Attachment_2_-_08_Drawings_E1.0_-_E5.3.pdf

PDF 3 MB Posted

Attached to
Mammoth Hotel Seismic Stabilization Phase 1 Federal contract opportunity
Solicitation number
P16PS00611
Issued by
Department of the Interior National Park Service National Office

About this file

Attachment 2 Drawings 08

View the file

Other files for this federal contract opportunity

Other files attached to Mammoth Hotel Seismic Stabilization Phase 1, newest first.
File Type Posted
13744_SSK-12.pdf PDF
P16PS00611_Amendment_5.pdf PDF
AF2.2_-_SECOND_FLOOR_FINISH_PLAN.pdf PDF
ASK_007_thru_011.pdf PDF
060312_SF_-_HISTORIC_WOOD_REPAIR.pdf PDF
230900_Instrumentation_and_Controls.pdf PDF
P16PS00611_Amendment_4.pdf PDF
093013_sf_-_Ceramic_Tiling.pdf PDF
MAMMOTH_SSK_FULL_SET_STRUCT.pdf PDF
060310_-_WOOD_CLEANING.pdf PDF
A0.4_-_COMPLETION_ _ACCESS.PDF PDF
ASK_001_thru_006.pdf PDF
072100_SF_-_THERMAL_INSULATION.pdf PDF
Civil_Revisions_C1.0 _C1.1 _C1.2 _C1.3.pdf PDF
Fire_Alarm_Revision_Sheets_FA1.0 _FA2.1 _FA3.1 _FA3.2 _FA4.0 _FA7.0.pdf PDF
Xanterra_-_Mammoth_Hotel_Limited_Hazardous_Materials_Inspection_Report.pdf PDF
P16PS00611_Amendment_3.pdf PDF
Amendment_2_P16PS00611.pdf PDF
Amendment_1_P16PS00611.pdf PDF
Attachment_1_Specifications_VOL_1.pdf PDF
Attachment_3_Geotechnical_Report.pdf PDF
Attachment_2_-_04_Drawings_FS0.0_-_FS7.1.pdf PDF
Attachment_6_Proposal_Submission_Package.zip ZIP file
Attachment_2_-_05_Drawings_S0.1_-_SD2.1.pdf PDF
Attachment_2_-_10_Drawings_FA1.0_-_FA7.0.pdf PDF
Attachment_5_General_Decision_Number_WY13.docx DOCX document
Attachment_2_-_06_Drawings_SD2.2_-_S5.7.pdf PDF
Attachment_4_Historic_Structures_Report.pdf PDF
P16PS00611_YELL_189105.pdf PDF
Attachment_2_-_02_Drawings_C1.0_-C9.7.pdf PDF
Attachment_2_-_01_Drawings_Cover_Sheet_-A0.5.pdf PDF
Attachment_1_Specifications_VOL_2.pdf PDF
Attachment_2_-_07_Drawings_M1.0_-_P4.0.pdf PDF
Attachment_2_-_09_Drawings_FP1.0_-_FP3.3.pdf PDF
Attachment_2_-_03_Drawings_AD2.0_-_A9.13.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMUNICATION DEVICES

S

V

OS

POWER DEVICES

T

ELECTRICAL LEGEND

AS

THERMOSTAT BY MC, ROUGH-IN BY EC

CEILING MOUNTED SPEAKER

CABLE TV JACK

WALL MOUNTED VOLUME CONTROLLER

DUPLEX RECEPTACLE SUBSCRIPT INDICATES TYPE:

DOUBLE DUPLEX RECEPTACLE, SUBSCRIPT ABOVE INDICATE TYPE

DUPLEX RECEPTACLE IN FLOOR BOX

VARIABLE FREQUENCY DRIVE

PHOTO CELL

CEILING MOUNTED OCCUPANCY SENSOR

FUSED DISCONNECT SWITCH

NON-FUSED DISCONNECT SWITCH

WP WEATHERPROOF

AC ABOVE COUNTER

FILLED CENTER INDICATES GFCI DEVICE

AQUASTAT BY PLUMBING CONTRACTOR, WIRED BY EC.

SPECIAL PURPOSE CONNECTION, BRACKET INDICATES WALL MOUNTING, BOX

INDICATES FLOOR MOUNTING

COMBINATION VOICE/ DATA DEVICE JACKS, BOX INDICATES FLOOR MOUNTING

208V SINGLE PHASE RECEPTACLE, CONFIGURATION NOTED ON PLANS

ELECTRICAL PANEL - SEE PANEL SCHEDULES FOR MOUNTING CONFIGURATION

PP

VFD

NUMBER INDICATES CABLE QUANTITY. IF NO NUMBER SHOWN, PROVIDE DEFAULT

QUANTITY OF THREE.

SINGLE POLE SWITCH

3-WAY SWITCH

PILOT LIGHT SWITCH

DIMMER SWITCH

P

D

SECURITY CAMERAS

ROUGH-IN FOR CAMERAS BY OTHERS. PROVIDE J-BOX IN CEILING OR WALL,

3/4" CONDUIT DOWN INTO CRAWL SPACE, ADD CAT-6 CABLE INTO

ELECTRICAL/TEL DATA B3. CONFIRM ALL LOCATIONS AND ROUGH-IN WIRING

SPECIFICATIONS WITH XANTERRA BEFORE INSTALLATION. CAT-6 TO BE

DIFFERENT COLOR THAN CAT-6 USED FOR TEL/DATA.

CCTV

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:3

A M

15BZ4199.004

06/10/2016

ELECTRICAL LEGENDS AND SCHEDULES

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E1.0

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

DRAWING LIST

E1.0 ELECTRICAL LEGENDS AND SCHEDULES

E1.1 ELECTRICAL PANEL SCHEDULES I

E1.2 ELECTRICAL PANEL SCHEDULES II

ED2.0 BASEMENT ELECTIRCAL DEMOLITION PLAN

ED2.1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

ED2.2 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

E2.0 BASEMENT ELECTRICAL PLAN

E2.1 FIRST FLOOR POWER AND SPECIAL SYSTEMS REMODEL PLAN

E2.2 SECOND FLOOR POWER AND SPECIAL SYSTEMS REMODEL PLAN

E3.1 FIRST FLOOR LIGHTING REMODEL PLAN

E3.2 SECOND FLOOR LIGHTING REMODEL PLAN

E5.0 ELECTRICAL DETAILS I

E5.1 ELECTRICAL DETAILS II

E5.2 ELECTRICAL DETAILS III

E5.3 ELECTRICAL DETAILS IIII

LUMINAIRE SCHEDULE

CALLOU

T MANUFACTURER MODEL MOUNTING LAMP

ELECTRICAL

DATA DESCRIPTION

A1 LITHONIA VOLUMETRIC LED SURFACE RTLX4 40L EZ1 LP835 CEILING 3500 LUMEN LED 120 V/1-29 VA

A2 DAY-BRITE LED STRIP LF 4 EZ 38 30 U LAG CEILING 3800 LUMEN LED 120 V/1-44 VA

A3 KENALL LED RECESSED 2X2 CSEFL22 45L35K DCC 120 AF 2H U CEILING 4300 LUMEN LED 120 V/1-49 VA CLASS 100 ENVIRONMENT LUMINAIRE. RECESS INTO CEILING.

C1 SONNEMAN LIGHTING BAUHAUS REVISITED SCONCE 2492.01 WALL 400 LUMEN LED 120 V/1-10 VA POLISHED CHROME.

C2 REJUVENATION LIGHTING GRAYDON WALL SCONCE A0214 WALL 270 LUMEN LED 1 EA 120 V/1-5 VA POLISHED NICKEL FINISH. PROVIDE GE LED4DA15-W/TP 4.5 WATT 270 LUMEN LED LAMP.

C3 HUDSON VALLEY LIGHTING BLACKWELL DRUM SHADE 9006-PN CEILING 270 LUMEN LED 2 EA 120 V/1-12 VA POLISHED NICKEL FINISH

C4 'E' REJUVENATION LIGHTING ARTHUR FLUSH MOUNT A9422 BO843 CEILING 270 LUMEN LED 3 EA 120 V/1-10 VA POLISHED CHROME FINISH. PROVIDE GE LED4DA15-W/TP 4.5 WATT 270 LUMEN LED LAMPS.

C5 'E' REJUVENATION LIGHTING GLIDE SEMI-FLUSH A2141 B4984 CEILING 270 LUMEN LED 120 V/1-15 VA POLISHED CHROME FINISH. PROVIDE GE LED4DA15-W/TP 4.5 WATT 270 LUMEN LED LAMPS IN ALL LUMINAIRES EXCEPT THE

SIXTEEN (16) LUMINAIRES IN THE 2ND LEVEL CONFERENCE AND BOARD ROOMS, AND ALL LUMINAIRES IN OFFICES 150/155 AND

SKI SHOP/STORAGE 143. FOR THESE LUMINAIRES PROVIDE GE LED11DA19/830 11 WATT 800 LUMEN LED LAMPS.

D1 JUNO LED IC-RATED 4" DOWNLIGHT 1C1LWDG4N-3K-1-14B-WH CEILING 600 LUMEN LED 120 V/1-10 VA PROVIDE 50 FIXTURES WITH 1C1RLWDG4N REMODEL HOUSINGS. THE BALANCE OF THE FIXTURES SHALL HAVE NEW

CONTRUCTION HOUSINGS AS SPECIFIED. REMODEL HOUSINGS TO BE USED WHERE CONSTRUCTION CONDITIONS DO NOT ALLOW

THE USE OF NEW CONSTRUCTION HOUSINGS.

D2 LITHONIA LED WALL WASH DOWNLIGHT EVO WW 30/45 6WR 120 EZ1 CEILING 4500 LUMEN LED 120 V/1-50 VA PROVIDE 1% DIMMABLE DRIVER.

D3 JUNO LED IC-RATED 4" DOWNLIGHT IC1ALEDG4-6-1 440LEDG4-3K-6-WH CEILING 600 LUMEN LED 120 V/1-10 VA ADJUSTABLE DIE-CAST TRIM.

G1 MINKA-LAVERY DARK SKY LED SCONCE 8102 A138 L WALL 450 LUMEN LED 120 V/1-10 VA

G2 ADVENT LED ADA SCONCE AIW8332 L7.2W PT04 120-277V 3000 WALL 849 LUMEN LED 120 V/1-7 VA

H1 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.

H2 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.

H3 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.

H4 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.

H5 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.

H6 EXISTING HISTORICAL LIGHT FIXTURE CEILING 120 V/1-64 VA EXISTING FIXTURE. SEE SCOPE OF WORK BELOW.

T1 JUNO LINE VOLTAGE LED TRACK LIGHT T255LG2 3 N WH TRACK 3000 LUMEN LED 120 V/1-36 VA PROVIDE T18 WHITE RECESSED TRACK, FEED CONNECTORS AND STRAIGHT CONNECTORS.

T2 JUNO LOW VOLTAGE LED RECESSED PUCK LIGHT USTLR1-3K-BL UNDERCOUNTER 285 LUMEN LED 120 V/1-4 VA PROVIDE 60-WATT ELECTRONIC, DIMMABLE TRANSFORMER.

UC1 GE LED UNDERCOUNTER ACCENT TAPE LIGHT 93013521 UNDERCOUNTER 2W/FT LED 120 V/1-5 VA PROVIDE WITH 60-WATT LED DRIVERS, TETRA DIMMING MODULES (WHERE DIMMER IS INDICATED), MOUNTING TRACK, AND ALL

ACCESSORIES FOR A COMPLETE SYSTEM. APPROXIMATELY 850' REQUIRED.

X1 LITHONIA EDGE-LIT EXIT LRP 1 GC 120/277 WALL 120 V/1-5 VA

X2 CHLORIDE COMBO EXIT/EMERGENCY VCLANGW WALL 120 V/1-5 VA

X3 CHLORIDE EMERGENCY VU6L WALL 120 V/1-5 VA

HISTORIC/EXISTING LIGHT FIXTURE SCOPE OF WORK:

FIXTURE H1: EXISTING HISTORIC FIXTURES SHALL BE REMOVED, FULLY RESTORED, AND RELAMPED. SEE SPECIFICATION 265602. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S

CONDITION. THESE FIXTURES ARE BEING RELOCATED AND ARE NOT BEING INSTALLED IN THE SAME LOCATION. REPLACE EXISTING LAMPS WITH G E LED2G25/M/C 2-WATT 95 LUMEN 3000K 80 CRI LED LAMPS. EACH FIXTURE REQUIRES FOUR LAMPS.

FIXTURE H2: EXISTING HISTORIC FIXTURES SHALL BE REMOVED, REWIRED AND RELAMPED. RESTORATION IS NOT REQUIRED. DEMOLISH EXISTING FLUORESCENT LAMPS AND BALLAST. REPLACE LAMPS (FOUR/FIXTURE) WITH NEW 10-WATT 2G11-BASE 120-VOLT 1000-LUMEN LED LAMPS EQUAL TO FUTURE ENERGY

SYSTEMS 10W-2G11-WW-4PS-ETL-FR. THIS WILL REQUIRE REWIRING OF THE LAMP BASES WITHIN EACH LIGHT FIXTURE. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE REUSED SUBJECT TO AN INSPECTION OF ITS CONDITION. THESE

FIXTURES ARE BEING REINSTALLED IN THE SAME LOCATION.

FIXTURE H3: EXISTING HISTORIC FIXTURES SHALL BE REMOVED AND FULLY RESTORED AND RELAMPED. SEE SPECIFICATION 265602. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S

CONDITION. REPLACE EXISTING LAMPS WITH G E LED2G25/M/C 2-WATT 95 LUMEN 3000K 80 CRI LED LAMPS. EACH FIXTURE REQUIRES ONE LAMP. ONE FIXTURE IS BEING RELOCATED.

FIXTURE H4: EXISTING FIXTURES SHALL BE REMOVED AND REINSTALLED. RESTORATION IS NOT REQUIRED. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S CONDITION. THESE

FIXTURES ARE BEING REINSTALLED IN THE SAME LOCATION. RE-USE EXISTING LAMPS.

FIXTURE H5: EXISTING FIXTURE SHALL BE REMOVED AND REINSTALLED. RESTORATION IS NOT REQUIRED. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S CONDITION. THIS FIXTURE

IS BEING REINSTALLED IN THE SAME LOCATION. REPLACE EXISTING LAMPS WITH G E LED2G25/M/C 2-WATT 95 LUMEN 3000K 80 CRI LED LAMPS. SIX LAMPS ARE REQUIRED.

FIXTURE H6: EXISTING FAN/FIXTURE SHALL BE REMOVED AND REINSTALLED. RESTORATION IS NOT REQUIRED. REPLACE EXISTING ROUGH-IN BOX AND ALL RACEWAY AND WIRING. IF EXISTING ROUGH-IN BOX IS NOT A STANDARD BOX, IT MAY BE RE-USED SUBJECT TO AN INSPECTION OF IT'S CONDITION. THIS

FIXTURE IS NOT BEING REINSTALLED IN THE SAME LOCATION. RE-USE EXISTING LAMPS.

• PROVIDE FIXTURES C1, C2, C3, C4, C5, G1 AS SPECIFIED. SUBSTITUTES FOR A1, A2, A3, X1, X2, X3 FROM HUBBELL, COOPER, LITHONIA, LSI, PHILIPS DO NOT REQUIRE PRIOR APPROVAL. D1, D3, G2, T1, T2, UC1 REQUIRE PRIOR APPROVAL.

• FIXTURE D2 REQUIRES PRIOR APPROVAL. SUBMIT LIGHTING CALCS WITH SUBSTITUTION REQUEST. CALCS SHALL BE FOR FIVE LUMINAIRES ON 4' SPACING LOCATED IN 18' CEILINGS. LUMINAIRES SHALL BE 48" FROM WALL. CALCS SHALL SHOW LIGHT DISTRIBUTION ON WALL.

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

06/10/201

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:3

A M

15BZ4199.004

06/10/2016

ELECTRICAL PANEL SCHEDULES I

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E1.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

Notes:

Lighting 7322 VA 100.00% 7322 VA

Power 0 VA 0.00% 0 VA Total Est. Demand: 246 A

Receptacle 150175 VA 53.33% 80088 VA Total Conn.: 440 A

Other 115 VA 100.00% 115 VA Total Est. Demand: 88605 VA

Motor 700 VA 125.00% 875 VA Total Conn. Load: 158517 VA

Lighting - Dwelling Unit 205 VA 100.00% 205 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 506 A 387 A 450 A

Total Load: 59750 VA 46450 VA 52959 VA

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 -- -- -- 3667... 3667... -- -- -- 24

21 -- -- -- 3667... 3667... -- -- -- 22

19 P-1 60 A 3 3667... 3667... 3 60 A P-2 20

17 -- -- -- 6000... 4273... -- -- -- 18

15 -- -- -- 6000... 3493... -- -- -- 16

13 CONDENSING UNIT CU-1 80 A 3 6000... 4753... 3 100 A PANEL 2B 14

11 -- -- -- 7250... 8400... -- -- -- 12

9 -- -- -- 6549... 8400... -- -- -- 10

7 PANEL BA 100 A 3 8478... 8400... 3 100 A ELEVATOR 8

5 -- -- -- 1194... 7757... -- -- -- 6

3 -- -- -- 7309... 7365... -- -- -- 4

1 PANEL 1B 100 A 3 1216... 1262... 3 100 A PANEL 2A 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes:

Enclosure: Type 1

Mounting: Surface Wires: 4 Buss Rating: 600 A

Supply From: Phases: 3 Mains Type: MLO

Location: STOR. 151 Volts: 120/208 Wye A.I.C. Rating: 24,000

Panel: 1A

BREAKERS 14, 15, 16, 17, 19 SHALL BE 5MA GFI.

Notes:

Lighting 2409 VA 100.00% 2409 VA Total Est. Demand: 61 A

Power 0 VA 0.00% 0 VA Total Conn.: 87 A

Receptacle 28960 VA 67.27% 19480 VA Total Est. Demand: 21944 VA

Other 35 VA 100.00% 35 VA Total Conn. Load: 31424 VA

Lighting - Dwelling Unit 20 VA 100.00% 20 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 107 A 61 A 105 A

Total Load: 12160 VA 7309 VA 11946 VA

41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42

39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40

37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38

35 -- -- -- 700 VA 1496... 1 20 A Other 36

33 FC-8 20 A 2 700 VA 959 VA 1 20 A Lighting 34

31 700 VA -- -- -- 32

29 700 VA 2 20 A FC-7 30

27 Receptacle Room 151 20 A 1 360 VA 540 VA 1 20 A Receptacle MAP ROOM 147 28

25 Receptacle STOR. 151 20 A 1 1600... 1600... 1 20 A Receptacle STOR. 151 26

23 -- -- -- 1550... 500 VA -- -- -- 24

21 Coffee Maker Bar 147A 30 A 2 1550... 500 VA 2 30 A Receptacle 22

19 Receptacle BAR 147A 20 A 1 720 VA 4300... -- -- -- 20

17 Receptacle BAR 147A 20 A 1 360 VA 4300... 2 20 A Receptacle BAR 147A 18

15 Receptacle BAR 147A 20 A 1 180 VA 540 VA 1 20 A Receptacle Room 147A 16

13 Receptacle Room 147 20 A 1 720 VA 360 VA 1 20 A Receptacle BAR 147A 14

11 Receptacle 20 A 1 720 VA 720 VA 1 20 A Receptacle MAP ROOM 147 12

9 Fireplace Lobby 134 20 A 1 180 VA 720 VA 1 20 A Receptacle LOBBY 134 10

7 Receptacle Room 148, 134 20 A 1 360 VA 540 VA 1 20 A Receptacle LOBBY 134 8

5 Receptacle Room 135, 148 20 A 1 360 VA 540 VA 1 20 A Receptacle Room 148 6

3 Receptacle MAP ROOM 147 20 A 1 540 VA 540 VA 1 20 A Receptacle Room 155, 135 4

1 Receptacle Room 136, 134 20 A 1 720 VA 540 VA 1 20 A Receptacle MANAGER'S OFFICE 150 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes:

Enclosure: Type 1

Mounting: Surface Wires: 4 Buss Rating: 225 A

Supply From: 1A Phases: 3 Mains Type: MLO

Location: STOR. 151 Volts: 120/208 Wye A.I.C. Rating: 24,000

Panel: 1B

ALL SPACES SHALL HAVE 20/1 BREAKERS.

Notes:

Lighting 2996 VA 100.00% 2996 VA Total Est. Demand: 48 A

Power 0 VA 0.00% 0 VA Total Conn.: 60 A

Receptacle 18480 VA 77.06% 14240 VA Total Est. Demand: 17371 VA

Other 10 VA 100.00% 10 VA Total Conn. Load: 21611 VA

Lighting - Dwelling Unit 125 VA 100.00% 125 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 72 A 55 A 61 A

Total Load: 8519 VA 6556 VA 7256 VA

41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42

39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40

37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38

35 INVERTER 1A, 2 20 A 1 750 VA 0 VA 1 20 A Spare 36

33 Room 140, 139, 150, 155, 145, 135 20 A 1 560 VA 0 VA 1 20 A Spare 34

31 Lighting 20 A 1 469 VA 375 VA 1 20 A Lighting Room 146 32

29 -- -- -- 700 VA 180 VA 1 20 A Receptacle 30

27 FC-9 20 A 2 700 VA 356 VA 1 20 A Room E1, 140 28

25 Receptacle 20 A 1 180 VA 1055... 1 20 A Room 147, 147A, 134, 140 26

23 Room 143, 146 20 A 1 886 VA 180 VA 1 30 A SE-1 24

21 Room 143, 146 20 A 1 540 VA 200 VA -- -- -- 22

19 Receptacle LOBBY 134 20 A 1 720 VA 200 VA 2 20 A FC-10 20

17 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle VESTIBULE 156 18

15 Receptacle Space 6 20 A 1 360 VA 360 VA 1 20 A Receptacle 16

13 Hand Dryer Mens Restroom 139 20 A 1 1500... 1500... 1 20 A Hand Dryer Mens Restroom 139 14

11 Hand Dryer Womens Restroom 140 20 A 1 1500... 900 VA 1 20 A Receptacle Room 3, 4, 14 12

9 Receptacle Space 1 20 A 1 720 VA 1500... 1 20 A Hand Dryer Womens Restroom 140 10

7 Receptacle Space 1 20 A 1 720 VA 720 VA 1 20 A Receptacle Space 1 8

5 Receptacle Space 1 20 A 1 720 VA 720 VA 1 20 A Receptacle Room 1, 14 6

3 Receptacle Space 2 20 A 1 540 VA 720 VA 1 20 A Receptacle Space 1 4

1 Receptacle Space 2 20 A 1 360 VA 720 VA 1 20 A Receptacle Space 2 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes:

Enclosure: Type 1

Mounting: Surface Wires: 4 Buss Rating: 225 A

Supply From: 1A Phases: 3 Mains Type: MLO

Location: ELECTRICAL / TEL DATA B3 Volts: 120/208 Wye A.I.C. Rating: 10,000

Panel: BA

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:3

A M

15BZ4199.004

06/10/2016

ELECTRICAL PANEL SCHEDULES II

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E1.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

Notes:

Total Est. Demand: 27 A

Total Conn.: 27 A

Total Est. Demand: 9650 VA

Spare 4800 VA 100.00% 4800 VA Total Conn. Load: 9650 VA

Receptacle 4850 VA 100.00% 4850 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 15 A 35 A 36 A

Total Load: 1800 VA 3840 VA 4010 VA

29 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 30

27 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 28

25 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 26

23 Spare 0 A 1 0 VA 0 VA 1 20 A Spare 24

21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22

19 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 20

17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18

15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16

13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14

11 -- -- -- 2400... 0 VA 1 20 A Spare 12

9 UPS 30 A 2 2400... 180 VA 1 20 A Receptacle SKI SHOP / STORAGE 143 10

7 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle 8

5 Receptacle OFFICE 155 20 A 1 360 VA 1250... 1 20 A Receptacle 6

3 Receptacle REGISTRATION 135 20 A 1 720 VA 540 VA 1 20 A Receptacle BAR 147A 4

1 Receptacle Space 1 20 A 1 720 VA 360 VA 1 20 A Receptacle MANAGER'S OFFICE 150 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1

Mounting: Surface Wires: 4 Mains Rating:

Supply From: Phases: 3 Mains Type: MLO

Location: ELECTRICAL / TEL DATA B3 Volts: 120/208 Wye A.I.C. Rating: 10,000

Panel: UPS

BREAKRES 1, 14, 16, 19, 23, 25, 26, 27, 28, 30, 32 SHALL BE 5MA GFI.

Notes:

Lighting 1917 VA 100.00% 1917 VA Total Est. Demand: 55 A

Power 0 VA 0.00% 0 VA Total Conn.: 77 A

Receptacle 25715 VA 69.44% 17858 VA Total Est. Demand: 19905 VA

Other 70 VA 100.00% 70 VA Total Conn. Load: 27762 VA

Lighting - Dwelling Unit 60 VA 100.00% 60 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 106 A 61 A 65 A

Total Load: 12626 VA 7366 VA 7764 VA

41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42

39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40

37 Spare 20 A 1 0 VA 265 VA 1 20 A Lighting CONFERENCE ROOM 239 38

35 Spare 20 A 1 0 VA 821 VA 1 20 A Lighting HALLWAY 232 36

33 Spare 20 A 1 0 VA 348 VA 1 20 A Lighting - Dwelling Unit MEN'S RESTROOM 236 34

31 Lighting CONFERENCE ROOM 240 20 A 1 275 VA 1780... 1 20 A Receptacle PANTRY 234 32

29 Lighting TABLE STORAGE 241 20 A 1 332 VA 180 VA 1 20 A Receptacle PANTRY 234 30

27 Receptacle PANTRY 234 20 A 1 1780... 180 VA 1 20 A Receptacle PANTRY 234 28

25 Receptacle PANTRY 234 20 A 1 1600... 900 VA 1 20 A Receptacle Room 232, 234 26

23 Receptacle PANTRY 234 20 A 1 540 VA 150 VA -- -- -- 24

21 Receptacle Room 235, 232 20 A 1 720 VA 150 VA 2 20 A FC-3 22

19 Receptacle PANTRY 234 20 A 1 180 VA 2913... -- -- -- 20

17 -- -- -- 200 VA 2913... 2 40 A 218 18

15 FC-2 20 A 2 200 VA 1000... 1 20 A 225 16

13 -- -- -- 1200... 180 VA 1 20 A 225 14

11 39.1 20 A 2 1200... 333 VA -- -- -- 12

9 -- -- -- 2100... 333 VA -- -- -- 10

7 29.1 30 A 2 2100... 333 VA 3 20 A CU-2 8

5 Receptacle Room 238, 239 20 A 1 720 VA 375 VA -- -- -- 6

3 Hand Dryer Mens Restroom 236 20 A 1 180 VA 375 VA 2 20 A FC-5 4

1 Receptacle Room 237, 236, 232 20 A 1 720 VA 180 VA 1 20 A Hand Dryer Mens Restroom 236 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes:

Enclosure: Type 1

Mounting: Recessed Wires: 4 Buss Rating: 225 A

Supply From: 1A Phases: 3 Mains Type: MLO

Location: PANTRY 234 Volts: 120/208 Wye A.I.C. Rating: 10,000

Panel: 2A

Notes:

Total Est. Demand: 33 A

Total Conn.: 35 A

Power 0 VA 0.00% 0 VA Total Est. Demand: 11785 VA

Receptacle 11820 VA 92.30% 10910 VA Total Conn. Load: 12520 VA

Motor 700 VA 125.00% 875 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 41 A 29 A 37 A

Total Load: 4753 VA 3493 VA 4273 VA

41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42

39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40

37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38

35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36

33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34

31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32

29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30

27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28

25 -- -- -- 1250... 0 VA 1 20 A Spare 26

23 HRV-1 20 A 2 1250... 0 VA 1 20 A Spare 24

21 -- -- -- 300 VA 540 VA 1 20 A Receptacle BOARD ROOM 238 22

19 FC-6 20 A 2 300 VA 360 VA 1 20 A Receptacle BOARD ROOM 238 20

17 Receptacle BOARD ROOM 238 20 A 1 360 VA 333 VA -- -- -- 18

15 Receptacle Room 238, 239 20 A 1 720 VA 333 VA -- -- -- 16

13 Receptacle CONFERENCE ROOM 240 20 A 1 540 VA 333 VA 3 20 A HRV-2 14

11 Receptacle CONFERENCE ROOM 240 20 A 1 360 VA 1260... 1 20 A Receptacle Room 241, 240 12

9 -- -- -- 350 VA 360 VA 1 20 A Receptacle CONFERENCE ROOM 240 10

7 FC-1 20 A 2 350 VA 720 VA 1 20 A Receptacle CONFERENCE ROOM 240 8

5 -- -- -- 350 VA 360 VA 1 20 A Receptacle CONFERENCE ROOM 239 6

3 FC-4 20 A 2 350 VA 540 VA 1 20 A Receptacle Room 239 4

1 Receptacle CONFERENCE ROOM 239 20 A 1 540 VA 360 VA 1 20 A Receptacle CONFERENCE ROOM 239 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes:

Enclosure: Type 1

Mounting: Recessed Wires: 4 Buss Rating: 225 A

Supply From: 1A Phases: 3 Mains Type: MLO

Location: TABLE STORAGE 241 Volts: 120/208 Wye A.I.C. Rating: 10,000

Panel: 2B

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

30A

6 72

D

B

A

3 4 5

C

E

CRAWLSPACE ACCESS

ELEVATOR

MACHINE

ROOM

DN

DOOR TO CRAWLSPACE

ACCESS

SEE SPECIFICATION 26000 E1.1

FOR GENERAL DEMO NOTES.

SEE SPECIFICATION 26000 E1.1

FOR GENERAL DEMO NOTES.

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:5

A M

15BZ4199.004

06/10/2016

BASEMENT ELECTIRCAL DEMOLITION

PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

ED2.0

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"ED2.0

1 BASEMENT ELECTRICAL DEMOLITION PLAN

ELECTRICAL GENERAL DEMOLITION NOTES

1 DEMO DEVICES SHOWN ARE BASED ON LIMITED FIELD INVESTIGATION AND DO NOT NECESSARILY DEPICT

ENTIRE SCOPE OF DEMOLITION. ADDITIONAL DEVICES ARE LIKELY PRESENT BUT COULD NOT BE VERIFIED

DUE TO THE PRESENCE OF CASEWORK, FURNITURE OR OTHER OBSTRUCTIONS. DEMO ALL ELECTRICAL

DEVICES, EQUIPMENT, CONDUIT AND WIRING TO SUPPORT REMODEL EFFORT. DO NOT ABANDON 'IN PLACE'

ANY CONDUIT OR WIRING, INCLUDING LOW VOLTAGE WIRING. FIELD VERIFY ALL AREAS PRIOR TO BIDDING.

2 MAINTAIN ALL HISTORIC FIXTURES FOR RE-USE.

ELECTRICAL KEYNOTES

1 DEMO RECEPTACLE FEEDING ESPRESSO BAR ON MAIN FLOOR.

2 DEMO DISCONNECT FOR ‘SKI HUT’.

3 LOAD CENTER

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

UP

18" X 42"

18" X 30"

21" X 48"

18" X 42"18" X 42"18" X 42"

30A

30A

30A

S

C C

TV

C C

TV

J

J

V

SS S

SS

J

D

B

A

3 4 5

C

E

F

L1B

HAND DRYER

HAND DRYER

HAND DRYER

HAND DRYER

GIFT SHOP

LEM

SKI HUT ON CANOPY

H1

H1

H1

H1H1

H1

H1

H1

H1

H4

H2

H1

L1C

LC1

H2 H2 H2 H2 H2 H2

H2

H2H2H2H2H2

H2

TYP

TYP

H3 H3

H3

H6

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:0

A M

15BZ4199.004

06/10/2016

FIRST FLOOR ELECTRICAL DEMOLITION

PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

ED2.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"ED2.1

1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

ELECTRICAL GENERAL DEMOLITION NOTES

1 DEMO DEVICES SHOWN ARE BASED ON LIMITED FIELD INVESTIGATION AND DO NOT NECESSARILY DEPICT

ENTIRE SCOPE OF DEMOLITION. ADDITIONAL DEVICES ARE LIKELY PRESENT BUT COULD NOT BE VERIFIED

DUE TO THE PRESENCE OF CASEWORK, FURNITURE OR OTHER OBSTRUCTIONS. DEMO ALL ELECTRICAL

DEVICES, EQUIPMENT, CONDUIT AND WIRING TO SUPPORT REMODEL EFFORT. DO NOT ABANDON 'IN PLACE'

ANY CONDUIT OR WIRING, INCLUDING LOW VOLTAGE WIRING. FIELD VERIFY ALL AREAS PRIOR TO BIDDING.

2 MAINTAIN ALL HISTORIC FIXTURES FOR RE-USE.

ELECTRICAL KEYNOTES

1 “H” DESIGNATOR INDICATES HISTORICAL FIXTURE. FIXTURE TO BE RE-USED. SEE REMODEL PLAN FOR NEW LOCATIONS.

TYPICAL.

2 SAVE HAND DRYERS FOR RE-USE.

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

DN

24" X 48"

24" X 48"

X

24" X 72"

24" X 36" 24" X 36"

J

PP PP

PP

PP

PP

PP

6 72

D

B

A

3 4 5

C

E

L2B

LC2

MR UPS

H5

H4

H4

6 7

D

B

A

3 4 5

C

E

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:0

A M

15BZ4199.004

06/10/2016

SECOND FLOOR ELECTRICAL

DEMOLITION PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

ED2.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

ELECTRICAL GENERAL DEMOLITION NOTES

1 DEMO DEVICES SHOWN ARE BASED ON LIMITED FIELD INVESTIGATION AND DO NOT NECESSARILY DEPICT

ENTIRE SCOPE OF DEMOLITION. ADDITIONAL DEVICES ARE LIKELY PRESENT BUT COULD NOT BE VERIFIED

DUE TO THE PRESENCE OF CASEWORK, FURNITURE OR OTHER OBSTRUCTIONS. DEMO ALL ELECTRICAL

DEVICES, EQUIPMENT, CONDUIT AND WIRING TO SUPPORT REMODEL EFFORT. DO NOT ABANDON 'IN PLACE'

ANY CONDUIT OR WIRING, INCLUDING LOW VOLTAGE WIRING. FIELD VERIFY ALL AREAS PRIOR TO BIDDING.

2 MAINTAIN ALL HISTORIC FIXTURES FOR RE-USE.

ELECTRICAL KEYNOTES

1 SEE SPECIFICATION 26000 E1.1 B FOR INFORMATION REGARDING THIS EXISTING TELCOMM ROOM.

: 1/8" = 1'-0"ED2.2

1 SECOND FLOOR ELECTRICAL DEMOLITION PLAN NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

WP

T

6 72

D

B

A

3 4 5

C

E

1X2

A2 A2

A2A2A2A2

A2

A2

A2

A2

X2

X3

A2

X3 A2 X3

A2

X3

A2

X3

A2

A2

A2

A2

X3 A2A2

G2

BA 2

SEE 1/E5.1 FOR ADDITIONAL

REQUIREMENTS IN THIS ROOM

X2

X3

A2 A2

A2A2

P-2

P-1

GF-1

7 FCP ELEV

FC-9

FC-7 FC-8

A2

A2 A2 A2 A2 A2 A2 A2 A2 A2

UPS

INV-1A

FC-10

1A-20,22,24

1A-19,21,23

SE-1

A2

A2

A2 A2

P-3

BA-30

BA-25

BA-28

UPS-6

BA-20,22

UPS-8UPS-7

BA-23

BA-27,29

BA-26

G2

1B-30,32

1B-33,35

1A-8,10,12

BA-24

ELECTRICAL / TEL DATA

MECHANICAL

HALLWAY

STAIR

S1

HALLWAY

ELEV ELEC.

001A

INV-2

#10'S

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

BASEMENT ELECTRICAL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E2.0

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"E2.0

1 BASEMENT ELECTRICAL PLAN

ELECTRICAL KEYNOTES

1 PROVIDE LIGHT AND SWITCH IN ELEVATOR PIT.

2 PROVIDE RECEPTACLE IN ELEVATOR PIT.

3 ELEVATOR POWER CONNECTION – SEE RISER DIAGRAM FOR CIRCUIT AND EQUIPMENT REQUIREMENTS. ALSO PROVIDE

20/1 CIRCUIT AND DISCONNECT FOR ELEVATOR CAB LIGHT/POWER. PROVIDE CAT-6 CABLE TO DATA ROOM FOR

ELEVATOR COMMUNICATIONS. COORDINATE ALL CONNECTION LOCATIONS WITH ELEVATOR INSTALLER.

4 PROVIDE 30/2 NEMA 1 FUSED DISCONNECT. FUSE AT 15 AMPS. PROVIDE GFI RECEPTACLE ON OR NEAR FAN COIL WHERE

SHOWN. CONNECT TO NEAREST 120V CIRCUIT.

5 CONNECT TO VARIABLE FREQUENCY DRIVE PROVIDED BY TEMPERATURE CONTROLS CONTRACTOR.

6 CONNECT TO GLYCOL FEEDER. PROVIDE DISCONNECT IF NOT INCLUDED WITH EQUIPMENT.

7 PROVIDE 120V TO FIRE PANEL. PROVIDE CAT-5E TO OWNER’S TELEPHONE DISTRIBUTION FOR AUTO-DIALER.

8 CONTINUED TO FIRST FLOOR.

9 UNSWITCHED INVERTER CIRCUIT #1A. SEE DETAIL 6/E5.3.

10 LOCATE AT ENTRY TO CRAWL SPACE.

11 MOUNT INV-2 ABOVE OR BELOW INV-1A.

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

UP

18" X 30"

21" X 48"

18" X 42"18" X 42"18" X 42"

A C

A C

WP WP

WP

AC

AC

A C

V

V

V

S

S

S

S

S

WAP

WAP

WAP

S S

SS S

S

S S

S S

S S S

T

T T

T

T

T

T

T

T

A C

WAP

WP WP WP WP

A

WP

CCTV

C C T V

CCTV

C C T V

C C

TV

C C T V

CCTV

C C T V

C C T V

C C T V

CCTV

CCTV CCTV

CCTV

CCTV

C C T V

C C T V

CCTV

CCTV

C C T V

C C T V

CCTV

C C

TV

CCTV

C C

TV

C C

TV

C C T V

GIFT SHOP

SKI SHOP / STORAGE

WOMEN'S RESTROOM

MEN'S RESTROOM

DELIVERY

STAIR

S1

ELEVATOR

E1

REGISTRATION

FRONT OFFICE

MANAGER'S OFFICE

VESTIBULE

LOBBY

BAR

161A

HALLWAY

D

B

A

3 4 5

C

E

F

HDHD

HDHD

2TYP TYP

TYP

TYP

1B

1A

EF-2

EF-1

FS

EF-3

MAIL

1B-8

1B-21,23

1B-14

1B-15

UPS-4

1B-19

1B-16

1B-18,20

1B-17

1B-25 1B-26

1B-27

1B-22,24

1B-13

1B-121B-111B-10

BA-17

BA-16

BA-18

BA-6

BA-19

BA-7

BA-5

BA-8

BA-4

BA-12

UPS-1

BA-11

BA-10

BA-14

BA-13

1B-1

UPS-3

1B-4

UPS-5

1B-2

UPS-2

1B-5

1B-7

1B-6

BA-9

BA-12

BA-15

1B-3

1B-28

1B-9

INV-1B

BA-2

BA-3

BA-1

UPS-10

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

FIRST FLOOR POWER AND SPECIAL

SYSTEMS REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E2.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"E2.1

1 FIRST FLOOR POWER REMODEL PLAN

ELECTRICAL KEYNOTES

7 SEE FOOD SERVICE PLANS FOR EXACT LOCATIONS OF ALL DEVICES IN BAR AREA.

8 DEVICES REQUIRE UNDERSLAB CONDUIT.

9 COORDINATE LOCATION WITH ATM MACHINES.

10 PROVIDE POWER TO WATER BOTTLE FILLING STATION.

11 COFFEE MAKER. PROVIDE TWO PHASES, NEUTRAL AND GROUND. CONCEAL DISCONNECT WHERE SPACE PERMITS.

12 REMOTE BEER SYSTEM.

13 PROVIDE POWER TO FIREPLACE. EXTEND WIRING TO SWITCH IN REGISTRATION 135 FOR ON/OFF CONTROL.

14 CONNECT TO PILOT LIGHT SWITCH. SEE LIGHTING PLAN.

15 LOCATE IN CASEWORK IN THIS AREA.

ELECTRICAL KEYNOTES

1 PROVIDE 36” CAT-6 COILED IN J-BOX, TERMINATED WITH RJ-45 JACK. PROVIDE ROUND, BLANK COVER. WIRELESS

ROUTER PROVIDED/INSTALLED BY OWNER. LOCATE ON CENTERLINE OF ROOM, SYMMETRICAL TO LIGHTS.

2 CONNECT ALL SPEAKERS IN THIS ROOM TOGETHER AS A ZONE USING 16 AWG SPEAKER WIRE (WEST PENN #25225B OR

EQUAL) IN 1/2” EMT. CONNECT TO VOLUME SWITCH IN SPACE. ROUTE HOMERUN TO DATA ROOM IN BASEMENT AND

COIL 25’ FOR TERMINATION BY OWNER. INSTALL SYMMETRICALLY AROUND LIGHTS.

3 INSTALL RECEPTACLE ON SIDE OF CHASE. TYPICAL ALL RECEPTACLES FLANKING WINDOWS ON THIS WALL.

4 PROVIDE VOLUME SWITCH. CONNECT ALL SPEAKERS IN ROOM TO SWITCH FOR VOLUME CONTROL. WHEN ADJACENT

TO LIGHT SWITCHES, INSTALL IN COMMON MULTI-GANG BOX WITH COMMON MULTI-GANG FACEPLATE.

5 REINSTALL EXISTING HAND DRYERS.

6 CONNECT SPEAKER TO LOBBY ZONE.

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

DN

24" X 48"

X

24" X 72"

24" X 36" 24" X 36" AC

AC

ACAC A

C

AC

AC

S

S

S

V

V

S

S

V

V

S S

S

S S

WAP

WAP

WAP

AC

W P

AC AC ACAC

AC

AC

A C

BOARD ROOM

WOMEN'S RESTROOM

MEN'S RESTROOM

HALLWAY

CONFERENCE ROOM

CONFERENCE ROOM

PANTRY

STOR.

STAIR

S1

TABLE STORAGE

6 72

D

B

A

3 4 5

C

E

HD HD

2A

3 3 3

FC-3

CU-1

FC-2

HRV-2

FC-4

FC-6

FC-5

FC-1

HRV-1

6 6

9 10

FS

SCREEN

SCREEN

29.1

2B-14,16,18

2B-22 2B-20

2A-1

2B-15

2B-17

2B-19,21

2A-5

2A-4,6

2B-2

2A-3 2A-2

2A-21

2B-4

2B-6

2B-1 2B-8

2B-10

2B-12

2B-11

2A-15,17

2B-13

2B-7,9

2B-3,5

2B-23,25

CU-2

39.1

1A-13,15,17

2B

2A-7,9

2A-11,13

2A-26

2A-32 2A-27

2A-25

2A-162A-14

2A-23

2A-30

2A-19

2A-28

2A-18,20

2A-8,10,12

2A-22,24

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

SECOND FLOOR POWER AND SPECIAL

SYSTEMS REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E2.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"E2.2

1 SECOND FLOOR POWER REMODEL PLAN

ELECTRICAL KEYNOTES

1 PROVIDE NEW ELECTRIC HAND DRYERS.

2 PROVIDE VOLUME SWITCH. CONNECT ALL SPEAKERS IN ROOM TO SWITCH FOR VOLUME CONTROL. WHEN ADJACENT

TO LIGHT SWITCHES, INSTALL IN COMMON MULTI-GANG BOX WITH COMMON MULTI-GANG FACEPLATE.

3 CONNECT ALL SPEAKERS IN THIS ROOM TOGETHER AS A ZONE USING 16 AWG SPEAKER WIRE (WEST PENN #25225B OR

EQUAL) IN 1/2” EMT. CONNECT TO VOLUME SWITCH IN SPACE. ROUTE HOMERUN TO DATA ROOM IN BASEMENT AND

COIL 25’ FOR TERMINATION BY OWNER. INSTALL SYMMETRICALLY AROUND LIGHTS.

4 CONNECT SPEAKER TO CORRIDOR ZONE.

5 PROVIDE 36” CAT-6 COILED IN J-BOX, TERMINATED WITH RJ-45 JACK. PROVIDE ROUND, BLANK COVER. WIRELESS

ROUTER PROVIDED/INSTALLED BY OWNER. LOCATE ON CENTERLINE OF ROOM, SYMMETRICAL TO LIGHTS.

6 PROVIDE 30/2 NEMA 1 FUSED DISCONNECT. FUSE AT 15-AMPS.

7 DISCONNECT PROVIDED WITH UNIT. PROVIDE RECEPTACLE ON OR NEAR UNIT WHERE INDICATED. CONNECT TO

NEAREST 120V SOURCE.

8 SEE RISER DIAGRAM.

9 REFER TO FOOD SERVICE PLANS FOR SPECIFIC LOCATION OF ALL DEVICES.

10 COFFEE MAKER. PROVIDE TWO PHASES, NEUTRAL AND GROUND.

11 PROVIDE POWER TO MOTORIZED PROJECTION SCREEN. PROVIDE ROUGH-IN AND WIRING FOR CONTROLS.

12 COORDINATE LOCATION OF FLOORBOXES WITH NEW CONFERENCE ROOM TABLE TO BE PROVIDED BY XANTERRA.

BOXES TO BE USED TO FEED POWER INTO TABLE SUPPORTS.

13 PROVIDE POWER TO WATER BOTTLE FILLING STATION.

14 COOLER AND ICE MACHINE REMOTE CONDENSING UNITS. PROVIDE NEMA 3R DISCONNECTS.

15 PROVIDE ONE CAT-6 AND PLATE FOR WALL-HUNG PHONE. INSTALL AT 60”.

16 FOOD WARMER FED FROM CEILING. SEE FOOD SERVICES PLAN.

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

18" X 30"

21" X 48"

18" X 42"18" X 42"18" X 42"

P

F

DD

GIFT SHOP

SKI SHOP / STORAGE

WOMEN'S RESTROOM

MEN'S RESTROOM

DELIVERY

167STAIR

S1

ELEVATOR

E1

REGISTRATION

FRONT OFFICE

MANAGER'S OFFICE

VESTIBULE

LOBBY

BAR

161A

HALLWAY

6 72

D

B

A

3 4 5

C

E

F

C3

D1

D1

D1 D1 D1

C3

D1 D1 D1D1

C3

C3

D1

D1

D1

D1

D1 D1

D1

D1

D1

D1

D1

G1

G2

G1

G2

C1

C1

H2 H2 H2 H2 H2 H2

H2

H2H2H2H2H2H2

H2

H1

H4 C5

A1

A1 A1

C5

X1

X1

X1X1

X1

X1

X1

X1

X1

H3 H3

G1

H1

1B

1A

D1

C3

D1 D1 D1 D1

D1D1

D1 D1 D1

D1

D1 D1 D1

D1

D1

D1

C5

C5 C5

C5 C5

C5 C5 C5 C5

C5

T1

T1

T1

T1

T1

T1

C1

C1

C1

C1 C4

C4

C4

C1

C1

C1

C4

C4

H1

D1

D1

D1

D1

D1

D1

D1

D1 D1

D1 C3

C3

C3

C5

C5

C5

C5

H6

D1 D1 D1

D1

H1

H1

H1

H1

H1

H1

H1

D1 D1 D1 D1

D1 D1 D1

D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1 D1 D1

D1

D3

D3D3D3D3D3D3

D3 D3

D3

D3 D3

D3

D3

D1 D1 D1

D1

D1

D1

D1

D1

D1 D1D1

D1

D1

D2 D2 D2 D2 D2

D1

D1

D1

D1

D1 C2

C2

C2

C2

D1

TYP

D3 D3D3

MAIL

MAP ROOM

HALLWAY

STOR.

3 3

UC1 UC1

UC1 UC1

UC1

UC1

UC1

UC1

UC1

3 3

T2 T2 T2

T2

T2

T2

T2

H3

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

X2

7 8

A2

A2

A2

A2

D1 a b g c d d e e f f d d e e f f f f

G1

G1

1B-36

1B-34

BA-31

A2

D1

D1

BA-33

D1

D1

D1

D1 D1 D1

D1

D1

D1 D1

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:5

A M

15BZ4199.004

06/10/2016

FIRST FLOOR LIGHTING REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E3.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"E3.1

1 FIRST FLOOR LIGHTING REMODEL PLAN

ELECTRICAL KEYNOTES

9 1ST DIMMER CONTROLS TWO LONGER TRACKS, 2ND CONTROL S THREE SHORTER TRACKS.

10 CONNECT ONE SWITCH TO LIGHTS, SPEED SWITCH TO FAN.

11 1ST SWITCH CONTROLS D1, H 6 AND C5 LIGHT IN REGISTRATION 135. 2ND CONTROLS UC1 LIGHTS. 3RD SWITCH

CONTROLS LOBBY “D1” LIGHTS, 4TH SWITCH CONTROLS ALL OTHER LOBBY LIGHTS. FAN SPEED SWITCH CONTROLS FAN

IN “H6” FIXTURE.

12 UNSWITCHED INVERTER CIRCUIT #1B. SEE DETAIL 6/E5.3.

13 SWITCH LOCATION, SEE 18/E5.3. INSTALL ON BAR SIDE OF WALL.

14 SMALL LETTER INDICATES CONTROLLING SWITCH, TYP. SEE 18/E5.3.

15 EXTERIOR LIGHTING CIRCUIT ON INVERTER POWER. SEE DETAIL 6/E5.3.

16 EXTERIOR LIGHTING CIRCUIT. SEE DETAIL 6/E5.3.

ELECTRICAL KEYNOTES

1 COORDINATE INSTALLATION OF RECESSED TRACK WITH DRYWALL WORK.

2 PROVIDE PLYWOOD COVERS OVER TOP OF LIGHT FIXTURES IN ATTIC TO MAINTAIN 4” CLEARANCE FROM INSULATION.

CENTER THESE FIXTURES ON DECORATIVE MAP LOCATED ON WALL.

3 PROVIDE UC1 ACCENT LIGHTING UNDER CABINETS IN THIS AREA. INSTALL NEAR FRONT LIP. CONCEAL DRIVER IN

CASEWORK.

4 PROVIDE UC1 ACCENT LIGHTING UNDER LIP OF BAR, ON BARTENDER’S SIDE. CONCEAL DRIVER IN CASEWORK.

5 INSTALL RECESSED INTO ARCHITECTURAL ELEMENT ABOVE BAR. TYP.

6 IN MAIN ROOM CEILING ABOVE BAR.

7 CONTINUE TO 2ND FLOOR.

8 UNSWITCHED INVERTER CIRCUIT #1A FROM LOWER LEVEL. SEE DETAIL 6/E5.3.

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

X

24" X 72"

24" X 36" 24" X 36"

D

D

D

6 72

D

B

A

3 4 5

C

D1

D1

C5 C5

H5

A2 A2 A2 A2 A2

A1

A1

A1

A1

D1

D1

C1C1C1

D1

C4C1 C1 C1

G2 G2

A1 A1

H4

X1

X1 X1

D1 D1

D1D1 D1

D1

D1

C4

C4 C4

C5

D1

A3

A3 A3

A3 A3

A3

C5 C5 C5 C5

UC1

UC1

UC1

UC1

UC1 UC1

UC1

UC1

UC1

UC1

UC1

UC1

UC1UC1

1 1

D1

D1D1

C5

D1

D1

D1 D1 D1

D1 D1

D1 D1

D1 D1 D1 D1 D1

D1

D1

D1 D1

D1

D1

D1 D1 D1 D1

D1 D1

D1 D1 D1

D1 D1

D1

D1

D1 D1

D1 D1

D1

D1

D1D1

D1 D1

D1 D1 D1

D1

D1

D1

D1

D1 D1 D1 D1

D1D1D1 D1

D1

D1

D1

D1 D1D1D1

D1

D1

D1

D1

D1 D1 D1

D1

D1

C5C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

D1

D1

D1

D1 3

A2

X1

X3

X1

2A-29

6 2A-38

2A-34

2A-31

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:5

A M

15BZ4199.004

06/10/2016

SECOND FLOOR LIGHTING REMODEL

PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

RF

NG

RF

06/10/2016

E3.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"E3.2

1 SECOND FLOOR LIGHTING REMODEL PLAN

ELECTRICAL KEYNOTES

1 PROVIDE UC1 ACCENT LIGHTING UNDER CABINETS IN THIS AREA. INSTALL NEAR FRONT LIP. CONCEAL DRIVER IN

CASEWORK.

2 UC1 ACCENT LIGHTING INSTALLED INTO RECESSED CEILING NICHES. CEILING HAS THREE CASCADING NICHES, THIS PLAN

ONLY SHOWS ONE OF THE THREE. THUS, THE REQUIRED QUANTITY IS THREE TIMES THAT SHOWN ON THIS PLAN. SEE

1/E5.3 FOR MORE INFORMATION.

3 PROVIDE RECEPTACLE AND LIGHT AT TOP OF SHAFT IF REQUIRED BY ELEVATOR MANUFACTURER’S INSTALLATION

GUIDELINES. CONNECT TO NEAREST CIRCUIT.

4 UNSWITCHED INVERTER CIRCUIT #1A CONTINUED FROM FIRST FLOOR. SEE DETAIL 6/E5.3.

5 LOCATE AT ATTIC ACCESS.

6 1ST SWITCH (DIMMER) CONTROLS “UC1”, 2ND SWITCH CONTROLS “D1”, THIRD CONTROLS “C5”.

NORTH

Date

RO

NA

LD D. FAUST

Pr of es sio nal

Engineer (Electrical)

WYOMING

MP

120/208

3Ø, 4W

225A

FIRE RM PNL

120/208

3Ø, 4W

100A

EXISTING

ELEVATOR

70A

ST CB

DISH

WASHER

L1A

120/208

3Ø, 4W

225A

L2A

120/208

3Ø, 4W

225A

L3A

120/208

3Ø, 4W

225A

L4A

120/208

3Ø, 4W

225A

BSMT

120/208

3Ø, 4W

100A

LEM

120/208

3Ø, 4W

100A L1C

120/208

3Ø, 4W

100A

GIFT SHOP

120/208

1Ø, 3W

100A

L2B

120/208

3Ø, 4W

100A

LC2

120/208

1Ø, 3W

100A

L1B

120/208

3Ø, 4W

100ALC1

120/208

1Ø, 3W

100A

MR

120/208

1Ø, 3W

100A

LC3

120/208

1Ø, 3W

100A

LC2

120/208

1Ø, 3W

100A

OUTSIDE INSIDE

NORTHWESTERN

ENERGY

TRANSFORMER

4TH FLOOR

3RD FLOOR

2ND FLOOR

1ST FLOOR

CRAWL SPACE

DEMO PANEL, FEEDER AND BRANCH CIRCUITS

100%. SEE DEMO PLANS FOR LOCATION.

PANEL TO BE DEMOLISHED, FEEDER TO BE

REUSED. SEE PHASING NOTES ON REMODEL

RISER DIAGRAM.

PANEL OR EQUIPMENT TO REMAIN. WILL BE

DEMOLISHED OR REFED UNDER PHASE 2.

CT CAN AND METER BASE TO REMAIN.

TO SKI HUT

WIREWAY

MP

120/208

3Ø, 4W

225A

FIRE RM PNL

120/208

3Ø, 4W

100A

EXISTING

ELEVATOR

70A

ST CB

DISH

WASHER

L1A

120/208

3Ø, 4W

225A

L2A

120/208

3Ø, 4W

225A

L3A

120/208

3Ø, 4W

225A

L4A

120/208

3Ø, 4W

225A

BSMT

120/208

3Ø, 4W

100A

LC3

120/208

1Ø, 3W

100A

LC2

120/208

1Ø, 3W

100A

OUTSIDE INSIDE

NORTHWESTERN

ENERGY

TRANSFORMER

4TH FLOOR

1ST FLOOR

CRAWL SPACE/NEW BASEMENT

PROVIDE NEW 600-AMP NEMA 3R FUSED DISCONNECT.

NEW PANEL OR EQUIPMENT.

PANEL OR EQUIPMENT TO REMAIN. WILL BE DEMOLISHED OR RELOCATED UNDER PHASE 2.

UPS-1. SEE 7/E5.1. PROVIDE #10'S.

PROVIDE NEW PANEL. USE EXISTING FEEDER, MODIFY AS REQUIRED. COORDINATE DEMO

OF EXISTING PANEL AND FEEDER CUTOVER WITH XANTERRA I.T. GROUP. DUE TO

TEL/COMM EQUIPMENT PHASING, IT MAY BE REQUIRED TO HAVE BOTH PANELS (EXISTING

AND NEW) INSTALLED AND POWERED FOR A PERIOD OF TIME.

PROVIDE BUSSMAN POWER MODULE (OR EQUAL) FOR ELEVATOR. MODULE TO BE 100-AMP

WITH CONTROL POWER TRANSFORMER, FIRE SAFETY INTERFACE RELAY, "ON" PILOT LIGHT,

FIRE ALARM VOLTAGE MONITORING RELAY. PROVIDE NEMA 1 ENCLOSURE.

NOTE: BREAKER, FEEDER AND POWER MODULE SIZES ARE FOR BID ONLY. CONFIRM

ELEVATOR POWER REQUIREMENTS FROM ELEVATOR SHOP DRAWINGS AND PROVIDE

BREAKER, FEEDER AND POWER MODULE TO SUIT ELEVATOR EQUIPMENT.

UPS-2: 6 KW/KVA 208V HARDWIRED INPUT, 208V OUTPUT WITH L6-30R RECEPTACLE,

NOMINAL SIZE 17"H X 7"W X 29"D. APC SRT6KXLT, OR EQUAL. LOCATE UPS IN STORAGE

151. PROVIDE SHELF OR STAND TO MAINTAIN ABOVE FLOOR LEVEL. CONNECT UPS TO

PANEL 1B CIRCUIT 18/20. EXTEND POWER FROM UPS TO ESPRESSO MACHINE AT BAR AND

TERMINATE INTO L6-30R RECEPTACLE. SEE E2.1, KEYNOTE 16.

WIREWAY

BA

120/208

3Ø, 4W

225A

E5.0 : E5.0

6 ELECTRICAL RISER DIAGRAM - DEMO

NO SCALE

E5.0 : E5.0

8 ELECTRICAL RISER DIAGRAM - REMODEL

NO SCALE

1A

120/208

3Ø, 4W

600A

2B

120/208

3Ø, 4W

225A

3RD FLOOR

2ND FLOOR

1B

120/208

3Ø, 4W

225A

UPS

120/208

1Ø, 3W

100A

50-AMP 2-POLE CIRCUIT FROM UPS LOCATED

IN I.T. ROOM IN ADJACENT BUILDING

UPS

120/208

1Ø, 3W

100A

FROM UPS LOCATED IN I.T. ROOM IN ADJACENT BUILDING

E5.0 : E5.0

16 PLAN REFERENCE - ELECTRICAL SERVICE EQUIPMENT LOCATION

1/32" = 1'

PROJECT AREA

SEE 35/E5.0 BELOW FOR LOCATION

OF SERVICE EQUIPMENT

EXISTING ELECTRICAL

SERVICE EQUIPMENT

NORTH

NEW

ELEVATOR

E5.0 : E5.0

18 GROUNDING ELECTRODE DETAIL

NOT TO SCALE

4" X 12"

ELECTRICAL/TEL

DATA B3

#4 "UFER" GROUND IN NEW

BUILDING ADDITION FOUNDATION

#2/0 TO BUILDING STEEL

(IF AVAILABLE)

18/E5.0

NEW SERVICE DISCONNECT

(SEE 8/E5.0, ITEM 1)

2/0 IN 1" C.

ROUTE THROUGH

CRAWL SPACE

EXISTING WATER

SERVICE

ROOM

#6 TO TWO GROUND RODS

#2/0 TO EXISTING WATER SERVICE

IN 1/1/2" C. (SEE PLAN AT LEFT)

#4 TO EACH DATA RACK

AT SERVICE LOCATION

IN ELECTRICAL/TEL

DATA B3

UPS-1

SEE 7/E5.1 FOR LOCATION

#2/0 TO NEW FIRE SPRINKLER AND

WATER RISER IN MECHANICAL B4

FROM LIGHTNING PROTECTION SYSTEM

SEE E5.2

PROVIDE TVSS

NOTES:NOTES:

2A

120/208

3Ø, 4W

225A

CU-1

100A

NEMA 3R

FEEDER SCHEDULE:

PANEL 1A: 600-AMP, PARALLEL FOUR #350 MCM, #2/0 GROUND, 3" C.

PANELS BA, 1B, 2A, 2B: 100-AMP, FOUR #3, #8 GROUND, 1-1/4" C.

ELEVATOR: 100-AMP, THREE #3, #8 GROUND, 1-1/4" C.

CU-1: 80-AMP, THREE #4, #8 GROUND, 1" C.

CALCULATED FAULT CURRENT:

600-AMP DISCONNECT: 25,961 AMPS

PANEL 1A: 21,567 AMPS

PANEL BA: 3,767 AMPS

PANEL 1B: 19,393 AMPS

PANEL 2A: 5,418 AMPS

PANEL 2B: 6,729 AMPS

GENERAL ROUTING, FEEDER TO PANEL 1A. ROUTE

THROUGH CRAWL SPACE.

UPS-2

E5.0

NG

RF

RF ELECTRICAL DETAILS I

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

15BZ4199.004

10/13/2015

06/10/2016

TECH. REVIEW:

DATE:

SHEET

167OFPKG3

PKG.

NO.

PKG1

PKG2

DESIGNED:

CADD:

SUB SHEET NO. TITLE OF SHEET

www.aearchitects.com

71865

DRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

C O

N S T

R U

C T

IO

N

D O

C U

M E N

T S

12 N. BROADWAY

BELGRADE, MT 59714

PH: 406-388-3320

FAX: 406-388-3389

2040 HARNISH BLVD.

BILLINGS, MT 59101

PH: 406-245-0136

FAX: 406-245-2084

ACE PROJECT #: 15BZ4199.004

06/10/2016

YELLOWSTONE NATIONAL PARK, WYOMING

E5.1 : E5.1

7 ELECTRICAL/TEL DATA B5 - DETAILS

1/4" = 1' 0"

EQUIPMENT:

PANDUIT TWO-POST RACK #R2P WITH VERTICAL CABLE MANAGERS

ON EACH END, PANDUIT #WMPVHCF45E, OR EQUAL. PROVIDE

FOUR 48-PORT PATCH PANELS, ONE RACKMOUNT FIBER

TERMINATION ENCLOSURE FOR 24-STRAND FIBER. SECURE RACKS

TO CONCRETE FLOOR. BRACE WITH WITH SEISMIC GUSSET KITS

EQUAL TO CHATSWORTH 11592.

UPS: PROVIDE ONE 6 KVA/4.8 KW, RACK-MOUNT UPS, 120/208V

1-Ø INPUT, 120/208V OUTPUT. 4 MINUTE BATTERY LIFE AT 100%

LOAD. 4 EA L6-20R, 4 EA 5-20R OUTPUT RECEPTACLES. HARDWIRED

3W+G INPUT. 16.9"W X 26.1"D X 6.8" H. LIEBERT GXT3 OR EQUAL.

SEE RISER DIAGRAM 8/E5.0 FOR POWER CONNECTION.

PRE-INSTALLATION NOTE:

PRIOR TO INSTALLING ANY EQUIPMENT, SCHEDULE A MEETING WITH MR.

DON CLARK, XANTERRA IT DIRECTOR TO REVIEW LOCATION OF ALL

EQUIPMENT.

GROUND BAR. SEE 18/E5.0

PROVIDE 15" CABLE RUNWAY, PAINTED WELDED

STEEL, EQUAL TO CHATSWORTH 11252. BOLT

TO TOP OF RACKS WITH RACK-TO-RUNWAY

BRACKETS (CHATSWORTH 10595) AND TO

WALLS WITH WALL ANGLE KIT (CHATSWORTH

11420). PROVIDE RADIUS FITTINGS WHERE

REQUIRED. BOND TO GROUND BAR WITH #6.

ELECTRICAL PANELS, SEE POWER PLAN

PROVIDE THREE 4" EMT CONDUIT SLEEVES

THROUGH WALL. BUSH ENDS.

TYPICAL THREE-CONNECTOR WORKSTATION

E5.1 : E5.1

11 TYPICAL WORKSTATION JACKS AND CABLING

DECORA STYLE 4-PORT INSERT.

COLOR: SEE SPECIFICATION 272726 AND E5.3.

RJ-45 CAT-6 COUPLER.

COLOR: SEE SPECIFICATION 272726 AND E5.3.

FACEPLATE. COLOR: SEE SPECIFICATION 272726

AND E5.3.

DECORA STYLE 1-PORT INSERT.

COLOR: SEE SPECIFICATION 272726

AND E5.3.

ALL SCREW SLOTS TO BE LEFT IN VERTICAL

POSITION.

FACEPLATE. COLOR: SEE SPECIFICATION 272726

AND E5.3.

ALL SCREW SLOTS TO BE LEFT IN VERTICAL

POSITION.

SNAP-IN F-TYPE BULKHEAD MODULE.

COLOR: SEE SPECIFICATION 272726

AND E5.3.

TYPICAL TV CONNECTOR

LABEL: BLACK LETTERING ON CLEAR ADHESIVE

INSTALLED PLUMB AND SQUARE

PROVIDE BLANK. (IF FOUR CAT-6 ARE SPECIFIED,

PROVIDE ADDITIONAL CONNECTOR)

3"-5"

LOCATE ADJACENT RECEPTACLES SO THAT NO

MORE THAN 5" SEPARATES FACEPLATES. ALL

DEVICES TO BE PLUMB AND SQUARE WITH TOP OF

FACEPLATES AT SAME ELEVATION. COORDINATE

ADDITIONAL WALL FRAMING WHERE NECESSARY.

SEE SPECIFICATION 262726 FOR ALL

WIRING DEVICE SPECIFICATIONS

E5.1 : E5.1

35 PLAN REFERENCE - TEL/COMM BACKBONE CABLES AND RACEWAYS

1/32" = 1'

APPROXIMATE LOCATION OF INTERBUILDING 24-STRAND F.O. AND 100-PAIR COPPER TELEPHONE

CABLES. CABLES EXTENDED FROM HAYNES ADMINISTRATION BUILDING, BY OTHERS, WITH

SUFFICIENT LENGTHS COILED FOR EXTENSION TO ELECTRICAL/TEL DATA ROOM 'B3'. E.C. TO

EXTEND CABLES TO TEL DATA ROOM AND TERMINATE.

LOCATION OF ELECTRICAL/TEL DATA

ROOM 'B3' IN LOWER LEVEL

APPROXIMATE LOCATION UTILITY TELEPHONE PEDESTAL.

UTILITY TO REMOVE EXISTING SERVICE CABLE LEADING UP

BUILDING EXTERIOR AND INTO 2ND LEVEL COMM ROOM, AND

PROVIDE NEW CABLE INTO LOWER LEVEL ELECTRICAL/TEL DATA

ROOM 'B3'. E.C. TO DEMO ALL RACEWAY ABANDONED BY

UTILITY.

NORTH

PROVIDE THREE RACEWAYS IN LOWER LEVEL CRAWL SPACE TO

PROTECT COMMUNICATION CABLES. PROVIDE 3" EMT

CONDUIT FOR UTILITY CABLE. PROVIDE BENDS, PULL-BOXES

AND SUPPORTS AS REQUIRED. COORDINATE ALL

REQUIREMENTS WITH UTILITY. PROVIDE TWO 2"

NON-METALLIC CONDUITS FOR F.O. AND COPPER CABLES.

CONDUIT TO BE PVDF RESIN, EQUAL TO CARLON

PLENUM-GARD. COLOR SHALL BE ORANGE. PROVIDE CONDUIT

STRAPS OR SUPPORTS AT 36" SPACING.

PROVIDE SLEEVES INTO CRAWL SPACE.

FIRST LEVEL OF BUILDING SHOWN.

ALL REFERENCED WORK WILL TAKE

PLACE IN LOWER LEVEL.

EXISTING TEL/DATA ROOM ON BUILDING 2ND LEVEL. TO

ACCOMMODATE PHASING, F.O. AND COPPER CABLES MAY

HAVE TO TEMPORARILY BE ROUTED TO THIS LOCATION

BEFORE BEING ROUTED PERMANENTLY TO ROOM 'B3'.

CONTRACTOR SHALL COORDINATE WITH XANTERRA IT

GROUP AS REQUIRED.

E5.1 : E5.1

LOW VOLTAGE ROUGH-IN DETAIL

NOT TO SCALE

PROVIDE FOUR-SQUARE BOX WITH SINGLE-GANG MUD-RING.

LOCATE PER PLANS.

1" EMT DOWN INTO CRAWL SPACE.

BUSH END WITH PROTECTIVE

PLASTIC SLEEVE.

ON 2ND LEVEL WHERE CONDUIT MAY NEED TO OFFSET HORIZONTALLY BEFORE

DROPPING DOWN TO CRAWL SPACE, NON-METALLIC CONDUITS OF PVDF RESIN, EQUAL

TO CARLON PLENUM-GARD MAY BE USED. ALL VERTICAL RISERS SHALL BE EMT.

NOT TO SCALE

TYPICAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .