6_-Sustainability_Checklist_LEED_2009_FOVA_9-24-14.pdf

PDF 144 KB Posted

Attached to
Rehabilitate Buildings and Phase 1 Utilities at Fort Vancouver National Historic Site, Washington FOVA 174962
Solicitation number
P15PS00118
Issued by

About this file

Sustainability Checklist LEED 2009 FOVA 9-24-14

View the file

Other files

File Type Posted
0_-_Amend_6_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend__6_FOVA_Section_028213-_ASBESTOS_spec_revised_FINAL.pdf PDF
1_-_Amend_6__FOVA_Section_02_8319__LEAD-BASED_PAINT_spec_FINAL.pdf PDF
3_-_Amend_6_FOVA_174962_Q-A_responses.pdf PDF
0_-_Amend_5_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
4_-_Amend_5_FOVA_Questions.pdf PDF
3_-_Amend_5_FOVA_Site_Visit_Sign_in_Sheets_3-25.pdf PDF
2_-_ACM_Quantity_Estimates_FOVA_174962_.pdf PDF
1_-_Final_ACM_HazMat_SurveySummary_FOVA_041414KMA.PDF PDF
2__-_Amendment_4_FOVA_Questions.pdf PDF
0_-_Amend_4_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
1_-_Amendment_4_Attachment_1_FOVA_174962_.pdf PDF
2__-_Amendment_3_FOVA_Questions_3-13-15.pdf PDF
1_-_Amend_3_Attachment_1_FOVA__174962.pdf PDF
Past_Performance_Questionnaire_x_(1).doc DOC document
0_-_Amend_3_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
3_-Amendment_3_FOVA_Questions_3-16-15.pdf PDF
3_-_Amend_2_Attachment_1_FOVA_174962_pre_bid_list_of_attendees.pdf PDF
4_-_Amend_2_Attachment_2_FOVA_174962.pdf PDF
1_-_Amend_1_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend_2_Revised_SF_1442.pdf PDF
0_-_Amend_2_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
5_-_Amend_2_FOVA_Questions_3-10-15.pdf PDF
Amend_1_-_Revised_Contract_Clauses_-_FOVA_174962.pdf PDF
Amend_1_-_Attachment_2_-_SECTION_01_27_00_Phase_1.pdf PDF
Amend_1__-_Attachment_1_-_FOVA_174962_.pdf PDF
Drawings_No._389_126929.pdf PDF
Drawing_No._389_119939.pdf PDF
Hazmat_Survey_Compiled_-_FOVA_987-404.pdf PDF
FOVA__Proposal_Submission_Package_x.pdf PDF
Drawing_No._389_126282.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_2.pdf PDF
Supplemental_993_pics.pdf PDF
Drawing_No._389_105548_vol_1.pdf PDF
FOVA_Request_for_Proposal.pdf PDF
FOVA_Lead_Base_Paint_and_AHERA_Inspection__Amend_2_Clarification_to_report_questions.pdf PDF
Drawing_No._389_105548_vol_2.pdf PDF
Project_Specs_Rehabilitate_Utilities_and_Infrastructure_in_East_and_South_Vancouver_Barracks.pdf PDF
Drawing_No._389_80038A.pdf PDF
Wage_Rates_WA_-_2-12-2015.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_1.pdf PDF
Supplemental_989_pics.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fund Source: Gross Project Construction Cost:

Predesign Begin Date:

FY of Const. Funding

Park:

State: Region:

Type of Building

Project Type Building Renovation

Description:

Park/PMIS: FOVA 174962 / 175150 p p Forest

Based on the Gross Building Cost and the CRV this project is NOT a major renovation and therefore must meet federal requirements on only the applicable parts of the project (historic buildings may have exceptions)

0%

Gross Non Building (i.e. Site) Cost:

0% 0%

If Renovation, Exist. Bldg. CRV $13,146,559

Architectural Resources Group, Inc. FOVA

Gross Building Construction Cost:

75%% Federal Regulations Achieved 0%

Architect/Engineer Firm:

Pacific WestDate: July 25, 2014 WA

NPS Project Sustainability Checklist Building and Non-Building Projects

(For New Construction or Renovation) LEED 2009 Edition

Project Title: Rehabilitation of Building 987 & 404

Building Size (Square Feet)

69%

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

SS P 1

Construction Activity Pollution

Y N/A SWPPP will be developed for Y N/A Contractor will be required to

Gold (60 to 79)

0%

65 Missed Prereq.

0% 0%

Sustainability Features PMIS Submission Predesign Schematic Design Design Development

Missed Prereq.

Gold (60 to 79)

Missed Prereq. Missed Prereq. 65

LEED Certification Level Not Certified/Missing Prereq. Not Certified/Missing Prereq. Not Certified/Missing Prereq.

Construction

75%% Federal Regulations Achieved

Sustainable Sites (SS) Maximum LEED NC 2009 Credits: 26

Construction Documents

0%

Not Certified/Missing Prereq.

Total LEED-NC Credits

69%

SS Prereq 1 y

Prevention Y N/A p the project during CD phase. Y N/A q prepare an SWPPP.

SS Credit 1 Site Selection Y 1 Meets all site selection criteria. Y 1 Meets all site selection criteria.

SS Credit 2 Development Density & Community Connectivity

Y 3 Number of credits to be studied further. Y 3

Existing buildings are being reutilized on a previously developed site and the area meets density requirements.

SS Credit 3 Brownfield Redevelopment Y 1 Abatement of hazardous materials will be a part of the project.

Y 1 Abatement of hazardous materials will be a part of the project.

Alt ti T t ti There is only one bus line

SS Credit 4.1 Alternative Transportation, Public Transportation Access

Y 3 Number of credits to be studied further. N 0 within a 1/4 mile of 987 (C-

TRAN route 32) and not within that distance of 404.

SS Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms

Y 1 Bike racks and showers are provided at 987. Need to confirm requirements for 404.

N 0 Bike racks and showers are provided at 987 but not at 404.

SS Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles

N 0

Some preferred parking is provided in shared lots. NPS to verify if quantities are adequate for credit to individual project.

Y 1

Electric vehicle parking is provided at 404. Quantities of preferred parking provided in the shared lots to be confirmed by NPS.

Form E 62 (8/2/13) 1

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

SS Credit 4.4 Alternative Transportation, Parking Capacity

Y 2 Parking capacity will not exceed local zoning requirements. (NPS to verify)

Y 2 Parking capacity will not exceed local zoning requirements. (NPS to verify)

SS Credit 5.1 Site Development, Protect or Restore Habitat

Y 1

Site disturbance will be minimized and climate-appropriate plants will be selected where necessary.

Y 1

Site disturbance will be minimized and climate-appropriate plants will be selected where necessary.

SS Credit 5.2 Site Development, Maximize Open Space

Y 1 Credit may be feasible depending on how site area is defined.

N 0 Site boundary is too close to the buildings to include open space.

SS Credit 6.1 Stormwater Design, Quantity Control (See EISA Section 438)

N 0 N 0

SS Credit 6.2 Stormwater Design, Quality Control (See EISA Section 438)

N 0 N 0

EISA 2007,

Section 438 Protect Hydrology N N/A N N/A

SS Credit 7.1 Heat Island Effect, Non-Roof N 0 This appears feasible around 987 due to limited paving, but needs further study for 404needs further study for 404.

SS Credit 7.2 Heat Island Effect, Roof Y 1 This should be acheivable since both buildings are getting new roofs.

N 0 Product selected by NPS for 987 does not meet SRI requirements.

SS Credit 8 Light Pollution Reduction Y 1

DD - Exterior lighting coordination with master plan is needed. Will need to meet exterior lighting requirements for LZ1 - Dark (Park and Rural setting) Zone.

Y 1

2006 NPS Mgmt Policies (Para.

4.9) Soundscape Preservation N N/A

Generator may be an issue for soundscape preservation.

Needs further review.

N N/A

Generator may be an issue for soundscape preservation.

Acoustical data of selected unit to be reviewed during Construction.

2006 NPS Mgmt Policies (Para.

4.10) Dark Sky Preservation Y N/A All lighting to be dark sky friendly. Y N/A All lighting to be dark sky friendly.

Missed Prereq.

Missed Prereq.

Missed Prereq. 15 10 Missed

Prereq.LEED-NC Subtotal

Water Efficiency (WE) Maximum LEED NC 2009 Credits: 10

Form E 62 (8/2/13) 2 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

WE Prereq 1 Water Use Reduction, 20% Reduction (see Guiding Principle III ‐ Protect and Conserve Water)

Y N/A Low flow plumbing fixtures Y N/A Low flow plumbing fixtures

WE Credit 1

Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III ‐ Protect and Conserve

Y 2

Chose plants that easily adapt to the site, small use of turf, and courtyard is largely comprised of a permeable

Y 2

Chose plants that easily adapt to the site, small use of turf, and courtyard is largely comprised of a permeable

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Documents Construction

Water) comprised of a permeable material.

comprised of a permeable material.

WE Credit 1 (cont'd)

Water Efficient Landscaping, No Potable Use or No Irrigation

N 0 N 0

WE Credit 2 Innovative Wastewater Technologies

N 0 N 0

NPS Policy Water Metering Y N/A A new water meter will be provided during the sitewide utilities upgrade.

Y N/A A new water meter will be provided during the sitewide utilities upgrade.

EPACT 2005,

Section 109

Water Used for Energy Conservation

NA N/A NA N/A

Section 109 Conservation

WE Credit 3 Water Use Reduction (30%, 35%, 40%)

Y 2 Low flow plumbing fixtures Y 2 Low flow plumbing fixtures

Missed Prereq.

Missed Prereq.

Missed Prereq. 4 4 Missed

Prereq.

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Schematic Design Design Development

LEED-NC Subtotal

Energy & Atmosphere (EA) Maximum LEED NC 2009 Credits: 35

Sustainability Features PMIS Submission Predesign Construction Documents Construction

EA Prereq 1

Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I ‐ Employ Integrated Design Principles)

Y N/A Y N/A Commissioning included in specs.

EA Prereq 2 Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance)

Y N/A

The project will comply as designed using the whole building modeling approach.

We don't have any energy modeling scope currently.

Y N/A This building would comply following the modeling approach.

Form E 62 (8/2/13) 3 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

EA Prereq 3

Fundamental Refrigerant Management (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)

Y N/A No CFC refrigerants, VRF uses R410a Y N/A No CFC refrigerants, all equipment uses R410a

EA Credit 1

Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation ) (see Guiding Principle

Y 19 If we were to model this building, we would achieve 20 points, 19+regional focus.

Y 19 If we were to model this building, we would achieve 20 points, 19+regional focus.

Renovation.) (see Guiding Principle II ‐ Optimize Energy Performance)

EISA 2007,

Section 433

Reduce Fossil Fuel Derived Energy

Y N/A Zero fossil fuels Y N/A Zero fossil fuels

EO 13423, Sec.

2.(h)

Energy Efficient Electronic Products (Select EPEAT) (Predominantly relates to purchases of desktop/laptop computers and peripherals)

N N/A To be reviewed by USFS N N/A USFS determination required.

CFR Title 10, Part 436.4

Procure Energy Star or FEMP designated products

N N/A N N/A

EPACT 2005,

Section 104

Premium Efficiency Electric Motors

Y N/A HRV fan motors and circ fan motors shall be premium efficiency

Y N/A Fan motors are premium efficency motors.

EISA 2007,

Section 523

On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective)

N N/A Currently Not Proposed NA N/A

EA Credit 2 On-Site Renewable Energy*** 1%-13% Renewable Energy

N 0 PV panels may conflict with historic preservation requirements.

N 0

EA C dit 3

Enhanced Commissioning (required for projects with building size > 5 000 f) ( G idi P i i l I Y 2 N 0EA Credit 3 5,000 sf) (see Guiding Principle I ‐ Employ Integrated Design Principles)

Y 2 N 0

EA Credit 4 Enhanced Refrigerant Management (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)

N 0 Not possible with VRF equipment N 0 Not possible with VRF equipment

EA Credit 5

Measurement & Verification (see Guiding Principle II - Optimize Energy Performance)

N 0 Not possible without DDC system. Y 3

Meets Federal Requirements, but not meet more stringent LEED requirements. To meet Fed. Req's, all utilities must be equipped with meters for t ki b d N

Form E 62 (8/2/13) 4 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

MOU Guiding Principles & EO

13423

Measurement & Verification (see Guiding Principle II ‐ Optimize Energy Performance)

Y

A meter will be installed on the main electrical service to the building. The pull down only allows for 0 or 3 points to be claimed for this item. As this item also requires that natural gas and steam also be measured when present. Do all three need to be present and metered to claim the 3 points?

Y 3

A meter will be installed on the main electrical service to the building. The pull down only allows for 0 or 3 points to be claimed for this item. As this item also requires that natural gas and steam also be measured when present.

EA Credit 6 Green Power N 0 Not currently planned. N 0 Not currently planned.

Missed Prereq.

Missed Prereq.

Missed Prereq. 21 25 Missed

Prereq.

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

MR Prereq 1 Storage & Collection of Recyclables

Y N/A Areas for recycling will be created in each building as appropriate.

Y N/A Areas for recycling are shown on the plans.

Predesign Schematic Design Design Development Construction Documents

LEED-NC Subtotal

Materials & Resources (MR) Maximum LEED NC 2009 Credits: 14

Sustainability Features PMIS Submission Construction

MR Credit 1.1 Building Reuse, Maintain Existing Walls, Floors & Roof

Y 3

Changes to the building envelopes are very minimal.

Two points are easily acheivable and possibly 3.

Y 3

Changes to the building envelopes are very minimal.

Two points are easily acheivable and possibly 3.

MR Credit 1.2 Building Reuse, Maintain Interior Nonstructural Elements

Y 0

Given the extent of demo on the second floor of 987, it appears that more than 50% of the interior elements will be removed.

Y 0

Given the extent of demo on the second floor of 987, it appears that more than 50% of the interior elements will be removed.

MR Credit 2

Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)

Y 1 Waste management criteria will be integrated in specifications.

Y 1 Waste management criteria will be integrated in specifications.

MR Credit 2 (cont'd)

Construction Waste Management, Divert 75% Y 1

Waste management criteria will be integrated in Y 1

Waste management criteria will be integrated in

(cont d) from Disposal specifications. specifications.

MR Credit 3 Materials Reuse N 0

Material reuse in the project that meet LEED requirements are limited to window hardware and some door hardware. It does not seem that this will be enough for a credit.

N 0

In addition to window and door hardware reuse, salvaged brick veneer will be reused for repairs on 404. Still not enough quantity for credit.

Form E 62 (8/2/13) 5 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

MR Credit 4

Recycled Content, 10% (post‐ consumer + ½ pre‐consumer). Use EPA's CPG for designated products to use)

Y 1

Carpet, railings, ceiling tile and other materials will be specified with recycled content minimums.

Y 1

In addition to items listed in DD, concrete will allow for the use of coal fly ash and ground granulated blast furnace slag.

MR Credit 4 Recycled Content, 20% (post-consumer + ½ pre-consumer)

N 0

Since new materials integrated into preservation projects are fairly limited, it is unlikely that this will be achieved.

N 0

Since new materials integrated into preservation projects are fairly limited, it is unlikely that this will be achieved.

MR Credit 5 Regional Materials, Extracted, Processed & Manufactured Regionally

Y 0

Use of regional materials will be integraged in the specifications, including regionally obtained concrete, Y 1

Use of regional materials will be integraged in the specifications, including regionally obtained concrete, g y lumber, and plant materials. lumber, and plant materials.

EO 13423, Sec.

2.(d)

Biopreferred Products N N/A N N/A

Cannot use fiberboard for sheathing for structural work.

Specifying biodegradable form release agent.

MR Credit 6 Rapidly Renewable Materials N 0

Linoleum flooring and bamboo cabinetry are proposed, but quantities may not be adequate for the credit.

N 0 Linoleum flooring is proposed, but quantities will not be adequate for the credit.

Certified Wood (see Guiding Principle V ‐ Reduce Environmental Impact of Materials) ‐ Note: LEED requires FSC certification, but for compliance with federal i f h f ll i Thi ill b i d i hMR Credit 7 requirements any of the following certifications are sufficient: Forest Stewardship Council (FSC), Sustainable Forestry Initiative (SFI), American Tree Farm System (ATFS), or Programme for the Endorsement of Forest Certification (PEFC)

Y 1 This will be integrated in the specification. Y 1 Included in specs.

Missed Prereq.

Missed Prereq.

Missed Prereq. 7 8 Missed

Prereq.

Y N N/A P i t Concisely explain how dit/ i t i t t Y N N/A P i t

Concisely explain how dit/ i t i t t Y N N/A P i t

Concisely explain how dit/ i t i t t Y N N/A P i t

Concisely explain how dit/ i t i t t Y N N/A P i t

Concisely explain how dit/ i t i t t Y N N/A P i t

Concisely explain how dit/ i t i t t

Schematic Design Design Development Construction Documents Construction PMIS Submission Predesign

LEED-NC Subtotal

Indoor Environmental Quality (EQ) Maximum LEED NC 2009 Credits: 15

Sustainability Features Y, N, N/A Points credit/requirement is met at this milestone:

Y, N, N/A Points credit/requirement is met at this milestone:

Y, N, N/A Points credit/requirement is met at this milestone:

Y, N, N/A Points credit/requirement is met at this milestone:

Y, N, N/A Points credit/requirement is met at this milestone:

Y, N, N/A Points credit/requirement is met at this milestone:

EQ Prereq 1 Minimum IAQ Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality)

Y N/A Natural ventilaiton upstairs & basement, HRV downstairs. Y N/A Natural ventilaiton upstairs & basement, HRV downstairs.

EQ Prereq 2 Environmental Tobacco Smoke (ETS) Control

Y N/A Y N/A

Form E 62 (8/2/13) 6 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

EQ Credit 1 Outdoor Air Delivery Monitoring

N 0 Not possible w/ natural ventilation. N 0 Not possible w/ natural ventilation.

EQ Credit 2 Increased Ventilation N 0 Not possible w/ natural ventilation. N 0 Not possible w/ natural ventilation.

EQ Credit 3.1

Construction IAQ Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality)

Y 1 Y 1

Indoor Environmental Quality)

EQ Credit 3.2

Construction IAQ Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality)

Y 1 Y 1

EQ Credit 4.1

Low‐Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality)

Y 1 Criteria for low emitting materials will be included in the specifications.

Y 1 Criteria for low emitting materials is included in the specifications.

EQ Credit 4.2

Low‐Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality)

Y 1 Criteria for low emitting materials will be included in the specifications.

Y 1 Criteria for low emitting materials is included in the specifications.

EQ Credit 4.3

Low‐Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental

Y 1 Criteria for low emitting materials will be included in the specifications

Y 1 Criteria for low emitting materials is included in the specifications

Quality) the specifications. specifications.

EQ Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products

Y 1 Criteria for low emitting materials will be included in the specifications.

Y 1 Criteria for low emitting materials is included in the specifications.

EQ Credit 5 Indoor Chemical & Pollutant Source Control

Y 1

Bathrooms, copy rooms, and janitor closets are provided with exhaust. Floor mats will be integrated at entries.

Y 1

Bathrooms, copy rooms, and janitor closets are provided with exhaust. Floor mats will be provided by USFS at entries.

MOU Guiding Principles & EO

13423 Moisture Control N N/A Y N/A Moisture control practices are incorporated into project.

Controllability of Systems, Lighting EQ Credit 6.1 (See Guiding Principle IV, Enhance

Indoor Environmental Quality) Y 1 Y 1

EQ Credit 6.2 Controllability of Systems, Thermal Comfort

Y 1

Individual controls are not possible on second floor of 987, but operable windows will provide controllability.

Y 1

Individual controls are not possible on second floor of 987, but operable windows will provide controllability.

EQ Credit 7.1 Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality)

N 0 Systems are not designed for full cooling. N 0 Systems are not designed for full cooling.

Form E 62 (8/2/13) 7 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

EQ Credit 7.2 Thermal Comfort, Verification N 0 Previous credit required. N 0 Systems are not designed for full cooling.

EQ Credit 8.1

Daylight & Views, Daylight 75% of Spaces (See Guiding Principle IV, Enhance Indoor Environmental Quality)

Y 1

Existing window openings appear adequate to achieve 75% daylighting, assuming basement spaces are considered "not regularly occupied".

Y 1

Existing window openings appear adequate to achieve 75% daylighting, assuming basement spaces are considered "not regularly occupied". At 404, all offices have windows except the Radio Shop.

Vision glazing is provided in Vision glazing is provided in

EQ Credit 8.2 Daylight & Views, Views for 90% of Spaces

Y 1 most occupied spaces, assuming basement spaces are considered "not regularly occupied".

Y 1 most occupied spaces, assuming basement spaces are considered "not regularly occupied".

Missed Prereq.

Missed Prereq.

Missed Prereq. 11 11 Missed

Prereq.

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

ID Credit 1.1 Innovation in Design: Green Cleaning

Y 1

USFS to create a green cleaning program meeting LEED EBOM IEQ Prerequisite Y 1

USFS to create a green cleaning program meeting LEED EBOM IEQ Prerequisite

LEED-NC Subtotal

Design Development Construction DocumentsPMIS Submission Predesign

Innovation & Design Process (ID) Maximum LEED NC 2009 Credits: 6

Sustainability Features Construction Schematic Design

3. 3.

ID Credit 1.2 Innovation in Design:

Integrated Pest Management

Y 1

Utilize NPS Integrated Pest Management plan or develop plan following guidelines of LEED EBOM SSc3.

Y 1

Utilize NPS Integrated Pest Management plan or develop plan following guidelines of LEED EBOM SSc3.

ID Credit 1.3 Innovation in Design: Provide Specific Title

ID Credit 1.4 Innovation in Design: Provide Specific Title

ID Credit 1.5 Innovation in Design: Provide Specific Title

ID Credit 2 LEED® Accredited Professional

Y 1

D. Cooper is a LEED Accredited professional, as are others on the project team.

Y 1

D. Cooper is a LEED Accredited professional, as are others on the project team.

0 0 0 3 3 0

Regional Priority (RP)

LEED-NC Subtotal

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

RP Credit 1.1 Regional Priority Credit: MRc 1 - 75% Zip Code: 98663 Y 1

Minimum of 75% of existing building envelopes and structure will be reused.

Y 1 Minimum of 75% of existing building envelopes and structure will be reused.

Sustainability Features PMIS Submission Schematic Design g y ( ) Maximum LEED NC 2009 Credits: 4

Design Development Construction Documents Construction Predesign

Form E 62 (8/2/13) 8 credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:

Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents

RP Credit 1.2 Regional Priority Credit: EAc1 Y 1 Hazardous materials abatement will be part of the project.

Y 1 Hazardous materials abatement will be part of the project.

RP Credit 1.3 Regional Priority Credit:

SSc4.2

Y 1 Energy savings at 44%. Y 1 Energy savings at 44%.

RP Credit 1.4 Regional Priority Credit:

SSc4.4 Y 1

Parking capacity will not exceed local zoning requirements. (NPS to verify)

Y 1 Parking capacity will not exceed local zoning requirements. (NPS to verify)

0 0 0 4 4 0LEED-NC Subtotal

Non-LEED-NC Federal Requirements Maximum LEED NC 2009 Credits: 26

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:

MOU Guiding Principles & EO 13423 (pg. 3)

Complete Integrated Design Narrative During Predesign Only

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

LEED Certification Rating System Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points

For more information on LEED Certification and credits, visit www.usgbc.org

Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites.

* b ildi f 000 GS d j i b ildi h l 000 GS i h i d d C i i i h i d l i h S 0 200 " h C i i i " ll j l i h h i f C 2009 i i " d l

Schematic Design Design Development Construction Documents Construction

Maximum LEED NC 2009 Credits: 26

Sustainability Features PMIS Submission Predesign

*** The federal requirement (from EISA 2007) that relates to these LEED‐NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits.

For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0‐2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm).

** For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years ‐ not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential).

Form E 62 (8/2/13) 9