M1.0 MECHANICAL LEGENDS AND SCHEDULES
M1.1 MECHANICAL SCHEDULES II
MD3.1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN
MD3.2 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN
M2.0 BASEMENT HVAC REMODEL PLAN
M2.1 FIRST FLOOR HVAC REMODEL PLAN
M2.2 SECOND FLOOR HVAC REMODEL PLAN
M3.0 BASEMENT MECHANICAL PIPING REMODEL PLAN
M3.1 FIRST FLOOR MECHANICAL PIPING REMODEL PLAN
M3.2 SECOND FLOOR MECHANICAL PIPING REMODEL PLAN
M4.0 MECHANICAL DETAILS I
THIS IS A STANDARDIZED SYMBOLS LEGEND, ALL SYMBOLS SHOWN MAY
NOT APPEAR ON OR WITHIN THIS SET OF CONTRACT DOCUMENTS.
- ALL INTERIOR SUPPLY DUCTWORK.
- ALL EXHAUST DUCTWORK FROM THE BACKDRAFT DAMPER TO THE ROOF LINE.
- ALL FRESH AIR DUCTWORK.
- ALL OTHER INTERIOR EXHAUST DUCTWORK.
- ALL INTERIOR RETURN DUCTWORK.
INSULATED FLEXIBLE DUCTWORK MAY BE USED IN LOCATIONS SHOWN ON DRAWINGS AT THE
CONTRACTOR'S OPTION FOR A MAXIMUM OF 5 FT. LENGTH TO EACH DIFFUSER/REGISTER/ GRILLE.
UNINSULATED/UNLINED DUCTWORK INCLUDES:
INSULATED DUCTWORK INCLUDES:
18"Ø or 18"
HPS
MPS
LPS
C
HWR
HWS
HOT WATER
RETURN
HOT WATER
SUPPLY
HIGH PRESS.
STEAM
MED. PRESS.
STEAM
LOW PRESS.
STEAM
CONDENSATE
LINE
DOUBLE LINE
REPRESENTATION
SINGLE LINE
REPRESENTATION
DOUBLE LINE
REPRESENTATION
SINGLE LINE
REPRESENTATION
P.O.C.-POINT OF
CONNECTION
SWITCH
T'STAT. (PNEU./ELEC.)
SIDEWALL AIR DEVICE
WALL LOUVER
NEW EQUIPMENT
EXISTING TO REMAIN
PLAN
CODE
MANUFACTURER
MODEL
NUMBER
SHELL SIDE TUBE SIDE
REMARKS
GPM EWT # OF PASSES GPM EWT LWT
HE-1 TACO E12206S 5.91 218.5 2 380 124 140
HE-2 TACO E12206S 5.91 218.5 2 380 124 140
PLAN
CODE
MANUFACTURER MODEL NUMBER SIZE RPM GPM FT OF HD
ELECTRICAL DATA
REMARKS
HP VOLT AMP PH
P-1 TACO FI3009C 4" X 3" 1760 382 60 10 200 32.2 3
P-2 TACO FI3009C 4" X 3" 1760 382 60 10 200 32.2 3
P-3 TACO 003-BC4 3/4 X 3/4" 3250 1 1.4 1/40 115 0.43 1
RECIRC PUMP
FOR RADIANT
NOTES:
1) BRONZE CASING PUMP. PUMP SEALS SHALL BE PROPYLENE GLYCOL COMPATIBLE.
2) REFER TO THE MECHANICAL DETAILS FOR ADDITIONAL REQUIREMENTS.
3) P-1 AND P-2 ARE TO BE VARIABLE SPEED DRIVEN FOR VARIABLE FLOW OPERATION. PROVIDE MOTOR WITH SHAFT GROUNDING RINGS. VFDS BY THE TEMPERATURE CONTROL CONTRACTOR.
PLAN CODE MFGR MODEL NUMBER GPM PIPE SIZE REMARKS
AS-1 TACO 4900 306 5"
PLAN CODE MFGR MODEL NUMBER TOTAL VOLUME ACCEPT. VOLUME PRECHARGE PRESSURE
ET-1 TACO CA450-125 119 119 12
PLAN CODE MANUFACTURER MODEL NUMBER GAL CAPACITY PRESSURE RANGE
ELECTRICAL DATA
REMARKS
VOLTS AMPS
GF-1
GENERAL TREATMENT
PRODUCTS
GP30 30 100 115 17.2 SEE NOTES
NOTES: PROVIDE UNIT WITH FULLY AUTOMATED SYSTEM INCLUDING LOW LEVEL CUTOFF AND ALARM, ISOLATION VALVES, STRAINER, PRESSURE TANK WITH PRESSURE CONTROL, PRESSURE
REDUCING VALVE AND GAUGE. PROVIDE UNIT WITH LID DESIGNED TO ACCOMMODATE RELIEF VALVE PIPING. PROVIDE MAGNETIC STARTER, 110V MOTOR AND CONTROLS, 10' POWER CORD.
PLAN CODE MANUFACTURER
MODEL
NUMBER
COIL
FACADE
TUBES
HEIGHT TYPE
MOUNT
HEIGHT
BTU/FT GPM EWT °F REMARKS
H-1, 2, 3, 4, 5 SIGMA SRK-W-4-CV2
2-PASS
STRAIGHT
4 11 13/16"
WALL
MOUNT
4" AFF 655 0.5 140
CONTROL VALVE SHALL BE SIZED TO FIT
INSIDE PANEL ENCLOSURE
PLAN
CODE
MANUFACTURER
MODEL
NUMBER
FUNCTION NECK SIZE MATERIAL FINISH CFM
VOLUME
DAMPER
REMARKS
CD-8 KRUEGER 1400 SUPPLY 8 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
CD-10 KRUEGER 1400 SUPPLY 10 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
CD-12 KRUEGER 1400 SUPPLY 12 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
RG-6 KRUEGER 6690 RETURN 6 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
RG-8 KRUEGER 6690 RETURN 8 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
RG-10 KRUEGER 6690 RETURN 10 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
RG-14 KRUEGER 6690 RETURN 14 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
FG-1 REGGIO REGISTERS G1012 SUPPLY 10 x 8 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
FG-2 REGGIO REGISTERS G1016 RETURN 14 x 8 STEEL
ARCHITECT
SELECTED
SEE PLAN IN DUCT
NOTES:
1) PROVIDE ALL DUCT TRANSITIONS TO AND FROM GRILLES/REGISTERS/DIFFUSERS AS REQUIRED.
2) CONTRACTOR TO VERIFY EXACT BUILDING CONSTRUCTION AND CEILING TYPES AND PROVIDE THE CORRECT FRAMES FOR ALL AIR DIFFUSION PRODUCTS AS REQUIRED.
3) PROVIDE EXTENDED LINKAGE FROM HAND DAMPER TO A FLUSH CUP DAMPER REGULATOR IN ALL HARD CEILING LOCATIONS (HARD INACCESSIBLE CEILINGS). REFER TO ARCHITECTURAL REFLECTED CEILING PLANS
FOR ALL TYPES OF CEILINGS.
4) PROVIDE MANUAL VOLUME DAMPERS FOR CONNECTION TO ALL GRD'S.
5) SEE DRAWINGS FOR FURTHER GRD REQUIREMENTS.
PLAN
CODE
MANUFACTURER
MODEL
NUMBER
AIR SIDE COOLING DATA
REMARKS
CFM ESP
EAT TOTAL
CAP,
MBH
SENS
CAP,
MBH
MCA MOCP VOLT PH
DB WB
FC-1 DAIKIN FXMQ48PBVJU 1400 0.4 95 75 48 35.8 3.4 15 208 1
FC-2 DAIKIN FXMQ24PBVJU 400 0.4 95 75 24 15.6 1.8 15 208 1
FC-3 DAIKIN FXMQ07PBVJU 200 0.4 95 75 7.5 6.4 0.6 15 208 1
FC-4 DAIKIN FXMQ48PBVJU 1400 0.4 95 75 48 35.8 3.4 15 208 1
FC-5 DAIKIN FXMQ36PBVJU 1130 0.4 95 75 36 28.8 2.9 15 208 1
FC-6 DAIKIN FXMQ30PBVJU 800 0.4 95 75 30 23.8 2.8 15 208 1
FC-10 DAIKIN FXFQ48TVJU 1218 0 80 67 48 35 1.8 15 208 1
NOTES: PROVIDE FC-10 WITH BYCQ125B-W1 DECORATION PANEL
PLAN CODE MANUFACTURER MODEL NUMBER FUNCTION SIZE MATERIAL FINISH CFM DAMPER REMARKS
L-1 RUSKIN ELF6375DX OUTSIDE AIR 42 X 30" ALUMINUM ARCHITECT SELECTED 3600 IN DUCT
L-2 RUSKIN ELF6375DX EXHAUST 42 X 30" ALUMINUM ARCHITECT SELECTED 3240 IN DUCT
L-3 RUSKIN ELF6375DX OUTSIDE AIR 48 X 42" ALUMINUM ARCHITECT SELECTED 5700 IN DUCT
L-4 RUSKIN ELF6375DX EXHAUST 48 X 42" ALUMINUM ARCHITECT SELECTED 5130 IN DUCT
L-5 RUSKIN ELF6375DX OUTSIDE AIR 19 X 18" ALUMINUM ARCHITECT SELECTED 775 IN DUCT
PLAN
CODE
MANUF.
MODEL
NUMBER
HEAT
RECOVERY
METHOD
HX WINTER
PERFORMANCE
HX SUMMER
PERFORMANCE
SUPPLY FAN EXHAUST FAN ELECTRICAL FILTERS
OA
CFM
OA
DB
EXH
CFM
EXH
DB
OA
CFM
OA
DB
EXH
CFM
EXH
DB
CFM ESP HP CFM
ESP/
TSP
HP VOLT PH TYPE
HRV-1 ALDES SH4000i PLATE 3600 -20 3600 70 3600 95 3600 75 3600 0.5 2.18 3600 0.5 1.66 208 3 MERV 8
HRV-2 ALDES SH1000i PLATE 970 -20 970 70 970 95 970 75 970 0.5 0.74 970 0.5 0.44 208 3 MERV 8
NOTE: PROVIDE WITH SINGLE POINT POWER CONNECTION, FUSED DISCONNECT, DOUBLE WALL CONSTRUCTION, FACTORY MOUNTED SUPPLY FAN VFD AND INVERTER DUTY MOTOR FOR USE WITH VFD, FACTORY
MOUNTED FILTER ALARMS, BMS INTEGRATION, AND MOTORIZED ISOLATION DAMPERS OA AND EA.
PLAN
CODE
MANUFACTURER
MODEL
NUMBER
SERVES LOCATION
TOTAL
CAP.
BTUH
SEN.
CAP.
BTUH
AMB
TEMP
COMPRESSOR
REFERENCE
PRODUCT
REMARKS
VOLTS PH MCA
CU-1 DAIKIN RWEYQ216PCTJ
FC-1,2,3,4,5,6
FC-7
OUTDOOR 272457 271412 95 230 3 67.2 R-410A SEE BELOW
CU-2 AAON
CFA-007-A-0-8-A
C00G
FC-9
FIRST FLOOR
ROOF
76200 75550 95 208 3 2.6 R-410A SEE BELOW
NOTES: MOUNT ON RACK ON ROOF TO ALLOW WATER TO FLOW UNDERNEATH UNIT. PROVIDE BHFP22MA84U CONNECTION PIPING KIT FOR CU-1.
PLAN
CODE
MANUFACTURER
MODEL
NUMBER
FUNCTION SIZE MATERIAL FINISH CFM DAMPER REMARKS
GV-1 GREENHECK WIH OUTSIDE AIR 38 X 58" ALUMINUM ALUMINUM 3600 IN DUCT SEE NOTES
GV-2 GREENHECK WRH EXHAUST AIR 38 X 58" ALUMINUM ALUMINUM 3240 IN DUCT SEE NOTES
NOTES: 1) PROVIDE WITH BIRD SCREEN AND PRE-MANUFACTURED ROOF CURB.
3) INSTALL MANUAL VOLUME DAMPER IN DUCT BELOW.
PLAN
CODE
MANUF.
MODEL
NUMBER
CFM ESP RPM
ELECTRICAL
REMARKS
VOLT AMP PH
EF-1 PANASONIC FV-40VQ3 300 0.5 1646 120 0.25 1
CEILING MOUNT. PROVIDE WITH
SPEED CONTROLLER
EF-2 PANASONIC FV-40VQ3 300 0.5 1646 120 0.25 1
CEILING MOUNT. PROVIDE WITH
SPEED CONTROLLER
EF-3 PANASONIC FV-15VQS 75 .5 1822 120 0.12 1
CEILING MOUNT. PROVIDE WITH
SPEED CONTROLLER. CONTROL
WITH SWITCH.
NOTES: TERMINATE EXHAUST DUCTWORK WITH A WALL CAP WITH BIRD SCREEN. COORDINATE INSTALLATION WITH
ELECTRICAL CONTRACTOR.
M1.0
JD
KW
JD
06/10/2016
TECH. REVIEW:
DATE:
SHEET
167OFPKG3
PKG.
NO.
PKG1
PKG2
DESIGNED:
CADD:
SUB SHEET NO. TITLE OF SHEET
DRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
YELLOWSTONE NATIONAL PARK, WYOMING
ARCHITII ECTSP
C
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084 www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
XXXX
Issue Date
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C
06/10/2016
PLAN
CODE
MFG MODEL
AREA
(FT^2)
REQUIRED
OUTPUT
(MBH)
PROVIDED
OUTPUT
(MBH)
SUPPLY /
RETURN
TEMP.
(MAX °F)
GPM
GLYCOL
# OF
CIRC.
APPRX.
CIRC.
LENGTH
(FT)
CIRC.
SPACING
(IN)
TUBE
SIZE
MIN.
BEND
RADIUS
(IN.)
WATER
PRESS.
DROP
(FT H20)
REMARK
RA-1 WATTS
RADIANTPEX+
PB03210121
426 9.4 24.8 85 / 65 1.0 30 4 233 6 1/2" 4 1.3 SEE NOTES
NOTES:
1. PRESENT INSTALLATION INCLUDES SLAB TUBING, MANIFOLD, AND THE SOURCE PIPING INSIDE THE BUILDING FROM THE FOUNDATION WALL TO THE NEW MECHANICAL ROOM.
2. PROVIDE TACO 5000 SERIES MIXING VALVE.
3. FURNISH AND INSTALL ONE (1) SUPPLY AND RETURN MANIFOLD: WATTS 1" FLOWMETER MANIFOLD #D3803002SS STAINLESS STEEL WITH FLOW REGULATORS AND CIRCUIT ISOLATION CAP.
FURNISH WITH THE MANIFOLD WITH A 1" SS ACCESSORIES KIT WITH 1" FNPT ISOLATION BALL VALVES.
4. REFER TO DETAILS 5, 6, AND 7 ON SHEET M1.1 FOR FURTHER INSTRUCTIONS.
HWS/R BRANCH LINES
1"
HWR
1"
HWS
BALL VALVE (TYP.)
AUTO BALANCE VALVE.
EQUAL TO FLOW DESIGN INC.
MODEL #ACE. GPM FLOW RATE
TO BE 1 GPM
H W
R
H W
S
TO RADIANT HEAT
ZONE SLAB T-STAT
TACO #5004-CI
MIXING VALVE, OR
APPROVED EQUAL
TO & FROM RADIANT HEAT MANIFOLDS
IN THE VESTIBULE
P
IP
E D
IA
M
E T E R S M
A X
12" VERTICAL DROP
HEAT TRAP
H W
S
H W
R
SLAB INSULATION BY THE
GENERAL CONTRACTOR.
CONTRACTOR SHALL REFER TO THE
DETAILS ON THE CIVIL DRAWINGS FOR
ADDITIONAL COORDINATION AND
INSTALLATION REQUIREMENTS.
FOAM STAPLES OR
STRAP TO SLAB'S WIRE
MESH SYSTEM
INSTALL A MINIMUM OF 3" CONCRETE
ABOVE THE TOP OF THE PIPING. FOLLOW
THE RADIANT HEAT PIPING
MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR INSTALLATION OF
PIPING, SUPPORT, BRIDGING, AND
INSTALLATION AT EXPANSION JOINTS.
REFER TO STRUCTURAL DRAWINGS
FOR CONCRETE SLAB MAKEUP. SECURE
PIPING PER MANUFACTURER'S REQUIREMENTS
RADIANT FLOOR PIPING DETAIL6
M1.1 : M1.1 NO SCALE
RADIANT FLOOR PIPING DETAIL 27
M1.1 : M1.1 NO SCALE
RADIANT FLOOR PIPING DETAIL 38
M1.1 : M1.1 NO SCALE
PLAN
CODE
MANUFACTURER
MODEL
NUMBER
HEATING DATA COOLING DATA AIR SIDE ELECTRICAL DATA
FILTER REMARKS
GPM
PRESS
DROP
EWT LWT
EAT
DB
EAT
WB
REF
PRODUCT
TOTAL
CAP,
MBH
SENS
CAP,
MBH
CFM ESP
# OF
COILS
PRESS
DROP
HP
FAN
FLA
MCA VOLT PH
FC-7 ENVIRO-TEC H-30 8 0.91 140 118.9 ----- ----- ----- ----- ----- 2490 1 2 0.08 1 6.8 8.5 208 1 MERV 8
FC-8 ENVIRO-TEC H-30 8 0.91 140 118.9 ----- ----- ----- ----- ----- 2450 1 2 0.08 1 6.8 8.5 208 1 MERV 8
FC-9 ENVIRO-TEC H-30 8 0.91 140 118.9 80 67 R-410A 86.7 51.2 1740 1 2 0.08 1 6.8 8.5 208 1 MERV 8
NOTES: 1) PROVIDE FACTORY CERTIFIED START UP, ADJUSTMENT, AND OWNER INSTRUCTION AS REQUIRED.
2) MOUNT UNITS ON CONCRETE CURB 4" LARGER IN EACH DIRECTION. EXCAVATE AROUND UNIT FOR ACCESS AND SERVICE.
INSULATION BOARD (BY OTHERS)
BASE MATERIAL
CONCRETE SLAB RADIANT FLOOR PIPING
M1.1
MECHANICAL SCHEDULES II
06/10/2016
TECH. REVIEW:
DATE:
SHEET
167OFPKG3
PKG.
NO.
PKG1
PKG2
DESIGNED:
CADD:
SUB SHEET NO. TITLE OF SHEET
DRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
YELLOWSTONE NATIONAL PARK, WYOMING
ARCHITII ECTSP
C
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084 www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
XXXX
Issue Date
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C
06/10/2016
JD
KW
JD
UP
6 72
D
B
A
3 4 5
C
E
1 1 1 1 1 1 1 1
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
2 2 2
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:5
A M
15BZ4199.004
06/10/2016
FIRST FLOOR MECHANICAL PIPING
DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
MD3.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"MD3.1
1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN
MECHANICAL KEYNOTES
1 CAREFULLY REMOVE EXISTING RADIATOR AND ALL ASSOCIATED PIPING AND VALVES. PRESENT ALL RADIATORS TO
CONTRACTING OFFICER FOR SALVAGE.
2 CAREFULLY REMOVE EXISTING RADIATOR AT APPROXIMATE LOCATION. GENERAL CONTRACTOR SHALL REMOVE AND
REFURBISH RADIATOR BEFORE RE-INSTALLATION. GENERAL CONTRACTOR SHALL SAND, PAINT, AND FINISH RADIATOR
TO BE RE-INSTALLED IN NON-WORKING CONDITION.
MECHANICAL PIPING GENERAL DEMOLITION NOTES
1 GENERAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO PERFORM THE WORK
DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL
ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.
2 COORDINATE HVAC AND PLUMBING EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.
3 THE INFORMATION SHOWN ON THIS DRAWING WAS OBTAINED FROM EXISTING DRAWINGS AND VISUAL FIELD
OBSERVATIONS WHICH SHALL BE INCLUDED IN THE SCOPE OF WORK. FIELD VERIFY ALL EXISTING CONDITIONS AND
PROVIDE DEMOLITION AS REQUIRED TO ACCOMODATE CONSTRUCTION.
4 NOTIFY THE CONTRACTING OFFICER OF ANY SYSTEM SHUT-DOWNS AND APPROXIMATE SHUT-DOWN TIME PRIOR TO
COMMENCING WITH WORK.
5 CONTRACTOR SHALL REMOVE ALL DEMO'D MATERIALS FROM BUILDING, UNLESS SPECIFICALLY NOTED TO BE
ABANDONED IN PLACE.
6 DRAWINGS SHOW GENERAL LOCATIONS OF MATERIALS TO BE REMOVED. IT SHALL BE THE CONTRACTORS
RESPONSIBILITY TO DETERMINE THE EXTENT OF WORK REQUIRED FOR A COMPLETE SYSTEM REMOVAL.
7 CONTRACTING OFFICER HAS FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT/MATERIAL CALLED OUT TO BE REMOVED.
CONTRACTOR SHALL PRESENT ALL DEMO'D EQUIPMENT/MATERIAL TO CONTRACTING OFFICER PRIOR TO REMOVING
FROM SITE.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
DN
D
B
A
3 4 5
C
E
1 1 1 1
R
EX
R
EXR
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
R
EX
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:0
A M
15BZ4199.004
06/10/2016
SECOND FLOOR MECHANICAL PIPING
DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
MD3.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"MD3.2
1 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN
MECHANICAL KEYNOTES
1 CAREFULLY REMOVE EXISTING RADIATOR AND ALL ASSOCIATED PIPING AND VALVES. PRESENT ALL RADIATORS TO
CONTRACTING OFFICER FOR SALVAGE.
2 CAREFULLY REMOVE EXISTING RADIATOR AT APPROXIMATE LOCATION. GENERAL CONTRACTOR SHALL REMOVE AND
REFURBISH RADIATOR BEFORE RE-INSTALLATION. GENERAL CONTRACTOR SHALL SAND, PAINT, AND FINISH RADIATOR
TO BE RE-INSTALLED IN NON-WORKING CONDITION AT HOTEL FRONT ENTRY ON FIRST FLOOR.
MECHANICAL PIPING GENERAL DEMOLITION NOTES
1 GENERAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO PERFORM THE WORK
DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL
ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.
2 COORDINATE HVAC AND PLUMBING EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.
3 THE INFORMATION SHOWN ON THIS DRAWING WAS OBTAINED FROM EXISTING DRAWINGS AND VISUAL FIELD
OBSERVATIONS WHICH SHALL BE INCLUDED IN THE SCOPE OF WORK. FIELD VERIFY ALL EXISTING CONDITIONS AND
PROVIDE DEMOLITION AS REQUIRED TO ACCOMODATE CONSTRUCTION.
4 NOTIFY THE CONTRACTING OFFICER OF ANY SYSTEM SHUT-DOWNS AND APPROXIMATE SHUT-DOWN TIME PRIOR TO
COMMENCING WITH WORK.
5 CONTRACTOR SHALL REMOVE ALL DEMO'D MATERIALS FROM BUILDING, UNLESS SPECIFICALLY NOTED TO BE
ABANDONED IN PLACE.
6 DRAWINGS SHOW GENERAL LOCATIONS OF MATERIALS TO BE REMOVED. IT SHALL BE THE CONTRACTORS
RESPONSIBILITY TO DETERMINE THE EXTENT OF WORK REQUIRED FOR A COMPLETE SYSTEM REMOVAL.
7 CONTRACTING OFFICER HAS FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT/MATERIAL CALLED OUT TO BE REMOVED.
CONTRACTOR SHALL PRESENT ALL DEMO'D EQUIPMENT/MATERIAL TO CONTRACTING OFFICER PRIOR TO REMOVING
FROM SITE.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
D
B
A
3 4 5
C
E
22"x16"
18"x8" x1
16"x14"16"x12"12"x12"10"x8" x8 x8 x8 x8
22"x16" x8 x8
18"x14" x1
14"x8"
14"x8" x8 x8 x8
22"x16"16"x12" x1 x8
14"x8"
10"x8" 14"x12"
18"x12" 18"x14" 22"x14" x1
22"x16"
16"x12" x1
14"x8" x8
FC
FC
FC
x8 x8 x8 x8 x8
1 1 1 1 1
1 1 1 1 1
2 2 x1 x1
8"x10" 10"x10" 8"x8" x8
"1 x2
20"x14"
14"x20"
MECHANICAL
ELECTRICAL / TEL DATA
HALLWAY
HALLWAY
STAIR
S1
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:3
A M
15BZ4199.004
06/10/2016
BASEMENT HVAC REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
M2.0
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"M2.0
1 BASMENT HVAC REMODEL PLAN
MECHANICAL GENERAL NOTES
1 MECHANICAL CONTRACTOR SHALL CUT ALL
FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED
TO PERFORM THE WORK DEPICTED IN THESE
CONTRACT DOCUMENTS AND SPECIFICATIONS.
GENERAL CONTRACTOR SHALL PATCH ALL
ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF
AS REQUIRED TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
2 COORDINATE EXACT LOCATION OF DIFFUSERS AND
GRILLES WITH REFLECTED CEILING PLAN AND
LIGHTING LAYOUT.
3 FLEX DUCT RUN OUTS SHALL BE LIMITED TO 5'-0".
4 COORDINATE HVAC AND PLUMBING EQUIPMENT
WITH ALL OTHER TRADES AS REQUIRED.
5 ALL CEILING DIFFUSERS TO BE 4-WAY UNLESS
OTHERWISE NOTED.
6 DUCT PENETRATIONS THROUGH ROOF TO BE
COORDINATED WITH JOIST LAYOUT.
7 ALL DUCTS ABOVE CORRIDOR AREAS TO BE
MINIMUM 24 GAUGE SHEET METAL.
8 PROVIDE FLUSH CUP CONCEALED OPERATORS ON
ALL HAND DAMPERS LOCATED ABOVE HARD
CEILINGS.
9 LINE ALL SUPPLY AND RETURN DUCTS WITH 1" A.L.
WITHIN 15' OF FANS.
10 ALL DUCT DIMENSIONS SHOWN ON PLANS ARE
CLEAR INTERIOR DIMENSIONS.
11 PROGRAMMABLE THERMOSTATS SHALL BE
PROVIDED WITH NEW BATTERIES AT TIME OF
SUBSTANTIAL COMPLETION.
12 VERIFY EXACT LOCATION OF T-STATS WITH
ARCHITECT PRIOR TO INSTALLATION.
13 SEAL ALL MECHANICAL PENETRATIONS THROUGH
FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE
RATED SYSTEM.
14 PROVIDE LOCKING COVERS FOR ALL THERMOSTATS
LOCATED IN PUBLIC SPACES.
MECHANICAL KEYNOTES
1 ROUTE 10X8" SUPPLY DUCT UP THROUGH FLOOR TO FLOOR GRILLE ABOVE. CONNECT TO GRILLE AS REQUIRED.
2 ROUTE 14X8" RETURN DUCT UP THROUGH FLOOR TO FLOOR GRILLE ABOVE. CONNECT TO GRILLE AS REQUIRED.
3 ROUTE SUPPLY AND RETURN DUCTS UP THROUGH CHASE TO FIRST FLOOR CEILING SPACE ABOVE. SEE SHEET M2.1 FOR
CONTINUATION.
4 MOUNT UNIT ON CONCRETE PAD AT APPROXIMATE LOCATION SHOWN. EXCAVATE DIRT AROUND UNIT TO PROVIDE
ACCESS FOR SERVICE/REPLACEMENT.
5 INSTALL MANUAL VOLUME DAMPER IN DUCT AT APPROXIMATE LOCATION SHOWN. SET DAMPER TO ALLOW 300 CFM
THROUGH. CONNECT DUCT INTO RETURN DUCT OF FC-9.
6 INSTALL MANUAL VOLUME DAMPER IN DUCT AT APPROXIMATE LOCATION SHOWN. SET DAMPER TO ALLOW 250 CFM
THROUGH. CONNECT DUCT INTO RETURN DUCT OF FC-7.
7 INSTALL MANUAL VOLUME DAMPER IN DUCT AT APPROXIMATE LOCATION SHOWN. SET DAMPER TO ALLOW 225 CFM
THROUGH. CONNECT DUCT INTO RETURN DUCT OF FC-8.
8 MOUNT FC-9 HANGING OFF STRUCTURE WITH VIBRATION ISOLATORS AT APPROXIMATE LOCATION.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
18" X 42"
18" X 30"
21" X 48"
18" X 42"18" X 42"18" X 42"
GIFT SHOP
SKI SHOP / STORAGE
WOMEN'S RESTROOM
MEN'S RESTROOM
LOBBY
DELIVERY
STAIR
S1
ELEVATOR
E1
MANAGER'S OFFICE
FRONT OFFICE
REGISTRATION
HALLWAY
MAP ROOM
STOR.
BAR
161A
VESTIBULE
6 72
D
B
A
3 4 5
C
E
FG-1
350 CFM
FG-2
495 CFM
FG-2
495 CFM
FG-1
415 CFM
FG-1
415 CFM
FG-1
415 CFM
FG-1
415 CFM FG-1
415 CFM FG-1
415 CFM
FG-2
495 CFM
FG-2
495 CFM
FG-2
490 CFM
FG-2
490 CFM
FG-1
350 CFM
FG-1
350 CFM
FG-1
350 CFM
FG-1
350 CFM
FG-1
350 CFM
FG-1
350 CFM
FG-2
490 CFM
FG-2
490 CFM
1 1 1 1 1 1 1 1 1 1 1
2 2
M2.1 ø
EF
EF
6"ø3 ø ø
6"ø
RG-10
315 CFM
ø ø
RG-10
315 CFM
CD-10
290 CFM
CD-10
290 CFM
CD-10
290 CFM
RG-10
315 CFM
RG-10
315 CFM
CD-10
290 CFM
ø
10"ø
14"x10"
20"x12" 14"x10" x1
20"x10"
12"x10" ø ø 12"x10" ø ø
CD-10
290 CFM
CD-10
290 CFM
ø1 ø ø
6"ø
L-5
775 CFM
EF
6"ø
8"ø ø
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:3
A M
15BZ4199.004
06/10/2016
FIRST FLOOR HVAC REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
M2.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"M2.1
1 FIRST FLOOR HVAC REMODEL PLAN
MECHANICAL GENERAL NOTES
1 MECHANICAL CONTRACTOR SHALL CUT ALL
FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED
TO PERFORM THE WORK DEPICTED IN THESE
CONTRACT DOCUMENTS AND SPECIFICATIONS.
GENERAL CONTRACTOR SHALL PATCH ALL
ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF
AS REQUIRED TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
2 COORDINATE EXACT LOCATION OF DIFFUSERS AND
GRILLES WITH REFLECTED CEILING PLAN AND
LIGHTING LAYOUT.
3 FLEX DUCT RUN OUTS SHALL BE LIMITED TO 5'-0".
4 COORDINATE HVAC AND PLUMBING EQUIPMENT
WITH ALL OTHER TRADES AS REQUIRED.
5 ALL CEILING DIFFUSERS TO BE 4-WAY UNLESS
OTHERWISE NOTED.
6 DUCT PENETRATIONS THROUGH ROOF TO BE
COORDINATED WITH JOIST LAYOUT.
7 ALL DUCTS ABOVE CORRIDOR AREAS TO BE
MINIMUM 24 GAUGE SHEET METAL.
8 PROVIDE FLUSH CUP CONCEALED OPERATORS ON
ALL HAND DAMPERS LOCATED ABOVE HARD
CEILINGS.
9 LINE ALL SUPPLY AND RETURN DUCTS WITH 1" A.L.
WITHIN 15' OF FANS.
10 ALL DUCT DIMENSIONS SHOWN ON PLANS ARE
CLEAR INTERIOR DIMENSIONS.
11 PROGRAMMABLE THERMOSTATS SHALL BE
PROVIDED WITH NEW BATTERIES AT TIME OF
SUBSTANTIAL COMPLETION.
12 VERIFY EXACT LOCATION OF T-STATS WITH
ARCHITECT PRIOR TO INSTALLATION.
13 SEAL ALL MECHANICAL PENETRATIONS THROUGH
FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE
RATED SYSTEM.
14 PROVIDE LOCKING COVERS FOR ALL THERMOSTATS
LOCATED IN PUBLIC SPACES.
MECHANICAL KEYNOTES
1 INSTALL SUPPLY FG-1 IN FLOOR AT APPROXIMATE LOCATION SHOWN. ROUTE DUCT THROUGH BASEMENT CRAWLSPACE
AND CONNECT TO GRILLE AS REQUIRED.
2 INSTALL RETURN FG-2 IN FLOOR AT APPROXIMATE LOCATION SHOWN. ROUTE DUCT THROUGH BASEMENT
CRAWLSPACE AND CONNECT TO GRILLE AS REQUIRED.
3 ROUTE 6" EXHAUST DUCT AS SHOWN TO EXTERIOR WALL. TERMINATE AT WALL CAP WITH BIRD SCREEN.
4 ROUTE 8" FIREPLACE EXHAUST TO APPROXIMATE LOCATION SHOWN, AT LEAST 10' FROM ADJACENT WALL.
TERMINATE WITH ANODIZED BLACK ROOF CAP WITH BIRD SCREEN.
5 ROUTE SUPPLY AND RETURN DUCTS DOWN THROUGH CHASE TO BASEMENT BELOW. SEE SHEET M2.0 FOR
CONTINUATION.
: 1/4" = 1'-0"M2.1M2.1
2 LOBBY FIREPLACE VENT SECTION
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
24" X 48"
24" X 48"
X
24" X 72"
24" X 36" 24" X 36"
BOARD ROOM
CONFERENCE ROOM
CONFERENCE ROOM
HALLWAY
WOMEN'S RESTROOM
MEN'S RESTROOM
STOR.
STAIR
S1
PANTRY
TABLE STORAGE
CD-12
530 CFM
CD-10
300 CFM
CD-10
300 CFM
RG-10
475 CFM
CD-8
200 CFM
RG-8
175 CFM
RG-10
250 CFM
CD-10
400 CFM
CD-10
350 CFM
RG-14
630 CFM
RG-14
630 CFM
CD-10
350 CFM
CD-10
350 CFM
CD-10
350 CFM
CD-10
350 CFM
CD-10
350 CFM
RG-14
630 CFM
RG-14
630 CFM
CD-10
350 CFM
CD-10
350 CFM
CD-10
400 CFM
CD-10
400 CFM
RG-14
360 CFM
RG-14
360 CFM
FC
FC
FC
FC
FC
FC
6 72
D
B
A
3 4 5
C
E
CD-12
600 CFM
CD-12
600 CFM
RG-14
810 CFM
CD-12
600 CFM
CD-12
600 CFM
RG-14
810 CFM
CD-12
600 CFM
CD-12
600 CFM
14"ø ø ø ø ø ø
10"ø ø
14"ø14"ø ø
10"ø
6"ø
10"ø10"ø
14"ø 14"ø ø ø
10"ø ø
16"ø
14"ø ø
10"x10"
14"ø 14"ø x1 ø
10"ø
6"ø
8"ø
8"ø
RG-8
130 CFM
RG-8
130 CFM
RG-8
75 CFM
RG-10
225 CFM
RG-10
225 CFM
RG-6
75 CFM
RG-6
35 CFM
RG-6
75 CFM
8"ø
8"ø ø ø ø ø
12"x10"
L-4
5130 CFM
L-3
5700 CFM
20"x24"
GV
GV
RG-14
810 CFM
RG-14
810 CFM
ø ø
HRV
HRV
14"ø
18"x14"
24"x14"
32"x14"
48"x14"
48"x14"
14"x14" ø x2
20"x24"
24"x14"
20"x14"14"x14"
34"x14" ø
12"ø 6"ø
12"x12"
14"x14"
14"x14" x1 ø x1
14"x14"
10"ø ø ø
12"ø ø ø
8"ø14"x12"
6"ø
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
SECOND FLOOR HVAC REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
M2.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"M2.2
1 SECOND FLOOR HVAC REMODEL PLAN
MECHANICAL GENERAL NOTES
1 MECHANICAL CONTRACTOR SHALL CUT ALL
FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED
TO PERFORM THE WORK DEPICTED IN THESE
CONTRACT DOCUMENTS AND SPECIFICATIONS.
GENERAL CONTRACTOR SHALL PATCH ALL
ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF
AS REQUIRED TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
2 COORDINATE EXACT LOCATION OF DIFFUSERS AND
GRILLES WITH REFLECTED CEILING PLAN AND
LIGHTING LAYOUT.
3 FLEX DUCT RUN OUTS SHALL BE LIMITED TO 5'-0".
4 COORDINATE HVAC AND PLUMBING EQUIPMENT
WITH ALL OTHER TRADES AS REQUIRED.
5 ALL CEILING DIFFUSERS TO BE 4-WAY UNLESS
OTHERWISE NOTED.
6 DUCT PENETRATIONS THROUGH ROOF TO BE
COORDINATED WITH JOIST LAYOUT.
7 ALL DUCTS ABOVE CORRIDOR AREAS TO BE
MINIMUM 24 GAUGE SHEET METAL.
8 PROVIDE FLUSH CUP CONCEALED OPERATORS ON
ALL HAND DAMPERS LOCATED ABOVE HARD
CEILINGS.
9 LINE ALL SUPPLY AND RETURN DUCTS WITH 1" A.L.
WITHIN 15' OF FANS.
10 ALL DUCT DIMENSIONS SHOWN ON PLANS ARE
CLEAR INTERIOR DIMENSIONS.
11 PROGRAMMABLE THERMOSTATS SHALL BE
PROVIDED WITH NEW BATTERIES AT TIME OF
SUBSTANTIAL COMPLETION.
12 VERIFY EXACT LOCATION OF T-STATS WITH
ARCHITECT PRIOR TO INSTALLATION.
13 SEAL ALL MECHANICAL PENETRATIONS THROUGH
FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE
RATED SYSTEM.
14 PROVIDE LOCKING COVERS FOR ALL THERMOSTATS
LOCATED IN PUBLIC SPACES.
MECHANICAL KEYNOTES
1 MOUNT HRV-2 FROM ROOF STRUCTURE IN ATTIC SPACE. ROUTE SUPPLY DUCTWORK TO RETURN SIDE OF VRV AS
SHOWN.
2 ROUTE 14X14" OUTSIDE AIR DUCT TO APPROXIMATE LOCATION. TRANSITION TO 48X42" DUCT AND ATTACH TO
LOUVER ON DORMER ON NORTH SIDE OF ROOF. FIELD VERIFY EXACT LOCATION.
3 ROUTE 14X14" EXHAUST DUCT TO APPROXIMATE LOCATION. TRANSITION TO 48X42" DUCT AND ATTACH TO LOUVER
ON DORMER ON NORTH SIDE OF ROOF. FIELD VERIFY EXACT LOCATION.
4 SET MANUAL VOLUME DAMPER TO ALLOW 75 CFM THROUGH.
5 SET MANUAL VOLUME DAMPER TO ALLOW 130 CFM THROUGH.
6 SET MANUAL VOLUME DAMPER TO ALLOW 150 CFM THROUGH.
7 SET MANUAL VOLUME DAMPER TO ALLOW 40 CFM THROUGH.
8 SET MANUAL VOLUME DAMPER TO ALLOW 450 CFM THROUGH.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
T
P
P
ET
GF
2 2
6 72
D
B
A
3 4 5
C
E
AS
HE
HE
FC
FC
FC
ø L
P S
4"ø LPS 1 1/4"ø LPC
4"ø LPS
/4 "ø
L P C ø M
P S
6"ø MPS
6" ø
M
PS
ø M
P S
1 1/4"ø HWS
1 1/4"ø HWR 1 1/4"ø HWR
1 1/4"ø HWS
4"ø HWR 4"ø HWS
4"ø HWR 4"ø HWS
4"ø HWR ø H
W R ø H
W S ø H
W S ø H
W R
/2 ø H
W S
/2 ø H
W R
/2 ø H
W S
/2 ø H
W R
/2 ø H
W R
/2 ø H
W S
1/2"ø HWS 1/2"ø HWR
4"ø HWR ø H
W R ø H
W S
1 1/4"ø HWR
1 1/4"ø HWS
P
RL
RS
FC
RL
RS
11 11 11
MECHANICAL
ELECTRICAL / TEL DATA
HALLWAY
STAIR
S1
1/2"ø HWS
1/2"ø HWR
H
3/4"ø HWS
3/4"ø HWR
/4 ø H
W S
/4 ø H
W R
3/4"ø HWS
3/4"ø HWR
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
BASEMENT MECHANICAL PIPING
REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
M3.0
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"M3.0
1 BASEMENT MECHANICAL PIPING REMODEL PLAN
MECHANICAL PIPING GENERAL NOTES
1 MECHANICAL CONTRACTOR SHALL CUT ALL
FLOORS, WALLS, CEILINGS AND ROOF AS
REQUIRED TO PERFORM THE WORK DEPICTED IN
THESE CONTRACT DOCUMENTS AND
SPECIFICATIONS. GENERAL CONTRACTOR
SHALL PATCH ALL ASSOCIATED FLOORS,
WALLS, CEILINGS, AND ROOF AS REQUIRED TO
THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
2 SEAL ALL MECHANICAL PENETRATIONS
THROUGH FIRE RATED ASSEMBLIES WITH
UL-APPROVED FIRE RATED SYSTEM.
3 HYDRONIC VALVES 2" AND SMALLER TO BE
BALL VALVES. HYDRONIC VALVES LARGER
THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.
4 LOCATE ALL VALVES ABOVE ACCESSIBLE
CEILINGS OR PROVIDE ACCESS PANEL IN
CEILING FOR VALVE ACCESS. ACCESS PANELS
SHALL BE RATED WHERE REQUIRED.
5 COORDINATE HVAC AND PLUMBING ROUTING
AND EQUIPMENT WITH ALL OTHER TRADES AS
REQUIRED.
6 VERIFY EXACT LOCATION OF THERMOSTATS
WITH ARCHITECT PRIOR TO INSTALLATION.
7 THERMOSTATS TO BE LOCATED AT 48" A.F.F.
8 CAREFULLY REMOVE AND SALVAGE ALL
EXISTING RADIATORS. COORDINATE WITH
ARCHITECT AND CONTRACTING OFFICER FOR
UNITS TO BE REFURBISHED AND REPLACED.
9 COORDINATE ALL BASEMENT MECHANICAL
PIPING WITH EXISTING CONDITIONS AND NEW
FOOTING CONSTRUCTION.
10 PROVIDE LOCKING COVERS FOR ALL
THERMOSTATS LOCATED IN PUBLIC SPACES.
MECHANICAL KEYNOTES
1 CAP HWS/HWR FOR FUTURE PHASE 2 CONNECTIONS.
2 ROUTE HWS/HWR UP IN WALL TO SERVE RADIATOR ON FIRST FLOOR. SEE SHEET M3.1 FOR CONTINUATION.
3 P.O.C. CONNECT TO EXISTING STEAM AND CONDENSATE RETURN PIPING. FIELD VERIFY EXACT LOCATION.
4 ROUTE 1" HWS/HRW TO MIXING VALVE AT APPROXIMATE LOCATION SHOWN.
5 ROUTE 1" HWS TO P-3 AT APPROXIMATE LOCATION SHOWN.
6 INSTALL RADIANT HEAT MANIFOLD AT APPROXIMATE LOCATION SHOWN. ROUTE RADIANT HEAT PIPING THROUGH
VESTIBULE FLOOR ABOVE. SEE SHEET M3.1 FOR CONTINUATION.
7 INSTALL BALANCING VALVE AT APPROXIMATE LOCATION SHOWN. SET VALVE AT 1.0 GPM.
8 MOUNT FC-7 IN CEILING AT APPROXIMATE LOCATION SHOWN. ROUTE REFRIGERANT PIPING UP IN WALL TO SECOND
FLOOR ATTIC SPACE AT APPROXIMATE LOCATION SHOWN. SEE SHEETS M3.1 AND M3.2 FOR CONTINUATION.
9 ROUTE RS/RL PIPING UP IN WALL TO ROOF ABOVE FIRST FLOOR. SEE SHEET M3.2 FOR CONTINUATION. SIZE PIPING PER
MANUFACTURER RECOMMENDATION.
10 INSTALL CONTROL VALVE AT APPROXIMATE LOCATION. SET FLOW AT 8 GPM.
11 INSTALL CONTROL VALVE AT APPROXIMATE LOCATION. SET FLOW AT 0.5 GPM.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
18" X 30"
21" X 48"
18" X 42"18" X 42"18" X 42"
T
T T
T
T
T
T
T
T
GIFT SHOP
SKI SHOP / STORAGE
WOMEN'S RESTROOM
MEN'S RESTROOM
LOBBY
DELIVERY
STAIR
S1
ELEVATOR
E1
MANAGER'S OFFICE
FRONT OFFICE
REGISTRATION
HALLWAY
MAP ROOM
STOR.
BAR
161A
VESTIBULE
6 72
D
B
A
3 4 5
C
E
H
H
H
H
1 1
H
4 4 4 4
1/2"ø HWS
1/2"ø HWR
RL
RS
1/2"ø HWS
1/2"ø HWR
1/2"ø HWS 1/2"ø HWR
RL
RS
1/2"ø HWR 1/2"ø HWS
1/2"ø HWR
1/2"ø HWS
H
3/4"ø HWS
3/4"ø HWR
3/4"ø HWS
3/4"ø HWR
H
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
FIRST FLOOR MECHANICAL PIPING
REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
M3.1
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"M3.1
1 FIRST FLOOR MECHANICAL PIPING REMODEL PLAN
MECHANICAL PIPING GENERAL NOTES
1 MECHANICAL CONTRACTOR SHALL CUT ALL
FLOORS, WALLS, CEILINGS AND ROOF AS
REQUIRED TO PERFORM THE WORK DEPICTED IN
THESE CONTRACT DOCUMENTS AND
SPECIFICATIONS. GENERAL CONTRACTOR
SHALL PATCH ALL ASSOCIATED FLOORS,
WALLS, CEILINGS, AND ROOF AS REQUIRED TO
THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
2 SEAL ALL MECHANICAL PENETRATIONS
THROUGH FIRE RATED ASSEMBLIES WITH
UL-APPROVED FIRE RATED SYSTEM.
3 HYDRONIC VALVES 2" AND SMALLER TO BE
BALL VALVES. HYDRONIC VALVES LARGER
THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.
4 LOCATE ALL VALVES ABOVE ACCESSIBLE
CEILINGS OR PROVIDE ACCESS PANEL IN
CEILING FOR VALVE ACCESS. ACCESS PANELS
SHALL BE RATED WHERE REQUIRED.
5 COORDINATE HVAC AND PLUMBING ROUTING
AND EQUIPMENT WITH ALL OTHER TRADES AS
REQUIRED.
6 VERIFY EXACT LOCATION OF THERMOSTATS
WITH ARCHITECT PRIOR TO INSTALLATION.
7 THERMOSTATS TO BE LOCATED AT 48" A.F.F.
8 CAREFULLY REMOVE AND SALVAGE ALL
EXISTING RADIATORS. COORDINATE WITH
ARCHITECT AND CONTRACTING OFFICER FOR
UNITS TO BE REFURBISHED AND REPLACED.
9 COORDINATE ALL BASEMENT MECHANICAL
PIPING WITH EXISTING CONDITIONS AND NEW
FOOTING CONSTRUCTION.
10 PROVIDE LOCKING COVERS FOR ALL
THERMOSTATS LOCATED IN PUBLIC SPACES.
MECHANICAL KEYNOTES
1 INSTALL NEW RADIANT HEAT PANEL AT APPROXIMATE LOCATION SHOWN. ROUTE HWS/HWR PIPING UP FROM
BASEMENT.
2 CONTINUE REFRIGERANT PIPING FROM BASEMENT TO SECOND FLOOR ATTIC SPACE AT APPROXIMATE LOCATION
SHOWN. SEE SHEETS M3.0 AND M3.2 FOR CONTINUATION.
3 CONTINUE RS/RL PIPING IN WALL FROM FIRST FLOOR ROOF TO BASEMENT TO SERVE FC-9. SEE SHEETS M3.0 AND M3.2
FOR CONTINUATION. SIZE PIPING PER MANUFACTURER RECOMMENDATION.
4 RE-INSTALL SHORTER HISTORIC RADIATORS BACK IN ORIGINAL LOCATION AS SHOWN. RADIATORS TO BE REFURBISHED
BUT NON-FUNCTIONAL.
5 INSTALL THERMOSTAT FOR LOBBY AT APPROXIMATE LOCATION SHOWN. INSTALL REMOTE SENSOR IN SOUTH WALL OF
MAIL 136 IN LOBBY.
6 INSTALL REMOTE SENSOR AT APPROXIMATE LOCATION SHOWN. INSTALL THERMOSTAT IN WEST WALL OF
REGISTRATION 135 AS SHOWN.
7 INSTALL RADIANT IN FLOOR HEATING PIPING THROUGHOUT VESTIBULE PER MANUFACTURER RECOMMENDATION.
BASIS OF DESIGN IS 4 LOOPS OF 1/2" PIPING FROM MANIFOLD AT 6" SPACING.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
24" X 48"
X
24" X 72"
24" X 36" 24" X 36"
TT
T
T
T
T
BOARD ROOM
CONFERENCE ROOM
CONFERENCE ROOM
HALLWAY
WOMEN'S RESTROOM
MEN'S RESTROOM
STOR.
STAIR
S1 PANTRY
TABLE STORAGE
6 72
D
B
A
3 4 5
C
E
FC
FC
FC
FC
FC
FC
RS
RL
RS
1 1/4"ø CD
RL
/4 "ø
C D
RS
RL
RS
RL
/4 "ø
C D
1 1/4"ø CD
RS
RL
/4 "ø
C D
RL
RS
RS
/4 "ø
C D
RL RS
CU
1RS
RL
CU
1 1/4"ø CD
RS
RL
RS
RL
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:5
A M
15BZ4199.004
06/10/2016
SECOND FLOOR MECHANICAL PIPING
REMODEL PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
JD
JD
06/10/2016
M3.2
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
: 1/8" = 1'-0"M3.2
1 SECOND FLOOR MECHANICAL PIPING REMODEL PLAN
MECHANICAL KEYNOTES
1 ROUTE VRV CONDENSATE DRAIN PIPING TO MOP SINK AT APPROXIMATE LOCATION SHOWN.
2 ROUTE CONDENSATE DRAIN PIPING INSIDE BUILDING AND ROUTE TO NEAREST FLOOR SINK.
3 ROUTE REFRIGERANT PIPING DOWN IN WALL AT APPROXIMATE LOCATION TO CEILING SPACE OF BASEMENT
ELECTRICAL ROOM TO SERVE FC-7. SEE SHEETS M3.1 AND M3.0 FOR CONTINUATION.
4 ROUTE RS/RL PIPING DOWN IN WALL TO SERVE FC-9 IN BASEMENT. SEE SHEET M3.0 FOR CONTINUATION. SIZE PIPING
PER MANUFACTURER RECOMMENDATION.
5 MOUNT CONDENSING UNIT ON A RACK AT APPROXIMATE LOCATION SHOWN.
6 CONDENSING UNIT FOR FOOD SREVICE EQUIPMENT. SEE FOOD SERVICE SCHEDULES FOR MORE INFORMATION.
MECHANICAL PIPING GENERAL NOTES
1 MECHANICAL CONTRACTOR SHALL CUT ALL
FLOORS, WALLS, CEILINGS AND ROOF AS
REQUIRED TO PERFORM THE WORK DEPICTED IN
THESE CONTRACT DOCUMENTS AND
SPECIFICATIONS. GENERAL CONTRACTOR
SHALL PATCH ALL ASSOCIATED FLOORS,
WALLS, CEILINGS, AND ROOF AS REQUIRED TO
THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
2 SEAL ALL MECHANICAL PENETRATIONS
THROUGH FIRE RATED ASSEMBLIES WITH
UL-APPROVED FIRE RATED SYSTEM.
3 HYDRONIC VALVES 2" AND SMALLER TO BE
BALL VALVES. HYDRONIC VALVES LARGER
THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.
4 LOCATE ALL VALVES ABOVE ACCESSIBLE
CEILINGS OR PROVIDE ACCESS PANEL IN
CEILING FOR VALVE ACCESS. ACCESS PANELS
SHALL BE RATED WHERE REQUIRED.
5 COORDINATE HVAC AND PLUMBING ROUTING
AND EQUIPMENT WITH ALL OTHER TRADES AS
REQUIRED.
6 VERIFY EXACT LOCATION OF THERMOSTATS
WITH ARCHITECT PRIOR TO INSTALLATION.
7 THERMOSTATS TO BE LOCATED AT 48" A.F.F.
8 CAREFULLY REMOVE AND SALVAGE ALL
EXISTING RADIATORS. COORDINATE WITH
ARCHITECT AND CONTRACTING OFFICER FOR
UNITS TO BE REFURBISHED AND REPLACED.
9 COORDINATE ALL BASEMENT MECHANICAL
PIPING WITH EXISTING CONDITIONS AND NEW
FOOTING CONSTRUCTION.
10 PROVIDE LOCKING COVERS FOR ALL
THERMOSTATS LOCATED IN PUBLIC SPACES.
NORTH
Date
13863
WYOMING
P ro fe ss ion al En gineer (Mechanical)
KIP
WEEDA
4"HWR FROM SYSTEM
4" LPS
HEAT EXCHANGER, HE-1
MODULATING HTG. VALVE, x MBH
MODULATING HTG. VALVE, x MBH
SEE FOR PUMP PIPING & VALVING, TYP.
GLYCOL FEEDER
4"HWS TO SYSTEM 4"HWS
4"HWR
4"
4"
4"HWS
4"HWR
4"
4"
1"CW
T&P RELIEF VALVE,
PIPE TO FLOOR DRAIN,
M4.2
TYP.
4"
4"
UNION, TYP.
4"
BUTTERFLY VALVE, TYP.
AUTO
AIR
VENT
AS-1
THERMOMETER,
TYP.
ET-1
F & T TRAP, 4"
4"
4"
L
P R
4" LPR
STRAINER
4"
TRAP
VACUUM BREAKER
3/4" SWING CHECK
12" MIN4"
4"
4" LPS
4" LPS BYPASS
4"
4"
THERMOSTATIC
BASE MOUNTED PUMP
TRIPLE DUTY VALVE
DISCHARGE
CONCRETE PAD
DRIP PAN
SUPPORT LEG
SUCTION DIFFUSER WITH
STRAINER
FLEXIBLE CONNECTOR
LUG BODY BUTTERFLY
VALVE
PRESSURE GAUGE
SUCTION
NOTE:
PUMP SHALL BE SECURED TO
CONCRETE PAD WITH FLUSH
TYPE ANCHORS AND CAP
SCREWS.
GF-1
4" LPS
HEAT EXCHANGER, HE-2
MODULATING HTG. VALVE, x MBH
MODULATING HTG. VALVE, x MBH
T&P RELIEF VALVE,
PIPE TO FLOOR DRAIN,
TYP.
4" LPR
4"
4"
UNION, TYP.
4"
BUTTERFLY VALVE, TYP.
THERMOMETER,
TYP.
F & T TRAP, 4"
4"
4"
L
P R
4" LPR
STRAINER
4"
TRAP
VACUUM BREAKER
3/4" SWING CHECK
12" MIN4"
4"
4" LPS
4" LPS BYPASS
4"
4"
THERMOSTATIC
4"HWS
4"HWR
M4.0 : M4.0
1 STEAM TO HOT WATER HEAT EXCHANGER DETAIL
NO SCALE
FLEX DUCT REFER TO DRAWINGS
SUPPLY FLOOR GRILLE, REFER TO SCHEDULE
REFER TO GRD
SCHEDULE FOR
NECK SIZE
FOR SIZE, MAXIMUM 5 FT. LENGTH,
SECURE FLEX DUCT
TO DUCTWORK WITH
DRAW BAND CLAMP
FLEX DUCT SHALL BE USED ONLY
WHERE SHOWN ON THE DRAWINGS.
FLOOR
FLOOR MOUNTED GRILLE DETAIL12
M4.0 : M4.0 NO SCALE
CEILING MOUNTED DIFFUSER DETAIL13
M4.0 : M4.0 NO SCALE
FLEX DUCT REFER TO DRAWINGS
SUPPLY DIFFUSER, REFER TO SCHEDULE
REFER TO GRD
SCHEDULE FOR
NECK SIZE
FOR SIZE, MAXIMUM 5 FT. LENGTH,
NOTE:
DIFFUSER SHALL BE SUPPORTED
INDEPENDENTLY FROM THE
CEILING SYSTEM.
SECURE FLEX DUCT TO DUCTWORK
WITH DRAW BAND CLAMP
FLEX DUCT SHALL BE USED ONLY
WHERE SHOWN ON THE DRAWINGS.
CEILING, REFER TO ARCHITECTURAL
DRAWINGS FOR TYPE.
PIPE HANGER DETAIL15
M4.0 : M4.0 NO SCALE
PIPING INSULATION AS SPECIFIED.
INSULATION SHALL RUN CONTINUOUS
THROUGH HANGER OR CLAMP.
PIPING 1-1/2" OR LESS: INSTALL PROTECTION SHIELD
PIPING 2" AND GREATER: INSTALL THERMAL-HANGER SHIELD INSERT
CLEVIS STYLE HANGER FOR 2" AND GREATER PIPING.
SWIVEL BAND STYLE PERMISSIBLE FOR 1-1/2" AND SMALLER PIPING.
HANGER ROD SIZE AND HANGER SPACING PER SPECIFICATIONS
PIPE HANGER NOTES:
1. FOR TRAPEZE SUPPORTED PIPING: 1-1/2" AND LESS PIPING INSTALL PROTECTION SHIELD AND PIPE
CLAMP, INSULATION SHALL BE CONTINUOUS. 2" AND GREATER PIPING INSTALL THERMAL-HANGER
SHIELD INSERT AND PIPE CLAMP, INSULATION SHALL BE CONTINUOUS.
2. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
SIGMA PANEL RADIATOR
TEMPERATURE CONTROL VALVE
ONIX TUBING
PANEL ENCLOSUREONIX TUBING
AUTO-BALANCE VALVE
UNION
RADIANT PANEL HEATER DETAIL16
M4.0 : M4.0 NO SCALE
FLOOR
4" RECOMMENDED
*CONTROL VALVES SHALL BE SIZED TO FIT INSIDE PANEL ENCLOSURE
P
P
GF
ET
AS
1 HE
HE
BASE MOUNTED PUMP DETAIL11
M4.0 : M4.0 NO SCALE
M4.0
MECHANICAL DETAILS
06/10/2016
TECH. REVIEW:
DATE:
SHEET
167OFPKG3
PKG.
NO.
PKG1
PKG2
DESIGNED:
CADD:
SUB SHEET NO. TITLE OF SHEET
DRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
YELLOWSTONE NATIONAL PARK, WYOMING
ARCHITII ECTSP
C
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084 www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
XXXX
Issue Date
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C
06/10/2016
JD
KW
JD
G
HPC
MPC
LPC
CD
HWR
HWS
RS
RL
HPS
MPS
LPS
STM
HWRC
HW
CW
V
V
GW
SAN
SAN
P1.0 PLUMBING LEGENDS AND SCHEDULES
PD2.0 BASEMENT DOMESTIC WASTE AND VENT DEMOLITION PLAN
PD2.1 FIRST FLOOR DOMESTIC WASTE AND VENT DEMOLITION PLAN
PD2.2 SECOND FLOOR DOMESTIC WASTE AND VENT DEMOLITION PLAN
PD3.0 BASEMENT DOMESTIC WATER DEMOLITION PLAN
PD3.1 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN
PD3.2 SECOND FLOOR DOMESTIC WATER DEMOLITION PLAN
P2.0 BASEMENT DOMESTIC WASTE AND VENT REMODEL PLAN
P2.1 FIRST FLOOR DOMESTIC WASTE AND VENT REMODEL PLAN
P2.2 SECOND FLOOR DOMESTIC WASTE AND VENT REMODEL PLAN
P3.0 BASEMENT DOMESTIC WATER REMODEL PLAN
P3.1 FIRST FLOOR DOMESTIC WATER REMODEL PLAN
P3.2 SECOND FLOOR DOMESTIC WATER REMODEL PLAN
P4.0 PLUMBING DETAILS
PLAN
CODE
ITEM MANUFACTURER MODEL NUMBER MATERIAL & FINISH TRIM
ROUGH-IN SIZE
REMARKS
CW HW SAN VENT
LAV-1
H.C. COUNTERTOP
LAVATORY
KOHLER
BRYANT
K-2699-1
VITREOUS CHINA WHITE
KOHLER K-7517-CP 0.5
GALLON TOUCHLESS
2"
2" 2" 11 2"
INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM
TO ALL A.N.S.I. & A.D.A. REQUIREMENTS. PROVIDE K-7129-A-CP GRID DRAIN FROM
CONTRACTING OFFICER'S INVENTORY.
WC-1
F.V. H.C. F.M. WATER
CLOSET
KOHLER ----- -----
KOHLER K-10956-CP
1.28 GALLON F.V.
1" --- 4" 2"
PROVIDE WATER CLOSET AND SEAT FROM CONTRACTING OFFICER'S INVENTORY.
PROVIDE NEW FLUSH VALVE FOR EACH FIXTURE.
UR-1 URINAL KOHLER
BARDON
K-4904-ET
VITREOUS CHINA WHITE
KOHLER K-10949-CP
0.125 GALLON F.V.
1" --- 4" 2" -----------------------------------------
DF-1 DRINKING FOUNTAIN ELKAY LZWS-EDFPBM117K STAINLESS STEEL ---------- 1
2" ---- 11
2" 11 2"
WALL-MOUNTED, SEMI-RECESSED. MOUNT TO CONFORM TO ALL A.N.S.I. & A.D.A.
REQUIREMENTS.
FD-1 FLOOR DRAIN WADE W-1103-STD5
CAST IRON BODY CAST IRON
INTERIOR
SATIN NICKEL-BRONZE TOP ---- ---- 3" 11
2" W/ TRAP PRIMER CONNECTION
FD-2 FLOOR DRAIN WADE W-1103-STD5
CAST IRON BODY CAST IRON
INTERIOR
SATIN NICKEL-BRONZE TOP ---- ---- 3" 11
2" W/ TRAP PRIMER CONNECTION. PROVIDE FLOOR DRAIN WITH NO WEEP HOLES.
FS-1 FLOOR SINK WADE W-9110-16
CAST IRON BODY A.R.E.
INTERIOR
---------- ---- ---- 3",4" 11
2" PROVIDE W/ 34" GRATE
MS-1 MOP SINK FIAT MSB-2424 MOLDED STONE ---------- 3
4"
4" 3" 11
2"
PROVIDE W/ DELTA FAUCET #28C8073 WITH VACUUM BREAKER, T&S B-0706 SERVICE
FAUCET, INTEGRAL CHECK STOPS, HOSE & BRACKET, FIAT MOP HANGER #889-CC, &
VINYL BUMPER GUARD #E-77-AA.
EW-1 EYE WASH STATION BRADLEY S19-220BSS STAINLESS STEEL ---------- 1
2" ---- 11
2" 11
2" MOUNT ON WALL NEXT TO MOP SINK. ROUTE SAN TO MOP SINK.
S-1 BAR SINK KOHLER POISE K-3391-H STAINLESS STEEL KOHLER K-8762 1
2"
2" 2" 11
2"
INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM
TO ALL A.N.S.I. & A.D.A. REQUIREMENTS.
NOTES.
1. REUSE EXISTING LAVATORY, WATER CLOSET AND URINAL FIXTURES. EXISTING WATER CLOSETS AND URINALS TO BE PROVIDED WITH NEW FLUSH VALVE.
2. ALL NEW FIXTURES TO MATCH EXISTING WHERE AVAILABLE.
PLAN CODE MANUFACTURER MODEL NUMBER SIZE RPM GPM FT OF HD
ELECTRICAL
REMARKS
HP VOLT PH
SE-1 WEIL 2429 3" 1750 150 13 1 115 1 SEE NOTES
NOTES:
1. PROVIDE WEIL 8806 48" COVER AND 3316 STANDARD MOUNT CURB.
FIRE/ WATER SERVICE DETAIL11
P1.0 : P1.0 NO SCALE
4" DOMESTIC
PER SPECIFICATIONS
SUPPORT AND INSULATE
TYP.
SHUT-OFF
GATE VALVE
3" BUILDING SUPPLY
MAIN
LINE
BY-PASS
PRESSURE DOUBLE CHECK
WATTS 009QT REDUCED
BACKFLOW PREVENTOR
PRV - SET
AT 70 PSI
WATER METER
FLOOR
ROOF MEMBRANE
STRUCTURAL DECK
BASE PLATE
INSULATION
SINGLE PLY
CAST IRON PIPING
NOTES:
A) PIPE FLASHING FOR SINGLE PLY ROOF.
B) ROOF PENETRATION AND FLASHING TO BE
PROVIDED BY GENERAL CONTRACTOR. ALL WORK IS
TO BE PERFORMED BY PERSONNEL AUTHORIZED BY THE
ROOFING MANUFACTURER AS REQUIRED TO
MAINTAIN THE WARRANTY.
PVC MEMBRANE
FLASHING FULLY
ADHERED.
ALUMINUM TAPE TO
COVER ASPHALT.
STAINLESS STEEL
HOSE CLAMP.
APPROVED BEAD
OF SEALANT.
VENT THROUGH ROOF DETAIL12
P1.0 : P1.0 NO SCALE
SADDLE
INSULATION SHIELD AT HANGER
WELD
HANGER ROD
HANGER ROD
UNISTRUT STYLE
HANGER
ROD
INSERT
SHIELD
UNISTRUT
INSULATION, USE VAPOR BARRIER TYPE.
FOR DOMESTIC CW OR CHILLED WATER DO
NOT PENETRATE VAPOR BARRIER WITH
HANGERS.
INSULATION, USE VAPOR BARRIER
TYPE. FOR DOMESTIC CW OR
CHILLED WATER DO NOT
PENETRATE VAPOR BARRIER WITH
HANGERS.
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION INSERT
UNDER INSULATION SHIELD.
PIPE SIZE 2" AND
GREATER-SWIVEL STYLE,
PIPE SIZE LESS THAN
2"-CLEVIS STYLE.
NOTE:
MATERIAL CONTAINING
ASBESTOS SHALL NOT BE
USED FOR INSULATION
INSERTS NOT
REQUIRED ON
HW / HWRC
PIPING ONLY CW
/ CHILLED WATER
1/8 BEND
FLOOR LINE
WASTE LINE LENGTH TO SUIT
WASTE LINE
1/8 BEND
FINISHED GRADE
CLEANOUT
1/8 BEND
WASTE LINE UP TO FIXTURE
WASTE LINE LENGTH TO SUIT
FLOOR LINE
CHROME
WALLCOVER
& SCREW
MAY EXTEND AS A
WASTE OR VENT
LINE
WALL
PLUGGED
TEE
WASTE LINE
DWV OR STORM PIPE
FLOOR LINE
NOTE:
CONTRACTOR SHALL COORDINATE
THE LOCATION OF ALL F.C.O.,
W.C.O., AND C.O.T.G. WITH THE
ARCHITECT.
CLEANOUT AND ACCESS
COVER. TOP OF COVER TO BE
FLUSH WITH TOP OF FLOOR.
BALANCE OF
PIPING SAME AS
CLEANOUT TO
GRADE
1/8 BEND IF CLEANOUT
OCCURS AT END OF LINE
16" SQUARE CONCRETE PAD
TROWEL SMOOTH AND EDGE
BRASS CLEANOUT PLUG WITH
COUNTER SINK HEAD
PIPE HANGER DETAIL16
P1.0 : P1.0 NO SCALE
CLEAN OUT DETAIL17
P1.0 : P1.0 NO SCALE
STRAINER
P1.0
PLUMBING LEGENDS AND SCHEDULES
06/10/2016
TECH. REVIEW:
DATE:
SHEET
167OFPKG3
PKG.
NO.
PKG1
PKG2
DESIGNED:
CADD:
SUB SHEET NO. TITLE OF SHEET
DRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
YELLOWSTONE NATIONAL PARK, WYOMING
ARCHITII ECTSP
C
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084 www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
XXXX
Issue Date
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C
06/10/2016
NT
KW
NT
B
A
3 4 5
C
E
3 3 3 3
A R C H I T E C T U R E
I N T E R I O R S
H I S T O R I C www.aearchitects.com
2 2 2 N O R T H H I G G I N S
M I S S O U L A, M T 5 9 8 0 2
P H. 4 0 6 . 7 2 1 . 5 6 4 3
F A X. 4 0 6 . 7 2 1 . 1 8 8 7
6 0 8 N O R T H 2 9 T H
B I L L I N G S, M T 5 9 1 0 1
P H. 4 0 6 . 2 4 8 . 2 6 3 3
F A X. 4 0 6 . 2 4 8 . 2 4 2 7
4 2 8 E A S T M E N D E N H A L L
B O Z E M A N, M T 5 9 7 1 5
P H. 4 0 6 . 4 5 3 . 7 3 1 0
PROJECT NO.
NPS PROJ NO.
REVISIONS
DRAWING NO.
PKG
NO.
PKG1
PKG2
PKG3
SHEET
OF
DESIGNED:
CADD:
TECH REVIEW:
DATE
TITLE OF SHEETDRAWING NO.
0 1 2 3 4 5 6 7 8 9 10 inches
12 N. BROADWAY
BELGRADE, MT 59714
Ph: 406-388-3320
Fax: 406-388-3398
ACE PROJECT #: 15BZ4199.004
2040 HARNISH BLVD.
BILLINGS, MT 59101
Ph: 406-245-0136
Fax: 406-245-2084
/1
/2
:3
:4
A M
15BZ4199.004
06/10/2016
BESEMENT DOMESTIC WASTE AND VENT
DEMOLITION PLAN
MAMMOTH HOTEL SEISMIC
STABILIZATION & REHABILITATION -
PHASE 1
YELLOWSTONE NATIONAL PARK, WYOMING
KW
NT
NT
06/10/2016
PD2.0
C O
N
ST
R U
C T I O
N D
O C
U M
E N
T S
PLUMBING KEYNOTES
1 DEMO EXISTING SAN PIPING TO EXTERIOR OF NEW CONSTRUCTION AND CAP EXISTING.
2 DEMO SUSPENDED FLOOR DRAIN AND ASSOCIATED PIPING.
3 DEMO SAN PIPING UP TO EXISTING FIXTURE. SEE PD2.1 FOR CONTINUATION UP.
PLUMBING GENERAL DEMOLITION NOTES
1 GENERAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO PERFORM THE WORK
DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL
ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.
2 COORDINATE HVAC AND PLUMBING EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.
3 THE INFORMATION SHOWN ON THIS DRAWING WAS OBTAINED FROM EXISTING DRAWINGS AND VISUAL FIELD
OBSERVATIONS WHICH SHALL BE INCLUDED IN THE SCOPE OF WORK. FIELD VERIFY ALL EXISTING CONDITIONS AND
PROVIDE DEMOLITION AS REQUIRED TO ACCOMODATE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .