[A]_Project_Specifications-Index_7-2-25.pdf

PDF 154 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

This is a Project Specifications Index document prepared by the City of Plant City Engineering Department in Hillsborough County, Florida, for the Collins Street Complete Street Improvements—Phase I project (IFB 25-014EN-FC-IFB). The project encompasses a comprehensive street renovation of approximately 1/4 mile of S. Collins Street from E. Laura Street to south of E. Alabama Street, including paving, grading, drainage, concrete curb and sidewalk installation, striping, signage, signalization improvements, landscape enhancements, hardscape installations, irrigation systems, and lighting improvements. The project also requires replacement of an existing potable water main and appurtenances. The contractor must coordinate the relocation and undergrounding of private utilities concurrent with the project schedule. The bid was released on August 18, 2025, with questions due by September 8, 2025, and proposals due by October 9, 2025. Substantial completion is required within 365 calendar days from the Notice to Proceed.

The specifications are compiled from multiple sources and authors, including Kimley-Horn and Associates (Scope of Work and General Specifications), Dewberry (Watermain Replacement), and the City of Plant City (General Requirements and Traffic Cabinet Special Requirements). The project incorporates by reference the Hillsborough County Public Works Standard Specifications for Construction (2023) and the Florida Department of Transportation FY 2024-25 Standard Specifications for Road and Bridge Construction. Contractors must hold a State of Florida General Contractor's License and FDOT Prequalification. The project involves coordination with existing utility infrastructure from Tampa Electric Company, Charter Communications, Frontier Communications, and City of Plant City water systems. No specific budget amount is disclosed in this specifications index; however, the project structure with multiple line-item bid categories across various disciplines suggests a substantial municipal infrastructure investment.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Index

Item Description Author Date

Scope of Work Kimley-Horn and Associates 7/1/2025

General Specifications Kimley-Horn and Associates 7/1/2025

General Requirements City of Plant City 7/1/2025

Watermain Replacement Dewberry │ Hydro 6/2025

Traffic Cabinet Special Requirements

City of Plant City 1/2020

Public Works Standard Specifications for Construction (2023) (incorporated by reference)

Hillsborough County 10/2023

Copy available at: https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/public-works-publications

FY 2024-25 Standard Specifications for Road and Bridge Construction (incorporated by reference)

Florida Department of Transportation

Copy available at: https://www.fdot.gov/programmanagement/specs.shtm/

CITY OF PLANT CITY

ENGINEERING

302 W.REYNOLDS ST.

PLANT CITY, FL 33563

Collins Street Complete Street

Improvements-Phase I

25-014EN-FC-IFB

https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/public-works-publications https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/public-works-publications https://www.fdot.gov/programmanagement/specs.shtm/

File details come from the government source that posted it. Updated .