[A]_Project_Specifications-Index_10-29-25.pdf

PDF 155 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

This is a Specifications Index document prepared by the City of Plant City, Florida, in conjunction with engineering firms Kimley-Horn and Associates and Dewberry for the Collins Street Complete Street Improvements—Phase I project (IFB 25-014EN-FC-IFB). The project encompasses a comprehensive street renovation of approximately one-quarter mile of S. Collins Street from E. Laura Street to south of E. Alabama Street, including paving, grading, drainage, concrete curb and sidewalk installation, utility relocations, traffic signalization, landscaping, hardscape enhancements, and replacement of an existing potable water main. The specifications index references the Scope of Work (dated July 1, 2025), General Specifications (dated October 29, 2025), General Requirements, and specialized sections addressing watermain replacement and traffic cabinet requirements. The bid was released August 18, 2025, with questions due September 8, 2025, and proposals due October 9, 2025. The contractor must achieve substantial completion within 365 calendar days from the Notice to Proceed and coordinate utility relocations with private providers including TECO, Charter Communications, and Frontier Communications concurrent with project execution.

The project specifications incorporate by reference the Hillsborough County Public Works Standard Specifications for Construction (2023) and the Florida Department of Transportation FY 2024-25 Standard Specifications for Road and Bridge Construction, available through their respective websites. Bidders must hold a State of Florida General Contractor's License and FDOT Prequalification. The project involves multiple line-item bid categories across road and drainage, watermain replacement, hardscape, landscape, irrigation, signalization, and lighting work, indicating a substantial municipal infrastructure investment. Supporting consulting firms include Madrid Engineering Group for groundwater and soil contamination assessment and Rummel, Klepper & Kahl, LLP for construction engineering and inspection. Contractor selection will be evaluated based on project experience, financial resources, prior bond history, licensure status, equipment capabilities, and references. Comprehensive insurance coverage is required, and no specific set-aside designations for disadvantaged enterprises were noted in the documentation.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Index

Item Description Author Date

Scope of Work Kimley-Horn and Associates 7/1/2025

General Specifications Kimley-Horn and Associates 10/29/2025

General Requirements City of Plant City 7/1/2025

Watermain Replacement Dewberry │ Hydro 6/2025

Traffic Cabinet Special Requirements

City of Plant City 1/2020

Public Works Standard Specifications for Construction (2023) (incorporated by reference)

Hillsborough County 10/2023

Copy available at: https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/public-works-publications

FY 2024-25 Standard Specifications for Road and Bridge Construction (incorporated by reference)

Florida Department of Transportation

Copy available at: https://www.fdot.gov/programmanagement/specs.shtm/

Approved Product List City of Plant City 7/2024

CITY OF PLANT CITY

ENGINEERING

302 W.REYNOLDS ST.

PLANT CITY, FL 33563

Collins Street Complete Street

Improvements-Phase I

25-014EN-FC-IFB

https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/public-works-publications https://hcfl.gov/government/cip-projects-and-resources/publications-and-technical-bulletins/public-works-publications https://www.fdot.gov/programmanagement/specs.shtm/

File details come from the government source that posted it. Updated .