FOVA 174962 - Project Specs Rehabilitate Utilities and Infrastructure in East and South Vancouver Barracks

View the file

Other files

File Type Posted
0_-_Amend_6_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend__6_FOVA_Section_028213-_ASBESTOS_spec_revised_FINAL.pdf PDF
1_-_Amend_6__FOVA_Section_02_8319__LEAD-BASED_PAINT_spec_FINAL.pdf PDF
3_-_Amend_6_FOVA_174962_Q-A_responses.pdf PDF
0_-_Amend_5_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
4_-_Amend_5_FOVA_Questions.pdf PDF
3_-_Amend_5_FOVA_Site_Visit_Sign_in_Sheets_3-25.pdf PDF
2_-_ACM_Quantity_Estimates_FOVA_174962_.pdf PDF
1_-_Final_ACM_HazMat_SurveySummary_FOVA_041414KMA.PDF PDF
2__-_Amendment_4_FOVA_Questions.pdf PDF
0_-_Amend_4_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
1_-_Amendment_4_Attachment_1_FOVA_174962_.pdf PDF
2__-_Amendment_3_FOVA_Questions_3-13-15.pdf PDF
1_-_Amend_3_Attachment_1_FOVA__174962.pdf PDF
Past_Performance_Questionnaire_x_(1).doc DOC document
0_-_Amend_3_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
3_-Amendment_3_FOVA_Questions_3-16-15.pdf PDF
3_-_Amend_2_Attachment_1_FOVA_174962_pre_bid_list_of_attendees.pdf PDF
6_-Sustainability_Checklist_LEED_2009_FOVA_9-24-14.pdf PDF
4_-_Amend_2_Attachment_2_FOVA_174962.pdf PDF
1_-_Amend_1_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend_2_Revised_SF_1442.pdf PDF
0_-_Amend_2_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
5_-_Amend_2_FOVA_Questions_3-10-15.pdf PDF
Amend_1_-_Revised_Contract_Clauses_-_FOVA_174962.pdf PDF
Amend_1_-_Attachment_2_-_SECTION_01_27_00_Phase_1.pdf PDF
Amend_1__-_Attachment_1_-_FOVA_174962_.pdf PDF
Drawings_No._389_126929.pdf PDF
Drawing_No._389_119939.pdf PDF
Hazmat_Survey_Compiled_-_FOVA_987-404.pdf PDF
FOVA__Proposal_Submission_Package_x.pdf PDF
Drawing_No._389_126282.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_2.pdf PDF
Supplemental_993_pics.pdf PDF
Drawing_No._389_105548_vol_1.pdf PDF
FOVA_Request_for_Proposal.pdf PDF
FOVA_Lead_Base_Paint_and_AHERA_Inspection__Amend_2_Clarification_to_report_questions.pdf PDF
Drawing_No._389_105548_vol_2.pdf PDF
Drawing_No._389_80038A.pdf PDF
Wage_Rates_WA_-_2-12-2015.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_1.pdf PDF
Supplemental_989_pics.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 32 33 Photographic Documentation for Historic Preservation Projects 01 33 23 Submittal Procedures 01 35 13.22 Archeological Protection 01 35 23 Safety Requirements 01 35 91 Historical Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 55 26 Traffic Control 01 57 19.12 Noise & Acoustics Management 01 57 23 Temporary Storm Water Pollution Prevention 01 67 00 Product Requirements 01 73 23 Seismic Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 74 19A Project Waste Management Plan Worksheet 01 74 19B Standard Solid Waste Conversions 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 - CONCRETE

Not Used.

DIVISION 04 – MASONRY

Not Used.

DIVISION 05 - METALS

Not Used.

DIVISION 06 – WOOD, PLASTICS, COMPOSITES

Not Used.

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

DIVISION 08 - OPENINGS

Not Used.

FOVA 174966 TOC-1

FEBRUARY 6, 2015

DIVISION 09 - FINISHES

09 96 00 Protective Coatings

DIVISION 10 – SPECIALTIES

Not Used.

DIVISION 11 - EQUIPMENT

Not Used.

DIVISION 12 - FURNISHINGS

Not Used.

DIVISION 13 - SPECIAL CONSTRUCTION

Not Used

DIVISION 14 - CONVEYING EQUIPMENT

Not Used.

DIVISION 21 - FIRE SUPPRESSION

Not Used.

DIVISION 22 – PLUMBING

22 30 10 Heat Trace System

DIVISION 23 - HEATING VENTILATING AND AIR-CONDITIONING (HVAC)

Not Used.

DIVISION 25 - INTEGRATED AUTOMATION

Not Used

DIVISION 26 – ELECTRICAL

26 05 00 General Requirements for Electrical Work 26 05 13 Medium Voltage Conductors and Cables 26 05 19 Low Voltage Conductors 26 05 26 Grounding System 26 05 33 Conduits, Vaults, and Fittings

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY & SECURITY

FOVA 174966 TOC-2

DIVISION 31– EARTHWORK

31 20 00 Earthwork

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses 32 12 16 Asphalt Paving 32 13 20 Site Concrete 32 92 19 Seeding

DIVISION 33 – UTIITIES

33 05 00 Common Work Results For Utilities 33 05 16 Precast Concrete Utility Vaults 33 49 13 Manholes and Structures 33 44 13.13 Storm Utility Catch Basins

DIVISION 34 – TRANSPORTATION

Not Used

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

Not Used

DIVISION 40 – PROCESS INTEGRATION

Not Used

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

Not Used

DIVISION 42 – PROCESS HEATING, COOLING AND DRYING EQUIPMENT

Not Used

DIVISION 43 – PROCESS GAS AND LIQUID HANDLING

Not Used

DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT

Not Used

DIVISION 45 – INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT

Not Used

DIVISION 46 –WATER AND WASTEWATER EQUIPMENT

Not Used

DIVISION 48 – ELECTRICAL POWER GENERATION

Not Used

APPENDICES

Appendix A - Geotechnical Engineering Report Appendix B - Closeout and O&M Requirements

FOVA 174966 TOC-3

Division 1 Specifications

General Requirements

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government Furnished Materials.

5. Contractor use of premises.

6. Public use of site.

7. Occupancy requirements for buildings.

8. Work Restrictions.

9. Special Construction Requirements.

10. Soils Investigation Report.

11. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Fort Vancouver National Historic Site, East and South Barracks, Vancouver, Washington.

1. The project consists of replacing utilities (water, sewer, storm, electric and telecommunications) along McClelland Road, Alvord Road, Fort Vancouver Way, East Fifth Street and installing new utilities from Evergreen Boulevard to McClelland Road.

The project also involves installing associated services to designated Park Buildings.

There is a separate project (Phase 2) that will occur after the completion of Phase 1.

B. The Work consists of the following (Phase 1):

1. The Work includes installation of the following:

a. New 12-inch waterline from Evergreen Boulevard through the open Parade

Grounds to McClelland Road.

b. Installing new water services, fire services, sewer lateral, communications, and power to buildings P989, P987, P704, P404, P721 and P722. Two of the services will be heat traced and most will be concrete encased.

c. Storm drainage improvements to Fort Vancouver Way including new curb and gutter system.

d. Earthwork associated with the services going to building P721 and P722.

C. The Work in Phase 1 will be followed by Phase 2 Utilities upgrades in a few years, which is not in the contact documents.

D. Project will be constructed under a single prime contract for Each Phase.

FOVA - 174966 01 11 00 - 1

050611 SUMMARY OF WORK

1.3 WORK PHASES

A. The Work in this contract shall be conducted in a single phase:

1. Phase One: Consists of installing a new 12-inch waterline from East Evergreen Boulevard to McClellan Road, installing new water services, fire services, sewer lateral, communications, and power to buildings P989, P987, P704, P404, P721 and P722. The work also includes storm drainage improvements to Fort Vancouver Way. Utility mainlines will be handed off to utility providers following construction.

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.

B. Preceding Work: Not Used.

C. Concurrent Work: Government will award separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract.

1. A separate contract will be awarded to an Unknown Contractor for Rehabilitating Building 987 for U.S.F.S. Headquarters. And Rehabilitate Building 404 for U.S.F.S Dispatch Center.

2. Utilities serving these building to be coordinated with this project. In General, the scope of this project involves bringing utilities either to the meter, or to one foot from the building. Refer to Drawings for specific details.

D. Future Work: Future work shall consist of the Phase 2 utilities installation as defined in 1.3 A 2.

1.5 CONTRACTOR USE OF SITE

A. General: Contractor shall have limited use of the site for construction operations during the construction period. Limit use of premises to work areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to areas show on the Drawings. Modifications to these limits shall be approved by the contracting Officer.

B. Storage of Materials: Confine storage of materials to Contractor Staging Area shown on Drawing G2, off of East Fifth Street and adjacent to building P405.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

FOVA - 174966 01 11 00 - 2

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Construction Camp: Establishment of a camp within the park will not be permitted.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

1.6 PUBLIC USE OF SITE

A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.

Road closures will be permitted, when required, upon specific approval of Contracting Officer for a maximum of four weeks.

1.7 OCCUPANCY REQUIRMENTS FOR BUILIDINGS

A. Existing Buildings

1. Full Government Occupancy: Government may occupy some buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

FOVA - 174966 01 11 00 - 3

B. New Buildings

1. Government Occupancy of Completed Areas of Construction: Government reserves the right to occupy and to place and install equipment in completed areas of building, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the entire project.

a. Contracting Officer will prepare a Beneficial Occupancy letter for each specific portion of the Work to be occupied before Government occupancy.

b. Obtain a Certificate of Occupancy from the NPS before Government occupancy.

c. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.

d. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.

1.8 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

1. If weekend, evening or early morning hours are needed to complete project on schedule, Contractor shall obtain approval for proposed hours from COR.

B. Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than seven days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

D. Nonsmoking Building: Not Used. All government buildings are non-smoking.

1.9 SPECIAL CONSTRUCTION REQUIREMENTS

A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

FOVA - 174966 01 11 00 - 4

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.

B. Archeology. There are known archeological sites in the area, including a burial site. All excavations in the burial site boundary (as shown in the drawings) shall be hand dug. Contractor shall be constantly monitored by National Park Service Archeological Staff during all excavations operations for the project.

1.10 SOILS INVESTIGATION REPORT

A. A soils investigation report entitled Geotechnical Engineering Report Rehabilitate Utilities Project Fort Vancouver National Historic Site Vancouver Washington has been prepared by GeoEngineers.

B. A copy of the report is available to all plan holders with this package. See Appendix K.

C. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

1.11 ADDITIONAL REPORTS

A. Not Used.

B. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

FOVA - 174966 01 11 00 - 5

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

FOVA - 174966

060613

01 26 01 - 1

CONTRACT MODIFICATION PROCEDURES

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

FOVA - 174966

060613

01 26 01 - 2

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate

FOVA - 174966

060613

01 26 01 - 3

CONTRACT MODIFICATION PROCEDURES

http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm%23ct

Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS.

All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

FOVA - 174966

060613

01 26 01 - 4 http://www.nps.gov/dscw/publicforms.htm%23ct

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. The following percentages establish the maximum allowable markups (OH&P) for contractor self-performed work:

Overhead………………10% Profit………………5.3%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

FOVA - 174966

060613

01 26 01 - 5

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 01 26 01

FOVA - 174966

060613

01 26 01 - 6

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (LIST OF CONTRACT LINE ITEMS IN PHASE 1)

3.1 CONTRACT LINE ITEM NO. 1 SITE PREPARATION AND IMPROVEMENTS

This line item includes the following:

A. Mobilization, Demobilization, Bonds and Insurance.

1. Costs associated with mobilizing to perform the work and includes equipment move-in cost; bond and insurance; coordination, connection and service charges for temporary and permanent electrical, water telephone and natural gas utilities; additional permits required to complete the work; miscellaneous start-up; and demobilization.

B. Sediment and Erosion Control

1. All labor, equipment, and materials to install and maintain all erosion control measures shown on the plans, maintain the project site daily, sweep streets, and apply dust control measures. Work also includes weekly cleanup and disposal of construction debris and waste materials, weekly cleanup of the debris captured by silt sacks, routine maintenance of the sacks during construction, replacement of sacks during the project when necessary or directed, and removal of all erosion control items at the completion of the project.

Replacement sacks are incidental to the bid item.

C. Landscape Restoration

1. Restoration of all landscaped and planted areas disturbed or damaged during the construction of this project, including the re-seeding of the parade ground and other grassy areas, as well as the replanting of any plants disturbed or destroyed over the course of the project due to construction activity.

D. Site Restoration

1. Restoration of all hardscape areas disturbed or damaged during the construction of this project, including the paving and gravel finished surfaces and other hardscape areas.

FOVA - 174966 01 27 00 - 1

050611 DEFINITION OF CONTRACT LINE ITEMS

E. Traffic Control

1. All labor, equipment and materials for installing all necessary traffic control measures.

Specific requirements include a traffic control plan acceptable to National Parks Service, City and County, construction signage, pedestrian access signage, signage for access and egress to adjacent properties, clean up, and setup and removal of signage as many times as is required by construction sequencing. Necessary traffic control measures include but are not limited to temporary signage, drums, delineators, temporary pavement markers, arrow boards and flaggers.

F. Potholing and Utility Locates

1. Locating service connections and existing utilities, for the purpose of avoiding conflicts with proposed construction.

G. Existing Utility Demolition and Removal

1. All work related to the abandonment in place, plugging, demolition, and removal of all existing utilities designated on the drawings to be abandoned or demolished.

H. Existing Asphalt Pavement Demolition and Removal

1. All work related to the demolition of the existing asphalt pavement as required for the installation of all utilities and completion of all construction related to this project.

I. Existing Curb, Gutter, and Sidewalk Removal

1. All work related to the demolition and removal of existing paved, curb, gutter, and sidewalk as required for the installation of all utilities and completion of all construction related to this project.

J. Electrical Demolition

1. All work related to the abandonment, demolition and removal of existing electrical utilities at the locations designated on the drawings, and as required for the installation of all utilities and completion of all construction related to this project.

K. Pea Gravel, Fill, Grading and Compaction in Burial Site Boundary

1. All work related to the installation of pea gravel, fill, grading, and compaction of utilities services to Building P721 and P722 to the lines, grades and dimensions shown on the Drawings. The boundary of the fill, grading an compaction shall be from the east side of Buildings P722 and P721, the west side of Alvord Road, the South side of McClelland Road, and the north side of the southern boundary of the Burial Site. This would also include the placement of pea gravel in between building P721 and P722.

L. Paving

1. All work related to the installation of 3-1/2” thick asphalt, and 12-inch compacted aggregate base, on trench areas located within paved roadways not being completely re-paved. It also includes full paving in designated area.

M. Concrete Sidewalk

1. All work related to the installation of a 5 foot wide concrete sidewalk, including 4” thick concrete, and 4-inch compacted aggregate base.

N. Concrete Curb and Gutter

FOVA - 174966 01 27 00 - 2

1. All work related to the installation of a 2 foot wide concrete curb and gutter system, including 6” thick concrete gutter, and 6-inch high curb.

O. Measurement of Payment: The quantity for payment of this item shall be on a lump sum basis.

P. Payment will be made at the contract lump sum price.

3.2 CONTRACT LINE ITEM NO. 2 MECHANICAL UTILITIES

This line item includes the following:

A. 12-Inch Waterline

1. All work related to the installation of the Phase I 12-inch waterline at the location and depth shown on the drawings, including trench excavation, shoring (if required), spoils hauling, pipe bedding, spoils removal, trench backfill, compaction, and compaction testing. all fittings, valves, and accessories.

B. Relocation of Existing Water Meter

1. All work related to the relocation of the existing water meter located

C. Fire Flow Distribution Lines

1. All work related to the installation of the Phase I Building Fire Flow Fire suppressant lines at the size, location and depth shown on the drawings, including trench excavation, dewatering, concrete encasement, spoils removal, pipe bedding, trench backfill, all fittings, valves, and accessories.

D. Domestic Water Supply Lines

1. All work related to the installation of the Phase I Building domestic water supply lines at the size, location and depth shown on the drawings, including trench excavation, concrete encasement, spoils removal, pipe bedding, trench backfill, all fittings, valves, and accessories.

E. Heat Trace

1. All work related to the mechanical installation of the heat trace system on the potable water and fire lines running to building P987.

F. Fire Hydrant Assemblies

1. All work related to the installation of all Phase I fire hydrant assemblies, at the location and depth shown on the drawings, including trench excavation, pipe bedding, trench backfill, main tapping, all fittings, valves, and accessories.

G. Sanitary Sewer Manhole

1. All work related to the installation of sanitary sewer manholes at the location, depth and size as shown on the drawings, including all excavation, bedding, dewatering, backfill, spoils removal, connection to existing 6-inch clay and installation costs.

H. Sanitary Sewer Line

1. All work related to the installation of the Phase I sanitary sewer lines at the size, location and depth shown on the drawings, including trench excavation, dewatering, pipe bedding, trench backfill, spoils removal, all fittings, and accessories.

FOVA - 174966 01 27 00 - 3

I. Sanitary Sewer Laterals

1. All work related to the installation of the Phase I sanitary sewer lateral lines at the size, location and depth shown on the drawings, including trench excavation, dewatering, concrete encasement, spoils removal, pipe bedding, trench backfill, all fittings, and accessories.

J. Fort Vancouver Way Storm Drain Improvements

1. All work related to the installation of the Phase I storm drain improvements at the size, location and depth shown on the drawings, including demolition, curb and gutter installation, trench excavation, trench installation, trench backfill, all fittings, and accessories.

K. Building Storm Drain Improvements

1. All work related to improvement of designated building storm drain systems, including disconnecting or rerouting down spouts.

L. Measurement of Payment: The quantity for payment of this item shall be on a lump sum basis.

M. Payment will be made at the contract lump sum price.

3.3 CONTRACT LINE ITEM NO. 3 ELECTICAL UTILITIES

A. This line item includes the following:

B. Electrical Conduits and Accessories

1. All work related to the installation of the Phase I electrical Conduits and accessories at the location and depth shown on the drawings, including trench excavation, pipe bedding, trench backfill, all fittings, and accessories. This includes electrical, cable, and phone conduits.

C. Heat Trace

1. All work related to the electrical installation of the heat trace system on the potable water and fire lines running to building P987.

D. Transformers

1. All work related to the installation of the Phase I electrical transformers at the locations shown on the drawings, including the installation of the equipment pad.

E. Telephone Pole

1. All work related to the installation of telephone poles at the locations shown on the drawings.

F. Clark PUD Charge

1. The Clark PUD Charge related to the construction and improvements of this project.

G. Qwest Telecommunications Charge

1. The Qwest Telecommunications charge related to the construction and improvements of this project.

H. Measurement of Payment: The quantity for payment of this item shall be on a lump sum basis.

FOVA - 174966 01 27 00 - 4

I. Payment will be made at the contract lump sum price.

END OF SECTION 01 27 00

FOVA - 174966 01 27 00 - 5

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Construction Coordination.

2. Coordination Drawings.

3. Requests for Information (RFIs).

4. NPS/DSC SharePoint Project Website.

5. Project meetings.

6. Environmental Coordination.

7. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

FOVA - 174966 01 31 00 - 1

060613 PROJECT MANAGEMENT AND COORDINATION

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

9. Commissioning activities.

1.3 SUBMITTALS

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

e. Indicate required installation sequences.

2. Sheet Size: At least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by 40 inches (750 by 1000 mm).

3. Number of Copies: Submit four opaque copies of each submittal. Contracting Officer will return one copy.

4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Mechanical and Plumbing Work: Show the following:

a. Sizes and bottom elevations of piping and conduit runs, including insulation, bracing, flanges, and support systems.

FOVA - 174966 01 31 00 - 2

b. Dimensions of major components, such as valves, access doors, cleanouts and electrical distribution equipment.

c. Fire-rated enclosures around ductwork.

2. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1 inch in diameter and larger.

b. Light fixture locations.

c. Location of pull boxes and junction boxes, dimensioned from column center lines.

3. Fire-Protection System: Show the following:

a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.

4. Review: Contracting Officer (CO) will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.

5. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."

C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.

2. File Preparation Format: AutoCad.dwg, Version 2011 operating in Microsoft Windows operating system.

3. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.

4. Contracting Officer (CO) will furnish Contractor one set of digital data files (AutoCad.dwg) of Drawings for use in preparing coordination digital data files.

a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.

b. Digital Data Software Program: Drawings are available in AutoCad.dwg.

D. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

FOVA - 174966 01 31 00 - 3

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Contractors Commissioning Plan.

E. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies.

Work shall not commence until written Notice to Proceed has been issued.

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form: Complete the RFI Form on the NPS/DSC SharePoint website as follows:

1. Enter the general information at the top of the form.

2. Under the “Action” section at the bottom of the form, select “Question” then select

“CMR” in the drop-down of the “Send to” box.

3. Enter the details of the question and attach related documents.

4. Select “Submit Form” at the bottom of the page.

FOVA - 174966 01 31 00 - 4

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.5 PROJECT WEB SITE

A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period. The NPS/DSC SharePoint Project website will be used for the following functions:

1. Project directory.

2. Project correspondence.

3. Meeting agendas and minutes.

4. Contract modifications forms and logs.

5. RFI form and processing.

6. Task and issue management.

7. Photo documentation.

8. Baseline schedule, schedule updates and calendar management.

9. Submittal form and processing.

10. Payment coordination documentation.

11. Drawing and specification document hosting, viewing, and updating.

12. Online document collaboration.

13. Reminder and tracking functions.

14. Archiving functions.

15. Notification of submittal and RFI statuses and current responsible party.

16. Permits and addendums

B. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using the NPS/DSC SharePoint Project website and shall be coordinated with the SharePoint Project team as appropriate.

C. Submit to the CO a list of all employees who will need access to the website. The users will receive an invitation to register from the Department of Interior (DOI). Once the user is registered on the DOI website, they will be given access to the NPS/DSC SharePoint Project

FOVA - 174966 01 31 00 - 5

website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.

D. All users will be required to have the following software packages:

1. Internet Explorer version 7 or later.

2. Adobe Acrobat Professional (Pro) version 9 or later

1.6 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Protection of Archeological Resources

4. Jobsite Safety.

5. Resolution of comments on required Division 01 documents.

6. Coordination of Subcontractors.

7. Labor law application.

8. Modifications.

9. Payments to Contractor.

10. Payroll reports.

11. Contract time.

12. Liquidated damages.

13. Contractor Performance Evaluation.

14. Display of Hotline posters.

15. Notice to proceed.

16. Correspondence procedures.

17. NPS/DSC SharePoint Project website.

18. Acceptance/rejection of work.

19. Progress meetings.

20. Submittal procedures.

21. NPS Final Accessibility Inspection.

22. Environmental requirements.

23. Permit requirements.

24. As-constructed drawings/operation and maintenance (O&M) manuals.

25. Saturday, Sunday, holiday and night work.

26. Reference materials.

27. Value engineering.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.

All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

FOVA - 174966 01 31 00 - 6

http://www.nps.gov/dscw/precon_spproj.htm

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of…

This is the start of the file's text. The full file is on GovTribe.