Attachment_2_-_07_Drawings_M1.0_-_P4.0.pdf

PDF 5 MB Posted

Attached to
Mammoth Hotel Seismic Stabilization Phase 1 Federal contract opportunity
Solicitation number
P16PS00611
Issued by
Department of the Interior National Park Service National Office

About this file

Attachment 2 Drawings 07

View the file

Other files for this federal contract opportunity

Other files attached to Mammoth Hotel Seismic Stabilization Phase 1, newest first.
File Type Posted
AF2.2_-_SECOND_FLOOR_FINISH_PLAN.pdf PDF
ASK_007_thru_011.pdf PDF
13744_SSK-12.pdf PDF
P16PS00611_Amendment_5.pdf PDF
MAMMOTH_SSK_FULL_SET_STRUCT.pdf PDF
060310_-_WOOD_CLEANING.pdf PDF
P16PS00611_Amendment_4.pdf PDF
060312_SF_-_HISTORIC_WOOD_REPAIR.pdf PDF
230900_Instrumentation_and_Controls.pdf PDF
093013_sf_-_Ceramic_Tiling.pdf PDF
P16PS00611_Amendment_3.pdf PDF
Civil_Revisions_C1.0 _C1.1 _C1.2 _C1.3.pdf PDF
A0.4_-_COMPLETION_ _ACCESS.PDF PDF
ASK_001_thru_006.pdf PDF
072100_SF_-_THERMAL_INSULATION.pdf PDF
Fire_Alarm_Revision_Sheets_FA1.0 _FA2.1 _FA3.1 _FA3.2 _FA4.0 _FA7.0.pdf PDF
Xanterra_-_Mammoth_Hotel_Limited_Hazardous_Materials_Inspection_Report.pdf PDF
Amendment_2_P16PS00611.pdf PDF
Amendment_1_P16PS00611.pdf PDF
Attachment_1_Specifications_VOL_2.pdf PDF
Attachment_2_-_09_Drawings_FP1.0_-_FP3.3.pdf PDF
Attachment_2_-_03_Drawings_AD2.0_-_A9.13.pdf PDF
Attachment_6_Proposal_Submission_Package.zip ZIP file
Attachment_2_-_05_Drawings_S0.1_-_SD2.1.pdf PDF
Attachment_1_Specifications_VOL_1.pdf PDF
Attachment_3_Geotechnical_Report.pdf PDF
Attachment_2_-_04_Drawings_FS0.0_-_FS7.1.pdf PDF
Attachment_2_-_10_Drawings_FA1.0_-_FA7.0.pdf PDF
Attachment_5_General_Decision_Number_WY13.docx DOCX document
Attachment_2_-_06_Drawings_SD2.2_-_S5.7.pdf PDF
Attachment_4_Historic_Structures_Report.pdf PDF
P16PS00611_YELL_189105.pdf PDF
Attachment_2_-_02_Drawings_C1.0_-C9.7.pdf PDF
Attachment_2_-_01_Drawings_Cover_Sheet_-A0.5.pdf PDF
Attachment_2_-_08_Drawings_E1.0_-_E5.3.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M1.0 MECHANICAL LEGENDS AND SCHEDULES

M1.1 MECHANICAL SCHEDULES II

MD3.1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

MD3.2 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN

M2.0 BASEMENT HVAC REMODEL PLAN

M2.1 FIRST FLOOR HVAC REMODEL PLAN

M2.2 SECOND FLOOR HVAC REMODEL PLAN

M3.0 BASEMENT MECHANICAL PIPING REMODEL PLAN

M3.1 FIRST FLOOR MECHANICAL PIPING REMODEL PLAN

M3.2 SECOND FLOOR MECHANICAL PIPING REMODEL PLAN

M4.0 MECHANICAL DETAILS I

THIS IS A STANDARDIZED SYMBOLS LEGEND, ALL SYMBOLS SHOWN MAY

NOT APPEAR ON OR WITHIN THIS SET OF CONTRACT DOCUMENTS.

- ALL INTERIOR SUPPLY DUCTWORK.

- ALL EXHAUST DUCTWORK FROM THE BACKDRAFT DAMPER TO THE ROOF LINE.

- ALL FRESH AIR DUCTWORK.

- ALL OTHER INTERIOR EXHAUST DUCTWORK.

- ALL INTERIOR RETURN DUCTWORK.

INSULATED FLEXIBLE DUCTWORK MAY BE USED IN LOCATIONS SHOWN ON DRAWINGS AT THE

CONTRACTOR'S OPTION FOR A MAXIMUM OF 5 FT. LENGTH TO EACH DIFFUSER/REGISTER/ GRILLE.

UNINSULATED/UNLINED DUCTWORK INCLUDES:

INSULATED DUCTWORK INCLUDES:

18"Ø or 18"

HPS

MPS

LPS

C

HWR

HWS

HOT WATER

RETURN

HOT WATER

SUPPLY

HIGH PRESS.

STEAM

MED. PRESS.

STEAM

LOW PRESS.

STEAM

CONDENSATE

LINE

DOUBLE LINE

REPRESENTATION

SINGLE LINE

REPRESENTATION

DOUBLE LINE

REPRESENTATION

SINGLE LINE

REPRESENTATION

P.O.C.-POINT OF

CONNECTION

SWITCH

T'STAT. (PNEU./ELEC.)

SIDEWALL AIR DEVICE

WALL LOUVER

NEW EQUIPMENT

EXISTING TO REMAIN

PLAN

CODE

MANUFACTURER

MODEL

NUMBER

SHELL SIDE TUBE SIDE

REMARKS

GPM EWT # OF PASSES GPM EWT LWT

HE-1 TACO E12206S 5.91 218.5 2 380 124 140

HE-2 TACO E12206S 5.91 218.5 2 380 124 140

PLAN

CODE

MANUFACTURER MODEL NUMBER SIZE RPM GPM FT OF HD

ELECTRICAL DATA

REMARKS

HP VOLT AMP PH

P-1 TACO FI3009C 4" X 3" 1760 382 60 10 200 32.2 3

P-2 TACO FI3009C 4" X 3" 1760 382 60 10 200 32.2 3

P-3 TACO 003-BC4 3/4 X 3/4" 3250 1 1.4 1/40 115 0.43 1

RECIRC PUMP

FOR RADIANT

NOTES:

1) BRONZE CASING PUMP. PUMP SEALS SHALL BE PROPYLENE GLYCOL COMPATIBLE.

2) REFER TO THE MECHANICAL DETAILS FOR ADDITIONAL REQUIREMENTS.

3) P-1 AND P-2 ARE TO BE VARIABLE SPEED DRIVEN FOR VARIABLE FLOW OPERATION. PROVIDE MOTOR WITH SHAFT GROUNDING RINGS. VFDS BY THE TEMPERATURE CONTROL CONTRACTOR.

PLAN CODE MFGR MODEL NUMBER GPM PIPE SIZE REMARKS

AS-1 TACO 4900 306 5"

PLAN CODE MFGR MODEL NUMBER TOTAL VOLUME ACCEPT. VOLUME PRECHARGE PRESSURE

ET-1 TACO CA450-125 119 119 12

PLAN CODE MANUFACTURER MODEL NUMBER GAL CAPACITY PRESSURE RANGE

ELECTRICAL DATA

REMARKS

VOLTS AMPS

GF-1

GENERAL TREATMENT

PRODUCTS

GP30 30 100 115 17.2 SEE NOTES

NOTES: PROVIDE UNIT WITH FULLY AUTOMATED SYSTEM INCLUDING LOW LEVEL CUTOFF AND ALARM, ISOLATION VALVES, STRAINER, PRESSURE TANK WITH PRESSURE CONTROL, PRESSURE

REDUCING VALVE AND GAUGE. PROVIDE UNIT WITH LID DESIGNED TO ACCOMMODATE RELIEF VALVE PIPING. PROVIDE MAGNETIC STARTER, 110V MOTOR AND CONTROLS, 10' POWER CORD.

PLAN CODE MANUFACTURER

MODEL

NUMBER

COIL

FACADE

TUBES

HEIGHT TYPE

MOUNT

HEIGHT

BTU/FT GPM EWT °F REMARKS

H-1, 2, 3, 4, 5 SIGMA SRK-W-4-CV2

2-PASS

STRAIGHT

4 11 13/16"

WALL

MOUNT

4" AFF 655 0.5 140

CONTROL VALVE SHALL BE SIZED TO FIT

INSIDE PANEL ENCLOSURE

PLAN

CODE

MANUFACTURER

MODEL

NUMBER

FUNCTION NECK SIZE MATERIAL FINISH CFM

VOLUME

DAMPER

REMARKS

CD-8 KRUEGER 1400 SUPPLY 8 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

CD-10 KRUEGER 1400 SUPPLY 10 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

CD-12 KRUEGER 1400 SUPPLY 12 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

RG-6 KRUEGER 6690 RETURN 6 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

RG-8 KRUEGER 6690 RETURN 8 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

RG-10 KRUEGER 6690 RETURN 10 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

RG-14 KRUEGER 6690 RETURN 14 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

FG-1 REGGIO REGISTERS G1012 SUPPLY 10 x 8 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

FG-2 REGGIO REGISTERS G1016 RETURN 14 x 8 STEEL

ARCHITECT

SELECTED

SEE PLAN IN DUCT

NOTES:

1) PROVIDE ALL DUCT TRANSITIONS TO AND FROM GRILLES/REGISTERS/DIFFUSERS AS REQUIRED.

2) CONTRACTOR TO VERIFY EXACT BUILDING CONSTRUCTION AND CEILING TYPES AND PROVIDE THE CORRECT FRAMES FOR ALL AIR DIFFUSION PRODUCTS AS REQUIRED.

3) PROVIDE EXTENDED LINKAGE FROM HAND DAMPER TO A FLUSH CUP DAMPER REGULATOR IN ALL HARD CEILING LOCATIONS (HARD INACCESSIBLE CEILINGS). REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR ALL TYPES OF CEILINGS.

4) PROVIDE MANUAL VOLUME DAMPERS FOR CONNECTION TO ALL GRD'S.

5) SEE DRAWINGS FOR FURTHER GRD REQUIREMENTS.

PLAN

CODE

MANUFACTURER

MODEL

NUMBER

AIR SIDE COOLING DATA

REMARKS

CFM ESP

EAT TOTAL

CAP,

MBH

SENS

CAP,

MBH

MCA MOCP VOLT PH

DB WB

FC-1 DAIKIN FXMQ48PBVJU 1400 0.4 95 75 48 35.8 3.4 15 208 1

FC-2 DAIKIN FXMQ24PBVJU 400 0.4 95 75 24 15.6 1.8 15 208 1

FC-3 DAIKIN FXMQ07PBVJU 200 0.4 95 75 7.5 6.4 0.6 15 208 1

FC-4 DAIKIN FXMQ48PBVJU 1400 0.4 95 75 48 35.8 3.4 15 208 1

FC-5 DAIKIN FXMQ36PBVJU 1130 0.4 95 75 36 28.8 2.9 15 208 1

FC-6 DAIKIN FXMQ30PBVJU 800 0.4 95 75 30 23.8 2.8 15 208 1

FC-10 DAIKIN FXFQ48TVJU 1218 0 80 67 48 35 1.8 15 208 1

NOTES: PROVIDE FC-10 WITH BYCQ125B-W1 DECORATION PANEL

PLAN CODE MANUFACTURER MODEL NUMBER FUNCTION SIZE MATERIAL FINISH CFM DAMPER REMARKS

L-1 RUSKIN ELF6375DX OUTSIDE AIR 42 X 30" ALUMINUM ARCHITECT SELECTED 3600 IN DUCT

L-2 RUSKIN ELF6375DX EXHAUST 42 X 30" ALUMINUM ARCHITECT SELECTED 3240 IN DUCT

L-3 RUSKIN ELF6375DX OUTSIDE AIR 48 X 42" ALUMINUM ARCHITECT SELECTED 5700 IN DUCT

L-4 RUSKIN ELF6375DX EXHAUST 48 X 42" ALUMINUM ARCHITECT SELECTED 5130 IN DUCT

L-5 RUSKIN ELF6375DX OUTSIDE AIR 19 X 18" ALUMINUM ARCHITECT SELECTED 775 IN DUCT

PLAN

CODE

MANUF.

MODEL

NUMBER

HEAT

RECOVERY

METHOD

HX WINTER

PERFORMANCE

HX SUMMER

PERFORMANCE

SUPPLY FAN EXHAUST FAN ELECTRICAL FILTERS

OA

CFM

OA

DB

EXH

CFM

EXH

DB

OA

CFM

OA

DB

EXH

CFM

EXH

DB

CFM ESP HP CFM

ESP/

TSP

HP VOLT PH TYPE

HRV-1 ALDES SH4000i PLATE 3600 -20 3600 70 3600 95 3600 75 3600 0.5 2.18 3600 0.5 1.66 208 3 MERV 8

HRV-2 ALDES SH1000i PLATE 970 -20 970 70 970 95 970 75 970 0.5 0.74 970 0.5 0.44 208 3 MERV 8

NOTE: PROVIDE WITH SINGLE POINT POWER CONNECTION, FUSED DISCONNECT, DOUBLE WALL CONSTRUCTION, FACTORY MOUNTED SUPPLY FAN VFD AND INVERTER DUTY MOTOR FOR USE WITH VFD, FACTORY

MOUNTED FILTER ALARMS, BMS INTEGRATION, AND MOTORIZED ISOLATION DAMPERS OA AND EA.

PLAN

CODE

MANUFACTURER

MODEL

NUMBER

SERVES LOCATION

TOTAL

CAP.

BTUH

SEN.

CAP.

BTUH

AMB

TEMP

COMPRESSOR

REFERENCE

PRODUCT

REMARKS

VOLTS PH MCA

CU-1 DAIKIN RWEYQ216PCTJ

FC-1,2,3,4,5,6

FC-7

OUTDOOR 272457 271412 95 230 3 67.2 R-410A SEE BELOW

CU-2 AAON

CFA-007-A-0-8-A

C00G

FC-9

FIRST FLOOR

ROOF

76200 75550 95 208 3 2.6 R-410A SEE BELOW

NOTES: MOUNT ON RACK ON ROOF TO ALLOW WATER TO FLOW UNDERNEATH UNIT. PROVIDE BHFP22MA84U CONNECTION PIPING KIT FOR CU-1.

PLAN

CODE

MANUFACTURER

MODEL

NUMBER

FUNCTION SIZE MATERIAL FINISH CFM DAMPER REMARKS

GV-1 GREENHECK WIH OUTSIDE AIR 38 X 58" ALUMINUM ALUMINUM 3600 IN DUCT SEE NOTES

GV-2 GREENHECK WRH EXHAUST AIR 38 X 58" ALUMINUM ALUMINUM 3240 IN DUCT SEE NOTES

NOTES: 1) PROVIDE WITH BIRD SCREEN AND PRE-MANUFACTURED ROOF CURB.

3) INSTALL MANUAL VOLUME DAMPER IN DUCT BELOW.

PLAN

CODE

MANUF.

MODEL

NUMBER

CFM ESP RPM

ELECTRICAL

REMARKS

VOLT AMP PH

EF-1 PANASONIC FV-40VQ3 300 0.5 1646 120 0.25 1

CEILING MOUNT. PROVIDE WITH

SPEED CONTROLLER

EF-2 PANASONIC FV-40VQ3 300 0.5 1646 120 0.25 1

CEILING MOUNT. PROVIDE WITH

SPEED CONTROLLER

EF-3 PANASONIC FV-15VQS 75 .5 1822 120 0.12 1

CEILING MOUNT. PROVIDE WITH

SPEED CONTROLLER. CONTROL

WITH SWITCH.

NOTES: TERMINATE EXHAUST DUCTWORK WITH A WALL CAP WITH BIRD SCREEN. COORDINATE INSTALLATION WITH

ELECTRICAL CONTRACTOR.

M1.0

JD

KW

JD

06/10/2016

TECH. REVIEW:

DATE:

SHEET

167OFPKG3

PKG.

NO.

PKG1

PKG2

DESIGNED:

CADD:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

YELLOWSTONE NATIONAL PARK, WYOMING

ARCHITII ECTSP

C

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084 www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

XXXX

Issue Date

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C

06/10/2016

PLAN

CODE

MFG MODEL

AREA

(FT^2)

REQUIRED

OUTPUT

(MBH)

PROVIDED

OUTPUT

(MBH)

SUPPLY /

RETURN

TEMP.

(MAX °F)

GPM

GLYCOL

# OF

CIRC.

APPRX.

CIRC.

LENGTH

(FT)

CIRC.

SPACING

(IN)

TUBE

SIZE

MIN.

BEND

RADIUS

(IN.)

WATER

PRESS.

DROP

(FT H20)

REMARK

RA-1 WATTS

RADIANTPEX+

PB03210121

426 9.4 24.8 85 / 65 1.0 30 4 233 6 1/2" 4 1.3 SEE NOTES

NOTES:

1. PRESENT INSTALLATION INCLUDES SLAB TUBING, MANIFOLD, AND THE SOURCE PIPING INSIDE THE BUILDING FROM THE FOUNDATION WALL TO THE NEW MECHANICAL ROOM.

2. PROVIDE TACO 5000 SERIES MIXING VALVE.

3. FURNISH AND INSTALL ONE (1) SUPPLY AND RETURN MANIFOLD: WATTS 1" FLOWMETER MANIFOLD #D3803002SS STAINLESS STEEL WITH FLOW REGULATORS AND CIRCUIT ISOLATION CAP.

FURNISH WITH THE MANIFOLD WITH A 1" SS ACCESSORIES KIT WITH 1" FNPT ISOLATION BALL VALVES.

4. REFER TO DETAILS 5, 6, AND 7 ON SHEET M1.1 FOR FURTHER INSTRUCTIONS.

HWS/R BRANCH LINES

1"

HWR

1"

HWS

BALL VALVE (TYP.)

AUTO BALANCE VALVE.

EQUAL TO FLOW DESIGN INC.

MODEL #ACE. GPM FLOW RATE

TO BE 1 GPM

H W

R

H W

S

TO RADIANT HEAT

ZONE SLAB T-STAT

TACO #5004-CI

MIXING VALVE, OR

APPROVED EQUAL

TO & FROM RADIANT HEAT MANIFOLDS

IN THE VESTIBULE

P

IP

E D

IA

M

E T E R S M

A X

12" VERTICAL DROP

HEAT TRAP

H W

S

H W

R

SLAB INSULATION BY THE

GENERAL CONTRACTOR.

CONTRACTOR SHALL REFER TO THE

DETAILS ON THE CIVIL DRAWINGS FOR

ADDITIONAL COORDINATION AND

INSTALLATION REQUIREMENTS.

FOAM STAPLES OR

STRAP TO SLAB'S WIRE

MESH SYSTEM

INSTALL A MINIMUM OF 3" CONCRETE

ABOVE THE TOP OF THE PIPING. FOLLOW

THE RADIANT HEAT PIPING

MANUFACTURER'S INSTALLATION

INSTRUCTIONS FOR INSTALLATION OF

PIPING, SUPPORT, BRIDGING, AND

INSTALLATION AT EXPANSION JOINTS.

REFER TO STRUCTURAL DRAWINGS

FOR CONCRETE SLAB MAKEUP. SECURE

PIPING PER MANUFACTURER'S REQUIREMENTS

RADIANT FLOOR PIPING DETAIL6

M1.1 : M1.1 NO SCALE

RADIANT FLOOR PIPING DETAIL 27

M1.1 : M1.1 NO SCALE

RADIANT FLOOR PIPING DETAIL 38

M1.1 : M1.1 NO SCALE

PLAN

CODE

MANUFACTURER

MODEL

NUMBER

HEATING DATA COOLING DATA AIR SIDE ELECTRICAL DATA

FILTER REMARKS

GPM

PRESS

DROP

EWT LWT

EAT

DB

EAT

WB

REF

PRODUCT

TOTAL

CAP,

MBH

SENS

CAP,

MBH

CFM ESP

# OF

COILS

PRESS

DROP

HP

FAN

FLA

MCA VOLT PH

FC-7 ENVIRO-TEC H-30 8 0.91 140 118.9 ----- ----- ----- ----- ----- 2490 1 2 0.08 1 6.8 8.5 208 1 MERV 8

FC-8 ENVIRO-TEC H-30 8 0.91 140 118.9 ----- ----- ----- ----- ----- 2450 1 2 0.08 1 6.8 8.5 208 1 MERV 8

FC-9 ENVIRO-TEC H-30 8 0.91 140 118.9 80 67 R-410A 86.7 51.2 1740 1 2 0.08 1 6.8 8.5 208 1 MERV 8

NOTES: 1) PROVIDE FACTORY CERTIFIED START UP, ADJUSTMENT, AND OWNER INSTRUCTION AS REQUIRED.

2) MOUNT UNITS ON CONCRETE CURB 4" LARGER IN EACH DIRECTION. EXCAVATE AROUND UNIT FOR ACCESS AND SERVICE.

INSULATION BOARD (BY OTHERS)

BASE MATERIAL

CONCRETE SLAB RADIANT FLOOR PIPING

M1.1

MECHANICAL SCHEDULES II

06/10/2016

TECH. REVIEW:

DATE:

SHEET

167OFPKG3

PKG.

NO.

PKG1

PKG2

DESIGNED:

CADD:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

YELLOWSTONE NATIONAL PARK, WYOMING

ARCHITII ECTSP

C

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084 www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

XXXX

Issue Date

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C

06/10/2016

JD

KW

JD

UP

6 72

D

B

A

3 4 5

C

E

1 1 1 1 1 1 1 1

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

2 2 2

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:5

A M

15BZ4199.004

06/10/2016

FIRST FLOOR MECHANICAL PIPING

DEMOLITION PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

MD3.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"MD3.1

1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

MECHANICAL KEYNOTES

1 CAREFULLY REMOVE EXISTING RADIATOR AND ALL ASSOCIATED PIPING AND VALVES. PRESENT ALL RADIATORS TO

CONTRACTING OFFICER FOR SALVAGE.

2 CAREFULLY REMOVE EXISTING RADIATOR AT APPROXIMATE LOCATION. GENERAL CONTRACTOR SHALL REMOVE AND

REFURBISH RADIATOR BEFORE RE-INSTALLATION. GENERAL CONTRACTOR SHALL SAND, PAINT, AND FINISH RADIATOR

TO BE RE-INSTALLED IN NON-WORKING CONDITION.

MECHANICAL PIPING GENERAL DEMOLITION NOTES

1 GENERAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO PERFORM THE WORK

DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL

ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.

2 COORDINATE HVAC AND PLUMBING EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.

3 THE INFORMATION SHOWN ON THIS DRAWING WAS OBTAINED FROM EXISTING DRAWINGS AND VISUAL FIELD

OBSERVATIONS WHICH SHALL BE INCLUDED IN THE SCOPE OF WORK. FIELD VERIFY ALL EXISTING CONDITIONS AND

PROVIDE DEMOLITION AS REQUIRED TO ACCOMODATE CONSTRUCTION.

4 NOTIFY THE CONTRACTING OFFICER OF ANY SYSTEM SHUT-DOWNS AND APPROXIMATE SHUT-DOWN TIME PRIOR TO

COMMENCING WITH WORK.

5 CONTRACTOR SHALL REMOVE ALL DEMO'D MATERIALS FROM BUILDING, UNLESS SPECIFICALLY NOTED TO BE

ABANDONED IN PLACE.

6 DRAWINGS SHOW GENERAL LOCATIONS OF MATERIALS TO BE REMOVED. IT SHALL BE THE CONTRACTORS

RESPONSIBILITY TO DETERMINE THE EXTENT OF WORK REQUIRED FOR A COMPLETE SYSTEM REMOVAL.

7 CONTRACTING OFFICER HAS FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT/MATERIAL CALLED OUT TO BE REMOVED.

CONTRACTOR SHALL PRESENT ALL DEMO'D EQUIPMENT/MATERIAL TO CONTRACTING OFFICER PRIOR TO REMOVING

FROM SITE.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

DN

D

B

A

3 4 5

C

E

1 1 1 1

R

EX

R

EXR

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

R

EX

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:0

A M

15BZ4199.004

06/10/2016

SECOND FLOOR MECHANICAL PIPING

DEMOLITION PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

MD3.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"MD3.2

1 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN

MECHANICAL KEYNOTES

1 CAREFULLY REMOVE EXISTING RADIATOR AND ALL ASSOCIATED PIPING AND VALVES. PRESENT ALL RADIATORS TO

CONTRACTING OFFICER FOR SALVAGE.

2 CAREFULLY REMOVE EXISTING RADIATOR AT APPROXIMATE LOCATION. GENERAL CONTRACTOR SHALL REMOVE AND

REFURBISH RADIATOR BEFORE RE-INSTALLATION. GENERAL CONTRACTOR SHALL SAND, PAINT, AND FINISH RADIATOR

TO BE RE-INSTALLED IN NON-WORKING CONDITION AT HOTEL FRONT ENTRY ON FIRST FLOOR.

MECHANICAL PIPING GENERAL DEMOLITION NOTES

1 GENERAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO PERFORM THE WORK

DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL

ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.

2 COORDINATE HVAC AND PLUMBING EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.

3 THE INFORMATION SHOWN ON THIS DRAWING WAS OBTAINED FROM EXISTING DRAWINGS AND VISUAL FIELD

OBSERVATIONS WHICH SHALL BE INCLUDED IN THE SCOPE OF WORK. FIELD VERIFY ALL EXISTING CONDITIONS AND

PROVIDE DEMOLITION AS REQUIRED TO ACCOMODATE CONSTRUCTION.

4 NOTIFY THE CONTRACTING OFFICER OF ANY SYSTEM SHUT-DOWNS AND APPROXIMATE SHUT-DOWN TIME PRIOR TO

COMMENCING WITH WORK.

5 CONTRACTOR SHALL REMOVE ALL DEMO'D MATERIALS FROM BUILDING, UNLESS SPECIFICALLY NOTED TO BE

ABANDONED IN PLACE.

6 DRAWINGS SHOW GENERAL LOCATIONS OF MATERIALS TO BE REMOVED. IT SHALL BE THE CONTRACTORS

RESPONSIBILITY TO DETERMINE THE EXTENT OF WORK REQUIRED FOR A COMPLETE SYSTEM REMOVAL.

7 CONTRACTING OFFICER HAS FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT/MATERIAL CALLED OUT TO BE REMOVED.

CONTRACTOR SHALL PRESENT ALL DEMO'D EQUIPMENT/MATERIAL TO CONTRACTING OFFICER PRIOR TO REMOVING

FROM SITE.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

D

B

A

3 4 5

C

E

22"x16"

18"x8" x1

16"x14"16"x12"12"x12"10"x8" x8 x8 x8 x8

22"x16" x8 x8

18"x14" x1

14"x8"

14"x8" x8 x8 x8

22"x16"16"x12" x1 x8

14"x8"

10"x8" 14"x12"

18"x12" 18"x14" 22"x14" x1

22"x16"

16"x12" x1

14"x8" x8

FC

FC

FC

x8 x8 x8 x8 x8

1 1 1 1 1

1 1 1 1 1

2 2 x1 x1

8"x10" 10"x10" 8"x8" x8

"1 x2

20"x14"

14"x20"

MECHANICAL

ELECTRICAL / TEL DATA

HALLWAY

HALLWAY

STAIR

S1

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:3

A M

15BZ4199.004

06/10/2016

BASEMENT HVAC REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

M2.0

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"M2.0

1 BASMENT HVAC REMODEL PLAN

MECHANICAL GENERAL NOTES

1 MECHANICAL CONTRACTOR SHALL CUT ALL

FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED

TO PERFORM THE WORK DEPICTED IN THESE

CONTRACT DOCUMENTS AND SPECIFICATIONS.

GENERAL CONTRACTOR SHALL PATCH ALL

ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF

AS REQUIRED TO THE SATISFACTION OF THE

ARCHITECT/ENGINEER.

2 COORDINATE EXACT LOCATION OF DIFFUSERS AND

GRILLES WITH REFLECTED CEILING PLAN AND

LIGHTING LAYOUT.

3 FLEX DUCT RUN OUTS SHALL BE LIMITED TO 5'-0".

4 COORDINATE HVAC AND PLUMBING EQUIPMENT

WITH ALL OTHER TRADES AS REQUIRED.

5 ALL CEILING DIFFUSERS TO BE 4-WAY UNLESS

OTHERWISE NOTED.

6 DUCT PENETRATIONS THROUGH ROOF TO BE

COORDINATED WITH JOIST LAYOUT.

7 ALL DUCTS ABOVE CORRIDOR AREAS TO BE

MINIMUM 24 GAUGE SHEET METAL.

8 PROVIDE FLUSH CUP CONCEALED OPERATORS ON

ALL HAND DAMPERS LOCATED ABOVE HARD

CEILINGS.

9 LINE ALL SUPPLY AND RETURN DUCTS WITH 1" A.L.

WITHIN 15' OF FANS.

10 ALL DUCT DIMENSIONS SHOWN ON PLANS ARE

CLEAR INTERIOR DIMENSIONS.

11 PROGRAMMABLE THERMOSTATS SHALL BE

PROVIDED WITH NEW BATTERIES AT TIME OF

SUBSTANTIAL COMPLETION.

12 VERIFY EXACT LOCATION OF T-STATS WITH

ARCHITECT PRIOR TO INSTALLATION.

13 SEAL ALL MECHANICAL PENETRATIONS THROUGH

FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE

RATED SYSTEM.

14 PROVIDE LOCKING COVERS FOR ALL THERMOSTATS

LOCATED IN PUBLIC SPACES.

MECHANICAL KEYNOTES

1 ROUTE 10X8" SUPPLY DUCT UP THROUGH FLOOR TO FLOOR GRILLE ABOVE. CONNECT TO GRILLE AS REQUIRED.

2 ROUTE 14X8" RETURN DUCT UP THROUGH FLOOR TO FLOOR GRILLE ABOVE. CONNECT TO GRILLE AS REQUIRED.

3 ROUTE SUPPLY AND RETURN DUCTS UP THROUGH CHASE TO FIRST FLOOR CEILING SPACE ABOVE. SEE SHEET M2.1 FOR

CONTINUATION.

4 MOUNT UNIT ON CONCRETE PAD AT APPROXIMATE LOCATION SHOWN. EXCAVATE DIRT AROUND UNIT TO PROVIDE

ACCESS FOR SERVICE/REPLACEMENT.

5 INSTALL MANUAL VOLUME DAMPER IN DUCT AT APPROXIMATE LOCATION SHOWN. SET DAMPER TO ALLOW 300 CFM

THROUGH. CONNECT DUCT INTO RETURN DUCT OF FC-9.

6 INSTALL MANUAL VOLUME DAMPER IN DUCT AT APPROXIMATE LOCATION SHOWN. SET DAMPER TO ALLOW 250 CFM

THROUGH. CONNECT DUCT INTO RETURN DUCT OF FC-7.

7 INSTALL MANUAL VOLUME DAMPER IN DUCT AT APPROXIMATE LOCATION SHOWN. SET DAMPER TO ALLOW 225 CFM

THROUGH. CONNECT DUCT INTO RETURN DUCT OF FC-8.

8 MOUNT FC-9 HANGING OFF STRUCTURE WITH VIBRATION ISOLATORS AT APPROXIMATE LOCATION.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

18" X 42"

18" X 30"

21" X 48"

18" X 42"18" X 42"18" X 42"

GIFT SHOP

SKI SHOP / STORAGE

WOMEN'S RESTROOM

MEN'S RESTROOM

LOBBY

DELIVERY

STAIR

S1

ELEVATOR

E1

MANAGER'S OFFICE

FRONT OFFICE

REGISTRATION

MAIL

HALLWAY

MAP ROOM

STOR.

BAR

161A

VESTIBULE

6 72

D

B

A

3 4 5

C

E

FG-1

350 CFM

FG-2

495 CFM

FG-2

495 CFM

FG-1

415 CFM

FG-1

415 CFM

FG-1

415 CFM

FG-1

415 CFM FG-1

415 CFM FG-1

415 CFM

FG-2

495 CFM

FG-2

495 CFM

FG-2

490 CFM

FG-2

490 CFM

FG-1

350 CFM

FG-1

350 CFM

FG-1

350 CFM

FG-1

350 CFM

FG-1

350 CFM

FG-1

350 CFM

FG-2

490 CFM

FG-2

490 CFM

1 1 1 1 1 1 1 1 1 1 1

2 2

M2.1 ø

EF

EF

6"ø3 ø ø

6"ø

RG-10

315 CFM

ø ø

RG-10

315 CFM

CD-10

290 CFM

CD-10

290 CFM

CD-10

290 CFM

RG-10

315 CFM

RG-10

315 CFM

CD-10

290 CFM

ø

10"ø

14"x10"

20"x12" 14"x10" x1

20"x10"

12"x10" ø ø 12"x10" ø ø

CD-10

290 CFM

CD-10

290 CFM

ø1 ø ø

6"ø

L-5

775 CFM

EF

6"ø

8"ø ø

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:3

A M

15BZ4199.004

06/10/2016

FIRST FLOOR HVAC REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

M2.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"M2.1

1 FIRST FLOOR HVAC REMODEL PLAN

MECHANICAL GENERAL NOTES

1 MECHANICAL CONTRACTOR SHALL CUT ALL

FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED

TO PERFORM THE WORK DEPICTED IN THESE

CONTRACT DOCUMENTS AND SPECIFICATIONS.

GENERAL CONTRACTOR SHALL PATCH ALL

ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF

AS REQUIRED TO THE SATISFACTION OF THE

ARCHITECT/ENGINEER.

2 COORDINATE EXACT LOCATION OF DIFFUSERS AND

GRILLES WITH REFLECTED CEILING PLAN AND

LIGHTING LAYOUT.

3 FLEX DUCT RUN OUTS SHALL BE LIMITED TO 5'-0".

4 COORDINATE HVAC AND PLUMBING EQUIPMENT

WITH ALL OTHER TRADES AS REQUIRED.

5 ALL CEILING DIFFUSERS TO BE 4-WAY UNLESS

OTHERWISE NOTED.

6 DUCT PENETRATIONS THROUGH ROOF TO BE

COORDINATED WITH JOIST LAYOUT.

7 ALL DUCTS ABOVE CORRIDOR AREAS TO BE

MINIMUM 24 GAUGE SHEET METAL.

8 PROVIDE FLUSH CUP CONCEALED OPERATORS ON

ALL HAND DAMPERS LOCATED ABOVE HARD

CEILINGS.

9 LINE ALL SUPPLY AND RETURN DUCTS WITH 1" A.L.

WITHIN 15' OF FANS.

10 ALL DUCT DIMENSIONS SHOWN ON PLANS ARE

CLEAR INTERIOR DIMENSIONS.

11 PROGRAMMABLE THERMOSTATS SHALL BE

PROVIDED WITH NEW BATTERIES AT TIME OF

SUBSTANTIAL COMPLETION.

12 VERIFY EXACT LOCATION OF T-STATS WITH

ARCHITECT PRIOR TO INSTALLATION.

13 SEAL ALL MECHANICAL PENETRATIONS THROUGH

FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE

RATED SYSTEM.

14 PROVIDE LOCKING COVERS FOR ALL THERMOSTATS

LOCATED IN PUBLIC SPACES.

MECHANICAL KEYNOTES

1 INSTALL SUPPLY FG-1 IN FLOOR AT APPROXIMATE LOCATION SHOWN. ROUTE DUCT THROUGH BASEMENT CRAWLSPACE

AND CONNECT TO GRILLE AS REQUIRED.

2 INSTALL RETURN FG-2 IN FLOOR AT APPROXIMATE LOCATION SHOWN. ROUTE DUCT THROUGH BASEMENT

CRAWLSPACE AND CONNECT TO GRILLE AS REQUIRED.

3 ROUTE 6" EXHAUST DUCT AS SHOWN TO EXTERIOR WALL. TERMINATE AT WALL CAP WITH BIRD SCREEN.

4 ROUTE 8" FIREPLACE EXHAUST TO APPROXIMATE LOCATION SHOWN, AT LEAST 10' FROM ADJACENT WALL.

TERMINATE WITH ANODIZED BLACK ROOF CAP WITH BIRD SCREEN.

5 ROUTE SUPPLY AND RETURN DUCTS DOWN THROUGH CHASE TO BASEMENT BELOW. SEE SHEET M2.0 FOR

CONTINUATION.

: 1/4" = 1'-0"M2.1M2.1

2 LOBBY FIREPLACE VENT SECTION

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

24" X 48"

24" X 48"

X

24" X 72"

24" X 36" 24" X 36"

BOARD ROOM

CONFERENCE ROOM

CONFERENCE ROOM

HALLWAY

WOMEN'S RESTROOM

MEN'S RESTROOM

STOR.

STAIR

S1

PANTRY

TABLE STORAGE

CD-12

530 CFM

CD-10

300 CFM

CD-10

300 CFM

RG-10

475 CFM

CD-8

200 CFM

RG-8

175 CFM

RG-10

250 CFM

CD-10

400 CFM

CD-10

350 CFM

RG-14

630 CFM

RG-14

630 CFM

CD-10

350 CFM

CD-10

350 CFM

CD-10

350 CFM

CD-10

350 CFM

CD-10

350 CFM

RG-14

630 CFM

RG-14

630 CFM

CD-10

350 CFM

CD-10

350 CFM

CD-10

400 CFM

CD-10

400 CFM

RG-14

360 CFM

RG-14

360 CFM

FC

FC

FC

FC

FC

FC

6 72

D

B

A

3 4 5

C

E

CD-12

600 CFM

CD-12

600 CFM

RG-14

810 CFM

CD-12

600 CFM

CD-12

600 CFM

RG-14

810 CFM

CD-12

600 CFM

CD-12

600 CFM

14"ø ø ø ø ø ø

10"ø ø

14"ø14"ø ø

10"ø

6"ø

10"ø10"ø

14"ø 14"ø ø ø

10"ø ø

16"ø

14"ø ø

10"x10"

14"ø 14"ø x1 ø

10"ø

6"ø

8"ø

8"ø

RG-8

130 CFM

RG-8

130 CFM

RG-8

75 CFM

RG-10

225 CFM

RG-10

225 CFM

RG-6

75 CFM

RG-6

35 CFM

RG-6

75 CFM

8"ø

8"ø ø ø ø ø

12"x10"

L-4

5130 CFM

L-3

5700 CFM

20"x24"

GV

GV

RG-14

810 CFM

RG-14

810 CFM

ø ø

HRV

HRV

14"ø

18"x14"

24"x14"

32"x14"

48"x14"

48"x14"

14"x14" ø x2

20"x24"

24"x14"

20"x14"14"x14"

34"x14" ø

12"ø 6"ø

12"x12"

14"x14"

14"x14" x1 ø x1

14"x14"

10"ø ø ø

12"ø ø ø

8"ø14"x12"

6"ø

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

SECOND FLOOR HVAC REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

M2.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"M2.2

1 SECOND FLOOR HVAC REMODEL PLAN

MECHANICAL GENERAL NOTES

1 MECHANICAL CONTRACTOR SHALL CUT ALL

FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED

TO PERFORM THE WORK DEPICTED IN THESE

CONTRACT DOCUMENTS AND SPECIFICATIONS.

GENERAL CONTRACTOR SHALL PATCH ALL

ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF

AS REQUIRED TO THE SATISFACTION OF THE

ARCHITECT/ENGINEER.

2 COORDINATE EXACT LOCATION OF DIFFUSERS AND

GRILLES WITH REFLECTED CEILING PLAN AND

LIGHTING LAYOUT.

3 FLEX DUCT RUN OUTS SHALL BE LIMITED TO 5'-0".

4 COORDINATE HVAC AND PLUMBING EQUIPMENT

WITH ALL OTHER TRADES AS REQUIRED.

5 ALL CEILING DIFFUSERS TO BE 4-WAY UNLESS

OTHERWISE NOTED.

6 DUCT PENETRATIONS THROUGH ROOF TO BE

COORDINATED WITH JOIST LAYOUT.

7 ALL DUCTS ABOVE CORRIDOR AREAS TO BE

MINIMUM 24 GAUGE SHEET METAL.

8 PROVIDE FLUSH CUP CONCEALED OPERATORS ON

ALL HAND DAMPERS LOCATED ABOVE HARD

CEILINGS.

9 LINE ALL SUPPLY AND RETURN DUCTS WITH 1" A.L.

WITHIN 15' OF FANS.

10 ALL DUCT DIMENSIONS SHOWN ON PLANS ARE

CLEAR INTERIOR DIMENSIONS.

11 PROGRAMMABLE THERMOSTATS SHALL BE

PROVIDED WITH NEW BATTERIES AT TIME OF

SUBSTANTIAL COMPLETION.

12 VERIFY EXACT LOCATION OF T-STATS WITH

ARCHITECT PRIOR TO INSTALLATION.

13 SEAL ALL MECHANICAL PENETRATIONS THROUGH

FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE

RATED SYSTEM.

14 PROVIDE LOCKING COVERS FOR ALL THERMOSTATS

LOCATED IN PUBLIC SPACES.

MECHANICAL KEYNOTES

1 MOUNT HRV-2 FROM ROOF STRUCTURE IN ATTIC SPACE. ROUTE SUPPLY DUCTWORK TO RETURN SIDE OF VRV AS

SHOWN.

2 ROUTE 14X14" OUTSIDE AIR DUCT TO APPROXIMATE LOCATION. TRANSITION TO 48X42" DUCT AND ATTACH TO

LOUVER ON DORMER ON NORTH SIDE OF ROOF. FIELD VERIFY EXACT LOCATION.

3 ROUTE 14X14" EXHAUST DUCT TO APPROXIMATE LOCATION. TRANSITION TO 48X42" DUCT AND ATTACH TO LOUVER

ON DORMER ON NORTH SIDE OF ROOF. FIELD VERIFY EXACT LOCATION.

4 SET MANUAL VOLUME DAMPER TO ALLOW 75 CFM THROUGH.

5 SET MANUAL VOLUME DAMPER TO ALLOW 130 CFM THROUGH.

6 SET MANUAL VOLUME DAMPER TO ALLOW 150 CFM THROUGH.

7 SET MANUAL VOLUME DAMPER TO ALLOW 40 CFM THROUGH.

8 SET MANUAL VOLUME DAMPER TO ALLOW 450 CFM THROUGH.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

T

P

P

ET

GF

2 2

6 72

D

B

A

3 4 5

C

E

AS

HE

HE

FC

FC

FC

ø L

P S

4"ø LPS 1 1/4"ø LPC

4"ø LPS

/4 "ø

L P C ø M

P S

6"ø MPS

6" ø

M

PS

ø M

P S

1 1/4"ø HWS

1 1/4"ø HWR 1 1/4"ø HWR

1 1/4"ø HWS

4"ø HWR 4"ø HWS

4"ø HWR 4"ø HWS

4"ø HWR ø H

W R ø H

W S ø H

W S ø H

W R

/2 ø H

W S

/2 ø H

W R

/2 ø H

W S

/2 ø H

W R

/2 ø H

W R

/2 ø H

W S

1/2"ø HWS 1/2"ø HWR

4"ø HWR ø H

W R ø H

W S

1 1/4"ø HWR

1 1/4"ø HWS

P

RL

RS

FC

RL

RS

11 11 11

MECHANICAL

ELECTRICAL / TEL DATA

HALLWAY

STAIR

S1

1/2"ø HWS

1/2"ø HWR

H

3/4"ø HWS

3/4"ø HWR

/4 ø H

W S

/4 ø H

W R

3/4"ø HWS

3/4"ø HWR

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

BASEMENT MECHANICAL PIPING

REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

M3.0

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"M3.0

1 BASEMENT MECHANICAL PIPING REMODEL PLAN

MECHANICAL PIPING GENERAL NOTES

1 MECHANICAL CONTRACTOR SHALL CUT ALL

FLOORS, WALLS, CEILINGS AND ROOF AS

REQUIRED TO PERFORM THE WORK DEPICTED IN

THESE CONTRACT DOCUMENTS AND

SPECIFICATIONS. GENERAL CONTRACTOR

SHALL PATCH ALL ASSOCIATED FLOORS,

WALLS, CEILINGS, AND ROOF AS REQUIRED TO

THE SATISFACTION OF THE

ARCHITECT/ENGINEER.

2 SEAL ALL MECHANICAL PENETRATIONS

THROUGH FIRE RATED ASSEMBLIES WITH

UL-APPROVED FIRE RATED SYSTEM.

3 HYDRONIC VALVES 2" AND SMALLER TO BE

BALL VALVES. HYDRONIC VALVES LARGER

THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.

4 LOCATE ALL VALVES ABOVE ACCESSIBLE

CEILINGS OR PROVIDE ACCESS PANEL IN

CEILING FOR VALVE ACCESS. ACCESS PANELS

SHALL BE RATED WHERE REQUIRED.

5 COORDINATE HVAC AND PLUMBING ROUTING

AND EQUIPMENT WITH ALL OTHER TRADES AS

REQUIRED.

6 VERIFY EXACT LOCATION OF THERMOSTATS

WITH ARCHITECT PRIOR TO INSTALLATION.

7 THERMOSTATS TO BE LOCATED AT 48" A.F.F.

8 CAREFULLY REMOVE AND SALVAGE ALL

EXISTING RADIATORS. COORDINATE WITH

ARCHITECT AND CONTRACTING OFFICER FOR

UNITS TO BE REFURBISHED AND REPLACED.

9 COORDINATE ALL BASEMENT MECHANICAL

PIPING WITH EXISTING CONDITIONS AND NEW

FOOTING CONSTRUCTION.

10 PROVIDE LOCKING COVERS FOR ALL

THERMOSTATS LOCATED IN PUBLIC SPACES.

MECHANICAL KEYNOTES

1 CAP HWS/HWR FOR FUTURE PHASE 2 CONNECTIONS.

2 ROUTE HWS/HWR UP IN WALL TO SERVE RADIATOR ON FIRST FLOOR. SEE SHEET M3.1 FOR CONTINUATION.

3 P.O.C. CONNECT TO EXISTING STEAM AND CONDENSATE RETURN PIPING. FIELD VERIFY EXACT LOCATION.

4 ROUTE 1" HWS/HRW TO MIXING VALVE AT APPROXIMATE LOCATION SHOWN.

5 ROUTE 1" HWS TO P-3 AT APPROXIMATE LOCATION SHOWN.

6 INSTALL RADIANT HEAT MANIFOLD AT APPROXIMATE LOCATION SHOWN. ROUTE RADIANT HEAT PIPING THROUGH

VESTIBULE FLOOR ABOVE. SEE SHEET M3.1 FOR CONTINUATION.

7 INSTALL BALANCING VALVE AT APPROXIMATE LOCATION SHOWN. SET VALVE AT 1.0 GPM.

8 MOUNT FC-7 IN CEILING AT APPROXIMATE LOCATION SHOWN. ROUTE REFRIGERANT PIPING UP IN WALL TO SECOND

FLOOR ATTIC SPACE AT APPROXIMATE LOCATION SHOWN. SEE SHEETS M3.1 AND M3.2 FOR CONTINUATION.

9 ROUTE RS/RL PIPING UP IN WALL TO ROOF ABOVE FIRST FLOOR. SEE SHEET M3.2 FOR CONTINUATION. SIZE PIPING PER

MANUFACTURER RECOMMENDATION.

10 INSTALL CONTROL VALVE AT APPROXIMATE LOCATION. SET FLOW AT 8 GPM.

11 INSTALL CONTROL VALVE AT APPROXIMATE LOCATION. SET FLOW AT 0.5 GPM.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

18" X 30"

21" X 48"

18" X 42"18" X 42"18" X 42"

T

T T

T

T

T

T

T

T

GIFT SHOP

SKI SHOP / STORAGE

WOMEN'S RESTROOM

MEN'S RESTROOM

LOBBY

DELIVERY

STAIR

S1

ELEVATOR

E1

MANAGER'S OFFICE

FRONT OFFICE

REGISTRATION

MAIL

HALLWAY

MAP ROOM

STOR.

BAR

161A

VESTIBULE

6 72

D

B

A

3 4 5

C

E

H

H

H

H

1 1

H

4 4 4 4

1/2"ø HWS

1/2"ø HWR

RL

RS

1/2"ø HWS

1/2"ø HWR

1/2"ø HWS 1/2"ø HWR

RL

RS

1/2"ø HWR 1/2"ø HWS

1/2"ø HWR

1/2"ø HWS

H

3/4"ø HWS

3/4"ø HWR

3/4"ø HWS

3/4"ø HWR

H

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

FIRST FLOOR MECHANICAL PIPING

REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

M3.1

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"M3.1

1 FIRST FLOOR MECHANICAL PIPING REMODEL PLAN

MECHANICAL PIPING GENERAL NOTES

1 MECHANICAL CONTRACTOR SHALL CUT ALL

FLOORS, WALLS, CEILINGS AND ROOF AS

REQUIRED TO PERFORM THE WORK DEPICTED IN

THESE CONTRACT DOCUMENTS AND

SPECIFICATIONS. GENERAL CONTRACTOR

SHALL PATCH ALL ASSOCIATED FLOORS,

WALLS, CEILINGS, AND ROOF AS REQUIRED TO

THE SATISFACTION OF THE

ARCHITECT/ENGINEER.

2 SEAL ALL MECHANICAL PENETRATIONS

THROUGH FIRE RATED ASSEMBLIES WITH

UL-APPROVED FIRE RATED SYSTEM.

3 HYDRONIC VALVES 2" AND SMALLER TO BE

BALL VALVES. HYDRONIC VALVES LARGER

THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.

4 LOCATE ALL VALVES ABOVE ACCESSIBLE

CEILINGS OR PROVIDE ACCESS PANEL IN

CEILING FOR VALVE ACCESS. ACCESS PANELS

SHALL BE RATED WHERE REQUIRED.

5 COORDINATE HVAC AND PLUMBING ROUTING

AND EQUIPMENT WITH ALL OTHER TRADES AS

REQUIRED.

6 VERIFY EXACT LOCATION OF THERMOSTATS

WITH ARCHITECT PRIOR TO INSTALLATION.

7 THERMOSTATS TO BE LOCATED AT 48" A.F.F.

8 CAREFULLY REMOVE AND SALVAGE ALL

EXISTING RADIATORS. COORDINATE WITH

ARCHITECT AND CONTRACTING OFFICER FOR

UNITS TO BE REFURBISHED AND REPLACED.

9 COORDINATE ALL BASEMENT MECHANICAL

PIPING WITH EXISTING CONDITIONS AND NEW

FOOTING CONSTRUCTION.

10 PROVIDE LOCKING COVERS FOR ALL

THERMOSTATS LOCATED IN PUBLIC SPACES.

MECHANICAL KEYNOTES

1 INSTALL NEW RADIANT HEAT PANEL AT APPROXIMATE LOCATION SHOWN. ROUTE HWS/HWR PIPING UP FROM

BASEMENT.

2 CONTINUE REFRIGERANT PIPING FROM BASEMENT TO SECOND FLOOR ATTIC SPACE AT APPROXIMATE LOCATION

SHOWN. SEE SHEETS M3.0 AND M3.2 FOR CONTINUATION.

3 CONTINUE RS/RL PIPING IN WALL FROM FIRST FLOOR ROOF TO BASEMENT TO SERVE FC-9. SEE SHEETS M3.0 AND M3.2

FOR CONTINUATION. SIZE PIPING PER MANUFACTURER RECOMMENDATION.

4 RE-INSTALL SHORTER HISTORIC RADIATORS BACK IN ORIGINAL LOCATION AS SHOWN. RADIATORS TO BE REFURBISHED

BUT NON-FUNCTIONAL.

5 INSTALL THERMOSTAT FOR LOBBY AT APPROXIMATE LOCATION SHOWN. INSTALL REMOTE SENSOR IN SOUTH WALL OF

MAIL 136 IN LOBBY.

6 INSTALL REMOTE SENSOR AT APPROXIMATE LOCATION SHOWN. INSTALL THERMOSTAT IN WEST WALL OF

REGISTRATION 135 AS SHOWN.

7 INSTALL RADIANT IN FLOOR HEATING PIPING THROUGHOUT VESTIBULE PER MANUFACTURER RECOMMENDATION.

BASIS OF DESIGN IS 4 LOOPS OF 1/2" PIPING FROM MANIFOLD AT 6" SPACING.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

24" X 48"

X

24" X 72"

24" X 36" 24" X 36"

TT

T

T

T

T

BOARD ROOM

CONFERENCE ROOM

CONFERENCE ROOM

HALLWAY

WOMEN'S RESTROOM

MEN'S RESTROOM

STOR.

STAIR

S1 PANTRY

TABLE STORAGE

6 72

D

B

A

3 4 5

C

E

FC

FC

FC

FC

FC

FC

RS

RL

RS

1 1/4"ø CD

RL

/4 "ø

C D

RS

RL

RS

RL

/4 "ø

C D

1 1/4"ø CD

RS

RL

/4 "ø

C D

RL

RS

RS

/4 "ø

C D

RL RS

CU

1RS

RL

CU

1 1/4"ø CD

RS

RL

RS

RL

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:5

A M

15BZ4199.004

06/10/2016

SECOND FLOOR MECHANICAL PIPING

REMODEL PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

JD

JD

06/10/2016

M3.2

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

: 1/8" = 1'-0"M3.2

1 SECOND FLOOR MECHANICAL PIPING REMODEL PLAN

MECHANICAL KEYNOTES

1 ROUTE VRV CONDENSATE DRAIN PIPING TO MOP SINK AT APPROXIMATE LOCATION SHOWN.

2 ROUTE CONDENSATE DRAIN PIPING INSIDE BUILDING AND ROUTE TO NEAREST FLOOR SINK.

3 ROUTE REFRIGERANT PIPING DOWN IN WALL AT APPROXIMATE LOCATION TO CEILING SPACE OF BASEMENT

ELECTRICAL ROOM TO SERVE FC-7. SEE SHEETS M3.1 AND M3.0 FOR CONTINUATION.

4 ROUTE RS/RL PIPING DOWN IN WALL TO SERVE FC-9 IN BASEMENT. SEE SHEET M3.0 FOR CONTINUATION. SIZE PIPING

PER MANUFACTURER RECOMMENDATION.

5 MOUNT CONDENSING UNIT ON A RACK AT APPROXIMATE LOCATION SHOWN.

6 CONDENSING UNIT FOR FOOD SREVICE EQUIPMENT. SEE FOOD SERVICE SCHEDULES FOR MORE INFORMATION.

MECHANICAL PIPING GENERAL NOTES

1 MECHANICAL CONTRACTOR SHALL CUT ALL

FLOORS, WALLS, CEILINGS AND ROOF AS

REQUIRED TO PERFORM THE WORK DEPICTED IN

THESE CONTRACT DOCUMENTS AND

SPECIFICATIONS. GENERAL CONTRACTOR

SHALL PATCH ALL ASSOCIATED FLOORS,

WALLS, CEILINGS, AND ROOF AS REQUIRED TO

THE SATISFACTION OF THE

ARCHITECT/ENGINEER.

2 SEAL ALL MECHANICAL PENETRATIONS

THROUGH FIRE RATED ASSEMBLIES WITH

UL-APPROVED FIRE RATED SYSTEM.

3 HYDRONIC VALVES 2" AND SMALLER TO BE

BALL VALVES. HYDRONIC VALVES LARGER

THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.

4 LOCATE ALL VALVES ABOVE ACCESSIBLE

CEILINGS OR PROVIDE ACCESS PANEL IN

CEILING FOR VALVE ACCESS. ACCESS PANELS

SHALL BE RATED WHERE REQUIRED.

5 COORDINATE HVAC AND PLUMBING ROUTING

AND EQUIPMENT WITH ALL OTHER TRADES AS

REQUIRED.

6 VERIFY EXACT LOCATION OF THERMOSTATS

WITH ARCHITECT PRIOR TO INSTALLATION.

7 THERMOSTATS TO BE LOCATED AT 48" A.F.F.

8 CAREFULLY REMOVE AND SALVAGE ALL

EXISTING RADIATORS. COORDINATE WITH

ARCHITECT AND CONTRACTING OFFICER FOR

UNITS TO BE REFURBISHED AND REPLACED.

9 COORDINATE ALL BASEMENT MECHANICAL

PIPING WITH EXISTING CONDITIONS AND NEW

FOOTING CONSTRUCTION.

10 PROVIDE LOCKING COVERS FOR ALL

THERMOSTATS LOCATED IN PUBLIC SPACES.

NORTH

Date

13863

WYOMING

P ro fe ss ion al En gineer (Mechanical)

KIP

WEEDA

4"HWR FROM SYSTEM

4" LPS

HEAT EXCHANGER, HE-1

MODULATING HTG. VALVE, x MBH

MODULATING HTG. VALVE, x MBH

SEE FOR PUMP PIPING & VALVING, TYP.

GLYCOL FEEDER

4"HWS TO SYSTEM 4"HWS

4"HWR

4"

4"

4"HWS

4"HWR

4"

4"

1"CW

T&P RELIEF VALVE,

PIPE TO FLOOR DRAIN,

M4.2

TYP.

4"

4"

UNION, TYP.

4"

BUTTERFLY VALVE, TYP.

AUTO

AIR

VENT

AS-1

THERMOMETER,

TYP.

ET-1

F & T TRAP, 4"

4"

4"

L

P R

4" LPR

STRAINER

4"

TRAP

VACUUM BREAKER

3/4" SWING CHECK

12" MIN4"

4"

4" LPS

4" LPS BYPASS

4"

4"

THERMOSTATIC

BASE MOUNTED PUMP

TRIPLE DUTY VALVE

DISCHARGE

CONCRETE PAD

DRIP PAN

SUPPORT LEG

SUCTION DIFFUSER WITH

STRAINER

FLEXIBLE CONNECTOR

LUG BODY BUTTERFLY

VALVE

PRESSURE GAUGE

SUCTION

NOTE:

PUMP SHALL BE SECURED TO

CONCRETE PAD WITH FLUSH

TYPE ANCHORS AND CAP

SCREWS.

GF-1

4" LPS

HEAT EXCHANGER, HE-2

MODULATING HTG. VALVE, x MBH

MODULATING HTG. VALVE, x MBH

T&P RELIEF VALVE,

PIPE TO FLOOR DRAIN,

TYP.

4" LPR

4"

4"

UNION, TYP.

4"

BUTTERFLY VALVE, TYP.

THERMOMETER,

TYP.

F & T TRAP, 4"

4"

4"

L

P R

4" LPR

STRAINER

4"

TRAP

VACUUM BREAKER

3/4" SWING CHECK

12" MIN4"

4"

4" LPS

4" LPS BYPASS

4"

4"

THERMOSTATIC

4"HWS

4"HWR

M4.0 : M4.0

1 STEAM TO HOT WATER HEAT EXCHANGER DETAIL

NO SCALE

FLEX DUCT REFER TO DRAWINGS

SUPPLY FLOOR GRILLE, REFER TO SCHEDULE

REFER TO GRD

SCHEDULE FOR

NECK SIZE

FOR SIZE, MAXIMUM 5 FT. LENGTH,

SECURE FLEX DUCT

TO DUCTWORK WITH

DRAW BAND CLAMP

FLEX DUCT SHALL BE USED ONLY

WHERE SHOWN ON THE DRAWINGS.

FLOOR

FLOOR MOUNTED GRILLE DETAIL12

M4.0 : M4.0 NO SCALE

CEILING MOUNTED DIFFUSER DETAIL13

M4.0 : M4.0 NO SCALE

FLEX DUCT REFER TO DRAWINGS

SUPPLY DIFFUSER, REFER TO SCHEDULE

REFER TO GRD

SCHEDULE FOR

NECK SIZE

FOR SIZE, MAXIMUM 5 FT. LENGTH,

NOTE:

DIFFUSER SHALL BE SUPPORTED

INDEPENDENTLY FROM THE

CEILING SYSTEM.

SECURE FLEX DUCT TO DUCTWORK

WITH DRAW BAND CLAMP

FLEX DUCT SHALL BE USED ONLY

WHERE SHOWN ON THE DRAWINGS.

CEILING, REFER TO ARCHITECTURAL

DRAWINGS FOR TYPE.

PIPE HANGER DETAIL15

M4.0 : M4.0 NO SCALE

PIPING INSULATION AS SPECIFIED.

INSULATION SHALL RUN CONTINUOUS

THROUGH HANGER OR CLAMP.

PIPING 1-1/2" OR LESS: INSTALL PROTECTION SHIELD

PIPING 2" AND GREATER: INSTALL THERMAL-HANGER SHIELD INSERT

CLEVIS STYLE HANGER FOR 2" AND GREATER PIPING.

SWIVEL BAND STYLE PERMISSIBLE FOR 1-1/2" AND SMALLER PIPING.

HANGER ROD SIZE AND HANGER SPACING PER SPECIFICATIONS

PIPE HANGER NOTES:

1. FOR TRAPEZE SUPPORTED PIPING: 1-1/2" AND LESS PIPING INSTALL PROTECTION SHIELD AND PIPE

CLAMP, INSULATION SHALL BE CONTINUOUS. 2" AND GREATER PIPING INSTALL THERMAL-HANGER

SHIELD INSERT AND PIPE CLAMP, INSULATION SHALL BE CONTINUOUS.

2. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

SIGMA PANEL RADIATOR

TEMPERATURE CONTROL VALVE

ONIX TUBING

PANEL ENCLOSUREONIX TUBING

AUTO-BALANCE VALVE

UNION

RADIANT PANEL HEATER DETAIL16

M4.0 : M4.0 NO SCALE

FLOOR

4" RECOMMENDED

*CONTROL VALVES SHALL BE SIZED TO FIT INSIDE PANEL ENCLOSURE

P

P

GF

ET

AS

1 HE

HE

BASE MOUNTED PUMP DETAIL11

M4.0 : M4.0 NO SCALE

M4.0

MECHANICAL DETAILS

06/10/2016

TECH. REVIEW:

DATE:

SHEET

167OFPKG3

PKG.

NO.

PKG1

PKG2

DESIGNED:

CADD:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

YELLOWSTONE NATIONAL PARK, WYOMING

ARCHITII ECTSP

C

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084 www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

XXXX

Issue Date

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C

06/10/2016

JD

KW

JD

G

HPC

MPC

LPC

CD

HWR

HWS

RS

RL

HPS

MPS

LPS

STM

HWRC

HW

CW

V

V

GW

SAN

SAN

P1.0 PLUMBING LEGENDS AND SCHEDULES

PD2.0 BASEMENT DOMESTIC WASTE AND VENT DEMOLITION PLAN

PD2.1 FIRST FLOOR DOMESTIC WASTE AND VENT DEMOLITION PLAN

PD2.2 SECOND FLOOR DOMESTIC WASTE AND VENT DEMOLITION PLAN

PD3.0 BASEMENT DOMESTIC WATER DEMOLITION PLAN

PD3.1 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN

PD3.2 SECOND FLOOR DOMESTIC WATER DEMOLITION PLAN

P2.0 BASEMENT DOMESTIC WASTE AND VENT REMODEL PLAN

P2.1 FIRST FLOOR DOMESTIC WASTE AND VENT REMODEL PLAN

P2.2 SECOND FLOOR DOMESTIC WASTE AND VENT REMODEL PLAN

P3.0 BASEMENT DOMESTIC WATER REMODEL PLAN

P3.1 FIRST FLOOR DOMESTIC WATER REMODEL PLAN

P3.2 SECOND FLOOR DOMESTIC WATER REMODEL PLAN

P4.0 PLUMBING DETAILS

PLAN

CODE

ITEM MANUFACTURER MODEL NUMBER MATERIAL & FINISH TRIM

ROUGH-IN SIZE

REMARKS

CW HW SAN VENT

LAV-1

H.C. COUNTERTOP

LAVATORY

KOHLER

BRYANT

K-2699-1

VITREOUS CHINA WHITE

KOHLER K-7517-CP 0.5

GALLON TOUCHLESS

2"

2" 2" 11 2"

INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM

TO ALL A.N.S.I. & A.D.A. REQUIREMENTS. PROVIDE K-7129-A-CP GRID DRAIN FROM

CONTRACTING OFFICER'S INVENTORY.

WC-1

F.V. H.C. F.M. WATER

CLOSET

KOHLER ----- -----

KOHLER K-10956-CP

1.28 GALLON F.V.

1" --- 4" 2"

PROVIDE WATER CLOSET AND SEAT FROM CONTRACTING OFFICER'S INVENTORY.

PROVIDE NEW FLUSH VALVE FOR EACH FIXTURE.

UR-1 URINAL KOHLER

BARDON

K-4904-ET

VITREOUS CHINA WHITE

KOHLER K-10949-CP

0.125 GALLON F.V.

1" --- 4" 2" -----------------------------------------

DF-1 DRINKING FOUNTAIN ELKAY LZWS-EDFPBM117K STAINLESS STEEL ---------- 1

2" ---- 11

2" 11 2"

WALL-MOUNTED, SEMI-RECESSED. MOUNT TO CONFORM TO ALL A.N.S.I. & A.D.A.

REQUIREMENTS.

FD-1 FLOOR DRAIN WADE W-1103-STD5

CAST IRON BODY CAST IRON

INTERIOR

SATIN NICKEL-BRONZE TOP ---- ---- 3" 11

2" W/ TRAP PRIMER CONNECTION

FD-2 FLOOR DRAIN WADE W-1103-STD5

CAST IRON BODY CAST IRON

INTERIOR

SATIN NICKEL-BRONZE TOP ---- ---- 3" 11

2" W/ TRAP PRIMER CONNECTION. PROVIDE FLOOR DRAIN WITH NO WEEP HOLES.

FS-1 FLOOR SINK WADE W-9110-16

CAST IRON BODY A.R.E.

INTERIOR

---------- ---- ---- 3",4" 11

2" PROVIDE W/ 34" GRATE

MS-1 MOP SINK FIAT MSB-2424 MOLDED STONE ---------- 3

4"

4" 3" 11

2"

PROVIDE W/ DELTA FAUCET #28C8073 WITH VACUUM BREAKER, T&S B-0706 SERVICE

FAUCET, INTEGRAL CHECK STOPS, HOSE & BRACKET, FIAT MOP HANGER #889-CC, &

VINYL BUMPER GUARD #E-77-AA.

EW-1 EYE WASH STATION BRADLEY S19-220BSS STAINLESS STEEL ---------- 1

2" ---- 11

2" 11

2" MOUNT ON WALL NEXT TO MOP SINK. ROUTE SAN TO MOP SINK.

S-1 BAR SINK KOHLER POISE K-3391-H STAINLESS STEEL KOHLER K-8762 1

2"

2" 2" 11

2"

INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM

TO ALL A.N.S.I. & A.D.A. REQUIREMENTS.

NOTES.

1. REUSE EXISTING LAVATORY, WATER CLOSET AND URINAL FIXTURES. EXISTING WATER CLOSETS AND URINALS TO BE PROVIDED WITH NEW FLUSH VALVE.

2. ALL NEW FIXTURES TO MATCH EXISTING WHERE AVAILABLE.

PLAN CODE MANUFACTURER MODEL NUMBER SIZE RPM GPM FT OF HD

ELECTRICAL

REMARKS

HP VOLT PH

SE-1 WEIL 2429 3" 1750 150 13 1 115 1 SEE NOTES

NOTES:

1. PROVIDE WEIL 8806 48" COVER AND 3316 STANDARD MOUNT CURB.

FIRE/ WATER SERVICE DETAIL11

P1.0 : P1.0 NO SCALE

4" DOMESTIC

PER SPECIFICATIONS

SUPPORT AND INSULATE

TYP.

SHUT-OFF

GATE VALVE

3" BUILDING SUPPLY

MAIN

LINE

BY-PASS

PRESSURE DOUBLE CHECK

WATTS 009QT REDUCED

BACKFLOW PREVENTOR

PRV - SET

AT 70 PSI

WATER METER

FLOOR

ROOF MEMBRANE

STRUCTURAL DECK

BASE PLATE

INSULATION

SINGLE PLY

CAST IRON PIPING

NOTES:

A) PIPE FLASHING FOR SINGLE PLY ROOF.

B) ROOF PENETRATION AND FLASHING TO BE

PROVIDED BY GENERAL CONTRACTOR. ALL WORK IS

TO BE PERFORMED BY PERSONNEL AUTHORIZED BY THE

ROOFING MANUFACTURER AS REQUIRED TO

MAINTAIN THE WARRANTY.

PVC MEMBRANE

FLASHING FULLY

ADHERED.

ALUMINUM TAPE TO

COVER ASPHALT.

STAINLESS STEEL

HOSE CLAMP.

APPROVED BEAD

OF SEALANT.

VENT THROUGH ROOF DETAIL12

P1.0 : P1.0 NO SCALE

SADDLE

INSULATION SHIELD AT HANGER

WELD

HANGER ROD

HANGER ROD

UNISTRUT STYLE

HANGER

ROD

INSERT

SHIELD

UNISTRUT

INSULATION, USE VAPOR BARRIER TYPE.

FOR DOMESTIC CW OR CHILLED WATER DO

NOT PENETRATE VAPOR BARRIER WITH

HANGERS.

INSULATION, USE VAPOR BARRIER

TYPE. FOR DOMESTIC CW OR

CHILLED WATER DO NOT

PENETRATE VAPOR BARRIER WITH

HANGERS.

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION INSERT

UNDER INSULATION SHIELD.

PIPE SIZE 2" AND

GREATER-SWIVEL STYLE,

PIPE SIZE LESS THAN

2"-CLEVIS STYLE.

NOTE:

MATERIAL CONTAINING

ASBESTOS SHALL NOT BE

USED FOR INSULATION

INSERTS NOT

REQUIRED ON

HW / HWRC

PIPING ONLY CW

/ CHILLED WATER

1/8 BEND

FLOOR LINE

WASTE LINE LENGTH TO SUIT

WASTE LINE

1/8 BEND

FINISHED GRADE

CLEANOUT

1/8 BEND

WASTE LINE UP TO FIXTURE

WASTE LINE LENGTH TO SUIT

FLOOR LINE

CHROME

WALLCOVER

& SCREW

MAY EXTEND AS A

WASTE OR VENT

LINE

WALL

PLUGGED

TEE

WASTE LINE

DWV OR STORM PIPE

FLOOR LINE

NOTE:

CONTRACTOR SHALL COORDINATE

THE LOCATION OF ALL F.C.O.,

W.C.O., AND C.O.T.G. WITH THE

ARCHITECT.

CLEANOUT AND ACCESS

COVER. TOP OF COVER TO BE

FLUSH WITH TOP OF FLOOR.

BALANCE OF

PIPING SAME AS

CLEANOUT TO

GRADE

1/8 BEND IF CLEANOUT

OCCURS AT END OF LINE

16" SQUARE CONCRETE PAD

TROWEL SMOOTH AND EDGE

BRASS CLEANOUT PLUG WITH

COUNTER SINK HEAD

PIPE HANGER DETAIL16

P1.0 : P1.0 NO SCALE

CLEAN OUT DETAIL17

P1.0 : P1.0 NO SCALE

STRAINER

P1.0

PLUMBING LEGENDS AND SCHEDULES

06/10/2016

TECH. REVIEW:

DATE:

SHEET

167OFPKG3

PKG.

NO.

PKG1

PKG2

DESIGNED:

CADD:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

YELLOWSTONE NATIONAL PARK, WYOMING

ARCHITII ECTSP

C

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084 www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

XXXX

Issue Date

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C

06/10/2016

NT

KW

NT

B

A

3 4 5

C

E

3 3 3 3

A R C H I T E C T U R E

I N T E R I O R S

H I S T O R I C www.aearchitects.com

2 2 2 N O R T H H I G G I N S

M I S S O U L A, M T 5 9 8 0 2

P H. 4 0 6 . 7 2 1 . 5 6 4 3

F A X. 4 0 6 . 7 2 1 . 1 8 8 7

6 0 8 N O R T H 2 9 T H

B I L L I N G S, M T 5 9 1 0 1

P H. 4 0 6 . 2 4 8 . 2 6 3 3

F A X. 4 0 6 . 2 4 8 . 2 4 2 7

4 2 8 E A S T M E N D E N H A L L

B O Z E M A N, M T 5 9 7 1 5

P H. 4 0 6 . 4 5 3 . 7 3 1 0

PROJECT NO.

NPS PROJ NO.

REVISIONS

DRAWING NO.

PKG

NO.

PKG1

PKG2

PKG3

SHEET

OF

DESIGNED:

CADD:

TECH REVIEW:

DATE

TITLE OF SHEETDRAWING NO.

0 1 2 3 4 5 6 7 8 9 10 inches

12 N. BROADWAY

BELGRADE, MT 59714

Ph: 406-388-3320

Fax: 406-388-3398

ACE PROJECT #: 15BZ4199.004

2040 HARNISH BLVD.

BILLINGS, MT 59101

Ph: 406-245-0136

Fax: 406-245-2084

/1

/2

:3

:4

A M

15BZ4199.004

06/10/2016

BESEMENT DOMESTIC WASTE AND VENT

DEMOLITION PLAN

MAMMOTH HOTEL SEISMIC

STABILIZATION & REHABILITATION -

PHASE 1

YELLOWSTONE NATIONAL PARK, WYOMING

KW

NT

NT

06/10/2016

PD2.0

C O

N

ST

R U

C T I O

N D

O C

U M

E N

T S

PLUMBING KEYNOTES

1 DEMO EXISTING SAN PIPING TO EXTERIOR OF NEW CONSTRUCTION AND CAP EXISTING.

2 DEMO SUSPENDED FLOOR DRAIN AND ASSOCIATED PIPING.

3 DEMO SAN PIPING UP TO EXISTING FIXTURE. SEE PD2.1 FOR CONTINUATION UP.

PLUMBING GENERAL DEMOLITION NOTES

1 GENERAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO PERFORM THE WORK

DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL

ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS REQUIRED TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.

2 COORDINATE HVAC AND PLUMBING EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.

3 THE INFORMATION SHOWN ON THIS DRAWING WAS OBTAINED FROM EXISTING DRAWINGS AND VISUAL FIELD

OBSERVATIONS WHICH SHALL BE INCLUDED IN THE SCOPE OF WORK. FIELD VERIFY ALL EXISTING CONDITIONS AND

PROVIDE DEMOLITION AS REQUIRED TO ACCOMODATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .