[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf

PDF 347 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

Summary

This is an exhibit document for the Collins Street Complete Street - Phase I project issued by the City of Plant City, Florida, and the Community Redevelopment Agency (CRA) of Plant City. The exhibit details site conditions and requirements for contractor use of a 611 S. Collins Street property during construction of a comprehensive street renovation project spanning approximately 1/4 mile of S. Collins Street from E. Laura Street to south of E. Alabama Street. The scope includes paving, grading, drainage improvements, concrete curb and sidewalk installation, utility relocations, traffic signalization, landscaping, hardscape enhancements, decorative lighting, and replacement of an existing potable water main. The property is made available by the CRA for office and sanitary facilities, parking, and equipment and material storage. Bids were due by October 9, 2025, with a substantial completion timeline of 365 calendar days from Notice to Proceed. Site inspections will be conducted at least weekly by City representatives.

The contractor must comply with specific conditions of use including connection of office and sanitary facilities to city potable water and sewer systems at the contractor's expense, implementation of secondary containment for fuel storage, daily inspections for equipment and fluid leaks, and weekly City inspections with immediate correction of any deficiencies. Contaminated or potentially contaminated soils and groundwater may only be stored within the Collins Street Right of Way as specified in contract documents. The contractor is responsible for site maintenance, security, and restoration to pre-construction condition. A temporary 6-foot chain link fence with two 12-foot gates is required, and a Spill Prevention and Response plan must be submitted in accordance with contract specifications. The project requires a State of Florida General Contractor's License and FDOT Prequalification, with evaluation based on project experience, financial resources, bond history, equipment, and references.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notes:

1) The property located at 611 S. Collins

Street is owned by the Community Redevelopment Agency of Plant City (CRA), and is made available to the Contractor for the purpose of office and sanitary facilities, parking, and equipment and material storage during the term of the project.

2) Contaminated or potentially contaminated soils and groundwater may not be stored at 611 S. Collins Street or any other location other than the Collins Street Right of Way, in the manner specified elsewhere in the contract documents.

3) No other properties owned by the CRA or the City of Plant City will be available for any use by Contractor.

4) Provide temporary 6’ high chain link fence with (2) 12’ gates where indicated.

5) Conditions of Use:

a. Office trailer and sanitary facilities must be connected to city potable water and sanitary sewer facilities.

Facilities are available adjacent to site. Contractor to apply for temporary service and pay applicable fees and charges.

b. Fuel storage must include secondary containment.

c. Contractor to perform at least daily inspections for vehicles and equipment leaking fluids of any manner, and for general housekeeping.

d. Contractor must report any leaked fluids, prevent further leaking, and provide cleanup & decontamination to the satisfaction of the City.

e. Site will be inspected at least weekly by City and/or City’s representative.

Contractor must correct any deleterious conditions immediately.

f. Contractor is responsible for site maintenance and security for the duration of the project.

g. Contractor to provide Spill Prevention and Response plan in accordance with Section 104.

h. Other conditions and requirements of the contract apply.

i. Restore site to pre-construction condition prior to final completion.

CITY OF PLANT CITY

ENGINEERING

302 W.REYNOLDS ST.

PLANT CITY, FL 33563

COLLINS STREET PHASE I

IMPROVEMENTS

DATE: 7/01/25

SCALE: NTS

611 Collins Street Site SHEET No

611 S. Collins Street

¾ acre site available for office, parking, and material & equipment storage.

No contaminated or potentially contaminated soils or water may be stored on the site.

Approximate project limits

CSX Railroad

Water Main

Sanitary Sewer

6’ Temporary Fence