2 - Amend 6 FOVA Section 028213- ASBESTOS spec revised FINAL.pdf

View the file

Other files

File Type Posted
0_-_Amend_6_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
1_-_Amend_6__FOVA_Section_02_8319__LEAD-BASED_PAINT_spec_FINAL.pdf PDF
3_-_Amend_6_FOVA_174962_Q-A_responses.pdf PDF
0_-_Amend_5_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
4_-_Amend_5_FOVA_Questions.pdf PDF
3_-_Amend_5_FOVA_Site_Visit_Sign_in_Sheets_3-25.pdf PDF
2_-_ACM_Quantity_Estimates_FOVA_174962_.pdf PDF
1_-_Final_ACM_HazMat_SurveySummary_FOVA_041414KMA.PDF PDF
2__-_Amendment_4_FOVA_Questions.pdf PDF
0_-_Amend_4_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
1_-_Amendment_4_Attachment_1_FOVA_174962_.pdf PDF
2__-_Amendment_3_FOVA_Questions_3-13-15.pdf PDF
1_-_Amend_3_Attachment_1_FOVA__174962.pdf PDF
Past_Performance_Questionnaire_x_(1).doc DOC document
0_-_Amend_3_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
3_-Amendment_3_FOVA_Questions_3-16-15.pdf PDF
3_-_Amend_2_Attachment_1_FOVA_174962_pre_bid_list_of_attendees.pdf PDF
6_-Sustainability_Checklist_LEED_2009_FOVA_9-24-14.pdf PDF
4_-_Amend_2_Attachment_2_FOVA_174962.pdf PDF
1_-_Amend_1_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend_2_Revised_SF_1442.pdf PDF
0_-_Amend_2_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
5_-_Amend_2_FOVA_Questions_3-10-15.pdf PDF
Amend_1_-_Revised_Contract_Clauses_-_FOVA_174962.pdf PDF
Amend_1_-_Attachment_2_-_SECTION_01_27_00_Phase_1.pdf PDF
Amend_1__-_Attachment_1_-_FOVA_174962_.pdf PDF
Drawings_No._389_126929.pdf PDF
Drawing_No._389_119939.pdf PDF
Hazmat_Survey_Compiled_-_FOVA_987-404.pdf PDF
FOVA__Proposal_Submission_Package_x.pdf PDF
Drawing_No._389_126282.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_2.pdf PDF
Supplemental_993_pics.pdf PDF
Drawing_No._389_105548_vol_1.pdf PDF
FOVA_Request_for_Proposal.pdf PDF
FOVA_Lead_Base_Paint_and_AHERA_Inspection__Amend_2_Clarification_to_report_questions.pdf PDF
Drawing_No._389_105548_vol_2.pdf PDF
Project_Specs_Rehabilitate_Utilities_and_Infrastructure_in_East_and_South_Vancouver_Barracks.pdf PDF
Drawing_No._389_80038A.pdf PDF
Wage_Rates_WA_-_2-12-2015.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_1.pdf PDF
Supplemental_989_pics.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOVA- 174962 & 175150 028213-1

ASBESTOS ABATEMENT SPECIFICATION

SECTION 028213- ASBESTOS ABATEMENT PROCEDURES

PART 1 – GENERAL

1.1 DESCRIPTION OF WORK:

A. General: This section includes all work necessary to reduce air concentrations of asbestos to the specified level and maintain the specified asbestos control limits during the life of the contract. It also includes removal, containment, and disposal of asbestos containing materials (ACMs).

1. Work Area: The work area includes:

a. ACM Vinyl Floor Tile & Mastic, exposed to view on concrete & concealed from view.

b. ACM Vinyl Floor Tile & Mastic, concealed from view under carpet on concrete.

c. ACM Vinyl Floor Tile, concealed from view &located under non-ACM vinyl floor tile.

d. ACM Thermal System Insulation, exposed to view.

e. ACM Thermal System Insulation, concealed from view.

f. ACM Mastic, roof

2. A hazardous materials survey has been completed and the testing results were provided in

Amendment 5.

3. The contractor is responsible for confirming the quantities of materials for removal.

1.2 QUALITY ASSURANCE:

A. Contractor Qualifications: The Contractor shall be a firm of established reputation (or if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which maintains a regular force of workmen skilled in asbestos abatement, and shall have performed this work on previous projects.

B. Laboratory Qualifications: Laboratory shall be regularly engaged in asbestos testing, and personnel used for monitoring airborne concentrations of asbestos fibers shall be proficient in this field. See "Submittals" paragraph for the specific information which must be submitted for approval of the laboratory.

C. Asbestos Control Limits: The enclosed work areas shall be defined as a regulated area in accordance with 29 CFR 1910.1001 and 29 CFR 1926.1101.

1. Inside Asbestos Work Area: For personnel wearing negative-pressure respirators, air concentrations of asbestos shall not exceed an 8-hour time weighted average of 0.1 fibers, per cubic centimeter of air by PCM analysis in accordance with NIOSH 7400 method. Regardless of respiratory protection worn, air concentrations inside the work area will not exceed an 8-hour time weighted average of 0.1 fibers per cubic centimeter. It is the responsibility of the contractor to provide an independent industrial hygiene consultant to provide the required personal air monitoring and to assure that all safety and health procedures are followed.

2. Outside Asbestos Work Area: Air concentrations of asbestos shall be maintained at the lowest attainable level and shall not exceed 0.01 fibers per cubic centimeter of air. This applies to all areas in the building while work is in progress except for the asbestos work area, and to the entire

FOVA- 174962 & 175150 028213-2

building, including the former work area, after final cleanup. To assure compliance with these standards, the asbestos abatement contractor shall provide the required air monitoring outside the contractor's work area and procure an industrial hygienist who shall have unrestricted access to the contractor's worksite to perform air sampling and clearance sampling activities. The asbestos abatement contractor may perform any air sampling he wishes to assure compliance and for comparison with this standard.

1.3 REFERENCES:

A. American National Standards Institute (ANSI) Publication:

Z9.2-79 Fundamentals Governing the Design and Operation of Local Exhaust Systems

B. American Society for Testing and Materials (ASTM) Publication:

E 849-82 Safety and Health Requirements relating to Occupational Exposure to Asbestos

C. Code of Federal Regulations (CFR):

29 CFR 1910.1001, Occupational Safety and Health Act (OSHA), INCLUDING Appendix A through I.

29 CFR 1910.20, Subpart C, General Safety and Health Provisions.

29 CFR 1910.134, OSHA General Industry Respirator Requirements.

29 CFR 1926.1101. Occupational Exposure to Asbestos, Construction Industry Standard, INCLUDING Appendix A through K.

40 CFR Part 61, Subpart M: U.S. Environmental Protection Agency, National Emission

Standards for Hazardous Air Pollutants (NESHAP) Asbestos.

State and Local Regulations: comply with all that are applicable to the project.

1.4 SUBMITTALS:

A. Initial Submittals of Asbestos Abatement Contractor or Subcontractor Qualification Information:

Items 1. 4. A.1 through 1.4.A.11 below are to be submitted 30 days prior to commencement of mitigation, and must approved by the contracting officer prior to commencement of mitigation.

1. Five Projects: Name and location of at least 5 asbestos abatement projects performed by the

Contractor, including name and telephone number of contract representative.

2. Experience and Qualifications of Supervision: Name of and experience record of superintendent and foreman. Include evidence of knowledge of applicable regulations; evidence of participation and successful completion of EPA approved training course in asbestos removal and/or supervision of asbestos related work; and experience with asbestos related work in a supervisory position as evidenced through supervision of at least two asbestos abatement contracts.

3. Experience and Qualifications of Workers: Name and experience record, if any, of workmen who

FOVA- 174962 & 175150 028213-3

will be assigned to this project. Include for each person evidence of successful completion of an

EPA approved course in asbestos removal. Provide certification that employees meet the medical surveillance requirements of the state for which they are licensed.

4. License Information: Provide a copy of a current Asbestos Contractor’s License, and all individual employee licensure required for asbestos removal.

5. Plan of Action: Submit a detailed plan of the procedures proposed for use in complying with the requirement and regulations included in this specification. The plan shall include the location and layout of decontamination areas, the sequencing of asbestos work, the interface of trades involved in the performance of work, methods to be used to assure the safety of building occupants and visitors to the site. Expand upon the use of portable HEPA ventilation system, closing out of the building's HVAC system during removal, method of removal to prohibit emissions in work area, and packaging of removed asbestos debris.

6. Disposal Plan: A disposal plan including location of approved disposal site and the contractor’s method for documenting proper asbestos disposal to the contracting officer or his designated representative.

7. Environmental Protection Agency (EPA) Notification: Provide a copy of the NESHAPS

Notification of Demolition Renovation Form sent to the Regional EPA Asbestos Regulation

Office. (Paragraph 1.2).

8. Local Government Notification: Provide a copy of the notification sent to the appropriate State or Local Governmental Asbestos Regulation Office. (Paragraph 1.2).

9. Certificates of Compliance: Submit certification that vacuums, ventilation equipment, and other equipment required to contain airborne asbestos fibers conform to ANSI Z9.2.

10. Information on Encapsulating Material: Submit written evidence that material meets the latest requirements of the Environmental Protection Agency (EPA) and possesses the specified characteristics.

11. Laboratory Qualification Information: Submit evidence of qualifications of testing laboratory and personnel. Accreditation by the American Industrial Hygiene Association (AIHA) for asbestos analysis and two most recent consecutive quarterly reports showing that the laboratory analyzing the samples has been judged proficient by successful participation in the National Institute for

Occupational Safety and Health (NIOSH) Proficiency Analytical Testing (PAT) Program, shall be considered sufficient evidence of compliance. In addition to microscopists employed by

AIHA accredited laboratories, microscopists who provide similar evidence of successful participation in the AIHA Asbestos Analyst's Registry may analyze the fibers-in-air on site, however, any samples which are sent to a laboratory for analysis must be analyzed by an AIHA accredited laboratory. This submittal must be approved by the Contracting Officer prior to beginning any testing.

B. During-Work Asbestos Abatement Submittals: Items 1.4.C.1 through 1.4.C.2, below, are to be submitted to the contracting officer or his designated representative as work progresses at the time specified.

1. Air Monitoring and Work Area Information:

a. Air Monitoring Results: Air monitoring of work areas is to be completed by a third party

FOVA- 174962 & 175150 028213-4

industrial hygiene firm. Results of all air shall be posted in a common area within 72 hours of collection. The contractor is responsible for the monitoring of their employees as required by regulations. A copy of the results shall be given to the contracting officer.

b. Differential Air Pressure Readings: Starting when a negative pressure containment is erected and approved by the contracting officer, a copy of the strip chart record of the work area relative pressure shall be submitted within 24 hours after the recording was made.

c. Work Area Inspections: An industrial hygiene firm contracted by the asbestos abatement contractor shall perform visual inspections of the work area for the pre-removal, pre-final, and re-occupancy stages of the work. The contractor shall notify the contracting officer at least 14 hours in advance of each required inspection.

2. Transporting and Disposing of Asbestos Containing Materials (ACM):

a. Disposal Receipts: Manifests from the transporter, which document the contractor's shipment of

ACM from the site (NESHAPS Waste Shipment Records) shall be submitted three days following removal of ACM from the premises. Each manifest shall provide date, quantity of material removed, and signature of an authorized representative of the transporter. A signed and dated copy to the Waste Shipment Record showing receipt at an authorized landfill must be received by NPS's designated representative within 30 calendar days of the date of the shipping receipt.

b. Transportation Vehicles: Transportation shall be in vehicles dedicated to asbestos transportation.

Vehicles shall be marked in accordance with DOT and NESHAPS regulations.

c. Shipping Manifest Forms: Signed and completed Shipping Manifest Forms (NESHAPS Waste

Shipment Records) shall be used for the transportation of ACM. This form shall be signed by each party who has control over the asbestos waste, and a copy retained by each party as responsibility for the waste is transferred to the next party. An example Shipping Manifest Form is attached on Page 02085-15.

C. Final Submittals: Items 1.4.D.1. and 1.4.D.2. below are to be submitted to the contracting officer's designated representative at the completion of work for each containment.

1. Daily Log: Copies of a daily log showing the date(s) and time(s) of entrance to and exit from the work area(s) for all persons.

2. Re-establish Systems: Submit written certification:

a. Describing the type, application, and quantity of ACMs removed by the contractor.

b. That final inspection items were completed.

c. That mechanical and electrical systems disturbed by the contractor during work under the contract have been reinstalled and are in working order. The contractor shall clean and replace filters on all air handlers that are in the work area prior to the work being completed.

1.5 CONTRACTOR RESPONSIBILITY:

FOVA- 174962 & 175150 028213-5

A. The Contractor shall assume full responsibility and liability for compliance with all applicable

Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable

Federal, State, and local regulations, and shall hold the NPS harmless for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors. The contractor is responsible for determining quantities of materials for removal.

1.6 PROJECT/SITE CONDITIONS:

A. Means of Egress: Establish and maintain emergency and fire exits from the work area.

B. Use of Existing Facilities: Use of existing toilets, showers, and/or other similar facilities as decontamination areas is prohibited.

C. Maintenance of Existing Equipment: See contract drawings for requirements.

D. Environmental Conditions to be Maintained: Normal environmental conditions (heat, light, air conditioning) must be maintained outside of the work area.

E. Decontamination Facility: Throughout the time that asbestos removal is taking place; the abatement contractor will maintain a working three -stage decontamination facility at the point of access to the containment. As a minimum, the decontamination facility will consist of a clean changing area, a shower and a contaminated changing area. The size and location of this facility shall be approved by the contracting officer.

F. Access to Work Area: Access to work areas shall be through decontamination areas. The following shall have access to work area:

1. NPS Contracting Officer or Designated Representative

2. NPS Safety & Environment Personnel

3. NPS Contract Monitoring Personnel

4. NPS Authorized Inspection Personnel

5. OSHA Inspectors

6. EPA Inspectors

7. Local Building or Health Officials

1.7 SEQUENCING/SCHEDULING:

A. Scheduling and hours of Asbestos abatement work will be determined prior to contractor submittals. Abatement of ACMs shall be performed prior to disturbance of those materials during rehabilitation activities.

PART TWO – PRODUCTS

FOVA- 174962 & 175150 028213-6

2.1 EQUIPMENT

A. Equipment, including protective clothing and respirators, used in the execution of this contract and provided to visitors to the site, shall comply with ASTM E 849 and with the applicable

Federal, State, and local regulations. Respirators shall conform to the OSHA requirements in 29

CFR 1910.134 and 29 CFR 1926.1101, except that single use and disposable respirators shall not be used. Type of respirators required shall be as specified in 29 CFR 1926.1101. If any air sampling indicates levels above 0.1 fibers per cubic centimeter (f/cc) by PCM analysis in accordance with NIOSH 7400 method or "too dirty to count," powered air or supplied air (type

"C") respirators will be required during actual removal operations.

2.2 ENCAPSULATING MATERIALS:

A. Encapsulating materials (sealants) shall meet the latest requirements of the Environmental

Protection Agency (EPA) and shall possess the following characteristics:

1. Adherence. The sealant eliminates fiber dispersal by adhering to the fibrous substrate with sufficient penetration to prevent separation of the sealant from the sprayed asbestos material.

2. Impact Penetration. It withstands impact and penetration, protects the enclosed sprayed asbestos material, and it must not cause separation of sprayed asbestos material from its original substrate.

3. Flexibility. It possesses enough flexibility to accommodate atmospheric changes and settling of the structure over time.

4. Resistance to Smoke and Flame. It shall have high flame retardant characteristics and a low toxic fume and smoke emission rating.

5. Ease of Application. It must be easily applied with relative insensitivity to errors in preparation or application. Ease of repair by routine maintenance personnel is desirable.

6. Toxicity. The sealant must be neither noxious nor toxic to application workers and structure users thereafter.

7. Permeability. It should have some permeability to water vapor to prevent condensation accumulation be resistant to common cleaning agents.

8. Stability. It should have suitable stability to weathering and aging.

B. Guarantee. Guarantee encapsulating materials to perform for a period of one year, in accordance with "Guarantee" clause of the General Conditions.

PART THREE – EXECUTION – GENERAL

3.1 PREPARATION:

A. Isolate the work area for the duration of the work by completely sealing off all openings and fixtures in the work area, including but not limited to, heating and ventilation ducts, doorways, corridors, windows, and lighting with minimum two layers of six-mil polyethylene sheeting taped securely in place.

FOVA- 174962 & 175150 028213-7

B. Build double barriers of plastic sheeting at all entrances and exits to the work area so that the work area is always closed off by one barrier when workers enter or exit.

C. Cover all surfaces in the work area with minimum one layer of six-mil polyethylene sheeting taped securely in place to protect from damage.

D. Before the work is begun, clean all removable items and equipment. Remove them from the work area and store as directed.

E. Cover all non-removable items and equipment in the work area with one layer six-mil plastic sheeting taped securely in place.

F. Post warning signs on the primary containment as required by 29 CFR 1910.1001, 29 CFR

1926.1101, ASTM E 849, and as directed by the Contracting Officer.

G. The asbestos abatement contractor shall obtain Written Approval of the Finished Primary

Containment from a certified industrial hygienist prior to starting any actual asbestos removal work and provide a copy to the Contracting Officer.

3.2 WORK PROCEDURE:

A. General Procedures: The enclosed work areas shall be defined as an asbestos regulated area and all asbestos worker protection and work practices not addressed in this specification shall be performed in conformance with the general safety and health provisions of 29 CFR 1910.1001, 29

CFR 1910.20, and 29 CFR 1926.1101, respectively. For asbestos abatement work, use general work practices, work practices for removal, and work practices for encapsulation as specified in

ASTM E 849, and other appropriate work procedures approved by the Environmental Protection

Agency (EPA). If a conflict arises, the more stringent application shall apply until a determination is made by the contracting officer or his designated representative.

B. Local Exhaust System: Provide a local exhaust system in the asbestos control area as required to meet the asbestos control limit and ceiling concentration. The local exhaust system shall be vented to the outside of the building. Equip exhaust openings with the necessary filters required to reduce the airborne asbestos concentration to below the asbestos control limit. Local exhaust equipment must be sufficient to maintain a negative air pressure of -0.02 inches of water in the asbestos control area for the duration of abatement until final clearance is achieved ( See 3.4 D.).

In no case shall the building ventilation system be used as the local exhaust system for asbestos control. Filtering in vacuums and exhaust equipment shall conform to ANSI Z9.2; HEPA filters shall be used in all vacuums and exhaust equipment. If the local exhaust system does not exhaust directly to the outside, the exhaust equipment shall be tested for integrity with a Dioctylphthalate

(DOP) or Dioctylsubacate (DOS) smoke generator and particle counter each time a containment is erected.

C. Coordination of Work of all Trades: Coordinate the work of all trades to assure that their work is performed in accordance with the applicable regulations and that the asbestos control limits are maintained at all times both inside and outside the asbestos work area.

3.3 QUALITY CONTROL:

FOVA- 174962 & 175150 028213-8

A. Monitoring: Monitoring of airborne concentrations of asbestos shall be in accordance with 29

CFR 1910.1001, 29 CFR 1926.1101, and ASTM E 849. Monitor the airborne concentration of asbestos before starting work to obtain a baseline fiber concentration in the affected areas. Then monitor once every four hours, continuously during the course of the work inside the asbestos work area; one time daily outside the entrance to the asbestos work area and at the exhaust opening of the local exhaust system. If monitoring shows airborne concentrations greater than the asbestos control limits, stop all work, correct the conditions causing the excessive levels, and notify the Contracting Officer immediately. In addition, monitor the airborne concentrations of asbestos after final cleanup and removal of the enclosure of the asbestos control area in accordance with paragraph "Final cleanup and removal of enclosures."

B. Site Inspection and Stop Work Orders: While performing asbestos abatement work, the

Contractor shall be subject to onsite inspection by NPS officials or NPS contracted inspection services. Work shall also be subject to inspection by OSHA and EPA inspectors and/or local building or health officials. If found to be in violation by one of these officials, the Contractor shall cease all work immediately. Until the violation is resolved, standby time required to resolve the violation shall be at the Contractor's expense. One complete set of equipment (such as respirators and disposable clothing) required for entry to the asbestos control area shall be made available within 2 hours of request by the Contracting Officer for inspection of the asbestos control area. Such requests will only be made during the contractor's working hours.

3.4 CLEANUP AND DISPOSAL:

A. Permits and Notifications: Secure necessary permits in conjunction with asbestos removal, hauling and disposition and provide timely notification of such actions, as may be required by federal, state, regional, and local authorities. Notify the Regional Office of the United States

Environmental Protection Agency and provide copies of the notification to the Contracting

Officer 10 days prior to the commencement of the work. Provide notification in accordance with

40 CFR 61.22(d)(1). (See Paragraph 1.1)

B. Housekeeping: Essential parts of asbestos dust control are housekeeping and cleanup procedures.

Maintain all surfaces throughout the building free of accumulations of asbestos fibers to prevent further dispersion. Give meticulous attention to restricting the spread of dust and debris, keep waste from being distributed over the general area or to lower floors. Use approved industrial vacuum cleaners with a HEPA filter to collect dust and small scrap. The blowing down of the space with compressed air is forbidden. Post appropriate asbestos hazard warning signs. In all possible instances workmen shall cleanup their own areas. Equip personnel engaged in cleaning up asbestos scrap and waste with necessary respiratory equipment and protective clothing.

C. Disposal of Asbestos: Collect and dispose of asbestos waste, scrap, debris, bags, containers, equipment, and asbestos contaminated clothing which may produce airborne concentrations of asbestos fibers in sealed impermeable bags. Prior to placing in bags, or containers, wet down asbestos wastes to reduce airborne concentrations. Waste asbestos material shall be disposed of in accordance with all Federal regulations at a sanitary landfill that meets EPA requirements. The contractor will provide the Contracting Officer or his designated representative with a copy of all hazardous waste manifests, haulers receipts or landfill receiving tickets resulting from the disposal of the asbestos waste. Establishment of any on-site temporary holding area for properly packaged asbestos waste must be approved by the Contracting Officer or his designated representative.

FOVA- 174962 & 175150 028213-9

D. Final Cleanup and Removal of Enclosure: The Contractor must notify the Contracting Officer that the work area is ready for final inspection. The Contracting Officer or his designated representative will inspect the work area prior to decontamination and removal of enclosure.

Visual observation of asbestos materials, dust or debris is not permitted on any surface in or around the work area. Clean work area in accordance with EPA approved methods. The

Contracting Officer's independent industrial hygienist will perform air sampling for clearance purposes. Perform sampling in an aggressive manner, using fans or similar equipment to create exaggerated air movement during the clearance air sampling. Repeat the decontamination and testing process until fiber concentration level reaches 0.01 f/cc in air by PCM analysis in accordance with NIOSH 7400 method. If fiber concentration does not exceed 0.01 f/cc, the

Contracting Officer or a designated representative may authorize removal of the enclosure.

Contracting Officer approval of final cleaning and restoration of the work area is required.

FOVA- 174962 & 175150 028213-10

SHIPPING MANIFEST

REPORTABLE QUANTITY, HAZARDOUS SUBSTANCE (ASBESTOS)

Total Quantity of Hazardous Substance: ______ Bags

______ Drums

______ Cubic Yards

______(Other Unit)

Waste Generator: Name:______________________________

(Building Name)

BLDG NO:____________ Address:____________________________

NPS Contract #: ________

Waste Pickup Site: Name:______________________________

(Prime Contractor)

Address:____________________________

Disposal Facility: Landfill Name:_______________________

Contact:______________________ Address: ___________________________

Phone:_______________________ ______________________ ZIP__________

NOTE: THIS FORM SHALL BE SIGNED BY EACH PARTY AS CONTROL OF THE HAZARDOUS

SUBSTANCE IS RELINQUISHED TO THE NEXT PARTY.

1.

RECEIVED FROM

Name, Representing

DATE

RECEIVED BY

Name, Representing

DATE

2.

3.

4.

5.

FOVA- 174962 & 175150 028213-11

APPENDIX A: NPS ASBESTOS ABATEMENT PROJECT CONTROL CHECKLIST

Asbestos Contractor Submittal Punch List

PROJECT__________________________________________

PROJECT NUMBER_________________________________

DATE REVIEWED__________________________________

REVIEWER________________________________________

_____ABATEMENT _____FLOORTILE _____ROOFING _____OTHER

A. Pre-Award Submittals: Items Submitted After Bid Receipt But Prior to Award:

Asbestos Contractor Qualification Information Asbestos Contractor Qualification Information IN REVIEWED APPROVED FILE REVIEWED APPROVED IN FILE

*1. Record of firm’s experience, including names and addresses of purchasers of service, location of work, and dates of performance __________ ________ ______

(Section 1.4.A.1.)

*2. Copy of daily log and air monitoring reports for last five jobs (Section 1.04.A.2.) __________ ________ ______

*3. Name of Superintendent: (Section 1.4.A.3.)

a. Record of experience __________ ________ ______

b. Record of training __________ ________ ______

*4. Names and experience record of employees: (Section 1.4.A.4.)

a. Record of experience __________ ________ ______

b. Copy of successful completion record for required training. __________ ________ ______

*5. Current State License: (Section 1.4.A.5.)

a. Washington __________ ________ ______

B. Post-Award Asbestos Abatement Submittals: Items to be submitted after award, but prior to beginning work:

REVIEWED APPROVED IN FILE

1. Plan of Action: (Section 1.4.B.1.)

a. Work plan showing location and layout of decontamination areas __________ ________ ______

b. Notification of EPA __________ ________ ______

(Section 1.4.B.3.)

FOVA- 174962 & 175150 028213-12

c. Notification of Local jurisdiction

(Section 1.4.B.4.) __________ ________ ______

d. Scheduling/sequencing of work __________ ________ ______

e. Interface of other trades in work schedule __________ ________ ______

f. Methods used to ensure safety of building occupants and visitors __________ ________ ______

>>>> Air to be monitored by

NPS /Tenant /Contractor __________ ________ ______

g. Disposal of waste, location of site, and permit from

Owner and regulatory authority __________ ________ ______

(1.4.B.2.)

h. Type of HEPA ventilation system __________ ________ ______

i. How will contractor close off and ensure that there are no leaks in building's HVAC system in contractor's work area __________ ________ ______

j. Methods of removal to be utilized __________ ________ ______

2. Certificates of Compliance: (Section 1.4.B.5.)

a. HEPA Vacuums __________ ________ ______

b. HEPA Ventilation equipment __________ ________ ______

c. Respirators __________ ________ ______

d. Other information __________ ________ ______

3. Information on Encapsulants: (Section 1.4.B.67.)

Compliance with Specification

EPA requirements __________ ________ ______

USED AS ENCAPSULANT _____, FLAMMABLE _____, SPRAYBACK _____,

OR COMBUSTIBLE _____, WETTING AGENT _____, NONCOMBUSTIBLE _____

4. Laboratory Qualification Information: (Section 1.4.B.78.)

a. Name and location of firm __________ ________ ______

b. Proof of current accreditation __________ ________ ______

c. Certification of Microscopist __________ ________ ______

FOVA- 174962 & 175150 028213-13

C. During-Work Asbestos Abatement Submittals: Items 1.4.C.1. through 1.4.C.2. below are to be submitted to the contracting officer or his designated representative as work progresses at the time specified:

1. Air Monitoring Results.(1.4.C.1.a.) __________ __________ ______

2. Differential Air Pressure Readings. __________ __________ ______

(Strip Charts) (1.4.1.b.)

3. Work Area Inspections. (1.4.C.1.c.) __________ __________ ______

4. Disposal Receipts. (1.4.C.2.a.) __________ __________ ______

(NESHAPS Waste Shipment Records)

a. Quantity of material listed.

b. Receipt signed and dated.

5. Transportation Vehicles(1.4.C.2.b.) __________ __________ ______

a. Dedicated Asbestos Vehicle.

b. Marked In Accordance With

DOT and NESHAPS regulations.

6. NESHAPS Waste Shipment Records.(1.4.C.2.c.) __________ __________ ______

a. Quantity of material listed

b. Receipt dated

c. Receipt signed by authorized representative of landfill

D. Final Submittals: Items 1.4.D.1. and 1.4.D.2. below are to be submitted to the contracting officer's designated representative at the completion of work for each containment.

1. Daily Log (1.4.D.1.) __________ __________ ______

2. Removal and Reestablish Systems

Certification. (1.4.D.2.) __________ __________ ______

a. Description of Materials

Removed. (1.4.D.2.a.) __________ __________ ______

b. Final Inspection Completed.

(1.4.D.2.b.) __________ __________ ______

c. Restoration of Systems.

(1.4.D.2.c.) __________ __________ ______

FOVA- 174962 & 175150 028213-14

E. NPS Asbestos Abatement Project Control and Close Out

a. Copy of EPA and Local Notifications __________ __________ ______

b. Copy of Project Specifications. __________ __________ ______

c. Independent Air Monitoring Report. __________ __________ ______

F. Notes: _________________________________________________________________________

Revised 01/2011

END OF SECTION 028213