4_-_Amend_2_Attachment_2_FOVA_174962.pdf

PDF 67 KB Posted

Attached to
Rehabilitate Buildings and Phase 1 Utilities at Fort Vancouver National Historic Site, Washington FOVA 174962
Solicitation number
P15PS00118
Issued by

About this file

Amend 2 Attachment 2 FOVA 174962

View the file

Other files

File Type Posted
0_-_Amend_6_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend__6_FOVA_Section_028213-_ASBESTOS_spec_revised_FINAL.pdf PDF
1_-_Amend_6__FOVA_Section_02_8319__LEAD-BASED_PAINT_spec_FINAL.pdf PDF
3_-_Amend_6_FOVA_174962_Q-A_responses.pdf PDF
0_-_Amend_5_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
4_-_Amend_5_FOVA_Questions.pdf PDF
3_-_Amend_5_FOVA_Site_Visit_Sign_in_Sheets_3-25.pdf PDF
2_-_ACM_Quantity_Estimates_FOVA_174962_.pdf PDF
1_-_Final_ACM_HazMat_SurveySummary_FOVA_041414KMA.PDF PDF
2__-_Amendment_4_FOVA_Questions.pdf PDF
0_-_Amend_4_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
1_-_Amendment_4_Attachment_1_FOVA_174962_.pdf PDF
2__-_Amendment_3_FOVA_Questions_3-13-15.pdf PDF
1_-_Amend_3_Attachment_1_FOVA__174962.pdf PDF
Past_Performance_Questionnaire_x_(1).doc DOC document
0_-_Amend_3_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
3_-Amendment_3_FOVA_Questions_3-16-15.pdf PDF
3_-_Amend_2_Attachment_1_FOVA_174962_pre_bid_list_of_attendees.pdf PDF
6_-Sustainability_Checklist_LEED_2009_FOVA_9-24-14.pdf PDF
1_-_Amend_1_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
2_-_Amend_2_Revised_SF_1442.pdf PDF
0_-_Amend_2_-_P15PS00118_-_FOVA_174962_SF30.pdf PDF
5_-_Amend_2_FOVA_Questions_3-10-15.pdf PDF
Amend_1_-_Revised_Contract_Clauses_-_FOVA_174962.pdf PDF
Amend_1_-_Attachment_2_-_SECTION_01_27_00_Phase_1.pdf PDF
Amend_1__-_Attachment_1_-_FOVA_174962_.pdf PDF
Drawings_No._389_126929.pdf PDF
Drawing_No._389_119939.pdf PDF
Hazmat_Survey_Compiled_-_FOVA_987-404.pdf PDF
FOVA__Proposal_Submission_Package_x.pdf PDF
Drawing_No._389_126282.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_2.pdf PDF
Supplemental_993_pics.pdf PDF
Drawing_No._389_105548_vol_1.pdf PDF
FOVA_Request_for_Proposal.pdf PDF
FOVA_Lead_Base_Paint_and_AHERA_Inspection__Amend_2_Clarification_to_report_questions.pdf PDF
Drawing_No._389_105548_vol_2.pdf PDF
Project_Specs_Rehabilitate_Utilities_and_Infrastructure_in_East_and_South_Vancouver_Barracks.pdf PDF
Drawing_No._389_80038A.pdf PDF
Wage_Rates_WA_-_2-12-2015.pdf PDF
Project_Specs_Bldgs_987-404_for_USFS_Vol_1.pdf PDF
Supplemental_989_pics.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 002 Attachment No. 2

P15PS00118 FOVA 174962

FOVA 174962

Specification Section 013216, 1.3, B. add the following to the end of the existing paragraph:

The government must track construction costs for Building 987 by Shell, Tenant Improvement and Custom Tenant Improvement categorizations. The schedule of value shall be provided in Uniformat II breakout to facilitate this categorization. The contractor shall work with the government on the base schedule of value and all subsequent contract cost modifications to determine the correct cost allocation.

The building construction cost for Building 987 will be divided into the following cost categories in accordance with established commercial real estate practice, General Services Administration guidelines, and the standards of the Building Owners and Managers Association International (BOMA), with general guidelines as follows:

1) Shell: The building shell includes the base building and tenant areas. The base building is the complete enveloping structure, the base building utilities systems, the utilities chases, restrooms, and the elevator and fire egress stairwells as required for code compliant. Tenant areas will have broom-clean concrete floor slabs or wood sub-floors, gypsum wallboard spackled and primed on exterior perimeter walls and interior core walls. Tenant areas ceiling considered part of the shell will be metal panels, gypsum wall board, or suspended acoustical tile ceilings with parabolic fluorescent lighting. In general, utilities will have been brought to tenant demised area but not run through them.

2) Tenant Improvements: Interior framing and finishes and fixtures, including utilities, fire alarms, fire, suppression systems, that typically take space from the shell condition (such as building envelop, utilities chases, and the elevator and fire egress stairwells) to a finished usable condition.

3) Custom Tenant Improvements: Customization includes security enhancements, lighting beyond shell provisions, server room temperature controls, communications and A/V connections or equipment, etc.

The government will provide additional definition to the successful bidder and will assist in the development of the schedule of values. This requirement is not intended to add administrative costs or burden to the project.

FOVA 174966

1. Specification Section 014000 – 1.4, H. Add the following to the end of the paragraph:

“The contractor shall pay for all permits, inspections, fees and any other costs associated with the requirements of this section.”

P15PS00118 FOVA 174962

2. Specification Section 017340 - 3.2, B. Delete and replace with:

B. Permits, inspections and fees: Portions of the Project are located on City or State owned roads that may require permits. In addition to encroachment permits and/or right-of-way permits, there may be grading permit requirements and others not identified here. There may also be tap fees for connecting to utilities not owned by the Federal Government as well as meter installation fees. In addition, inspections by local jurisdictions are required and any fees shall be paid for by the contractor. The contractor shall be responsible for obtaining and payment for all permits, inspections, and fees associated with installation of utilities for this project.

Commissioning specification Specification Section 019114 - 3.9 Deferred Testing - delete this section in its entirety.

Specification Section 019114 - 3.10 Equipment & System Schedule - change to Specification Section 019114 - 3.9 Equipment & System Schedule

File details come from the government source that posted it. Updated .