Attachment_2_-_01_Drawings_Cover_Sheet_-A0.5.pdf
PDF 2 MB Posted
- Attached to
- Mammoth Hotel Seismic Stabilization Phase 1 Federal contract opportunity
- Solicitation number
- P16PS00611
About this file
Attachment 2 Drawings 01
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TEAM
OWNER
NATIONAL PARK SERVICE
YELLOWSTONE NATIONAL PARK
MAMMOTH,WYOMING 82190
307.344.2429
CIVIL ENGINEER
DJ&A, P.C.
3203 S. RUSSELL ST.
MISSOULA, MONTAN 59801
406.721.4320
ARCHITECT
A&E ARCHITECTS, P.C.
222 NORTH HIGGINS
MISSOULA, MONTANA 59802
406.721.5643
STRUCTURAL ENGINEER
BEAUDETTE CONSULTING ENGINEERS
131 WEST MAIN STREET
MISSOULA, MONTANA 59802
406.721.7315
M/P/E ENGINEER
ASSOCIATED CONSTRUCTION
ENGINEERING
12 NORTH BROADWAY
BELGRADE, MONTANA 59714
406.388.3320
DRAWING INDEX
COVER COVER
A0.1 GENERAL NOTES
A0.2 SITE & AREA PLAN
A0.3 STAGING & SEQUENCING SITE PLAN
A0.4 COMPLETION & ACCESS
A0.5 CODE REVIEW
MECHANICAL
M1.0 MECHANICAL LEGENDS AND SCHEDULES
M1.1 MECHANICAL SCHEDULES II
MD3.1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN
MD3.2 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN
M2.0 BASEMENT HVAC REMODEL PLAN
M2.1 FIRST FLOOR HVAC REMODEL PLAN
M2.2 SECOND FLOOR HVAC REMODEL PLAN
M3.0 BASEMENT MECHANICAL PIPING REMODEL PLAN
M3.1 FIRST FLOOR MECHANICAL PIPING REMODEL PLAN
M3.2 SECOND FLOOR MECHANICAL PIPING REMODEL PLAN
M4.0 MECHANICAL DETAILS I
PLUMBING
P1.0 PLUMBING LEGENDS AND SCHEDULES
PD2.0 BASEMENT DOMESTIC WASTE AND VENT DEMOLITION PLAN
PD2.1 FIRST FLOOR DOMESTIC WASTE AND VENT DEMOLITION PLAN
PD2.2 SECOND FLOOR DOMESTIC WASTE AND VENT DEMOLITION PLAN
PD3.0 BASEMENT DOMESTIC WATER DEMOLITION PLAN
PD3.1 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN
PD3.2 SECOND FLOOR DOMESTIC WATER DEMOLITION PLAN
P2.0 BASEMENT DOMESTIC WASTE AND VENT REMODEL PLAN
P2.1 FIRST FLOOR DOMESTIC WASTE AND VENT REMODEL PLAN
P2.2 SECOND FLOOR DOMESTIC WASTE AND VENT REMODEL PLAN
P3.0 BASEMENT DOMESTIC WATER REMODEL PLAN
P3.1 FIRST FLOOR DOMESTIC WATER REMODEL PLAN
P3.2 SECOND FLOOR DOMESTIC WATER REMODEL PLAN
P4.0 PLUMBING DETAILS
ELECTRICAL
E1.0 ELECT. LEGENDS AND SCHEDULES
E1.1 ELECT. PANEL SCHEDULES
E1.2 ELECT. PANEL SCHEDULES
ED2.0 BASEMENT ELECT. DEMO
ED2.1 FIRST FLOOR ELECT. DEMO
ED2.2 SECOND FLOOR ELECT. DEMO
E2.0 BASEMENT ELECTRICAL PLAN
E2.1 FIRST FLOOR POWER & SPECIAL SYSTEMS
E2.2 SECOND FLOOR POWER & SPECIAL SYSTEMS
E3.1 FIRST FLOOR LIGHTING PLAN
E3.2 SECOND FLOOR LIGHTING PLAN
E5.0 ELECTRICAL DETAILS
E5.1 ELECTRICAL DETAILS
E5.2 ELECTRICAL DETAILS
E5.3 ELECTRICAL DETAILS
STRUCTURAL
S0.1 GENERAL NOTES
SD1.1 (E) FOUNDATION PLAN
SD2.1 (E) 1ST FLOOR FRAMING PLAN
SD2.2 (E) 2ND FLOOR FRAMING PLAN
SD2.3 (E) CEILING FRAMING PLAN
SD2.4 (E) ROOF FRAMING PLAN
S1.1 FOUNDATION PLAN—(N) WORK
S2.1 FIRST FLOOR FRAMING PLAN –(N) WORK
S2.2 2ND FLOOR FRAMING PLAN -- (N) WORK
S2.3 ROOF FRAMING PLAN – (N) WORK
S3.1 1ST FLOOR SHEAR WALL PLAN
S3.2 2ND FLOOR SHEARWALL PLAN
S4.1 STAIR FRAMING
S4.2 MOMENT FRAME CONNECTIONS
S5.1 DETAILS
S5.2 DETAILS
S5.3 DETAILS
S5.4 DETAILS
S5.5 DETAILS
S5.6 DETAILS
S5.7 DETAILS
FOOD SERVICE
FS0.0 FOOD SERVICE COVER
FS0.1 FOOD SERVICE GENERAL NOTES
FS1.0 FLOOR PLAN - BAR
FS1.1 FLOOR PLAN - PANTRY
FS3.0 ELECTRICAL PLAN - BAR
FS3.1 ELECTRICAL PLAN - PANTRY
FS4.0 PLUMBING PLAN - BAR
FS4.1 PLUMBING PLAN - PANTRY
FS5.0 DETAILS
FS6.0 BUILDING WORKS PLAN - BAR
FS6.1 BUILDING WORKS PLAN - PANTRY
FS7.0 WALK-IN DETAILS
FS7.1 WALK-IN DETAILS
FIRE PROTECTION
FP1.0 FIRE SPRINKLER GENERAL NOTES
FP2.0 DEMO CRAWLSPACE SPRINKLER PLAN
FP2.1 DEMO FIRST FLOOR SPRINKLER PLAN
FP2.2 DEMO SECOND FLOOR SPRINKLER PLAN
FP2.3 DEMO ATTIC LEVEL SPRINKLER PLAN
FP3.0 CRAWLSPACE SPRINKLER PLAN
FP3.1 FIRST FLOOR SPRINKLER PLAN
FP3.2 SECOND FLOOR SPRINKLER PLAN
FP3.3 ATTIC LEVEL SPRINKLER PLAN
FIRE PROTECTION
FA1.0 GENERAL NOTES & LEGENDS
FA2.0 FIRST FLOOR DEMO PLAN
FA2.1 SECOND FLOOR DEMO PLAN
FA3.0 BASEMENT PLAN
FA3.1 FIRST FLOOR PLAN
FA3.2 FIST FLOOR CONCEALED SPACE PLAN
FA3.3 SECOND FLOOR PLAN
FA3.4 ATTIC SPACE PLAN
FA4.0 DEVICE WIRING DETAILS
FA5.0 RISER DIAGRAM
FA7.0 CALCULATIONS
CIVIL
C1.0 CONTROL POINT COORDINATES
C1.1 SITE PHASING PLAN
C1.2 SITE DEMOLITION PLAN
C1.3 CIVIL SITE PLAN
C1.4 GRADING PLAN
C1.5 GRADING PLAN DETAIL
C1.6 GRADING POINTS
C1.7 ENTRANCE SECTION DETAIL
C1.8 PARKING AND SITE LAYOUT PLAN
C9.1 WATER PLAN AND PROFILE
C9.2 WATER DETAILS
C9.3 SEWER PLAN AND PROFILE
C9.4 SEWER DETAILS
C9.5 MISCELLANEOUS DETAILS
C9.6 STREET DETAILS
C9.7 STREET DETAILS
ARCHITECTURAL
AD2.0 BASEMENT DEMOLITION PLAN
AD2.1 FIRST FLOOR DEMOLITION PLAN
AD2.2 SECOND FLOOR DEMOLITION PLAN
AD2.7 ROOF DEMOLITION PLAN
AD7.0 BASEMENT DEMOLITION RCP
AD7.1 FIRST FLOOR DEMOLITION RCP
AD7.2 SECOND FLOOR DEMOLITION RCP
A2.0 BASEMENT FLOOR PLAN
A2.1 FIRST FLOOR PLAN
A2.2 SECOND FLOOR PLAN
A2.7 ROOF PLAN
AF2.0 BASEMENT FINISH PLAN
AF2.1 FIRST FLOOR FINISH PLAN
AF2.2 SECOND FLOOR FINISH PLAN
A3.1 ENLARGED FLOOR PLANS
A3.2 ENLARGED FLOOR PLANS
A4.1 EXTERIOR ELEVATIONS
A4.2 EXTERIOR ELEVATIONS
A5.1 BUILDING SECTIONS
A5.2 WALL SECTIONS
A5.3 WALL SECTIONS
A6.1 INTERIOR ELEVATIONS
A6.2 INTERIOR ELEVATIONS
A6.3 INTERIOR ELEVATIONS
A6.4 INTERIOR ELEVATIONS
A6.5 INTERIOR ELEVATIONS
A6.6 INTERIOR ELEVATIONS
A6.7 BAR INTERIOR ELEVATIONS
A6.8 CASEWORK TYPES & SCHEDULE
A6.9 CASEWORK DETAILS
A6.10 CASEWORK DETAILS
A6.11 TRIM PROFILES & CONSTRUCTION
A7.0 BASEMENT RCP
A7.1 FIRST FLOOR RCP
A7.2 SECOND FLOOR RCP
A8.1 EGRESS STAIR PLANS & ELEVATIONS
A8.2 ELEVATOR PLANS & SECTIONS.
A8.3 STAIR & RAILING DETAILS
A9.1 ROOM FINISH SCHED. & SIGNAGE
A9.2 DOOR SCHEDULE AND TYPES
A9.3 WINDOW SCHEDULE & TYPES
A9.4 DOOR DETAILS
A9.5 WINDOW DETAILS
A9.6 WALL TYPES & DETAILS
A9.7 PLAN DETAILS
A9.8 ROOF TYPES & DETAILS
A9.9 ROOF DETIALS
A9.10 CEILING DETAILS
A9.11 FINISH DETAILS
A9.12 RESTROOM DETAILS
A9.13 BAR DETAILS
THE CONTRACTOR SHALL PROTECT HISTORIC FABRIC DURING THE CONSTRUCTION, TYPICAL OF THIS BUILDING, AND THE SITE.
THE HOTEL AND GROUNDS ARE RECOGNIZED AS A SITE ON THE NATIONAL REGISTER OF HISTORIC PLACES. THE GROUNDS AND STRUCTURES WITHIN THE SITE NOT SPECIFICALLY CALLED OUT FOR WORK IN THESE DOCUMENTS SHALL BE PROTECTED FROM DAMAGE. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE CAUSED BY THE EXECUTION OF THIS CONTRACT, TO THE SATISFACTION OF THE ARCHITECT AND OWNER. EACH EMPLOYEE OF THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL BE INFORMED OF THE HISTORIC NATURE OF THE BUILDING AND MADE RESPONSIBLE FOR THE PROTECTION OF BUILDING ARTIFACTS, FOUND OBJECTS, AND OTHER "COLLECTABLE" ITEMS UNCOVERED DURING THE WORK. THESE ITEMS ARE THE PROPERTY OF THE OWNER, AND AS SUCH, ARE VALUABLE. NO SUCH PROPERTY SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR, CONTRACTOR'S EMPLOYEES OR SUBCONTRACTORS. IF ANY CULTURAL MATERIALS ARE DISCOVERED DURING CONSTRUCTION, WORK IN THE AREA SHALL HALT IMMEDIATELY. THE NPS MUST BE CONTACTED AND THE MATERIALS EVALUATED BY AN ARCHAEOLOGIST OR HISTORIAN MEETING THE SECRETARY OF INTERIOR'S PROFESSIONAL QUALIFICATION STANDARDS (48
FR 22716, SEPT. 1983).
HISTORICAL NOTE
1. "IN-KIND" - NEW MATERIALS INDICATED TO MATCH IN-KIND SHALL REPLICATE EXACTLY, IN EVERY REGARD, THE ORIGINAL
DETAIL, MATERIAL, TYPE, & FINISH OF ELEMENT TO BE REPLACED AS DETERMINED BY THE ARCHITECT.
2. TYPICAL (TYP.) AS USED IN THESE DOCUMENTS SHALL MEAN THE CONDITION IS THE SAME OR REPRESENTATIVE FOR ALL
SIMILAR CONDITIONS UNLESS OTHERWISE NOTED.
3. ALIGN: SHALL MEAN TO ACCURATELY LOCATE FINISHED FACES IN THE SAME PLANE. CONTRACTOR SHALL COORDINATE ALL
WORK NECESSARY TO ACHIEVE SAME.
DEFINITIONS
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS THROUGH EXISTING AS-BUILT DATA AND FIELD VERIFICATION. CONTRACTOR RESPONSIBLE TO VERIFY EXISTING CONDITIONS BEFORE CONSTRUCTION / ORDERING / INSTALLATION & NOTIFY ARCHITECT IMMEDIATELY IF ANY DISCREPANCY EXISTS FOR WRITTEN CLARIFICATION.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. CONTRACTOR IS EXPECTED TO USE
QUALITY, ACCEPTABLE STANDARD CONSTRUCTION PRACTICES & TECHNIQUES.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE 2009 INTERNATIONAL BUILDING CODE, N.F.P.A. 101, ALL APPLICABLE PLUMBING CODES, ALL APPLICABLE MECHANICAL CODES, ALL
APPLICABLE ELECTRICAL CODES, AND THE AMERICANS WITH DISABILITIES ACT.
4. MECHANICAL / PLUMBING / ELECTRICAL MODIFICATIONS SHALL BE DESIGNED AND INSTALLED BY CONTRACTOR TO BE CONSISTENT WITH THE INTENT OF THE DRAWINGS AND SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES.
5. CONTRACTOR RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS INFORMATION / DRAWINGS AT THE CONCLUSION
OF THE PROJECT FOR SUBMITTAL TO THE ARCHITECT AND OWNER.
6. LAKE HOTEL IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES. ALL CARE SHALL BE TAKEN TO PROTECT THE BUILDING, GROUNDS, AND HISTORIC FEATURES FROM DAMAGE. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION AS NECESSARY TO PROTECT ELEMENTS DURING THE COURSE OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE CAUSED BY THE EXECUTION OF THE WORK IN A MANNER AND TO A LEVEL SATISFACTORY TO THE OWNER
AT NO ADDITIONAL EXPENSE.
7. DO NOT SCALE FROM DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE ARCHITECT FOR WRITTEN
CLARIFICATION BEFORE PROCEEDING WITH WORK.
8. CONTRACTOR(S) SHALL GUARANTEE THEIR WORK FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. CONTRACTOR(S) SHALL PROVIDE REPLACEMENT ELEMENTS AND LABOR AT NO ADDITIONAL EXPENSE
TO THE OWNER.
9. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS & LABOR ASSOCIATED WITH COMPLETING THE WORK OUTLINED OR AS
NECESSARY TO ACHIEVE DESIGN INTENT.
10. CONTRACTOR TO REFER TO AND COORDINATE ALL ASPECTS OF THE WORK BETWEEN ALL CONTRACTORS, SUB- CONTRACTORS, SUPPLIERS, AND TRADES WITH DRAWINGS IN THESE DOCUMENTS. IF VARIATION OR FOR ADDITIONAL
CONSTRUCTION NOTES.
GENERAL PROJECT NOTES
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:3
A M
15021.00 6.10.2016
COVER
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
MM
DJ
6.10.2016
COVER
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE I
1 GRAND LOOP ROAD YELLOWSTONE NATIONAL PARK, WY 82190
PARK
NATIONAL
YELLOWSTONE
NATIONAL PARK
GRAND TETON
MEMORIAL PARKWAY
J.D. ROCKEFELLER JR.
310212
IDAHO
MONTANA
JACKSON
WYOMING
MONTANA
W
YO
M
IN
G
ID
AH
O
RIGBY
REXBURG
ST. ANTHONY
CODY
POWELL
HAYNES
ADMINISTRATION
BUILDING SEE A1.1
V.C.
V.C.
V.C.
V.C.
V.C.
HOTEL
LAKE
OFFICE
SUPERINTENDENT'S
FREMONT CO.
GALLATIN CO.
GATE
SILVER
LAKE
GRIZZLY R
IVE
R
YE LLO
W
S
TO
NE
, MONTANA
MONTANA
RED LODGE,
TO
WYOMING
TO CODY,
TO GRAND TETON NATIONAL PARK
LAKE
MARY
LAKE
ICE
LAKE
CASCADE
LAKE
GREBE
CREEK
INDIAN
TO LIVINGSTON
BOZEMAN
TO
ASHTON
TO
LAKE
HEBGEN
LAKE
WHITE
WAPITI LAKE
CREEK
PEBBLE
CREEK
SLOUGH
FALL
TOWER
BECHLER
GALLATIN NATIONAL FOREST
FOREST
NATIONAL
SHOSHONE
FORESTNATIONALTETON
FOREST
NATIONAL
TARGHEE
FOREST
NATIONAL
GALLATIN
MT. SHERIDAN
MT. HOLMES
RIVER
BE
CH
LE
R
RIVER
SNAKE
LAKE
IDAHO
MONTANA
CITY
COOKE
HOT SPRINGS
MAMMOTHWYOMING
MONTANA
GALLATIN
RIVER
ENTRANCE
NORTH
ROOSEVELT
TOWER-
RIVER
LAMAR
CONE
PELICAN
M O
N
TA
N A
W
YO
M
IN
G W
YO
M
IN
G
ID
AH
O
ENTRANCE
WEST
ENTRANCE
SOUTH
ENTRANCE
NORTH EAST
ENTRANCE
EAST
GARDINER
CANYON
NORRIS
MADISON
YELLOWSTONE
WEST
TETON COUNTY
PARK COUNTY
BRIDGE
FISHING
BAY
BRIDGE
FAITHFUL
OLD
THUMB
WEST
VILLAGE
GRANT
C O
U
N TY
C O
U
N TY
TETO
N
PARK
CONTINENTAL DIVIDE
DIVIDE
CONTINENTAL
LAKE
DELUSION
LAKE
SHOSHONE
LAKE
LEWIS
LAKE
HEART
YELLOWSTONE
ARCHITECTURAL ABBREVIATIONS
VG Vertical Grain VIF Verify In the Field VP Veneer Plaster, Vent Pipe VR Vapor Retarder VT Vinyl Tile VTR Vent Through Roof VWC Vinyl Wall Covering W West, Width, Wide, Water W/ With W/O Without WB Wood Base WC Watercloset WD Wood WDW Window WG Wired Glass, Wall Guard WIN Window WM Wire Mesh, Water Meter WND Window WP Waterproof, Weatherproof WR Water Resistant, Waste Receptacle WT Weight, Water Table, Watertight WWF Welded Wire Fabric YD Yard YR Year
@ At (the rate of) & And " Inch ' Foot # Number or Pound A Area, Ampere, Acre, AB Anchor Bolt, Asbestos Board ABV Above AC Air Conditioning, AC Acoustical ACC Access ACI American Concrete Institute ACOUST Acoustical ACT Acoustical Tile, Actual AD Access Door, Area Drain ADA Americans with Disabilities Act ADDL Additional ADJ Adjust, Adjustable, Adjacent AFF Above Finished Floor AGGR Aggregate ALUM Aluminum AMT Amount ANOD Anodized ANT Antenna AP Access Panel APPROX Approximate ARCH Architect, Architectural AS Acoustic Sealant AT Acoustical Tile ATC Acoustical Tile Ceiling ATM Automatic Teller Machine AUTO Automatic AVG Average AWG American Wire Gauge AWN Awning AX Axis B/B Back to Back B/ Bottom (of) BALBalance, Ballast BB Ball Bearing BBLBarrel BD Board BDRM Bedroom BELBelow BETW Between BEV Bevel BHP Brake Horsepower BHD Bulkhead BIT Bituminous BKR Breaker BL Base Line, Block BLDG Building BLKBlock BLKG Blocking BLT-IN Built-In BM Beam, Bench Mark BN Bullnose BO Blow Off, Bottom of (_) BOT Bottom BPLBearing Plate BR Bedroom, Brick, Brass BRDG Bridge, Bridging BS Both Sides, Backset, Bluestone BSMT Basement BTM Bottom BTR Better BTU British Thermal Units BTUH British Thermal Units per Hour BVLBevelled BW Both Ways BYP By Pass C/C Center to Center CAB Cabinet
CAV Cavity CB Catch Basin CBL Concrete Block CC Cubic Centimeter CCT Circuit CCW Counter Clockwise CCTV Closed Circuit TV CEM Cement CER Ceramic CF Cubic Feet CFLCounterflashing CFM Cubic Feet per Minute CFS Cubic Feet per Second CFTCubic Foot CG Corner Guard CHAM Chamfer CHAN Channel CI Cast Iron CIP Cast-in-Place CIR Circle, Circular CJ Control Joint CL Centerline, Clearance CLG Ceiling CLR Clear CLR OPG Clear Opening CLS Closure CM Circular Mil (1/1000 inch), Center Matched CMU Concrete Masonry Unit CNTR Center, Counter CO Contracting Officer, Company, Cleanout,Cased Opening COL Column CON Construction CONC Concrete CONT Continuous, Continue, Control CPL Cement Plaster CPR Copper CPT Carpet CR Chromium (plated), Curtain Rod CRPT Carpet CSK Countersink CSMT Casement CSTG Casting CT Ceramic Tile, Cork Tile CTR Center, Counter CU Copper, Cubic CU FT Cubic Feet CU YD Cubic Yard CW Clockwise, Cold Water CY Cubic Yard, Cycle CYL Cylinder D Deep, Depth, Drop, Drain D & M Dressed & Matched DA Double Acting DB Decibel DBL Double DC Direct Current DEG Degree DEGF Degree Farenheit DEM Demolish DEMO Demolition, Demolish DEPT Department DET Detail DF Drinking Fountain DH Double Hung DIAG Diagonal DIA Diameter DIMDimension DISP Dispenser DIV DivisionDN Down DO Ditto, or Door Opening DP Dampproofing, Dew Point DR Door, Drain, Dining Room DS Downspout, Disconnect Switch
DSP Dry Standpipe DT Drain Tile DTLDetail DVTL Dovetail DW Dumbwaiter, Distilled Water DWG Drawing(s) DWL Dowel
(E) Existing E TO E End to End EA Each EB Expansion Bolt EC Exposed Construction EG Edge Grain EIFS Exterior Insulation and Finish System EJ Expansion Joint EJECT Ejector EL Elevation, Elevator ELEC Electrical ELEV Elevator, Elevation EM Emergency ENCL Enclosure ENG Engineer ENT Entrance EPDM Ethylene Propylene Diene Monomer EQ Equal EQP Equipment EST Estimate EW Each Way EWH Electric Water Heater EX Exposed Construction, Exit EXC Excavate EXG Existing EXH Exhaust EXIST Existing EXP Expansion, Exposed EXT Exterior, Extinguish F Degrees Fahrenheit, Fuse FAB Fabricate FBD Fiberboard FC File Cabinet, Foot Candle FD Floor drain FDC Fire Department Connection FDN Foundation FE Fire Extinguisher FEC Fire Extinguisher Cabinet FF Finished Floor, Factory Finish FFE Finished Floor Elevation FGL Fiberglass FH Flat Head, Fire Hose FHY Fire Hydrant FIL Fillet FIN Finish, Finished FIX Fixture FIXT Fixture FL Floor FLRFloor FND Foundation FO Finished Opening FOB Free On Board FR Frame, Front, Fire Riser FOC Face of Concrete FOF Face of Finish FOS Face of Studs FP Fireproof FPL Fireplace FPM Feet per minute FPS Feet per Second FRM Frame FRP Fiberglass Reinforced Panel FS Floor Sink FSCW Flush Solid Core Wood FT Foot, Feet FTG Footing, Fitting
FUR Furred, Furring FURN Furnish, Furniture GA Gauge, Gage GAL Gallon GALV Galvanized GB Grab Bar, Gypsum Board GFCI Ground Fault Circuit Interrupter GFI Ground Fault Interrupter GL Glass GND Ground GOVT Government GPL Gypsum Lath GPM Gallons Per Minute GPS Gallons Per Second GR Grade, Grille, Granite GRND Ground GV Galvanized GYP Gypsum GYP BD Gypsum Board HB Hose Bib HBD Hardboard HC Hollow Core HDR Header HDW Hardware HEX Hexagonal HGR Hanger HGT Height HID High Intensity Discharge HM Hollow Metal HORIZ Horizontal HP High Pressure, Horse Power HR Hour(s) HT Height, Heat HV High Voltage HVAC Heating, Ventilating & Air Conditioning HWH Hot Water Heater HWS Hot Water Supply HWY Highway HZ Hertz (Cycles Per Second) ID Inside Diameter IN Inch INC Incandescent INCL Incline, Include INCR Increase INFO Information INSUL Insulation INT Interior, Internal INV Invert J Joist J-BOX Junction Box JANJanitor JCT Junction JST Joist JT Joint KG Kilogram KIP Kilopound (1000 pounds) KIT Kitchen KM Kilometer KP Kickplate KS Kitchen Sink L Angle, Left, Length, Long LABLaboratory, Labor LADLadder LAM Laminate, Laminated LAT Lateral LAVLavatory LB Pound (weight), Lag Bolt LF Linear Feat LINO Linoleum LN Length LNDG Landing LOC Locate, Locations LT Light
LTG Lighting LTL Lintel LT WT Lightweight LV Low Voltage LVR Louver MAINT Maintenance MAT Material MATL Material MAX Maximum MECH Mechanical MEZZ Mezzanine MFG Manufacturer, Manufacturing MFR Manufacturer MH Manhole MIN Minimum MISC Miscellaneous MLD Molding MLDG Molding MM Millimeter MO Masonry Opening MTD Mounted MTL Metal, Material MULL Mullion N North NAT Natural NB "Nota Bene" Latin phrase for "Take Special Note" NIC Not In Contract NO Number, Normally Open NOM Nominal NTS Not To Scale O/O Out to Out OC On Center OD Outside Diameter OH Overhead OPNG Opening OPP Opposite OZ Ounce P-LAM Plastic Laminate PC Pre-Cast PED Pedestal, Pedestrian PERIM Perimeter PERP Perpendicular PL Plate, Plan, Property LinePlastic Laminate, Plastic PLAM Plastic Laminate PLYWD Plywood PNL Panel PNT Paint POL Polish, Polished PR Pair PRC Precast PRCST Precast PREFAB Prefabricated PSF Pounds per square foot PSI Pounds per square inch PT Paint, Point, Pressure Treated PV PavingPVC Polyvinyl Chloride PVG Paving PVMT Pavement PVT Private PWR Power QUAL Quality QUANT Quantity QTR Quarter QTY Quantity R Riser, Radius, Resistance RA Return Air, Registered Architect RAD Radius, Radiator RB Rubber, Rubber Base, Resilient Base RCP Reflected Ceiling Plan RD Roof Drain, Round REBAR Reinforcing Bar REF Refer, Reference, Refrigerator REG Register, Regular
REINF Reinforcement, or Reinforce REM Remove, Removable REQD Required RES Resilient REV Reverse, Revise, Revision RF Roof RH Right Hand, Reheat, Relative Humidity RM Room RMV Remove RO Rough Opening ROW Right of Way RPM Revolutions Per Minute RPT Repeat (like "Ditto") RT Rubber Tile, Right S South, Sealant, Supply, Sink S4SSurfaced 4 Sides S&M Surfaced & Matched S&SStained & Sealed SALV Salvage SC Solid Core, Sill Cock SCHED Schedule SCWD Solid Core Wood SEC Second, Section, Secondary SECT Section SF Square Foot SHT Sheet SIM Similar SNT Sealant SOD Slab on Deck SOG Slab on Grade SPEC Specification, Specifications SPECS Specifications SQ Square SS Stainless Steel, Set Screw ST Straight, Stone Tile STC Sound Transmission Class STD Standard STL Steel STND Standard STR Structural STRT Straight STRUCT Structural SUCT Suction SUPP Supplementary, Supplement SY Square Yard SYM Symmetrical SYSSystem T/ Top (of) T&G Tongue & Groove TAN Tangent TD Trench Drain TEL Telephone TEMP Temporary, Tempered, Temperature THK Thick, Thickness THRU Through TLT Toilet TOL Tolerance TO Top Of (_) TR Tread, Transom TRANS Translucent, Transom TRD Tread TV Television TYPTypical UC Undercut UNO Unless (specifically) Noted Otherwise UT Utility VAC Vacuum VAR Varies VB Vapor Barrier, Vinyl Base VCT Vinyl Composition Tile VENT Ventilate, Ventilator VERT Vertical VEST Vestibule
EXPLANATION OF SYMBOLS
A2.1 : A6.1
A5.1
A5.1
A4.1
A6.1
A6.1
BUILDING
SECTION
WALL
SECTION ELEVATION
GRID LINE
2 31
TYPICAL SHEET LAYOUT
DETAIL
CALL OUT
108.1
WINDOW
DESIGNATION
INTERIOR
ELEVATION
ROOM NUMBER
DOOR NUMBER
A
ELEVATION
DETAIL
SECTION
SHEET WHERE
DETAIL APPEARS
POSITION OF
DETAIL ON SHEET
SHEET OF ORIGIN
A2.1
#1
#2
#3
#4
KEYNOTE
DESIGNATION
E1 WALL TYPE TAG
TITLE
ASSEMBLY CALL OUTRA-1
EQUIPMENT/ELEMENT TAGT-1
CASEWORK TAG
171.N.1
UC-1
ROOM NUMBER
ELEVATION DIRECTION
CABINET NUMBER
CABINET TYPE
ALUMINUM CONCRETE GRAVELEARTH DISTURBED
EARTH
RIGID
INSULATION
PLYWOOD
SAND
GYPNEW WALL
CONSTRUCTION
STEEL
WOOD
FINISH
WOOD
FINISH
WOOD
FINISH
HERRING
BONE TILE
CEDAR
SHINGLES
WOOD
FLOORING
WOOD
FLOORING
CEDAR
SHINGLES
OSB
HATCH PATTERNS
CARPET
GLAZING
A0.1
A0.1
A0.1
A0.2
PROJECT SITE
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:5
A M
15021.00 6.10.2016
GENERAL NOTES
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
Author
Designer
6.10.2016
A0.1
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: N.T.S.A0.1A0.1
4 MONTANA / IDAHO / WYOMING
: N.T.S.A0.1A0.1
3 UNITED STATES OF AMERICA
: N.T.S.A0.1A0.1
5 NORTH WEST CORNER OF WYOMING
: N.T.S.A0.1A0.1
15 YELLOWSTONE NATIONAL PARK
8"
DIP
10" DIP
" D
IP
UP
UP
UP
UP
UP
UP
UP
6 7
2D
2C
D
B
A
3 4 5
C
E
F
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
JU
NIPER STREET
STEAMPLANT
RECREATION HALL
GAO
1 1
MAMMOTH HOTEL
GRAND LO
OP RD
NORTH
ENTR
ANCE R
D
LODGEPOLE AVE.
JU
NIPER STREET
MAMMOTH HOT SPRINGS DINING ROOM
MAMMOTH
PAGODA
CHITTENDEN
HOUSE
STEAMPLANT
RECREATION HALL
GAO
PARADE GROUND
A0.2
HATCH INDICATES APPROXIMATE AREA OF (E) CONCRETE
REMOVAL AND (N) CONCRETE INSTALLATION.
LEGEND
HATCH INDICATES APPROXIMATE AREA OF EXCAVATION FOR
NEW STRUCTURAL FOUNDATION CONC. SLAB AND/OR STEM
WALL SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
HATCH INDICATES APPROXIMATE AREA OF EXCAVATION FOR
NEW UTILITIES AND/OR SERVICES. SEE CIVIL AND PLUMBING
FOR ADDITIONAL INFORMATION.
HATCH INDICATES APPROXIMATE AREA OF ASPHALT
PAVEMENT/CONCRETE CURB, GUTTER AND MISC.
ROAD/PARKING RECONFIGURATION.
DOTTED LINE INDICATES APPROXIMATE LOCATION OF
EXISTING STEAM TUNNEL. FIELD VERIFY TUNNEL DEPTH,
PHYSICAL DIMENSIONS, AND LOCATION PRIOR TO
EXCAVATION.
DASHED LINE INDICATES BOUNDARY OF MAMMOTH HOTEL
REHABILITATION PHASE I.
DASHED LINE INDICATES BOUNDARY OF MAMMOTH HOTEL
REHABILITATION PHASE II.
HATCH INDICATES APPROXIMATE AREA OF EXCAVATION FOR
NEW CONSTRUCTION.
MAMMOTH HOT SPRINGS
HOTEL
| PHASE II |
MAMMOTH HOT SPRINGS
HOTEL
| PHASE I |
KEY PLAN
NORTH
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:5
A M
15021.00 6.10.2016
SITE AND AREA PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
DJ
MM
DJ
6.10.2016
A0.2
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/16" = 1'-0"A0.2A0.2
16 SITE PLAN
NORTH
: 1" = 100'-0"A0.2A0.1
14 AREA PLAN NORTH
UP
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
JU
NIPER STR
EET
LODGEPOLE AVENUE
ALB
RIG
HT A
VENUE
STEAM PLANT
REC HALL
GAO
DINING HALL
NOTE:
CONSTRUCTION ACTIVITIES LOCATED
OUTSIDE PROJECT BOUNDARY ALLOWED
FOR SHORT DURATION UPON WRITTEN
APPROVAL OF CONTRACTING OFFICER.
LEGEND
PROJECT STAGING AND ACCESS, FULL PROJECT DURATION
DASHED LINE INDICATES PROJECT BOUNDARY
DASHED LINE INDICATES APPROXIMATE BOUNDARY OF
MAMMOTH HOTEL REHABILITATION PHASE II.
PROJECT STAGING AND ACCESS BUILDING TURNOVER
THROUGH APRIL 4, 2017
PROTECT ACCESS AND EGRESS AT EXISTING STAIR
UNTIL BUILDING CLOSURE DATE.
AREA OF NEW ADDITION
KEY NOTES
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:0
A M
15021.00 6.10.2016
STAGING & SEQUENCING SITE PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
A0.3
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1" = 20'-0"A0.3A4.1
16 SITE PLAN
NORTH
NOTE: SEE A0.4 FOR BUILDING
PLAN COMPLETION & ACCESS
UPUP
DN
UP UP
6 72
D
B
A
3 4 5
C
E
F
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
6 72
D
B
A
3 4 5
C
PHASE 2
PHASE 1
PHASE 2
PHASE 1
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
PROVIDE TEMPORARY
BARRIER FROM APRIL 4,
2016 TO PROJECT
COMPLETION.
6 72
D
B
A
3 4 5
C
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
LEGEND
CONTRACTOR ACCESS FULL PROJECT DURATION
DASHED LINE INDICATES PROJECT BOUNDARY OF
MAMMOTH HOTEL REHABILITATION PHASE I.
DASHED LINE INDICATES APPROXIMATE BOUNDARY OF
MAMMOTH HOTEL REHABILITATION PHASE II.
SUBSTANTIAL COMPLETION APRIL 4, 2017 WITH SHARED
CONTRACTOR / CONCESSIONAIRE ACCESS UNTIL PROJECT
COMPLETION.
AREAS TO REACH SUBSTANTIAL COMPLETION NO LATER
THAN APRIL 4TH 2017 WITH TURN OVER TO GOVERNMENT
FOR FULL USE NO LATER THAN APRIL 21, 2017
6 72
D
B
A
3 4 5
C
E
F
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
COMPLETION & ACCESS
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
Checker
MM
DJ
6.10.2016
A0.4
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/16" = 1'-0"A0.4A0.4
9 FIRST FLOOR PLAN
: 1/16" = 1'-0"A0.4A0.4
11 SECOND FLOOR PLAN
: 1/16" = 1'-0"A0.4A0.4
13 BASEMENT PLAN
NOTE
SEE SHEET A0.3 FOR EXTERIOR
STAGING AND ACCESS REQUIRMENTS.
NORTH NORTH
: 1/16" = 1'-0"A0.4A4.1
6 COMPLEATION AND ACCESS ROOF PLAN
NORTHNORTH
DN
UP
UP
6 72
D
B
A
3 4 5
C
E
STAIR
S1
133 SF
MANAGER'S
OFFICE
129 SF
FRONT
OFFICE
368 SF
SKI
SHOP /
STORAGE
1537 SF
GIFT
SHOP
MEN'S
RESTROOM
WOMEN'S
RESTROOM
212 SF
REGISTRATION
61 SF
ELEVATOR
E1
177 SF
DELIVERY
2274 SF
LOBBY
2297 SF
MAP
ROOM
HALLWAY
HALL
WAY
230 SF
STOR.
424 SF
VESTIBULE
57 SF
VESTIBULE
JAN.
174A
STOR.
173A
HALLWAY
207 SF
BAR
161A
A3
(4)
(51)
(2)
(1) (2)
(2)(2)
(151) (145)
(1)
PHASE II
PHASE I
PHASE II
PHASE I
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
1H
1H 1H 1H
1H
1H
1H (2)
(28)
75 75
6 72
D
B
A
3 4 5
C
169 SF
MEN'S
RESTROOM
173 SF
WOMEN'S
RESTROOM
1360 SF
HALLWAY
55 SF
STOR.
41 SF
JAN.
235 SF
STAIR
S1
268 SF
TABLE
STORAGE
1322 SF
CONFERENCE
ROOM
1169 SF
CONFERENCE
ROOM
ROOF BELOW
OPEN
BELOW
A3
535 SF
BOARD
ROOM
(33)
(74)
316 SF
PANTRY
(4)
(1)
(1)
(E)
ATTIC
263A
(87)
PHASE 2
PHASE 1
PHASE 2
PHASE 1
MAMMOTH HOT
SPRINGS HOTEL
| PHASE 2 |
BUILDING CODE INFORMATION
APPLICABLE BUILDING CODE: 2012 IEBC & IBC
BUILDING AGENCY / JURISDICTION: NPS
SEISMIC DESIGN CATEGORY: D
BASIC WIND SPEED: 3 SECOND GUST = 90 MPH
TOTAL BUILDING AREA: 16,843 SF (PHASE 1 ONLY)
TYPE OF CONSTRUCTION
(CHAPTER 6) CONSTRUCTION TYPE V-B
BUILDING ELEMENT
TABLE 601 STRUCTURAL FRAME
RATING
0 HR
TABLE 601 EXTERIOR BEARING WALLS 0 HR
TABLE 601 INTERIOR BEARING WALLS 0 HR
TABLE 601 FLOOR CONSTRUCTION 0 HR
TABLE 601 ROOF CONSTRUCTION 0 HR
FIRE-RESISTANCE RATING REQUIREMENTS
BUILDING CODE AREA CALCULATIONS
NOTES: 1. SEE CODE ANALYSIS PLANS FOR ACCOMPANYING INFORMATION
2. CODE INFORMATION BELOW LISTS SELECTED BUILDING
REQUIREMENTS BUT DOES NOT LIST ALL BUILDING CODE
REQUIREMENTS.
OCCUPANCY GROUP: A3 (PER CHAPTER 3)
CONSTRUCTION TYPE: TYPE V-B W/ APPROVED NFPA
13R AUTOMATIC SPRINKLER SYSTEM
AUTOMATIC SPRINKLER SYSTEM INCREASE (SEC 506.3) | 2 MULTI STORY, FULLY
SPRINKLERED.
ALLOWED | ACTUAL
FLOOR AREA PER STORY: 18,000 SF | BASEMENT:1796 SF
18,000 SF | FIRST: 10642 SF
18,000 SF | SECOND: 6838 SF
TOTAL ALLOWABLE AREA: 36,000 SF | 19276 SF
MAXIMUM ALLOWABLE STORIES : 2 STORIES | 2 STORIES
MAXIMUM ALLOWABLE HEIGHT: 60 FT | 47 FT
OCCUPANT LOAD TOTALS:
BASEMENT: 4 OCCUPANTS
FIRST FLOOR: 198 OCCUPANTS
SECOND FLOOR 104 OCCUPANTS
SEE CODE PLANS. OCCUPANT LOADS BASED ON MAXIMUM FLOOR AREA (SF) PER
OCCUPANT FROM TABLE 1004.1
PLUMBING FIXTURE COUNTS
FIXTURE TYPE FIXTURES REQ. NUMBER OF FIXTURES.
WC FIRST FLOOR 3M /4F 3M / 7F
WC SECOND FLOOR 2M / 3F 3M / 3F
LAV FIRST FLOOR 3M / 4F 3M / 4F
LAV SECOND FLOOR 2M / 2F 3M/ 3F
TABLE 601 EXTERIOR NON-BEARING WALLS 0 HR
TABLE 601 INTERIOR NON-BEARING WALLS
TABLE 601 EXTERIOR NON-BEARING WALLS
0 HR
0 HR
(2)
INCIDENTAL ACCESSORY OCCUPANCY:
(W/ OCCUPANT) W/ REQUIRED SEPARATION
PER TABLE 508.2.5 CALCULATED AS PART OF
MAJOR USE FOR AREA CALCULATION
PURPOSES.
ACCESSORY OCCUPANCY AREA:
(W/ OCCUPANT LOAD) W/ NO SEPARATION
REQUIRED AND CALCULATED AS PART OF
MAJOR USE FOR AREA IF TOTAL ACCESSORY
OCCUPANCIES OCCUPY LESS THAN 10% OF
MAJOR OCCUPANCY CLASSIFICATION AREA
PER SECTION 508.2.1
1-HOUR FIRE WALL, FIRE BARRIER, FIRE
PARTITION, OR SMOKE BARRIER WALL: OR
COMBINATION OF CONFORMING TO THE
MOST STRINGENT REQUIREMENTS FOR
EACH. SEE CODE SPECIFIC NAMES OF IBC
WALL DESIGNATION. ALL WITH FIRE-RESISTIVE
OPENING PROTECTION AT DOORS, WINDOWS,
DUCTS (WITH EXCEPTIONS), PENETRATIONS,
AND PROTECTION AT JOINTS. SEE WALL
TYPES, DOOR & WINDOW SCHEDULES,
MECHANICAL DRAWINGS, PENETRATION
DETAILS, AND JOINT DETAILS WHERE
APPLICABLE.
ROOM OCCUPANT LOAD (OR TOTAL FLOOR
OCCUPANT LOAD) PER SECTION 1004
EXIT SIGN W/ INTEGRATED DIRECTIONAL
ARROW WHERE OCCURS AT ALL EXITS -
EVERY 100' IN CORRIDORS AND IN SPACES
WHERE 2 MORE ARE REQUIRED PER SECTION
10.11. SEE ELECTRICAL DRAWINGS. (W/
POCHE IN QUADRANT INDICATING "EXIT" TEXT
SIDE OF SIGN) SIGNS SHOWN IN CORRIDORS
ARE CEILING HUNG. SIGNS SHOWN ON WALL
ARE WALL HUNG. REQUIRED EXIT AND EXIT
EGRESS DIRECTION
ACCUMULATIVE NUMBER OF OCCUPANTS
SERVED WITH EGRESS DIRECTION AT ARROW
LOCATION. (DESIGNATED WHERE (2) MEANS
OF EGRESS ARE REQUIRED PER TABLE
1004.1.2)
NOTE: EXIT TRAVEL DISTANCE - MAXIMUM OF
250' FOR "A3" OCCUPANCIES W/ SPRINKLER
SYSTEM, PER TABLE 1016.1. MAXIMUM
DISTANCE FOR EACH STORY SHOWN.
CODE LEGEND
D
B
A
C
816 SF
MECHANICAL
215 SF
ELECTRICAL
/ TEL
DATA
HALLWAY
STAIR
S1
114 SF
HALLWAY
(3)
(1)
A3
EXISTING ELEMENTS TO REMAIN
NEW ELEMENTS
LINE WORK LEGEND
A R C H I T E C T U R E I N T E R I O R S H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 5 9 8 0 2 P H. 4 0 6 . 7 2 1 . 5 6 4 3 F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 5 9 1 0 1 P H. 4 0 6 . 2 4 8 . 2 6 3 3 F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L B O Z E M A N, M T 5 9 7 1 5 P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
189105
/1
/2
:0
:1
A M
15021.00 6.10.2016
CODE REVIEW
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION
- PHASE I
YELLOWSTONE NATIONAL PARK, WYOMING
DJ
MM
DJ
6.10.2016
A0.5
CO
N
ST
R U
C
TI
O N
D O
CU
M
E N
TS
: 1/16" = 1'-0"A0.5A4.1
6 FIRST FLOOR CODE PLAN
: 1/16" = 1'-0"A0.5A4.1
11 SECOND FLOOR CODE PLAN
: 1/16" = 1'-0"A0.5A5.1
8 BASEMENT CODE PLAN
NORTH
NORTH
NORTH
File details come from the government source that posted it. Updated .