Attachment 2 Drawings 08
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMUNICATION DEVICES
S
V
OS
POWER DEVICES
T
ELECTRICAL LEGEND
AS
THERMOSTAT BY MC, ROUGH-IN BY EC
CEILING MOUNTED SPEAKER
CABLE TV JACK
WALL MOUNTED VOLUME CONTROLLER
DUPLEX RECEPTACLE SUBSCRIPT INDICATES TYPE:
DOUBLE DUPLEX RECEPTACLE, SUBSCRIPT ABOVE INDICATE TYPE
DUPLEX RECEPTACLE IN FLOOR BOX
VARIABLE FREQUENCY DRIVE
PHOTO CELL
CEILING MOUNTED OCCUPANCY SENSOR
FUSED DISCONNECT SWITCH
NON-FUSED DISCONNECT SWITCH
WP WEATHERPROOF
AC ABOVE COUNTER
FILLED CENTER INDICATES GFCI DEVICE
AQUASTAT BY PLUMBING CONTRACTOR, WIRED BY EC.
SPECIAL PURPOSE CONNECTION, BRACKET INDICATES WALL MOUNTING, BOX
INDICATES FLOOR MOUNTING
COMBINATION VOICE/ DATA DEVICE JACKS, BOX INDICATES FLOOR MOUNTING
208V SINGLE PHASE RECEPTACLE, CONFIGURATION NOTED ON PLANS
ELECTRICAL PANEL - SEE PANEL SCHEDULES FOR MOUNTING CONFIGURATION
PP
VFD
NUMBER INDICATES CABLE QUANTITY. IF NO NUMBER SHOWN, PROVIDE DEFAULT
QUANTITY OF THREE.
SINGLE POLE SWITCH
3-WAY SWITCH
PILOT LIGHT SWITCH
DIMMER SWITCH
P
D
SECURITY CAMERAS
ROUGH-IN FOR CAMERAS BY OTHERS. PROVIDE J-BOX IN CEILING OR WALL,
3/4" CONDUIT DOWN INTO CRAWL SPACE, ADD CAT-6 CABLE INTO
ELECTRICAL/TEL DATA B3. CONFIRM ALL LOCATIONS AND ROUGH-IN WIRING
SPECIFICATIONS WITH XANTERRA BEFORE INSTALLATION. CAT-6 TO BE
DIFFERENT COLOR THAN CAT-6 USED FOR TEL/DATA.
CCTV
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:3
A M
15BZ4199.004
06/10/2016
ELECTRICAL LEGENDS AND SCHEDULES
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E1.0
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
DRAWING LIST
E1.0 ELECTRICAL LEGENDS AND SCHEDULES
E1.1 ELECTRICAL PANEL SCHEDULES I
E1.2 ELECTRICAL PANEL SCHEDULES II
ED2.0 BASEMENT ELECTIRCAL DEMOLITION PLAN
ED2.1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED2.2 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
E2.0 BASEMENT ELECTRICAL PLAN
E2.1 FIRST FLOOR POWER AND SPECIAL SYSTEMS REMODEL PLAN
E2.2 SECOND FLOOR POWER AND SPECIAL SYSTEMS REMODEL PLAN
E3.1 FIRST FLOOR LIGHTING REMODEL PLAN
E3.2 SECOND FLOOR LIGHTING REMODEL PLAN
E5.0 ELECTRICAL DETAILS I
E5.1 ELECTRICAL DETAILS II
E5.2 ELECTRICAL DETAILS III
E5.3 ELECTRICAL DETAILS IIII
LUMINAIRE SCHEDULE
CALLOU
T MANUFACTURER MODEL MOUNTING LAMP
ELECTRICAL
DATA DESCRIPTION
A1 LITHONIA VOLUMETRIC LED SURFACE RTLX4 40L EZ1 LP835 CEILING 3500 LUMEN LED 120 V/1-29 VA
A2 DAY-BRITE LED STRIP LF 4 EZ 38 30 U LAG CEILING 3800 LUMEN LED 120 V/1-44 VA
A3 KENALL LED RECESSED 2X2 CSEFL22 45L35K DCC 120 AF 2H U CEILING 4300 LUMEN LED 120 V/1-49 VA CLASS 100 ENVIRONMENT LUMINAIRE. RECESS INTO CEILING.
C1 SONNEMAN LIGHTING BAUHAUS REVISITED SCONCE 2492.01 WALL 400 LUMEN LED 120 V/1-10 VA POLISHED CHROME.
C2 REJUVENATION LIGHTING GRAYDON WALL SCONCE A0214 WALL 270 LUMEN LED 1 EA 120 V/1-5 VA POLISHED NICKEL FINISH. PROVIDE GE LED4DA15-W/TP 4.5 WATT 270 LUMEN LED LAMP.
C3 HUDSON VALLEY LIGHTING BLACKWELL DRUM SHADE 9006-PN CEILING 270 LUMEN LED 2 EA 120 V/1-12 VA POLISHED NICKEL FINISH
C4 'E' REJUVENATION LIGHTING ARTHUR FLUSH MOUNT A9422 BO843 CEILING 270 LUMEN LED 3 EA 120 V/1-10 VA POLISHED CHROME FINISH. PROVIDE GE LED4DA15-W/TP 4.5 WATT 270 LUMEN LED LAMPS.
C5 'E' REJUVENATION LIGHTING GLIDE SEMI-FLUSH A2141 B4984 CEILING 270 LUMEN LED 120 V/1-15 VA POLISHED CHROME FINISH. PROVIDE GE LED4DA15-W/TP 4.5 WATT 270 LUMEN LED LAMPS IN ALL LUMINAIRES EXCEPT THE
SIXTEEN (16) LUMINAIRES IN THE 2ND LEVEL CONFERENCE AND BOARD ROOMS, AND ALL LUMINAIRES IN OFFICES 150/155 AND
SKI SHOP/STORAGE 143. FOR THESE LUMINAIRES PROVIDE GE LED11DA19/830 11 WATT 800 LUMEN LED LAMPS.
D1 JUNO LED IC-RATED 4" DOWNLIGHT 1C1LWDG4N-3K-1-14B-WH CEILING 600 LUMEN LED 120 V/1-10 VA PROVIDE 50 FIXTURES WITH 1C1RLWDG4N REMODEL HOUSINGS. THE BALANCE OF THE FIXTURES SHALL HAVE NEW
CONTRUCTION HOUSINGS AS SPECIFIED. REMODEL HOUSINGS TO BE USED WHERE CONSTRUCTION CONDITIONS DO NOT ALLOW
THE USE OF NEW CONSTRUCTION HOUSINGS.
D2 LITHONIA LED WALL WASH DOWNLIGHT EVO WW 30/45 6WR 120 EZ1 CEILING 4500 LUMEN LED 120 V/1-50 VA PROVIDE 1% DIMMABLE DRIVER.
D3 JUNO LED IC-RATED 4" DOWNLIGHT IC1ALEDG4-6-1 440LEDG4-3K-6-WH CEILING 600 LUMEN LED 120 V/1-10 VA ADJUSTABLE DIE-CAST TRIM.
G1 MINKA-LAVERY DARK SKY LED SCONCE 8102 A138 L WALL 450 LUMEN LED 120 V/1-10 VA
G2 ADVENT LED ADA SCONCE AIW8332 L7.2W PT04 120-277V 3000 WALL 849 LUMEN LED 120 V/1-7 VA
H1 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.
H2 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.
H3 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.
H4 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.
H5 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.
H6 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.
T1 JUNO LINE VOLTAGE LED TRACK LIGHT T255LG2 3 N WH TRACK 3000 LUMEN LED 120 V/1-36 VA PROVIDE T18 WHITE RECESSED TRACK, FEED CONNECTORS AND STRAIGHT CONNECTORS.
T2 JUNO LOW VOLTAGE LED RECESSED PUCK LIGHT USTLR1-3K-BL UNDERCOUNTER 285 LUMEN LED 120 V/1-4 VA PROVIDE 60-WATT ELECTRONIC, DIMMABLE TRANSFORMER.
UC1 GE LED UNDERCOUNTER ACCENT TAPE LIGHT 93013521 UNDERCOUNTER 2W/FT LED 120 V/1-5 VA PROVIDE WITH 60-WATT LED DRIVERS, TETRA DIMMING MODULES (WHERE DIMMER IS INDICATED), MOUNTING TRACK, AND ALL
ACCESSORIES FOR A COMPLETE SYSTEM. APPROXIMATELY 850' REQUIRED.
X1 LITHONIA EDGE-LIT EXIT LRP 1 GC 120/277 WALL 120 V/1-5 VA
X2 CHLORIDE COMBO EXIT/EMERGENCY VCLANGW WALL 120 V/1-5 VA
X3 CHLORIDE EMERGENCY VU6L WALL 120 V/1-5 VA
HISTORIC/EXISTING LIGHT FIXTURE SCOPE OF WORK:
FIXTURE H1: EXISTING HISTORIC FIXTURES SHALL BE REMOVED, FULLY RESTORED, AND RELAMPED. SEE SPECIFICATION 265602. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S
CONDITION. THESE FIXTURES ARE BEING RELOCATED AND ARE NOT BEING INSTALLED IN THE SAME LOCATION. REPLACE EXISTING LAMPS WITH G E LED2G25/M/C 2-WATT 95 LUMEN 3000K 80 CRI LED LAMPS. EACH FIXTURE REQUIRES FOUR LAMPS.
FIXTURE H2: EXISTING HISTORIC FIXTURES SHALL BE REMOVED, REWIRED AND RELAMPED. RESTORATION IS NOT REQUIRED. DEMOLISH EXISTING FLUORESCENT LAMPS AND BALLAST. REPLACE LAMPS (FOUR/FIXTURE) WITH NEW 10-WATT 2G11-BASE 120-VOLT 1000-LUMEN LED LAMPS EQUAL TO FUTURE ENERGY
SYSTEMS 10W-2G11-WW-4PS-ETL-FR. THIS WILL REQUIRE REWIRING OF THE LAMP BASES WITHIN EACH LIGHT FIXTURE. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE REUSED SUBJECT TO AN INSPECTION OF ITS CONDITION. THESE
FIXTURES ARE BEING REINSTALLED IN THE SAME LOCATION.
FIXTURE H3: EXISTING HISTORIC FIXTURES SHALL BE REMOVED AND FULLY RESTORED AND RELAMPED. SEE SPECIFICATION 265602. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S
CONDITION. REPLACE EXISTING LAMPS WITH G E LED2G25/M/C 2-WATT 95 LUMEN 3000K 80 CRI LED LAMPS. EACH FIXTURE REQUIRES ONE LAMP. ONE FIXTURE IS BEING RELOCATED.
FIXTURE H4: EXISTING FIXTURES SHALL BE REMOVED AND REINSTALLED. RESTORATION IS NOT REQUIRED. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S CONDITION. THESE
FIXTURES ARE BEING REINSTALLED IN THE SAME LOCATION. RE-USE EXISTING LAMPS.
FIXTURE H5: EXISTING FIXTURE SHALL BE REMOVED AND REINSTALLED. RESTORATION IS NOT REQUIRED. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S CONDITION. THIS FIXTURE
IS BEING REINSTALLED IN THE SAME LOCATION. REPLACE EXISTING LAMPS WITH G E LED2G25/M/C 2-WATT 95 LUMEN 3000K 80 CRI LED LAMPS. SIX LAMPS ARE REQUIRED.
FIXTURE H6: EXISTING FAN/FIXTURE SHALL BE REMOVED AND REINSTALLED. RESTORATION IS NOT REQUIRED. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S CONDITION. THIS
FIXTURE IS NOT BEING REINSTALLED IN THE SAME LOCATION. RE-USE EXISTING LAMPS.
• PROVIDE FIXTURES C1, C2, C3, C4, C5, G1 AS SPECIFIED. SUBSTITUTES FOR A1, A2, A3, X1, X2, X3 FROM HUBBELL, COOPER, LITHONIA, LSI, PHILIPS DO NOT REQUIRE PRIOR APPROVAL. D1, D3, G2, T1, T2, UC1 REQUIRE PRIOR APPROVAL.
• FIXTURE D2 REQUIRES PRIOR APPROVAL. SUBMIT LIGHTING CALCS WITH SUBSTITUTION REQUEST. CALCS SHALL BE FOR FIVE LUMINAIRES ON 4' SPACING LOCATED IN 18' CEILINGS. LUMINAIRES SHALL BE 48" FROM WALL. CALCS SHALL SHOW LIGHT DISTRIBUTION ON WALL.
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
06/10/201
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:3
A M
15BZ4199.004
06/10/2016
ELECTRICAL PANEL SCHEDULES I
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E1.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
Notes:
Lighting 7322 VA 100.00% 7322 VA
Power 0 VA 0.00% 0 VA Total Est. Demand: 246 A
Receptacle 150175 VA 53.33% 80088 VA Total Conn.: 440 A
Other 115 VA 100.00% 115 VA Total Est. Demand: 88605 VA
Motor 700 VA 125.00% 875 VA Total Conn. Load: 158517 VA
Lighting - Dwelling Unit 205 VA 100.00% 205 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 506 A 387 A 450 A
Total Load: 59750 VA 46450 VA 52959 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 -- -- -- 3667... 3667... -- -- -- 24
21 -- -- -- 3667... 3667... -- -- -- 22
19 P-1 60 A 3 3667... 3667... 3 60 A P-2 20
17 -- -- -- 6000... 4273... -- -- -- 18
15 -- -- -- 6000... 3493... -- -- -- 16
13 CONDENSING UNIT CU-1 80 A 3 6000... 4753... 3 100 A PANEL 2B 14
11 -- -- -- 7250... 8400... -- -- -- 12
9 -- -- -- 6549... 8400... -- -- -- 10
7 PANEL BA 100 A 3 8478... 8400... 3 100 A ELEVATOR 8
5 -- -- -- 1194... 7757... -- -- -- 6
3 -- -- -- 7309... 7365... -- -- -- 4
1 PANEL 1B 100 A 3 1216... 1262... 3 100 A PANEL 2A 2
CKT Load Name Trip Poles A B C Poles Trip Load Name CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Buss Rating: 600 A
Supply From: Phases: 3 Mains Type: MLO
Location: STOR. 151 Volts: 120/208 Wye A.I.C. Rating: 24,000
Panel: 1A
BREAKERS 14, 15, 16, 17, 19 SHALL BE 5MA GFI.
Notes:
Lighting 2409 VA 100.00% 2409 VA Total Est. Demand: 61 A
Power 0 VA 0.00% 0 VA Total Conn.: 87 A
Receptacle 28960 VA 67.27% 19480 VA Total Est. Demand: 21944 VA
Other 35 VA 100.00% 35 VA Total Conn. Load: 31424 VA
Lighting - Dwelling Unit 20 VA 100.00% 20 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 107 A 61 A 105 A
Total Load: 12160 VA 7309 VA 11946 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38
35 -- -- -- 700 VA 1496... 1 20 A Other 36
33 FC-8 20 A 2 700 VA 959 VA 1 20 A Lighting 34
31 700 VA -- -- -- 32
29 700 VA 2 20 A FC-7 30
27 Receptacle Room 151 20 A 1 360 VA 540 VA 1 20 A Receptacle MAP ROOM 147 28
25 Receptacle STOR. 151 20 A 1 1600... 1600... 1 20 A Receptacle STOR. 151 26
23 -- -- -- 1550... 500 VA -- -- -- 24
21 Coffee Maker Bar 147A 30 A 2 1550... 500 VA 2 30 A Receptacle 22
19 Receptacle BAR 147A 20 A 1 720 VA 4300... -- -- -- 20
17 Receptacle BAR 147A 20 A 1 360 VA 4300... 2 20 A Receptacle BAR 147A 18
15 Receptacle BAR 147A 20 A 1 180 VA 540 VA 1 20 A Receptacle Room 147A 16
13 Receptacle Room 147 20 A 1 720 VA 360 VA 1 20 A Receptacle BAR 147A 14
11 Receptacle 20 A 1 720 VA 720 VA 1 20 A Receptacle MAP ROOM 147 12
9 Fireplace Lobby 134 20 A 1 180 VA 720 VA 1 20 A Receptacle LOBBY 134 10
7 Receptacle Room 148, 134 20 A 1 360 VA 540 VA 1 20 A Receptacle LOBBY 134 8
5 Receptacle Room 135, 148 20 A 1 360 VA 540 VA 1 20 A Receptacle Room 148 6
3 Receptacle MAP ROOM 147 20 A 1 540 VA 540 VA 1 20 A Receptacle Room 155, 135 4
1 Receptacle Room 136, 134 20 A 1 720 VA 540 VA 1 20 A Receptacle MANAGER'S OFFICE 150 2
CKT Load Name Trip Poles A B C Poles Trip Load Name CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Buss Rating: 225 A
Supply From: 1A Phases: 3 Mains Type: MLO
Location: STOR. 151 Volts: 120/208 Wye A.I.C. Rating: 24,000
Panel: 1B
ALL SPACES SHALL HAVE 20/1 BREAKERS.
Notes:
Lighting 2996 VA 100.00% 2996 VA Total Est. Demand: 48 A
Power 0 VA 0.00% 0 VA Total Conn.: 60 A
Receptacle 18480 VA 77.06% 14240 VA Total Est. Demand: 17371 VA
Other 10 VA 100.00% 10 VA Total Conn. Load: 21611 VA
Lighting - Dwelling Unit 125 VA 100.00% 125 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 72 A 55 A 61 A
Total Load: 8519 VA 6556 VA 7256 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38
35 INVERTER 1A, 2 20 A 1 750 VA 0 VA 1 20 A Spare 36
33 Room 140, 139, 150, 155, 145, 135 20 A 1 560 VA 0 VA 1 20 A Spare 34
31 Lighting 20 A 1 469 VA 375 VA 1 20 A Lighting Room 146 32
29 -- -- -- 700 VA 180 VA 1 20 A Receptacle 30
27 FC-9 20 A 2 700 VA 356 VA 1 20 A Room E1, 140 28
25 Receptacle 20 A 1 180 VA 1055... 1 20 A Room 147, 147A, 134, 140 26
23 Room 143, 146 20 A 1 886 VA 180 VA 1 30 A SE-1 24
21 Room 143, 146 20 A 1 540 VA 200 VA -- -- -- 22
19 Receptacle LOBBY 134 20 A 1 720 VA 200 VA 2 20 A FC-10 20
17 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle VESTIBULE 156 18
15 Receptacle Space 6 20 A 1 360 VA 360 VA 1 20 A Receptacle 16
13 Hand Dryer Mens Restroom 139 20 A 1 1500... 1500... 1 20 A Hand Dryer Mens Restroom 139 14
11 Hand Dryer Womens Restroom 140 20 A 1 1500... 900 VA 1 20 A Receptacle Room 3, 4, 14 12
9 Receptacle Space 1 20 A 1 720 VA 1500... 1 20 A Hand Dryer Womens Restroom 140 10
7 Receptacle Space 1 20 A 1 720 VA 720 VA 1 20 A Receptacle Space 1 8
5 Receptacle Space 1 20 A 1 720 VA 720 VA 1 20 A Receptacle Room 1, 14 6
3 Receptacle Space 2 20 A 1 540 VA 720 VA 1 20 A Receptacle Space 1 4
1 Receptacle Space 2 20 A 1 360 VA 720 VA 1 20 A Receptacle Space 2 2
CKT Load Name Trip Poles A B C Poles Trip Load Name CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Buss Rating: 225 A
Supply From: 1A Phases: 3 Mains Type: MLO
Location: ELECTRICAL / TEL DATA B3 Volts: 120/208 Wye A.I.C. Rating: 10,000
Panel: BA
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:3
A M
15BZ4199.004
06/10/2016
ELECTRICAL PANEL SCHEDULES II
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E1.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
Notes:
Total Est. Demand: 27 A
Total Conn.: 27 A
Total Est. Demand: 9650 VA
Spare 4800 VA 100.00% 4800 VA Total Conn. Load: 9650 VA
Receptacle 4850 VA 100.00% 4850 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 15 A 35 A 36 A
Total Load: 1800 VA 3840 VA 4010 VA
29 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 30
27 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 28
25 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 26
23 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 24
21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22
19 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 20
17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18
15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16
13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14
11 -- -- -- 2400... 0 VA 1 20 A Spare 12
9 UPS 30 A 2 2400... 180 VA 1 20 A Receptacle SKI SHOP / STORAGE 143 10
7 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle 8
5 Receptacle OFFICE 155 20 A 1 360 VA 1250... 1 20 A Receptacle 6
3 Receptacle REGISTRATION 135 20 A 1 720 VA 540 VA 1 20 A Receptacle BAR 147A 4
1 Receptacle Space 1 20 A 1 720 VA 360 VA 1 20 A Receptacle MANAGER'S OFFICE 150 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating:
Supply From: Phases: 3 Mains Type: MLO
Location: ELECTRICAL / TEL DATA B3 Volts: 120/208 Wye A.I.C. Rating: 10,000
Panel: UPS
BREAKRES 1, 14, 16, 19, 23, 25, 26, 27, 28, 30, 32 SHALL BE 5MA GFI.
Notes:
Lighting 1917 VA 100.00% 1917 VA Total Est. Demand: 55 A
Power 0 VA 0.00% 0 VA Total Conn.: 77 A
Receptacle 25715 VA 69.44% 17858 VA Total Est. Demand: 19905 VA
Other 70 VA 100.00% 70 VA Total Conn. Load: 27762 VA
Lighting - Dwelling Unit 60 VA 100.00% 60 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 106 A 61 A 65 A
Total Load: 12626 VA 7366 VA 7764 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 265 VA 1 20 A Lighting CONFERENCE ROOM 239 38
35 Spare 20 A 1 0 VA 821 VA 1 20 A Lighting HALLWAY 232 36
33 Spare 20 A 1 0 VA 348 VA 1 20 A Lighting - Dwelling Unit MEN'S RESTROOM 236 34
31 Lighting CONFERENCE ROOM 240 20 A 1 275 VA 1780... 1 20 A Receptacle PANTRY 234 32
29 Lighting TABLE STORAGE 241 20 A 1 332 VA 180 VA 1 20 A Receptacle PANTRY 234 30
27 Receptacle PANTRY 234 20 A 1 1780... 180 VA 1 20 A Receptacle PANTRY 234 28
25 Receptacle PANTRY 234 20 A 1 1600... 900 VA 1 20 A Receptacle Room 232, 234 26
23 Receptacle PANTRY 234 20 A 1 540 VA 150 VA -- -- -- 24
21 Receptacle Room 235, 232 20 A 1 720 VA 150 VA 2 20 A FC-3 22
19 Receptacle PANTRY 234 20 A 1 180 VA 2913... -- -- -- 20
17 -- -- -- 200 VA 2913... 2 40 A 218 18
15 FC-2 20 A 2 200 VA 1000... 1 20 A 225 16
13 -- -- -- 1200... 180 VA 1 20 A 225 14
11 39.1 20 A 2 1200... 333 VA -- -- -- 12
9 -- -- -- 2100... 333 VA -- -- -- 10
7 29.1 30 A 2 2100... 333 VA 3 20 A CU-2 8
5 Receptacle Room 238, 239 20 A 1 720 VA 375 VA -- -- -- 6
3 Hand Dryer Mens Restroom 236 20 A 1 180 VA 375 VA 2 20 A FC-5 4
1 Receptacle Room 237, 236, 232 20 A 1 720 VA 180 VA 1 20 A Hand Dryer Mens Restroom 236 2
CKT Load Name Trip Poles A B C Poles Trip Load Name CKT
Notes:
Enclosure: Type 1
Mounting: Recessed Wires: 4 Buss Rating: 225 A
Supply From: 1A Phases: 3 Mains Type: MLO
Location: PANTRY 234 Volts: 120/208 Wye A.I.C. Rating: 10,000
Panel: 2A
Notes:
Total Est. Demand: 33 A
Total Conn.: 35 A
Power 0 VA 0.00% 0 VA Total Est. Demand: 11785 VA
Receptacle 11820 VA 92.30% 10910 VA Total Conn. Load: 12520 VA
Motor 700 VA 125.00% 875 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 41 A 29 A 37 A
Total Load: 4753 VA 3493 VA 4273 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38
35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36
33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34
31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32
29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30
27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28
25 -- -- -- 1250... 0 VA 1 20 A Spare 26
23 HRV-1 20 A 2 1250... 0 VA 1 20 A Spare 24
21 -- -- -- 300 VA 540 VA 1 20 A Receptacle BOARD ROOM 238 22
19 FC-6 20 A 2 300 VA 360 VA 1 20 A Receptacle BOARD ROOM 238 20
17 Receptacle BOARD ROOM 238 20 A 1 360 VA 333 VA -- -- -- 18
15 Receptacle Room 238, 239 20 A 1 720 VA 333 VA -- -- -- 16
13 Receptacle CONFERENCE ROOM 240 20 A 1 540 VA 333 VA 3 20 A HRV-2 14
11 Receptacle CONFERENCE ROOM 240 20 A 1 360 VA 1260... 1 20 A Receptacle Room 241, 240 12
9 -- -- -- 350 VA 360 VA 1 20 A Receptacle CONFERENCE ROOM 240 10
7 FC-1 20 A 2 350 VA 720 VA 1 20 A Receptacle CONFERENCE ROOM 240 8
5 -- -- -- 350 VA 360 VA 1 20 A Receptacle CONFERENCE ROOM 239 6
3 FC-4 20 A 2 350 VA 540 VA 1 20 A Receptacle Room 239 4
1 Receptacle CONFERENCE ROOM 239 20 A 1 540 VA 360 VA 1 20 A Receptacle CONFERENCE ROOM 239 2
CKT Load Name Trip Poles A B C Poles Trip Load Name CKT
Notes:
Enclosure: Type 1
Mounting: Recessed Wires: 4 Buss Rating: 225 A
Supply From: 1A Phases: 3 Mains Type: MLO
Location: TABLE STORAGE 241 Volts: 120/208 Wye A.I.C. Rating: 10,000
Panel: 2B
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
30A
6 72
D
B
A
3 4 5
C
E
CRAWLSPACE ACCESS
ELEVATOR
MACHINE
ROOM
DN
DOOR TO CRAWLSPACE
ACCESS
SEE SPECIFICATION 26000 E1.1
FOR GENERAL DEMO NOTES.
SEE SPECIFICATION 26000 E1.1
FOR GENERAL DEMO NOTES.
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:5
A M
15BZ4199.004
06/10/2016
BASEMENT ELECTIRCAL DEMOLITION
PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
ED2.0
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"ED2.0
1 BASEMENT ELECTRICAL DEMOLITION PLAN
ELECTRICAL GENERAL DEMOLITION NOTES
1 DEMO DEVICES SHOWN ARE BASED ON LIMITED FIELD INVESTIGATION AND DO NOT NECESSARILY DEPICT
ENTIRE SCOPE OF DEMOLITION. ADDITIONAL DEVICES ARE LIKELY PRESENT BUT COULD NOT BE VERIFIED
DUE TO THE PRESENCE OF CASEWORK, FURNITURE OR OTHER OBSTRUCTIONS. DEMO ALL ELECTRICAL
DEVICES, EQUIPMENT, CONDUIT AND WIRING TO SUPPORT REMODEL EFFORT. DO NOT ABANDON 'IN PLACE'
ANY CONDUIT OR WIRING, INCLUDING LOW VOLTAGE WIRING. FIELD VERIFY ALL AREAS PRIOR TO BIDDING.
2 MAINTAIN ALL HISTORIC FIXTURES FOR RE-USE.
ELECTRICAL KEYNOTES
1 DEMO RECEPTACLE FEEDING ESPRESSO BAR ON MAIN FLOOR.
2 DEMO DISCONNECT FOR ‘SKI HUT’.
3 LOAD CENTER
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
UP
18" X 42"
18" X 30"
21" X 48"
18" X 42"18" X 42"18" X 42"
30A
30A
30A
S
C C
TV
C C
TV
J
J
V
SS S
SS
J
D
B
A
3 4 5
C
E
F
L1B
HAND DRYER
HAND DRYER
HAND DRYER
HAND DRYER
GIFT SHOP
LEM
SKI HUT ON CANOPY
H1
H1
H1
H1H1
H1
H1
H1
H1
H4
H2
H1
L1C
LC1
H2 H2 H2 H2 H2 H2
H2
H2H2H2H2H2
H2
TYP
TYP
H3 H3
H3
H6
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:0
A M
15BZ4199.004
06/10/2016
FIRST FLOOR ELECTRICAL DEMOLITION
PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
ED2.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"ED2.1
1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ELECTRICAL GENERAL DEMOLITION NOTES
1 DEMO DEVICES SHOWN ARE BASED ON LIMITED FIELD INVESTIGATION AND DO NOT NECESSARILY DEPICT
ENTIRE SCOPE OF DEMOLITION. ADDITIONAL DEVICES ARE LIKELY PRESENT BUT COULD NOT BE VERIFIED
DUE TO THE PRESENCE OF CASEWORK, FURNITURE OR OTHER OBSTRUCTIONS. DEMO ALL ELECTRICAL
DEVICES, EQUIPMENT, CONDUIT AND WIRING TO SUPPORT REMODEL EFFORT. DO NOT ABANDON 'IN PLACE'
ANY CONDUIT OR WIRING, INCLUDING LOW VOLTAGE WIRING. FIELD VERIFY ALL AREAS PRIOR TO BIDDING.
2 MAINTAIN ALL HISTORIC FIXTURES FOR RE-USE.
ELECTRICAL KEYNOTES
1 “H” DESIGNATOR INDICATES HISTORICAL FIXTURE. FIXTURE TO BE RE-USED. SEE REMODEL PLAN FOR NEW LOCATIONS.
TYPICAL.
2 SAVE HAND DRYERS FOR RE-USE.
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
DN
24" X 48"
24" X 48"
X
24" X 72"
24" X 36" 24" X 36"
J
PP PP
PP
PP
PP
PP
6 72
D
B
A
3 4 5
C
E
L2B
LC2
MR UPS
H5
H4
H4
6 7
D
B
A
3 4 5
C
E
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:0
A M
15BZ4199.004
06/10/2016
SECOND FLOOR ELECTRICAL
DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
ED2.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
ELECTRICAL GENERAL DEMOLITION NOTES
1 DEMO DEVICES SHOWN ARE BASED ON LIMITED FIELD INVESTIGATION AND DO NOT NECESSARILY DEPICT
ENTIRE SCOPE OF DEMOLITION. ADDITIONAL DEVICES ARE LIKELY PRESENT BUT COULD NOT BE VERIFIED
DUE TO THE PRESENCE OF CASEWORK, FURNITURE OR OTHER OBSTRUCTIONS. DEMO ALL ELECTRICAL
DEVICES, EQUIPMENT, CONDUIT AND WIRING TO SUPPORT REMODEL EFFORT. DO NOT ABANDON 'IN PLACE'
ANY CONDUIT OR WIRING, INCLUDING LOW VOLTAGE WIRING. FIELD VERIFY ALL AREAS PRIOR TO BIDDING.
2 MAINTAIN ALL HISTORIC FIXTURES FOR RE-USE.
ELECTRICAL KEYNOTES
1 SEE SPECIFICATION 26000 E1.1 B FOR INFORMATION REGARDING THIS EXISTING TELCOMM ROOM.
: 1/8" = 1'-0"ED2.2
1 SECOND FLOOR ELECTRICAL DEMOLITION PLAN NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
WP
T
6 72
D
B
A
3 4 5
C
E
1X2
A2 A2
A2A2A2A2
A2
A2
A2
A2
X2
X3
A2
X3 A2 X3
A2
X3
A2
X3
A2
A2
A2
A2
X3 A2A2
G2
BA 2
SEE 1/E5.1 FOR ADDITIONAL
REQUIREMENTS IN THIS ROOM
X2
X3
A2 A2
A2A2
P-2
P-1
GF-1
7 FCP ELEV
FC-9
FC-7 FC-8
A2
A2 A2 A2 A2 A2 A2 A2 A2 A2
UPS
INV-1A
FC-10
1A-20,22,24
1A-19,21,23
SE-1
A2
A2
A2 A2
P-3
BA-30
BA-25
BA-28
UPS-6
BA-20,22
UPS-8UPS-7
BA-23
BA-27,29
BA-26
G2
1B-30,32
1B-33,35
1A-8,10,12
BA-24
ELECTRICAL / TEL DATA
MECHANICAL
HALLWAY
STAIR
S1
HALLWAY
ELEV ELEC.
001A
INV-2
#10'S
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
BASEMENT ELECTRICAL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E2.0
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"E2.0
1 BASEMENT ELECTRICAL PLAN
ELECTRICAL KEYNOTES
1 PROVIDE LIGHT AND SWITCH IN ELEVATOR PIT.
2 PROVIDE RECEPTACLE IN ELEVATOR PIT.
3 ELEVATOR POWER CONNECTION – SEE RISER DIAGRAM FOR CIRCUIT AND EQUIPMENT REQUIREMENTS. ALSO PROVIDE
20/1 CIRCUIT AND DISCONNECT FOR ELEVATOR CAB LIGHT/POWER. PROVIDE CAT-6 CABLE TO DATA ROOM FOR
ELEVATOR COMMUNICATIONS. COORDINATE ALL CONNECTION LOCATIONS WITH ELEVATOR INSTALLER.
4 PROVIDE 30/2 NEMA 1 FUSED DISCONNECT. FUSE AT 15 AMPS. PROVIDE GFI RECEPTACLE ON OR NEAR FAN COIL WHERE
SHOWN. CONNECT TO NEAREST 120V CIRCUIT.
5 CONNECT TO VARIABLE FREQUENCY DRIVE PROVIDED BY TEMPERATURE CONTROLS CONTRACTOR.
6 CONNECT TO GLYCOL FEEDER. PROVIDE DISCONNECT IF NOT INCLUDED WITH EQUIPMENT.
7 PROVIDE 120V TO FIRE PANEL. PROVIDE CAT-5E TO OWNER’S TELEPHONE DISTRIBUTION FOR AUTO-DIALER.
8 CONTINUED TO FIRST FLOOR.
9 UNSWITCHED INVERTER CIRCUIT #1A. SEE DETAIL 6/E5.3.
10 LOCATE AT ENTRY TO CRAWL SPACE.
11 MOUNT INV-2 ABOVE OR BELOW INV-1A.
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
UP
18" X 30"
21" X 48"
18" X 42"18" X 42"18" X 42"
A C
A C
WP WP
WP
AC
AC
A C
V
V
V
S
S
S
S
S
WAP
WAP
WAP
S S
SS S
S
S S
S S
S S S
T
T T
T
T
T
T
T
T
A C
WAP
WP WP WP WP
A
WP
CCTV
C C T V
CCTV
C C T V
C C
TV
C C T V
CCTV
C C T V
C C T V
C C T V
CCTV
CCTV CCTV
CCTV
CCTV
C C T V
C C T V
CCTV
CCTV
C C T V
C C T V
CCTV
C C
TV
CCTV
C C
TV
C C
TV
C C T V
GIFT SHOP
SKI SHOP / STORAGE
WOMEN'S RESTROOM
MEN'S RESTROOM
DELIVERY
STAIR
S1
ELEVATOR
E1
REGISTRATION
FRONT OFFICE
MANAGER'S OFFICE
VESTIBULE
LOBBY
BAR
161A
HALLWAY
D
B
A
3 4 5
C
E
F
HDHD
HDHD
2TYP TYP
TYP
TYP
1B
1A
EF-2
EF-1
FS
EF-3
1B-8
1B-21,23
1B-14
1B-15
UPS-4
1B-19
1B-16
1B-18,20
1B-17
1B-25 1B-26
1B-27
1B-22,24
1B-13
1B-121B-111B-10
BA-17
BA-16
BA-18
BA-6
BA-19
BA-7
BA-5
BA-8
BA-4
BA-12
UPS-1
BA-11
BA-10
BA-14
BA-13
1B-1
UPS-3
1B-4
UPS-5
1B-2
UPS-2
1B-5
1B-7
1B-6
BA-9
BA-12
BA-15
1B-3
1B-28
1B-9
INV-1B
BA-2
BA-3
BA-1
UPS-10
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
FIRST FLOOR POWER AND SPECIAL
SYSTEMS REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E2.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"E2.1
1 FIRST FLOOR POWER REMODEL PLAN
ELECTRICAL KEYNOTES
7 SEE FOOD SERVICE PLANS FOR EXACT LOCATIONS OF ALL DEVICES IN BAR AREA.
8 DEVICES REQUIRE UNDERSLAB CONDUIT.
9 COORDINATE LOCATION WITH ATM MACHINES.
10 PROVIDE POWER TO WATER BOTTLE FILLING STATION.
11 COFFEE MAKER. PROVIDE TWO PHASES, NEUTRAL AND GROUND. CONCEAL DISCONNECT WHERE SPACE PERMITS.
12 REMOTE BEER SYSTEM.
13 PROVIDE POWER TO FIREPLACE. EXTEND WIRING TO SWITCH IN REGISTRATION 135 FOR ON/OFF CONTROL.
14 CONNECT TO PILOT LIGHT SWITCH. SEE LIGHTING PLAN.
15 LOCATE IN CASEWORK IN THIS AREA.
ELECTRICAL KEYNOTES
1 PROVIDE 36” CAT-6 COILED IN J-BOX, TERMINATED WITH RJ-45 JACK. PROVIDE ROUND, BLANK COVER. WIRELESS
ROUTER PROVIDED/INSTALLED BY OWNER. LOCATE ON CENTERLINE OF ROOM, SYMMETRICAL TO LIGHTS.
2 CONNECT ALL SPEAKERS IN THIS ROOM TOGETHER AS A ZONE USING 16 AWG SPEAKER WIRE (WEST PENN #25225B OR
EQUAL) IN 1/2” EMT. CONNECT TO VOLUME SWITCH IN SPACE. ROUTE HOMERUN TO DATA ROOM IN BASEMENT AND
COIL 25’ FOR TERMINATION BY OWNER. INSTALL SYMMETRICALLY AROUND LIGHTS.
3 INSTALL RECEPTACLE ON SIDE OF CHASE. TYPICAL ALL RECEPTACLES FLANKING WINDOWS ON THIS WALL.
4 PROVIDE VOLUME SWITCH. CONNECT ALL SPEAKERS IN ROOM TO SWITCH FOR VOLUME CONTROL. WHEN ADJACENT
TO LIGHT SWITCHES, INSTALL IN COMMON MULTI-GANG BOX WITH COMMON MULTI-GANG FACEPLATE.
5 REINSTALL EXISTING HAND DRYERS.
6 CONNECT SPEAKER TO LOBBY ZONE.
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
DN
24" X 48"
X
24" X 72"
24" X 36" 24" X 36" AC
AC
ACAC A
C
AC
AC
S
S
S
V
V
S
S
V
V
S S
S
S S
WAP
WAP
WAP
AC
W P
AC AC ACAC
AC
AC
A C
BOARD ROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
HALLWAY
CONFERENCE ROOM
CONFERENCE ROOM
PANTRY
STOR.
STAIR
S1
TABLE STORAGE
6 72
D
B
A
3 4 5
C
E
HD HD
2A
3 3 3
FC-3
CU-1
FC-2
HRV-2
FC-4
FC-6
FC-5
FC-1
HRV-1
6 6
9 10
FS
SCREEN
SCREEN
29.1
2B-14,16,18
2B-22 2B-20
2A-1
2B-15
2B-17
2B-19,21
2A-5
2A-4,6
2B-2
2A-3 2A-2
2A-21
2B-4
2B-6
2B-1 2B-8
2B-10
2B-12
2B-11
2A-15,17
2B-13
2B-7,9
2B-3,5
2B-23,25
CU-2
39.1
1A-13,15,17
2B
2A-7,9
2A-11,13
2A-26
2A-32 2A-27
2A-25
2A-162A-14
2A-23
2A-30
2A-19
2A-28
2A-18,20
2A-8,10,12
2A-22,24
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
SECOND FLOOR POWER AND SPECIAL
SYSTEMS REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E2.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"E2.2
1 SECOND FLOOR POWER REMODEL PLAN
ELECTRICAL KEYNOTES
1 PROVIDE NEW ELECTRIC HAND DRYERS.
2 PROVIDE VOLUME SWITCH. CONNECT ALL SPEAKERS IN ROOM TO SWITCH FOR VOLUME CONTROL. WHEN ADJACENT
TO LIGHT SWITCHES, INSTALL IN COMMON MULTI-GANG BOX WITH COMMON MULTI-GANG FACEPLATE.
3 CONNECT ALL SPEAKERS IN THIS ROOM TOGETHER AS A ZONE USING 16 AWG SPEAKER WIRE (WEST PENN #25225B OR
EQUAL) IN 1/2” EMT. CONNECT TO VOLUME SWITCH IN SPACE. ROUTE HOMERUN TO DATA ROOM IN BASEMENT AND
COIL 25’ FOR TERMINATION BY OWNER. INSTALL SYMMETRICALLY AROUND LIGHTS.
4 CONNECT SPEAKER TO CORRIDOR ZONE.
5 PROVIDE 36” CAT-6 COILED IN J-BOX, TERMINATED WITH RJ-45 JACK. PROVIDE ROUND, BLANK COVER. WIRELESS
ROUTER PROVIDED/INSTALLED BY OWNER. LOCATE ON CENTERLINE OF ROOM, SYMMETRICAL TO LIGHTS.
6 PROVIDE 30/2 NEMA 1 FUSED DISCONNECT. FUSE AT 15-AMPS.
7 DISCONNECT PROVIDED WITH UNIT. PROVIDE RECEPTACLE ON OR NEAR UNIT WHERE INDICATED. CONNECT TO
NEAREST 120V SOURCE.
8 SEE RISER DIAGRAM.
9 REFER TO FOOD SERVICE PLANS FOR SPECIFIC LOCATION OF ALL DEVICES.
10 COFFEE MAKER. PROVIDE TWO PHASES, NEUTRAL AND GROUND.
11 PROVIDE POWER TO MOTORIZED PROJECTION SCREEN. PROVIDE ROUGH-IN AND WIRING FOR CONTROLS.
12 COORDINATE LOCATION OF FLOORBOXES WITH NEW CONFERENCE ROOM TABLE TO BE PROVIDED BY XANTERRA.
BOXES TO BE USED TO FEED POWER INTO TABLE SUPPORTS.
13 PROVIDE POWER TO WATER BOTTLE FILLING STATION.
14 COOLER AND ICE MACHINE REMOTE CONDENSING UNITS. PROVIDE NEMA 3R DISCONNECTS.
15 PROVIDE ONE CAT-6 AND PLATE FOR WALL-HUNG PHONE. INSTALL AT 60”.
16 FOOD WARMER FED FROM CEILING. SEE FOOD SERVICES PLAN.
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
18" X 30"
21" X 48"
18" X 42"18" X 42"18" X 42"
P
F
DD
GIFT SHOP
SKI SHOP / STORAGE
WOMEN'S RESTROOM
MEN'S RESTROOM
DELIVERY
167STAIR
S1
ELEVATOR
E1
REGISTRATION
FRONT OFFICE
MANAGER'S OFFICE
VESTIBULE
LOBBY
BAR
161A
HALLWAY
6 72
D
B
A
3 4 5
C
E
F
C3
D1
D1
D1 D1 D1
C3
D1 D1 D1D1
C3
C3
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1
D1
G1
G2
G1
G2
C1
C1
H2 H2 H2 H2 H2 H2
H2
H2H2H2H2H2H2
H2
H1
H4 C5
A1
A1 A1
C5
X1
X1
X1X1
X1
X1
X1
X1
X1
H3 H3
G1
H1
1B
1A
D1
C3
D1 D1 D1 D1
D1D1
D1 D1 D1
D1
D1 D1 D1
D1
D1
D1
C5
C5 C5
C5 C5
C5 C5 C5 C5
C5
T1
T1
T1
T1
T1
T1
C1
C1
C1
C1 C4
C4
C4
C1
C1
C1
C4
C4
H1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1 C3
C3
C3
C5
C5
C5
C5
H6
D1 D1 D1
D1
H1
H1
H1
H1
H1
H1
H1
D1 D1 D1 D1
D1 D1 D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1 D1 D1
D1
D3
D3D3D3D3D3D3
D3 D3
D3
D3 D3
D3
D3
D1 D1 D1
D1
D1
D1
D1
D1
D1 D1D1
D1
D1
D2 D2 D2 D2 D2
D1
D1
D1
D1
D1 C2
C2
C2
C2
D1
TYP
D3 D3D3
MAP ROOM
HALLWAY
STOR.
3 3
UC1 UC1
UC1 UC1
UC1
UC1
UC1
UC1
UC1
3 3
T2 T2 T2
T2
T2
T2
T2
H3
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
X2
7 8
A2
A2
A2
A2
D1 a b g c d d e e f f d d e e f f f f
G1
G1
1B-36
1B-34
BA-31
A2
D1
D1
BA-33
D1
D1
D1
D1 D1 D1
D1
D1
D1 D1
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:5
A M
15BZ4199.004
06/10/2016
FIRST FLOOR LIGHTING REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E3.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"E3.1
1 FIRST FLOOR LIGHTING REMODEL PLAN
ELECTRICAL KEYNOTES
9 1ST DIMMER CONTROLS TWO LONGER TRACKS, 2ND CONTROL S THREE SHORTER TRACKS.
10 CONNECT ONE SWITCH TO LIGHTS, SPEED SWITCH TO FAN.
11 1ST SWITCH CONTROLS D1, H 6 AND C5 LIGHT IN REGISTRATION 135. 2ND CONTROLS UC1 LIGHTS. 3RD SWITCH
CONTROLS LOBBY “D1” LIGHTS, 4TH SWITCH CONTROLS ALL OTHER LOBBY LIGHTS. FAN SPEED SWITCH CONTROLS FAN
IN “H6” FIXTURE.
12 UNSWITCHED INVERTER CIRCUIT #1B. SEE DETAIL 6/E5.3.
13 SWITCH LOCATION, SEE 18/E5.3. INSTALL ON BAR SIDE OF WALL.
14 SMALL LETTER INDICATES CONTROLLING SWITCH, TYP. SEE 18/E5.3.
15 EXTERIOR LIGHTING CIRCUIT ON INVERTER POWER. SEE DETAIL 6/E5.3.
16 EXTERIOR LIGHTING CIRCUIT. SEE DETAIL 6/E5.3.
ELECTRICAL KEYNOTES
1 COORDINATE INSTALLATION OF RECESSED TRACK WITH DRYWALL WORK.
2 PROVIDE PLYWOOD COVERS OVER TOP OF LIGHT FIXTURES IN ATTIC TO MAINTAIN 4” CLEARANCE FROM INSULATION.
CENTER THESE FIXTURES ON DECORATIVE MAP LOCATED ON WALL.
3 PROVIDE UC1 ACCENT LIGHTING UNDER CABINETS IN THIS AREA. INSTALL NEAR FRONT LIP. CONCEAL DRIVER IN
CASEWORK.
4 PROVIDE UC1 ACCENT LIGHTING UNDER LIP OF BAR, ON BARTENDER’S SIDE. CONCEAL DRIVER IN CASEWORK.
5 INSTALL RECESSED INTO ARCHITECTURAL ELEMENT ABOVE BAR. TYP.
6 IN MAIN ROOM CEILING ABOVE BAR.
7 CONTINUE TO 2ND FLOOR.
8 UNSWITCHED INVERTER CIRCUIT #1A FROM LOWER LEVEL. SEE DETAIL 6/E5.3.
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
X
24" X 72"
24" X 36" 24" X 36"
D
D
D
6 72
D
B
A
3 4 5
C
D1
D1
C5 C5
H5
A2 A2 A2 A2 A2
A1
A1
A1
A1
D1
D1
C1C1C1
D1
C4C1 C1 C1
G2 G2
A1 A1
H4
X1
X1 X1
D1 D1
D1D1 D1
D1
D1
C4
C4 C4
C5
D1
A3
A3 A3
A3 A3
A3
C5 C5 C5 C5
UC1
UC1
UC1
UC1
UC1 UC1
UC1
UC1
UC1
UC1
UC1
UC1
UC1UC1
1 1
D1
D1D1
C5
D1
D1
D1 D1 D1
D1 D1
D1 D1
D1 D1 D1 D1 D1
D1
D1
D1 D1
D1
D1
D1 D1 D1 D1
D1 D1
D1 D1 D1
D1 D1
D1
D1
D1 D1
D1 D1
D1
D1
D1D1
D1 D1
D1 D1 D1
D1
D1
D1
D1
D1 D1 D1 D1
D1D1D1 D1
D1
D1
D1
D1 D1D1D1
D1
D1
D1
D1
D1 D1 D1
D1
D1
C5C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
D1
D1
D1
D1 3
A2
X1
X3
X1
2A-29
6 2A-38
2A-34
2A-31
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:5
A M
15BZ4199.004
06/10/2016
SECOND FLOOR LIGHTING REMODEL
PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
RF
NG
RF
06/10/2016
E3.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"E3.2
1 SECOND FLOOR LIGHTING REMODEL PLAN
ELECTRICAL KEYNOTES
1 PROVIDE UC1 ACCENT LIGHTING UNDER CABINETS IN THIS AREA. INSTALL NEAR FRONT LIP. CONCEAL DRIVER IN
CASEWORK.
2 UC1 ACCENT LIGHTING INSTALLED INTO RECESSED CEILING NICHES. CEILING HAS THREE CASCADING NICHES, THIS PLAN
ONLY SHOWS ONE OF THE THREE. THUS, THE REQUIRED QUANTITY IS THREE TIMES THAT SHOWN ON THIS PLAN. SEE
1/E5.3 FOR MORE INFORMATION.
3 PROVIDE RECEPTACLE AND LIGHT AT TOP OF SHAFT IF REQUIRED BY ELEVATOR MANUFACTURER’S INSTALLATION
GUIDELINES. CONNECT TO NEAREST CIRCUIT.
4 UNSWITCHED INVERTER CIRCUIT #1A CONTINUED FROM FIRST FLOOR. SEE DETAIL 6/E5.3.
5 LOCATE AT ATTIC ACCESS.
6 1ST SWITCH (DIMMER) CONTROLS “UC1”, 2ND SWITCH CONTROLS “D1”, THIRD CONTROLS “C5”.
NORTH
Date
RO
NA
LD D. FAUST
Pr of es sio nal
Engineer (Electrical)
WYOMING
MP
120/208
3Ø, 4W
225A
FIRE RM PNL
120/208
3Ø, 4W
100A
EXISTING
ELEVATOR
70A
ST CB
DISH
WASHER
L1A
120/208
3Ø, 4W
225A
L2A
120/208
3Ø, 4W
225A
L3A
120/208
3Ø, 4W
225A
L4A
120/208
3Ø, 4W
225A
BSMT
120/208
3Ø, 4W
100A
LEM
120/208
3Ø, 4W
100A L1C
120/208
3Ø, 4W
100A
GIFT SHOP
120/208
1Ø, 3W
100A
L2B
120/208
3Ø, 4W
100A
LC2
120/208
1Ø, 3W
100A
L1B
120/208
3Ø, 4W
100ALC1
120/208
1Ø, 3W
100A
MR
120/208
1Ø, 3W
100A
LC3
120/208
1Ø, 3W
100A
LC2
120/208
1Ø, 3W
100A
OUTSIDE INSIDE
NORTHWESTERN
ENERGY
TRANSFORMER
4TH FLOOR
3RD FLOOR
2ND FLOOR
1ST FLOOR
CRAWL SPACE
DEMO PANEL, FEEDER AND BRANCH CIRCUITS
100%. SEE DEMO PLANS FOR LOCATION.
PANEL TO BE DEMOLISHED, FEEDER TO BE
REUSED. SEE PHASING NOTES ON REMODEL
RISER DIAGRAM.
PANEL OR EQUIPMENT TO REMAIN. WILL BE
DEMOLISHED OR REFED UNDER PHASE 2.
CT CAN AND METER BASE TO REMAIN.
TO SKI HUT
WIREWAY
MP
120/208
3Ø, 4W
225A
FIRE RM PNL
120/208
3Ø, 4W
100A
EXISTING
ELEVATOR
70A
ST CB
DISH
WASHER
L1A
120/208
3Ø, 4W
225A
L2A
120/208
3Ø, 4W
225A
L3A
120/208
3Ø, 4W
225A
L4A
120/208
3Ø, 4W
225A
BSMT
120/208
3Ø, 4W
100A
LC3
120/208
1Ø, 3W
100A
LC2
120/208
1Ø, 3W
100A
OUTSIDE INSIDE
NORTHWESTERN
ENERGY
TRANSFORMER
4TH FLOOR
1ST FLOOR
CRAWL SPACE/NEW BASEMENT
PROVIDE NEW 600-AMP NEMA 3R FUSED DISCONNECT.
NEW PANEL OR EQUIPMENT.
PANEL OR EQUIPMENT TO REMAIN. WILL BE DEMOLISHED OR RELOCATED UNDER PHASE 2.
UPS-1. SEE 7/E5.1. PROVIDE #10'S.
PROVIDE NEW PANEL. USE EXISTING FEEDER, MODIFY AS REQUIRED. COORDINATE DEMO
OF EXISTING PANEL AND FEEDER CUTOVER WITH XANTERRA I.T. GROUP. DUE TO
TEL/COMM EQUIPMENT PHASING, IT MAY BE REQUIRED TO HAVE BOTH PANELS (EXISTING
AND NEW) INSTALLED AND POWERED FOR A PERIOD OF TIME.
PROVIDE BUSSMAN POWER MODULE (OR EQUAL) FOR ELEVATOR. MODULE TO BE 100-AMP
WITH CONTROL POWER TRANSFORMER, FIRE SAFETY INTERFACE RELAY, "ON" PILOT LIGHT,
FIRE ALARM VOLTAGE MONITORING RELAY. PROVIDE NEMA 1 ENCLOSURE.
NOTE: BREAKER, FEEDER AND POWER MODULE SIZES ARE FOR BID ONLY. CONFIRM
ELEVATOR POWER REQUIREMENTS FROM ELEVATOR SHOP DRAWINGS AND PROVIDE
BREAKER, FEEDER AND POWER MODULE TO SUIT ELEVATOR EQUIPMENT.
UPS-2: 6 KW/KVA 208V HARDWIRED INPUT, 208V OUTPUT WITH L6-30R RECEPTACLE,
NOMINAL SIZE 17"H X 7"W X 29"D. APC SRT6KXLT, OR EQUAL. LOCATE UPS IN STORAGE
151. PROVIDE SHELF OR STAND TO MAINTAIN ABOVE FLOOR LEVEL. CONNECT UPS TO
PANEL 1B CIRCUIT 18/20. EXTEND POWER FROM UPS TO ESPRESSO MACHINE AT BAR AND
TERMINATE INTO L6-30R RECEPTACLE. SEE E2.1, KEYNOTE 16.
WIREWAY
BA
120/208
3Ø, 4W
225A
E5.0 : E5.0
6 ELECTRICAL RISER DIAGRAM - DEMO
NO SCALE
E5.0 : E5.0
8 ELECTRICAL RISER DIAGRAM - REMODEL
NO SCALE
1A
120/208
3Ø, 4W
600A
2B
120/208
3Ø, 4W
225A
3RD FLOOR
2ND FLOOR
1B
120/208
3Ø, 4W
225A
UPS
120/208
1Ø, 3W
100A
50-AMP 2-POLE CIRCUIT FROM UPS LOCATED
IN I.T. ROOM IN ADJACENT BUILDING
UPS
120/208
1Ø, 3W
100A
FROM UPS LOCATED IN I.T. ROOM IN ADJACENT BUILDING
E5.0 : E5.0
16 PLAN REFERENCE - ELECTRICAL SERVICE EQUIPMENT LOCATION
1/32" = 1'
PROJECT AREA
SEE 35/E5.0 BELOW FOR LOCATION
OF SERVICE EQUIPMENT
EXISTING ELECTRICAL
SERVICE EQUIPMENT
NORTH
NEW
ELEVATOR
E5.0 : E5.0
18 GROUNDING ELECTRODE DETAIL
NOT TO SCALE
4" X 12"
ELECTRICAL/TEL
DATA B3
#4 "UFER" GROUND IN NEW
BUILDING ADDITION FOUNDATION
#2/0 TO BUILDING STEEL
(IF AVAILABLE)
18/E5.0
NEW SERVICE DISCONNECT
(SEE 8/E5.0, ITEM 1)
2/0 IN 1" C.
ROUTE THROUGH
CRAWL SPACE
EXISTING WATER
SERVICE
ROOM
#6 TO TWO GROUND RODS
#2/0 TO EXISTING WATER SERVICE
IN 1/1/2" C. (SEE PLAN AT LEFT)
#4 TO EACH DATA RACK
AT SERVICE LOCATION
IN ELECTRICAL/TEL
DATA B3
UPS-1
SEE 7/E5.1 FOR LOCATION
#2/0 TO NEW FIRE SPRINKLER AND
WATER RISER IN MECHANICAL B4
FROM LIGHTNING PROTECTION SYSTEM
SEE E5.2
PROVIDE TVSS
NOTES:NOTES:
2A
120/208
3Ø, 4W
225A
CU-1
100A
NEMA 3R
FEEDER SCHEDULE:
PANEL 1A: 600-AMP, PARALLEL FOUR #350 MCM, #2/0 GROUND, 3" C.
PANELS BA, 1B, 2A, 2B: 100-AMP, FOUR #3, #8 GROUND, 1-1/4" C.
ELEVATOR: 100-AMP, THREE #3, #8 GROUND, 1-1/4" C.
CU-1: 80-AMP, THREE #4, #8 GROUND, 1" C.
CALCULATED FAULT CURRENT:
600-AMP DISCONNECT: 25,961 AMPS
PANEL 1A: 21,567 AMPS
PANEL BA: 3,767 AMPS
PANEL 1B: 19,393 AMPS
PANEL 2A: 5,418 AMPS
PANEL 2B: 6,729 AMPS
GENERAL ROUTING, FEEDER TO PANEL 1A. ROUTE
THROUGH CRAWL SPACE.
UPS-2
E5.0
NG
RF
RF ELECTRICAL DETAILS I
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
15BZ4199.004
10/13/2015
06/10/2016
TECH. REVIEW:
DATE:
SHEET
167OFPKG3
PKG.
NO.
PKG1
PKG2
DESIGNED:
CADD:
SUB SHEET NO. TITLE OF SHEET
www.aearchitects.com
71865
DRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
C O
N S T
R U
C T
IO
N
D O
C U
M E N
T S
12 N. BROADWAY
BELGRADE, MT 59714
PH: 406-388-3320
FAX: 406-388-3389
2040 HARNISH BLVD.
BILLINGS, MT 59101
PH: 406-245-0136
FAX: 406-245-2084
ACE PROJECT #: 15BZ4199.004
06/10/2016
YELLOWSTONE NATIONAL PARK, WYOMING
E5.1 : E5.1
7 ELECTRICAL/TEL DATA B5 - DETAILS
1/4" = 1' 0"
EQUIPMENT:
PANDUIT TWO-POST RACK #R2P WITH VERTICAL CABLE MANAGERS
ON EACH END, PANDUIT #WMPVHCF45E, OR EQUAL. PROVIDE
FOUR 48-PORT PATCH PANELS, ONE RACKMOUNT FIBER
TERMINATION ENCLOSURE FOR 24-STRAND FIBER. SECURE RACKS
TO CONCRETE FLOOR. BRACE WITH WITH SEISMIC GUSSET KITS
EQUAL TO CHATSWORTH 11592.
UPS: PROVIDE ONE 6 KVA/4.8 KW, RACK-MOUNT UPS, 120/208V
1-Ø INPUT, 120/208V OUTPUT. 4 MINUTE BATTERY LIFE AT 100%
LOAD. 4 EA L6-20R, 4 EA 5-20R OUTPUT RECEPTACLES. HARDWIRED
3W+G INPUT. 16.9"W X 26.1"D X 6.8" H. LIEBERT GXT3 OR EQUAL.
SEE RISER DIAGRAM 8/E5.0 FOR POWER CONNECTION.
PRE-INSTALLATION NOTE:
PRIOR TO INSTALLING ANY EQUIPMENT, SCHEDULE A MEETING WITH MR.
DON CLARK, XANTERRA IT DIRECTOR TO REVIEW LOCATION OF ALL
EQUIPMENT.
GROUND BAR. SEE 18/E5.0
PROVIDE 15" CABLE RUNWAY, PAINTED WELDED
STEEL, EQUAL TO CHATSWORTH 11252. BOLT
TO TOP OF RACKS WITH RACK-TO-RUNWAY
BRACKETS (CHATSWORTH 10595) AND TO
WALLS WITH WALL ANGLE KIT (CHATSWORTH
11420). PROVIDE RADIUS FITTINGS WHERE
REQUIRED. BOND TO GROUND BAR WITH #6.
ELECTRICAL PANELS, SEE POWER PLAN
PROVIDE THREE 4" EMT CONDUIT SLEEVES
THROUGH WALL. BUSH ENDS.
TYPICAL THREE-CONNECTOR WORKSTATION
E5.1 : E5.1
11 TYPICAL WORKSTATION JACKS AND CABLING
DECORA STYLE 4-PORT INSERT.
COLOR: SEE SPECIFICATION 272726 AND E5.3.
RJ-45 CAT-6 COUPLER.
COLOR: SEE SPECIFICATION 272726 AND E5.3.
FACEPLATE. COLOR: SEE SPECIFICATION 272726
AND E5.3.
DECORA STYLE 1-PORT INSERT.
COLOR: SEE SPECIFICATION 272726
AND E5.3.
ALL SCREW SLOTS TO BE LEFT IN VERTICAL
POSITION.
FACEPLATE. COLOR: SEE SPECIFICATION 272726
AND E5.3.
ALL SCREW SLOTS TO BE LEFT IN VERTICAL
POSITION.
SNAP-IN F-TYPE BULKHEAD MODULE.
COLOR: SEE SPECIFICATION 272726
AND E5.3.
TYPICAL TV CONNECTOR
LABEL: BLACK LETTERING ON CLEAR ADHESIVE
INSTALLED PLUMB AND SQUARE
PROVIDE BLANK. (IF FOUR CAT-6 ARE SPECIFIED,
PROVIDE ADDITIONAL CONNECTOR)
3"-5"
LOCATE ADJACENT RECEPTACLES SO THAT NO
MORE THAN 5" SEPARATES FACEPLATES. ALL
DEVICES TO BE PLUMB AND SQUARE WITH TOP OF
FACEPLATES AT SAME ELEVATION. COORDINATE
ADDITIONAL WALL FRAMING WHERE NECESSARY.
SEE SPECIFICATION 262726 FOR ALL
WIRING DEVICE SPECIFICATIONS
E5.1 : E5.1
35 PLAN REFERENCE - TEL/COMM BACKBONE CABLES AND RACEWAYS
1/32" = 1'
APPROXIMATE LOCATION OF INTERBUILDING 24-STRAND F.O. AND 100-PAIR COPPER TELEPHONE
CABLES. CABLES EXTENDED FROM HAYNES ADMINISTRATION BUILDING, BY OTHERS, WITH
SUFFICIENT LENGTHS COILED FOR EXTENSION TO ELECTRICAL/TEL DATA ROOM 'B3'. E.C. TO
EXTEND CABLES TO TEL DATA ROOM AND TERMINATE.
LOCATION OF ELECTRICAL/TEL DATA
ROOM 'B3' IN LOWER LEVEL
APPROXIMATE LOCATION UTILITY TELEPHONE PEDESTAL.
UTILITY TO REMOVE EXISTING SERVICE CABLE LEADING UP
BUILDING EXTERIOR AND INTO 2ND LEVEL COMM ROOM, AND
PROVIDE NEW CABLE INTO LOWER LEVEL ELECTRICAL/TEL DATA
ROOM 'B3'. E.C. TO DEMO ALL RACEWAY ABANDONED BY
UTILITY.
NORTH
PROVIDE THREE RACEWAYS IN LOWER LEVEL CRAWL SPACE TO
PROTECT COMMUNICATION CABLES. PROVIDE 3" EMT
CONDUIT FOR UTILITY CABLE. PROVIDE BENDS, PULL-BOXES
AND SUPPORTS AS REQUIRED. COORDINATE ALL
REQUIREMENTS WITH UTILITY. PROVIDE TWO 2"
NON-METALLIC CONDUITS FOR F.O. AND COPPER CABLES.
CONDUIT TO BE PVDF RESIN, EQUAL TO CARLON
PLENUM-GARD. COLOR SHALL BE ORANGE. PROVIDE CONDUIT
STRAPS OR SUPPORTS AT 36" SPACING.
PROVIDE SLEEVES INTO CRAWL SPACE.
FIRST LEVEL OF BUILDING SHOWN.
ALL REFERENCED WORK WILL TAKE
PLACE IN LOWER LEVEL.
EXISTING TEL/DATA ROOM ON BUILDING 2ND LEVEL. TO
ACCOMMODATE PHASING, F.O. AND COPPER CABLES MAY
HAVE TO TEMPORARILY BE ROUTED TO THIS LOCATION
BEFORE BEING ROUTED PERMANENTLY TO ROOM 'B3'.
CONTRACTOR SHALL COORDINATE WITH XANTERRA IT
GROUP AS REQUIRED.
E5.1 : E5.1
LOW VOLTAGE ROUGH-IN DETAIL
NOT TO SCALE
PROVIDE FOUR-SQUARE BOX WITH SINGLE-GANG MUD-RING.
LOCATE PER PLANS.
1" EMT DOWN INTO CRAWL SPACE.
BUSH END WITH PROTECTIVE
PLASTIC SLEEVE.
ON 2ND LEVEL WHERE CONDUIT MAY NEED TO OFFSET HORIZONTALLY BEFORE
DROPPING DOWN TO CRAWL SPACE, NON-METALLIC CONDUITS OF PVDF RESIN, EQUAL
TO CARLON PLENUM-GARD MAY BE USED. ALL VERTICAL RISERS SHALL BE EMT.
NOT TO SCALE
TYPICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .