROUGHOUT
CONSTRUCTION.
SALVAGE (E) RADIATORS. TYP. STRIP, REPAIR AND REFINISH FOR
REINSTALLATION. FIELD COORDINATE EXACT RADIATORS TO BE
RE-INSTALLED WITH CONTRACTING OFFICER. SALVAGE
REMIANING RADIATORS TO OWNER.
REMOVE (E) WOOD TRIM AND PILASTER CONSTRUCTION TO
ACCOMODATE (N) WORK. PREPARE FOR (N) FINISH.
(E) COLUMNS. PROTECT THROUGHOUT CONSTRUCTION.
(E) DOORS. PROTECT THROUGHOUT CONSTRUCTION.
34 CAREFULLY REMOVE (E) BOTTLE FILLER. SALVAGE TO WONER.
SEE PLUMBING.
COORDINATE (N) PENETRATIONS FOR MECHANICAL.35
REMOVE (E) CONCRETE SLABS AND CURB FOR NEW WORK.
COORDINATE EXTENT WITH CIVIL.
PROTECT (E) METAL RAILING. CLEAN AND RE-FINISH TO MATCH
"IN-KIND" TO EXISTING.
PROTECT (E) CONCRETE DOCK
REMOVE (E) STAIR AND ACCOCIATED HARDWARE. PREPARE
FOR (N) FLOOR HATCH.
CAREFULLY REMOVE & SALVAGE WOOD TRIMS ADJOINING
WALL FINISH AND PREPARE FOR (N) WORK.
MODIFIY (E) WALL ? & FINISH. COORDINATE EXTENT WITH (N)
WORK.
PROTECT (E) WINDOW & TRIM IN THEIR ENTIRITY. SEE WINDOW
SCHEDUAL FOR ADDITIONAL INFORMATION.
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:0
A M
15021.00 6.10.2016
FIRST FLOOR DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AD2.1
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD2.1AD2.1
11 DEMO FIRST FLOOR PLAN NORTH
DN
UP
6 72
D
B
A
3 4 5
C
E
F
2 2 2 2 2 2 2 2
22 22 22 22 22
11 11
4 4 4
4 4 4 4
11111 MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
77777
7 9 14
9 14
99999
9 9
9 9
20 14
6 6
6 6 6
161616
PHASE 2
PHASE 1
PHASE 2
PHASE 1
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
8' - 9" 7' - 4"
7'
2"
11111111 11 11
9 9
14 14 14 14 14
1414 14 14 14
ROOF STRUCTURE ABOVE. SEE
ROOF DEMOLITION PLAN FOR
ADDITIONAL INFORMATION.
16 16 16 16 16
16 16 16
D S1.6
D S1.5
D S1.7
(E) DOOR
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
CAREFULLY REMOVE WALL FINISH AND STRUCTURE FOR NEW
OPENING. SALVAGE TRIM & PANELING. COORDINATE LOCATION
AND EXTENT WITH (N) WORK.
DEMOLITION KEYNOTES:
COORDINATE REMOVAL OF ELECTRICAL, MECHANICAL AND FIRE
SYSTEMS WITHIN PHASE I WORK AREA.
REMOVE (E) WINDOW, FRAM, TRIM AND ACCESSORIES IN THEIR
ENTIRIETY. SALVAGE SASH, WEIGHTS AND GLASS TO WONER
REMOVE AND SALVAGE (E) WINDOW, FRAME AND TRIM.
RESTORE (E) WINDOW WITH (N) INSULATED FIRE GLAZING.
REMOVE (E) DOOR, FRAME, HARDWARE, AND TRIM IN THEIR
ENTIRETY. SALVAGE TO OWNER.
REMOVE (E) STAIR, HANDRAILS FINISHES AND ENCLOSURE IN
ITS ENTIRETY. PREPARE FOR (N) WORK.
REMOVE (E) WALL IN ITS ENTIRETY TO ACCOMMODATE (N)
WORK. COORDINATE WITH STRUCTURAL.
REMOVE (E) COLUMNS UPON ROOF REMOVAL IN THEIR
ENTIRETY. PREPARE FOR (N) WORK.
EXISTING PBX ENCLOSURE. ROOM CONTAINS CRITICAL
EQUIPMENT THAT MAY NOT BE DISABLED AT ANY TIME DURING
CONSTRUCTION. ALL CARE SHALL BE TAKEN TO MAINTAIN
INTEGRITY, POWER UNTIL THE SERVICE IS ESTABLISHED AT (N)
LOCATION..
REMOVE (E) FLOOR FINISH, SUBSTRATE AND TRIMS IN THEIR
ENTIRETY TO SOUND STRUCTURE.
EXISTING DOOR. PROTECT THROUGHOUT CONSTRUCTION.
OPEN TO BELOW
REMOVE (E) FIREPLACE EXHAUST AND FLUE IN THEIR
ENTIRETY. COORDINATE EXHAUST REVISIONS WITH (N) WORK.
PROTECT EXISTING FINISHES TO REMAIN THROUGH OUT
CONSTRUCTION. COORDINATE WITH (N) WORK.
SALVAGE EXISTING RADIATOR. TYP. STRIP, REPAIR AND RE-
FINISH. PREPARE FOR RE-INSTALLATION. FIELD COORDINATE
EXACT RADIATORS TO BE RE-INSTALLED WITH CONTRACTING
OFFICER. SALVAGE ALL OTHERS TO OWNER.
REMOVE EXISTING FLOOR FINISH, SUBFLOOR AND
STRUCTURAL FRAMING. SEE STRUCTURAL AND REMODEL PLAN
FOR EXTENT.
REMOVE (E) WALL FINISH, UNDERLAYMENT AND TRIM TO SOUND
STRUCTURE. COORDINATE AND PREPARE FOR (N) WORK.
18 REMOVE (E) CASEWORK AND PLUMBING FIXTURES. IN THEIR
ENTIRETY.
19 SEE AD2.7 FOR ADDITIONAL INFORMATION.
CONTRACDTOR SHALL TAKE ALL CARE AND PROTECT (E)
COMMUNICATIONS CABLEING & FIBER OPTIC THROUGHT
CONSTRUCTION SERVING (E) PBX & AREA TELE/DATA..
COORDINATE SWITHING AND RELOCATION OF SERVICES
TO (N) ROOM 004 AT THE EARLIEST POSSIBLE TIME.
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:0
A M
15021.00 6.10.2016
SECOND FLOOR DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AD2.2
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD2.2AD2.2
11 DEMO SECOND FLOOR PLAN
NORTH
B
A
3 4 5
C
E
F
6 6
7 5
PHASE 2
PHASE 1
PHASE 2
PHASE 1
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
10 10
REMOVE (E) WOOD SHINGLES, SHEATHING, STRUCTURE,
FLASHING AND TRIMS IN THEIR ENTIRETY. COORDINATE
EXTENT WITH (N) WORK.
DEMOLITION KEYNOTES:
REMOVE (E) OVERFRAMED ROOF. COORDINATE WITH (N)
STRUCTURAL UPGRADES AND ROOF.
REMOVE (E) ROOF SHINGLES, FLASHING & TRIM TO SOUND
STRUCTURE. PREPARE FOR STRUCTURAL UPGRADES.
REMOVE (E) ROOF FACIA, TRIM AND FLASHINGS IN THEIR
ENTIRITY. PREPARE AREA FOR (N) WORK. COORDINATE
EXTENT.
REMOVE (E) MEMBRANE ROOF FINISH, INSULATION, ALL
UNDERLAYMENT, TRIMS, FLASHING AND ACCESSORIES TO
SOUND STRUCTURE.
REMOVE (E) ROOF AND STRUCTURE IN THEIR ENTIRETY AT
REMOVED STAIR AND VESTIBULE.
REMOVE (E) EXTERIOR WALL FINISH TO EXTENT REQUIRED TO
COMPLETE (N) ROOF. FIELD COORDINATE EXTENT. REPAIR "IN-
KIND"
REMOVE ALL (E) ROOF PENETRATIONS IN THEIR ENTIRETY.
COORDINATE (N) PENETRATIONS AND ROUTING FROM (E)
EQUIPMENT TO REMAIN TO (N) PENETRATIONS.
REMOVE (E) ROOF FINISH, TRIM AND FLASHING & ACCESSORIES
IN THEIR ENTIRITY TO SOUND UNDERLAYMENT. PREPARE FOR
(N) WORK.
REMOVE (E) ROOF ? IN THEIR ENTIRITY.
TEMPORARYLY REMOVE ALL (E) MECHANICAL AND
ELECTRICAL EQUIPMENT SERVING PHASE II AREA TO
FACILITATE (N) WORK. RE-INSTALL AND SETUP EQUPMENT.
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
HATCH INDICATES APPROXIMATE AREA OF FULL
ROOF FINISH & STRUCTURE DEMOLITION TO
TOP OF (E) WALLS. COORDINATE EXTENT WITH
(N) WORK.
HATCH LEGEND
HATCH INDICATES APPROXIMATE AREA OF ROOF
FINISH, FLASHING, TRIM REMOVAL TO UNDER
UNDERLAYMENT. COORDINATE WITH (
STRUCTURAL UPGRADES. PREPARE FOR (N) ROOF
FINISH.
HATCH INDICATES APPROXIMATE AREA OF
MEMBRANE ROOFING. REMOVE MEMBRANE ,
INUSLATION, TRIM, FLASHING, AND
ACCESSORIES IN THEIR ENTIRITY TO
STRUCTURAL UNDERLAYMENT. PREPARE
FOR STRUCTURAL UPGRADES AND (n)
FINISH.
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
ROOF DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
DJ
MM
DJ
6.10.2016
AD2.7
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD2.7AD2.7
11 DEMO ROOF PLAN NORTH
A
3 4 5
5 2
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
2 2
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
REMOVE (E) FOUNDATION WALL IN ITS ENTIRETY.
DEMOLITION KEYNOTES:
REMOVE PORTION OF FOUNDATION WALL & FOOTING IN
PREPARATION FOR NEW OPENING. FIELD COORDINATE EXTENT
OF DEMOLITION.
REMOVE PORTION OF FOUNDATION WALL IN PREPARATION FOR
(N) STRUCTURAL UPGRADES. SEE STRUCTURAL FOR
ADDITIONAL INFORMATION. FIELD COORDINATE EXTENT OF
DEMOLITION.
REMOVE ALL (E) MECHANICAL, ELECTRICAL, PLUMBING AND
FIRE PROTECTION UTILITIES SERVING PHASE I WORK AREA
IN THEIR ENTIRETY.
PROTECT (E) MECHANICAL, ELECTRICAL, PLUMBING AND
FIRE PROTECTION UTILITIES SERVING PHASE II AREA.
COORDINATE REROUTING OF (E) UTILITIES SERVING PHASE
II AREA AS NECESSARY TO ALLOW FUTURE REMODEL
WITHOUT AFFECTING (N) WORK TYP.
PROTECT (E) UTILITIES TO REMAIN & SERVING OTHER
BUILDINGS.
REMOVE (E) CEILING, STRUCTURE AND FLOORING FOR (N)
ELEVATOR. COORDINATE EXTENT WITH NEW CONSTRUCTION.8
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
BASEMENT DEMOLITION RCP
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AD7.0
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD7.0AD7.0
11 DEMO BASEMENT FLOOR RCP NORTH
B
A
3 4 5
C
E
F
8 8
7 8
3 3 3 3 3 3
333333
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
3 3
14 14
15 1515
15 15 15 15
15 15
BELOW STAIR
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
PROTECT (E) CEILING FINISHES AND TRIM.
DEMOLITION KEYNOTES:
OPEN TO ABOVE
CAREFULLY REMOVE (E) FIRE SUPPRESSION AND DETECTION
DEVICES, PIPING, BOXES AND MISC. COMPONENTS. REPAIR
PENETRATIONS TO MATCH IN-KIND HISTORIC FINISHES.
REMOVE, SALVAGE AND RESTORE HISTORIC LIGHT FIXTURES.
PREPARE FOR RE-INSTALLATION. COORDINATE LOCATIONS
WITH NEW LAYOUT. SEE ELECTRICAL.
REMOVE (E) HISTORIC MAP LIGHTING. PATCH & REPAIR CEILING
FINISH TO MATCH "IN-KIND" HISTORIC FINISHES.
REMOVE (E) LIGHTING DEVICES, BOXES AND EXPOSED
CONDUIT AND ACCESSORIES IN THEIR ENTIRETY. REPAIR AND
PREPARE AREA FOR (N) WORK.
REMOVE (E) CEILING FINISH TO SOUND STRUCTURE.
COORDINATE EXTENT WITH (N) WORK.
REMOVE (E) STAIR, CEILING, LIGHT FIXTURES, FIRE
SUPPRESSION AND ALL OTHER COMPONENTS IN THEIR
ENTIRETY.
REMOVE (E) VESTIBULE ENTRY IN ITS ENTIRITY.
SALVAGE (E) LIGHT FIXTURE AND FAN AT REGISTRATION.
PREPARE FOR RE-INSTALLATION.
REMOVE (E) BEADBOARD FINISH AND TRIM IN THEIR ENTIRETY.
REMOVE (E) LIGHTING, FIRE SUPPRESSION, FIRE DETECTION
AND MISC ACCESSORIES AND COMPONENTS IN THEIR
ENTIRETY.
REMOVE (E) CEILING, STRUCTURE AND FLOORING FOR (N)
ELEVATOR. COORDINATE EXTENT WITH NEW CONSTRUCTION.
REMOVE (E) SOFFIT AND TRIM. SALVAGE TRIM.14
CAREFULLY REMOVE (E) COLUMN FINISH IN ITS ENTIRETY FOR
(N) STRUCTURAL WORK. PREPARE FOR (N) FINISH TO MATCH
(E) "IN-KIND".
REMOVE (E) LIGHTING AND EXPOSED UTILITIES AT PORTE-
COCHERE TYP. PREPEARE FOR (N) WORK AND CONCEALMENT.
17 REMOVE AND SALVAGE TO OWNER (E) WALL SCONCE.
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
FIRST FLOOR DEMOLITION RCP
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AD7.1
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD7.1AD7.1
11 DEMO FIRST FLOOR RCP NORTH
B
A
3 4 5
C
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
PHASE 2
PHASE 1
PHASE 2
PHASE 1
NOTE
THIS ROOM CONTAINS CRITICAL COMMUNICATION INFRASTRUCTURE.
CONTRACTOR SHALL PROTECT AND ENSURE CONTINIOUS OPERATION
THROUGHOUT CONSTRUCTION. COORDINATE SEQUENCING FOR
RELOCATION OF EQUIPMENT TO (N) ROOM 004 AT THE EARLIEST POSSIBLE
TIME.
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD
CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
DOCUMENTS. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
2. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY
ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR
STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITIONS
WORK.
3. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF
FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN-KIND TO
EXISTING FOLLOWING INTEGRATION.
4. CONTRACTOR TO PROTECT EXISTING BUILDING AND ELEMENTS
DURING CONSTRUCTION
5. CONTRACTOR SHALL MAINTAIN A WEATHER TIGHT ENVIRONMENT
DURING ROOF REMOVAL AND REPLACEMENT, TYPICAL. ANY
ELEMENTS DAMAGED OR DISTURBED BY DEMOLITION / NEW WORK
SHALL BE REPLACED IN THEIR ENTIRETY TO MATCH IN-KIND TO
EXISTING AT CONTRACTOR'S EXPENSE. UPON COMPLETION, NEW
AND EXISTING WORK SHALL INTEGRATE SEAMLESSLY TO CREATE A
FINISHED ARCHITECTURAL APPEARANCE.
6. CONTRACTOR SHALL PROVIDE ANY NECESSARY SHORING TO
MAINTAIN BUILDING INTEGRITY THROUGHOUT CONSTRUCTION.
7. REMOVE WALLS SHOWN BY DASHED LINE IN THEIR ENTIRETY UNO.
SEE LINE WORK LEGEND.
GENERAL DEMOLITION NOTES
DEMOLISHED ELEMENTS
EXISTING ELEMENTS TO REMAIN
LINEWORK LEGEND
REMOVE (E) CEILING, TRIM, ACCESSORIES AND STRUCTURE IN
ITS ENTIRETY. COORDINATE EXTENT WITH (N) WORK.
DEMOLITION KEYNOTES:
10 REMOVE (E) COLUMNS UPON ROOF REMOVAL IN THEIR
ENTIRETY. PREPARE FOR (N) WORK.
11 (E) ROOF STRUCTURE. SEE ROOF DEMOLITION PLAN FOR
ADDITIONAL INFORMATION.
REMOVE (E) LIGHTING, BOXES, CONDUIT, FIRE SUPPRESSION,
AND FIRE DETECTION IN ITS ENTIRETY.
FIELD COORDINATE REMOVAL OF (E) CEILING FINISH, TRIM, LIGHTING,
ETC. TO ACCOMMODATE (N) WORK. FIELD COORDINATE EXTENTS.
PROTECT (E) CEILING FINISHES AND TRIM TO GREATEST
EXTENT POSSIBLE. REPAIR ALL DAMAGED IN-KIND.
REMOVE (E) STAIR ENCLOSURE AND ALL UTILITIES IN THEIR
ENTIRETY.
PROTECT (E) CEILING FINISH AND UTILITIES. TYP.
REMOVE (E) ELECTRICAL, FIRE SUPPRESSION AND FIRE
DETECTION IN ITS ENTIRETY.
MODIFY (E) UTILITY SYSTEMS TO BE MAINTAINED AT PHASE II
WORK AREA AS NECESSARY.
REMOVE, SALVAGE AND RESTORE HISTORIC LIGHT FIXTURES.
PREPARE FOR RE-INSTALLATION.
12 REMOVE & SALVAGE (E) RADIATOR. PREPARE FOR RE-
INSTALLATION AT DIFFERENT LOCATION.
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
SECOND FLOOR DEMOLITION RCP
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AD7.2
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AD7.2AD7.2
11 DEMO SECOND FLOOR RCP
NORTH
D
A
3 4 5
E
F
A4.2
A5.1
A5.1
A4.1
A5.1
A5.1
A5.1
A5.1
A5.3
A5.2
8' - 6" 9' - 6" 7' - 1"
ELECTRICAL
/ TEL
DATA
STAIR
S1
004.1 002.1
1.
3.
HALLWAY
HALLWAY
MECHANICAL
± 175' - 5"
26' - 0" 17' - 10" 28' - 3" 26' - 0" 32' - 0" 45' - 4"
5'
1"
8' - 2" 1' - 8"
3' - 10" 18' - 7" 5' - 10" 24' - 0"
3'
4"
1'
0" 6'
0"
4' - 3"
F2
F2
I1 I1
F2
I3
I3
F2
I1 F2
F2
F2
F2
F2
F2
F2
F2
F2
F2 F2
F2
3' - 0" 1' - 1"
F2
I3I3
B4.2
ELEV
ELEC.
001A2'
7"
ALIGN
F2
F2
3" 3'
0"
1 1
F1
F1 F1F1
8' - 10" 7' - 1"
001A.1
F1
3'
3"
4' - 2" 5' - 10" 11' - 8"
4'
ALIGN
ALIGN
1'
A8.1
A8.2
5'
5"
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
A8.3
ELEVATOR
E1
F2
3' - 1"
7' - 11" VIF
8'
5" V
IF
F1F1
EXISTING ELEMENTS TO REMAIN
NEW ELEMENTS
LINE WORK LEGEND
(N) CONC. FOUNDATION WALL. SEE A9.5 FOR WALL TYPES.
KEYNOTES:
(N) CONC. ELEVATOR PIT. SEE A8.2
EXCAVATE AND INSTALL (N) STRUCTURAL UPGRADES AND UNDERPIN
AT (E) EXTERIOR WALL. SEE STRUCTURAL
EXCAVATE AND EXTEND (E) TUNNEL TO (N) MECHANICAL ROOM.
(E) UTILITY TUNNEL. FIELD COORDINATE EXACT LOCATION,
DIMENSIONS AND CONDITIONS. SEE STRUCTURAL FOR ADDITIONAL
INFORMATION.
DASHED LINE INDICATES (N) PATIO FOUNDATION WALL. SEE
STRUCTURAL FOR DEPTHS AND WALL TYPES.
(N) WIRE MESH ELECTRONICS ENCLOSURE. SEE A8.3
PROVIDE AND INSTALL (N) FLOOR HATCH (FROM ABOVE) AND
PERMANENT METAL WALL LADDER AT (E) BASEMENT
CRAWLSPACE ACCESS.
(N) MECHANICAL PAD AND EQUIPMENT. EXCAVATE (E) SOIL WHILE
NOT DISTURBING (E) STRUCTURAL MEMBERS TO PROVIDE
REQUIRED ACCESS. TYP.
FIELD VERIFY AND COORDINATE (N) CONSTRUCTION ADJACENT TO
(E) UTILITY TUNNEL. TAKE ALL CARE TO PROTECT (E) TUNNEL AND
UTILITIES IT CONTAINS.
(N) RECESSED FIRE EXTINGUISHING CABINET3
1. REFER TO ALL DRAWINGS FOR ADDITIONAL INFORMATION CONCERNING THE
WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY VARIANCE OR
CONFLICT PRIOR TO COMMENCING WORK.
2. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
ANY VARIANCE BETWEEN EXISTING CONDITIONS AND THE REQUIREMENTS OF
THE WORK PRIOR TO STARTING CONSTRUCTION.
3. NEW FINISHES AND MATERIALS ADJOINING EXISTING FINISHES AND
MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION. NEW SURFACES SHALL ALIGN WITH
EXISTING ADJACENT SURFACES UNLESS NOTED OTHERWISE.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE
RENOVATION INCLUDING DEMOLITION AND REPAIR OF ITEMS NOT
SPECIFICALLY INDICATED BUT NECESSARY TO COMPLETE THE WORK
OUTLINED.
5. CONTRACTOR TO PROVIDE FIRE BLOCKING AT ALL OPEN WALLS. NOT TO
EXCEED UNBOUND HEIGHT OF 10'-0". PATCH AND REPAIR ANY / ALL EXISTING
WALL SURFACES AS NECESSARY TO PROVIDE SUITABLE SUBSTRATE FOR NEW
FINISHES OR FINISHED APPEARANCE OF EXISTING ELEMENTS TO REMAIN.
6. CONTRACTOR SHALL REPAIR ALL DAMAGE AND CLEAN ALL SURFACES
IMPACTED BY CONSTRUCTION ACTIVITIES. REPAINT ENTIRE SURFACES AS
NECESSARY.
7. MATCH HISTORIC CONDITIONS 'IN-KIND' UNLESS NOTED OTHERWISE.
8. ALL DIMENSIONS ARE FROM FACE OF STRUCTURAL FRAMING/FOUNDATION
TO FACE OF STRUCTURAL FRAMING/FOUNDATION, UNLESS NOTED
OTHERWISE.
9. SEE A9.5 FOR WALL TYPES
GENERAL NOTES
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
BASEMENT FLOOR PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
MM
DJ
6.10.2016
A2.0
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"A2.0A2.0
16 BASEMENT FLOOR PLAN NORTH
D
B
A
3 4 5
C
E
F
A6.113
A4.2
A4.2
A4.1
± 175' - 5"
26' - 0" 17' - 10" 28' - 3" 26' - 0" 32' - 0" 45' - 4"
3' - 0"
A3.1
A3.1
A8.2
SKI
SHOP /
STORAGE
GIFT
SHOP
MEN'S
RESTROOM
WOMEN'S
RESTROOM
REGISTRATION
171MAIL
ELEVATOR
E1
DELIVERY
LOBBY
MAP
ROOM
HALLWAY
A 160.1
A 160.2
A 162.2
B 163.4
B 163.2
B 163.1
B 170.1
C 172.1
C 172.1G
6.
165.1
2.
A5.1
A5.1
A4.1
0"
9'
6'
0"
6' - 2" 8' - 2" 8' - 2" 9' - 9" 8' - 2" 8' - 2" 10' - 1"
A 160.6
A 160.5
A 160.4
A6.2
A8.1
STAIR
S1
MANAGER'S
OFFICE
FRONT
OFFICE
VESTIBULE
VESTIBULE
16816
7.
S1 .1
3.
6' - 6"
1' - 8"
21' - 8" 16' - 4"
10' - 1" 11' - 9" 2' - 6"
7.
0.
7'
0"
A3.2
JAN.
174A
STOR.
173A
HALLWAY
A6.3
8 3
A3.1
A5.1
A5.1
A 163.9
A 163.10
A 162.1
A 163.8
A 163.7
A 163.6
A 163.5
B 163.3
7'
2"
10" 6' - 0" 7' - 6" 3' - 3" 6' - 6"
9' - 0"
A5.1
A5.1
A5.3
A5.2
1' - 8"8' - 1"
8.
8.
BAR
161A
E2
E2
I2
10' - 10"
I1
E2
E2
I2 I1
I1
I1
E2
I1
E2
E2
E2
2 2
2 11 1
2 2 STOR.
163.1
I4
I4
A 160.3
A 160.7
6" 6' - 4"
0.
1 160.2
4.
PHASE II
PHASE I
PHASE II
PHASE I
2.
UP
UP
UP
1A
.1
173.1
171.1
5.
161.316 1.
UP
17 17 17
JAN.
167A
4'
0"
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
7A
.1
18 18 18 18
18 18 18
6' - 6"
5.
164.2
A3.2
A3.2
A3.2
169.1
4'
5"
5'
5"
(E) RAMP
(E) STAIR
UP
DN
A9.7
E Q
E Q
DN
DN
A9.7
A9.7
A9.7
A3.1
4' - 5" 9' - 0" 3' - 8"
(E) CONC. PATIO
M
IN
5' C
LE
A
R
A9.7
A9.7
A6.9
DN
A9.7
A9.7
171.2
0.
0.
A9.6
A9.6
A9.6
6 SIM
A9.6
6 TYP
3A
.1
4A
.1
161.1
10 10
10 TYP.
A4.1
A4.1
A4.1
E 161.10
E 161.9
E 161.8
E 161.7
E 161.6
E 161.5
E 161.4
E 161.3
E 161.2E
161.1
INFILL (E) WINDOW/DOOR WAY. ALIGN WITH (N)
FINISHES WITH (E) FINISHES AND MATCH "IN-KIND"
PLASTER WALL SURFACE, WOOD WAINSCOT AND
TRIM.
KEY NOTES
FIELD COORDINATE REINSTALLATION OF RESTORED
MAP & GUARDRAIL. CLEAN, REPAIR AND REFINISH (E)
WALL PANELING AT LOCATION OF FUTURE MAP
ARTIFACT RE-INSTALLATION BY OWNER.
(N) ASPHALT PAVING. SEE CIVIL FOR ADDITIONAL
INFORMATION.
RESTORE AND REINSTALL (E) METAL / WOOD RAILING.22
SHIM (E) WALL TO ACHIEVE LEVEL, PLUMB & TRUE
FINISH.
INSTALL RESTORED HISTORIC DRINKING FOUNTAIN.
LOCATION OF (N) WATER BOTTLE FILLING STATION.
SEE INTERIOR ELEVATIONS
LOCATION OF (N) RECYCLING STATION. SEE A6.9
INSTALL SALVAGED, RESTORED & REFINISHED NON
FUNCTIONAL HISTORIC RADIATOR OVER (N)
MECHANICAL FLOOR GRILL AS SELECTED FROM
SALVAGED RADIATORS BY CONTRACTING OFFICER.
APPROXIMATE LOCATION OF (E) UTILITY TUNNEL.
FIELD COORDINATE EXACT LOCATION AND
CONDITIONS THAT MAY AFFECT THE WORK. TYP.
PROVIDE (N) PLASTER WALL FINISH OVER (N) GYP.
BOARD TO MATCH "IN-KIND" HISTORIC FINISH. ENTIRE
WALL.
(N) CUSTOM INSULATED WOOD WALL WINDOW UNITS.
BASE DETAILS AND PROFILES ON EXISTING MAP
ROOM SEE SCHEDULE AND DETAILS FOR ADDITIONAL
INFORMATION.
(N) BELLHOP CASEWORK. N.I.C.
(N) BENCH SEATING. N.I.C.
(N) ELEVATED CONCRETE PATIO
(N) RECESSED SNOW/ DIRT GRATING. SEE A9.10
(N)CONCRETE WALKWAY AND CURB. SEE CIVIL FOR
ADDITIONAL INFORMATION.
REPAIR AND REFINISH (E) WOOD PILASTER TRIMS.
(N) PORTE COCHERE COLUMN FINISH TO MATCH (E)
HISTORIC IN-KIND. TYP.
REPLICATE "IN-KIND" (E) WOOD PILASTER TRIMS AT
AREA OF (N) MOMENT FRAME INSTALLATION.
COORDINATE EXTENTS WITH REQUIREMENTS OF
MOMENT FRAME INSTALLATION.
INFILL FLOOR FRAMING FALLOWING STAIR REMOVAL.
INSTALL (N) 36" SQUARE FLOOR HATCH AND
PERMANENT METAL WALL LADDER TO CRAWLSPACE.
(N) EYE WASH STATION
(N) CONC. DOWNSPOUT SPLASH BLOCK. FIELD
COORDINATE EXACT LOCATION.
1. REFER TO ALL DRAWINGS FOR ADDITIONAL INFORMATION CONCERNING THE
WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY VARIANCE OR
CONFLICT PRIOR TO COMMENCING WORK.
2. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
ANY VARIANCE BETWEEN EXISTING CONDITIONS AND THE REQUIREMENTS OF
THE WORK PRIOR TO STARTING CONSTRUCTION.
3. NEW FINISHES AND MATERIALS ADJOINING EXISTING FINISHES AND
MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION. NEW SURFACES SHALL ALIGN WITH
EXISTING ADJACENT SURFACES UNLESS NOTED OTHERWISE.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE
RENOVATION INCLUDING DEMOLITION AND REPAIR OF ITEMS NOT
SPECIFICALLY INDICATED BUT NECESSARY TO COMPLETE THE WORK
OUTLINED.
5. CONTRACTOR TO PROVIDE FIRE BLOCKING AT ALL OPEN WALLS. NOT TO
EXCEED UNBOUND HEIGHT OF 10'-0". PATCH AND REPAIR ANY / ALL EXISTING
WALL SURFACES AS NECESSARY TO PROVIDE SUITABLE SUBSTRATE FOR NEW
FINISHES OR FINISHED APPEARANCE OF EXISTING ELEMENTS TO REMAIN.
6. CONTRACTOR SHALL REPAIR ALL DAMAGE AND CLEAN ALL SURFACES
IMPACTED BY CONSTRUCTION ACTIVITIES. REPAINT ENTIRE SURFACES AS
NECESSARY.
7. MATCH HISTORIC CONDITIONS 'IN-KIND' UNLESS NOTED OTHERWISE.
8. ALL DIMENSIONS ARE FROM FACE OF STRUCTURAL FRAMING/FOUNDATION
TO FACE OF STRUCTURAL FRAMING/FOUNDATION, UNLESS NOTED
OTHERWISE.
9. SEE A9.5 FOR WALL TYPES
GENERAL NOTES
EXISTING ELEMENTS TO REMAIN
NEW ELEMENTS
LINE WORK LEGEND
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
FIRST FLOOR PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
DJ
MM
DJ
6.10.2016
A2.1
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
NORTH
: 1/8" = 1'-0"A2.1A2.1
11 FIRST FLOOR PLAN
TT
T
T
T
T
UP
6 72
D
B
A
HALLWAY
STAIR
S1
4 5
C
CONFERENCE
ROOM
CONFERENCE
ROOM
TABLE
STORAGE
PANTRY
STOR.
BOARD
ROOM
WOMEN'S
RESTROOM
MEN'S
RESTROOM
HALLWAY
A4.2
A4.2
A4.1
" V
IF
175' - 5" VIF
26' - 0" 17' - 10" 28' - 3" 26' - 0" 32' - 0" 45' - 4"
4' - 10" 3' - 3" 6' - 6" 3' - 3" 13' - 5" 3' - 3" 7' - 9" 3' - 3" 8' - 6" 3' - 3" 8' - 0" 3' - 3" 7' - 9" 3' - 3" 7' - 2" 3' - 3" 7' - 9" 3' - 3" 7' - 9" 3' - 3"
3'
3" 5'
7"
3'
3" 6'
0"
C 266.2G
C 266.2
C 266.1G
C 266.1
C 266.3
C 266.3G
C 266.4
C 266.4G
B 268.1
C 261.1
C 261.1G
C S1.1
C 271.1
C 271.1G
C 271.2
C 271.2G
269.1
1.
A3.1
5'
0"
0"
13' - 0" 3' - 3"
5'
6" 3'
3"
4.
5.
4.
5.
6.
7.
8.
263.2
19' - 10" 3' - 3"
A5.1
A5.1
A4.1
A8.1
2' - 5"
A6.4
36A6.5
14' - 6" 5' - 5" 4' - 1" 7' - 0" 5' - 5" 6' - 4"
10"
3' - 8" 21' - 6" 3' - 0"
263.1 7'
6"
7'
6"
0'
R200' R
1'
6" 9'
7"
1.
1.
A5.1
A5.1
3' - 2"
2' - 4" 9' - 2" 6' - 10"
7'
2"
A6.416
B 267.1
C 265.3G
C 265.3
C 265.2G
C 265.2
C 265.1G
C 265.1
C 264.4G
C 264.4
C 264.3G
C 264.3
C 264.2G
C 264.2
C 264.1G
C 264.1
C 263.1G
C 263.1
5' - 6" 3' - 3" 7' - 6" 3' - 3"
C 261.2
C 261.2G
C 261.3
C 261.3G
A5.1
A5.1
EXISTING ATTIC WITH
STRUCTURAL UPGRADE. SEE
STRUCTURAL AND ROOF
PLAN FOR ADDITIONAL
INFORMATION.
A6.5
A5.3
A5.2
C S1.1G
E2
E2
E2
E2
0.
JAN.
1.
5A
.1
4A
.1
6' - 8" 6' - 8"
I1 I1
I1
I1
I2I2
I1
I2I2
I1
I1
I2I2
I1
I1
I1
I1
I1
I1
6' - 8"
10 10
PHASE 2
PHASE 1
PHASE 2
PHASE 1
D 260.1
D 260.2
D 260.3
A6.4
A6.5
6' - 4"
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
263A.1 2' - 5"
5' - 0" 8' - 2" 7' - 1" 9' - 4" 1' - 10"
S1
.2 DN
1' - 9"
A9.7
6' - 4"
2' - 4"
A8.2
A3.1
DN
DN
1' - 7"
HALLWAY
(E)
ATTIC
263A
CL
264A
CL
265A
C 260.4
C 260.4G
2"
1' - 0"
17 TYP. WALL ALL
CORNERS
13 1315
A4.1
A4.1
A4.1
TYP.
1. REFER TO ALL DRAWINGS FOR ADDITIONAL INFORMATION CONCERNING THE
WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY VARIANCE OR
CONFLICT PRIOR TO COMMENCING WORK.
2. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
ANY VARIANCE BETWEEN EXISTING CONDITIONS AND THE REQUIREMENTS OF
THE WORK PRIOR TO STARTING CONSTRUCTION.
3. NEW FINISHES AND MATERIALS ADJOINING EXISTING FINISHES AND
MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION. NEW SURFACES SHALL ALIGN WITH
EXISTING ADJACENT SURFACES UNLESS NOTED OTHERWISE.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE
RENOVATION INCLUDING DEMOLITION AND REPAIR OF ITEMS NOT
SPECIFICALLY INDICATED BUT NECESSARY TO COMPLETE THE WORK
OUTLINED.
5. CONTRACTOR TO PROVIDE FIRE BLOCKING AT ALL OPEN WALLS. NOT TO
EXCEED UNBOUND HEIGHT OF 10'-0". PATCH AND REPAIR ANY / ALL EXISTING
WALL SURFACES AS NECESSARY TO PROVIDE SUITABLE SUBSTRATE FOR NEW
FINISHES OR FINISHED APPEARANCE OF EXISTING ELEMENTS TO REMAIN.
6. CONTRACTOR SHALL REPAIR ALL DAMAGE AND CLEAN ALL SURFACES
IMPACTED BY CONSTRUCTION ACTIVITIES. REPAINT ENTIRE SURFACES AS
NECESSARY.
7. MATCH HISTORIC CONDITIONS 'IN-KIND' UNLESS NOTED OTHERWISE.
8. ALL DIMENSIONS ARE FROM FACE OF STRUCTURAL FRAMING/FOUNDATION
TO FACE OF STRUCTURAL FRAMING/FOUNDATION, UNLESS NOTED
OTHERWISE.
9. SEE A9.5 FOR WALL TYPES
GENERAL NOTES
EXISTING ELEMENTS TO REMAIN
NEW ELEMENTS
LINE WORK LEGEND
KEY NOTES
SHIM (E) WALL FRAMING TO ACHIEVE SMOOTH, FLAT
FINISH .
INSTALL (N) WATER FOUNTAIN AND BOTTLE FILLING
STATION. SEE INTERIOR ELEVATIONS
OPEN TO BELOW
(N) OPERABLE WALL PANEL SYSTEM. CONTRACTOR
SHALL COORDINATE AND INSTALL STRUCTURAL
SUPPORT FOR (N) OPERABLE WALL SYSTEM TO BE
INSTALLED AT A FUTURE DATE. WALL PANELS AND
RUNNING TRACK NOT IN CONTRACT. ENSURE
STRUCTURAL SUPPORT, BEAM AND FLOOR FINISH
ARE PLUMB, LEVEL AND TRUE TO A TOLERANCE OF +/-
1/8" OVER LENGTH OF FUTURE WALL.
(N) CUSTOM METAL HANDRAIL
(N) STAIR. REPAIR AND RESTORE (E) WOOD
GUARDRAIL, WALL AND TRIM TO MATCH IN-KIND
HISTORIC. PROVIDE (N) HANDRAIL. SEE A8.3
ROOF BELOW. SEE ROOF PLAN FOR ADDITIONAL
INFORMATION.
(N) MAP ROOM ATTIC ACCESS.
(N) CUSTOM WOOD CASE WORK & COUNTERTOP-N.I.C.
CONTRACTOR SHALL PROVIDE ALL IN WALL
BLOCKING REQUIRED FOR FUTURE CASEWORK
INSTALLATION BY OTHERS. COORDINATE
ELECTRICAL/DATA INSTALLATION TO ACCOMMODATE
INDICATED CONDITIONS. PHOTO DOCUMENT
BLOCKING AND PROFICE MEASURED AS BUILT
INFORMATION.
INFILL (E) WINDOW/DOOR WAY. ALIGN WITH (N)
FINISHES WITH (E) FINISHES AND MATCH "IN-KIND"
PLASTER WALL SURFACE, WOOD WAINSCOT AND
TRIM.
LOCATION OF (N) RECYCLING STATION. SEE A6.9
NEW ADA COMPLIANT HANDRAIL. SEE A8.3 FOR
ADDITIONAL INFORMATION.
REMOVE (E) WIRE GLASS, RESTORE SASH AND FRAME.
INSTALL (N) 1 HOUR FIRE RATED INSULATED GLAZING
UNITS. RE-INSTALL AND PROVIDE (N) FLASHING AND
WOOD TRIMS TO MATCH "IN-KIND" HISTORIC.
REMOVE ALL SURFACE MOUNTED UTILITIES AND FIRE
COMPONENTS. PATCH AND REPAIR WALLS, CEILINGS.
CLEAN, RESTORE AND REFINISH TRIMS. TYP
THROUGHOUT AREA. MATCH "IN-KIND" HISTORIC
FINISHES.
REMOVE (E) CARPET RUNNER. CLEAN RESTORE AND
RE-FINISH WOOD TREADS, WALL PANELING AND
TRIMS.
COORDINATE FRAMING AND FINISH AT LOWER
WINDOW SASH.
PROVIDE AND INSTALL BRONZE CORNER GUARDS
RAILS. SEE A9.10 FOR ADDITIONAL INFORMATION.17
CONTRACTOR SHALL COORDINATE AND INSTALL ALL
PLUMBING, ELECTRICAL AND BLOCKING REQUIRED
FOR FUTURE KITCHEN EQUIPMENT INDICATED TO
POINT OF FINAL EQUIPMENT CONNECTION. PHOTO
DOCUMENT AND PROVIDE MEASURED AS BUILT
INFORMATION AND FINISH SPACE.
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:2
A M
15021.00 6.10.2016
SECOND FLOOR PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
DJ
MM
DJ
6.10.2016
A2.2
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"A2.2A2.2
11 SECOND FLOOR PLAN NORTH
B
A
3 4 5
C
E
F
A4.2
A4.2
A4.1
A5.1
A5.1
A5.1
A5.1
A5.1
A5.1
A5.3
A5.2
8" / 12" SLOPE
8"
" S
LO
P
E
8"
" S
LO
P
E
8"
" S
LO
P
E
8" / 12" SLOPE8" / 12" SLOPE
8" / 12" SLOPE
8" / 12" 8" / 12"
8"
8" / 12"8" / 12"
8"
8" / 12" SLOPE / TYP.
7 7
5'
1"
26' - 0" 17' - 10" 28' - 3" 26' - 0" 32' - 0" 45' - 4"
175' - 5"
A4.1
A9.8
1 TYP
A9.8
1 TYP
A9.8
1 TYP
A9.8
1 TYP
A9.8
1 TYP
A9.8
A9.8
A9.8
2 TYP
A9.8
2 TYP
A9.8
2 TYP
A9.8
16 TYP
1/ 4"
" S
LO
P E
1/2" / 12" SLOPE
RA1
RA3
RA3 RA3
RA2 RA1
RA3
8 8 8 8
8 8 8 8
8 8
1/ 4"
1/4" / 12" 1/4" / 12"
1/4" / 12"
8 8
4' - 4"
8'
8" 12' - 4"
4' - 4" 8' - 0" 6'
6"
2'
2"
13' - 0"
4'
0"
PHASE 2
PHASE 1
PHASE 2
PHASE 1
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
RA1
RA1
RA1
RA1
RA2
RA2
13' - 3" 6' - 10"
A9.9
6 TYP
A9.9
6 TYP
A9.9
6 TYP
A9.9
6 TYP
A9.8
A9.8
A9.8
16 TYP
A9.8
17 TYP
1/2" / 12"
A9.9
11 TYP
A9.9
11 TYP
1/2" / 12"
1/4" / 12" : VALLEY
1/4
VAL
LE
Y
A9.9
11 TYP
1/4" / 12" 1/ 4"
/ 1 2"
A9.8
NOTE: SEE 14/A9.7 FOR ROOF TYPES
1/4" / 1 2"
A9.9
6 TYPSIM.
A9.9
A9.9
A9.9
12 TYP
9' - 6" 81' - 6"
9"
A9.9
17 TYP
A9.9
17 TYP
A9.9
13 TYP
A9.9
13 TYP
A9.9
13 TYP
A9.9
13 TYP
A9.9
6 TYP
A9.8
A9.8
11 SIM
A9.9
1/2" / 12"
" V
IF
13' - 5" VIF
1/ 4"
1/
4"
3' - 0"
TY
P.
6'
0"
6' - 0"
6'
0"
3' - 0"
3' - 0"
10 10
(N) MEMBRANE ROOF ASSEMBLY, FLASHING AND
ACCESSORIES.
KEY NOTES
(N) ROOF SCUPPER AND DOWNSPOUT. SEE A9.7
(N) LIGHTNING PROTECTION SYSTEM. DESIGN
AND PROVIDE ANTENNA AND SYSTEM
COMPONENTS REQUIRED. SEE ELECTRICAL.
ROUT ALL CONDUIT AND DOWN LEADS
CONCEALED WITHIN ATTIC AND STRUCTURE TO
CRAWLSPACE. FIELD VERIFY AND INSTALL
GROUNDING IN CRAWLSPACE WHERE POSSIBLE.
LIGHTER HATCH INDICATES APPROXIMATE AREA
OF (N) ICE AND WATER MEMBRANE. INSTALL PMF
RECOMMENDATIONS. AT FIELD AREAS OF
CEDAR SHINGLE ROOFING PROVIDE ASPHALT
FELT UNDERLAYMENT PER CSSB
RECOMMENDATION.
(N) CEDAR ROOF FINISH, SHEATHING AND
STRUCTURE.
(N) CEDAR ROOF FINISH AND STRUCTURAL
SHEATHING.
PIPE PENETRATION. SEE MECHANICAL
(N ) MECHANICAL GRAVITY VENTILATION AND CURB.
FIELD COORDINATE LOCATION TO ENSURE UNIT DOES
NOT RISE HIGHER THAN RIDGE. LOCATE TO LIMIT
VIEW FROM ROADWAY TO GREATEST EXTENT
POSSIBLE. CUSTOM FINISH CURB AND VENTILATION
COLOR AS SELECTED BY CONTRACTING OFFICER.
INSTALL (N FIREPLACE FLUE AND EXHAUST FAN.
COORDINATE EXACT LOCATION TO LIMIT VISUAL
IMPACT TO EXTERIOR FROM ROADWAY. ROUT ALL
ELECTRICAL AND FLUE CONCEALED.
PROVIDE CONT. OPEN COPPER "W" VALLEY FLASHING.
PROVIDE CUSTOM SEAMLESS COPPER CRICKET
AND MECHANICAL EQUIPMENT. FIELD COORDINATE
SIZE.
11 EXISTING ELEMENTS TO REMAIN
NEW ELEMENTS
LINE WORK LEGEND
1. REFER TO ALL DRAWINGS FOR ADDITIONAL INFORMATION CONCERNING THE
WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY VARIANCE OR
CONFLICT PRIOR TO COMMENCING WORK.
2. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
ANY VARIANCE BETWEEN EXISTING CONDITIONS AND THE REQUIREMENTS OF
THE WORK PRIOR TO STARTING CONSTRUCTION.
3. NEW FINISHES AND MATERIALS ADJOINING EXISTING FINISHES AND
MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION. NEW SURFACES SHALL ALIGN WITH
EXISTING ADJACENT SURFACES UNLESS NOTED OTHERWISE.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE
RENOVATION INCLUDING DEMOLITION AND REPAIR OF ITEMS NOT
SPECIFICALLY INDICATED BUT NECESSARY TO COMPLETE THE WORK
OUTLINED.
5. CONTRACTOR TO PROVIDE FIRE BLOCKING AT ALL OPEN WALLS. NOT TO
EXCEED UNBOUND HEIGHT OF 10'-0". PATCH AND REPAIR ANY / ALL EXISTING
WALL SURFACES AS NECESSARY TO PROVIDE SUITABLE SUBSTRATE FOR NEW
FINISHES OR FINISHED APPEARANCE OF EXISTING ELEMENTS TO REMAIN.
6. CONTRACTOR SHALL REPAIR ALL DAMAGE AND CLEAN ALL SURFACES
IMPACTED BY CONSTRUCTION ACTIVITIES. REPAINT ENTIRE SURFACES AS
NECESSARY.
7. MATCH HISTORIC CONDITIONS 'IN-KIND' UNLESS NOTED OTHERWISE.
8. ALL DIMENSIONS ARE FROM FACE OF STRUCTURAL FRAMING/FOUNDATION
TO FACE OF STRUCTURAL FRAMING/FOUNDATION, UNLESS NOTED
OTHERWISE.
9. SEE A9.5 FOR WALL TYPES
GENERAL NOTES
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:3
A M
15021.00 6.10.2016
ROOF PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
A2.7
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"A2.7A2.7
11 ROOF PLAN NORTH
A
3 4 51
ELECTRICAL
/ TEL
DATA
STAIR
S1
004.1 002.1
1.
3.
HALLWAY
HALLWAY
MECHANICAL
± 175' - 5"
26' - 0" 17' - 10" 28' - 3" 26' - 0" 32' - 0" 45' - 4"
8' - 2" 1' - 8"
3' - 10" 18' - 7" 5' - 10" 24' - 0"
6 6
ELEV
ELEC.
001A
A8.3
A8.1168
44SEE AF2.1 FOR FINISH
THIS AREA
2 10SLOPE
3 3 3
4 5
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
(N) CONC. SLOPING WALKWAY. FIELD COORDINATE MAX SLOPE 1:20
KEYNOTES:
FIELD COORDINATE SLOPING WALKWAY LENGTH TO ACHIVE MAX
SLOPE. REPLACE (E) CONC FLOOR AS REQUIRED.
NO FLOOR FINISH
(N) CONC MAT-SLAB. EXPOSED - NO FINISH
PROVIDE (N) CONC. RECESSED CATCH BASIN AT ELEVATOR PIT.
COORDINATE REQUIREMENTS WITH ELEVATOR MANUFACUTUR.
SEALED CONC. FLOORS. 1/8" : 12" SLOPE.
FLOOR DRAIN
(N) DETECTABLE WARNING DEVICE.
(E) TUNNEL
(E) CRAWLSPACE ACCESS TO REMAIN.
EXISTING ELEMENTS TO REMAIN
NEW ELEMENTS
LINE WORK LEGEND
SEALED CONCRETE
HATCH LEGEND
FLOOR FINISHES INDICATED SHALL RUN CONTINUOUS BELOW
CASEWORK, FIXTURES AND EQUIPMENT UNLESS NOTED
OTHERWISE.
HATCH DIRECTION IS NOT NECESSARILY INTENDED TO REPRESENT
ACTUAL MATERIAL ORIENTATION. FIELD COORDINATE EXISTING
CONDITIONS, INSTALLATION AND THROUGH SUBMITTAL PROCESS
FOR FINAL LAYOUTS. MATCH "IN-KIND" WHEREVER POSSIBLE.
UNLESS NOTED OTHERWISE.
REFERENCE DETAILS FOR TRANSITIONS BETWEEN DISSIMILAR
MATERIALS.
GENERAL NOTES
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
BASEMENT FINISH PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
AF2.0
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/8" = 1'-0"AF2.0AF2.0
11 BASEMENT FLOOR FINISH PLAN NORTH
UP UP
6 72
D
B
A
3 4 5
C
E
D N
DN
23 3
9 7
7 7
LOBBY
MAP
ROOM
BAR
161A
HALLWAY
173 HALLWAY
HALL
WAY
REGISTRATION
FRONT
OFFICE
MANAGER'S
OFFICE
DELIVERY
STAIR
S1
SKI
SHOP /
STORAGE
WOMEN'S
RESTROOM
MEN'S
RESTROOM
GIFT
SHOP
ELEVATOR
E1
JAN.
167A
STOR.
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
(E) FIRE PLACE
A9.11
HALLWAY
150A
A9.11
A9.11
A9.11
1 TYP
A9.11
A9.11
11 11
A9.11
A9.11
UP
A9.11
1 TYP
A9.11
(E) CONC. PATIO
(E) STAIR
A9.11
A9.11
11 11
TYP. ABOVE13
UP
UP
6"
RESILIENT SHEET
FLOORINGCOCO MAT
HARDWOOD FLOOR
CARPET
SEALED CONCRETE
TILE - BOARDER & FIELD
PATTERN.
FINISH FLOOR LEGEND
(N) EXTERIOR…