About this file

This document is an Exhibits Index for the Collins Street Complete Street Improvements-Phase I project by the City of Plant City, Florida. The project involves multiple technical plans and studies prepared by various consulting firms, including Kimley-Horn and Associates (roadway, signalization, lighting, and landscape plans), Dewberry │ Hydro (watermain replacement), Madrid CPWG (soil and groundwater management), and Terracon Consultants, Inc. (geotechnical reports). The project is identified by the reference number 25-014EN-FC-IFB and appears to be a comprehensive street improvement initiative scheduled for implementation in 2025.

The exhibits include multiple technical and regulatory documents such as utility work schedules from TECO, Charter Communications, and Frontier Communications, a right-of-way use permit application, and environmental permits including an ERP Exemption Letter from SWFWMD and a NOA-PWS General Permit from FL DOH-Hillsborough. The project will utilize the Florida Department of Transportation's FY2024-25 Standard Plans for Road and Construction, which are incorporated by reference and available online. The comprehensive set of exhibits suggests a complex infrastructure project involving roadway reconstruction, utility coordination, environmental compliance, and comprehensive street improvements in Plant City.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits Index

Item Description Author Date Roadway Plans Kimley-Horn and Associates 2/10/2025 Signing and P’vmt. Marking Plans Kimley-Horn and Associates 2/10/2025 Signalization Plans Kimley-Horn and Associates 2/10/2025 Lighting Plans Kimley-Horn and Associates 2/10/2025 Landscape, Hardscape, and Irrigation Plans

Kimley-Horn and Associates 2/10/2025

Watermain Replacement Dewberry │ Hydro 262025 Soil & Groundwater Management Plan

Madrid CPWG 11/2024

611 Collins Street Site City of Plant City 7/1/2025 CSX Railroad TROE Location Sketch City of Plant City 10/23/2024 ERP – Exemption Letter SWFWMD 5/31/2021 NOA – PWS General Permit FL DOH-Hillsborough 2/28/2022 Geotechnical Report - Cores Terracon Consultants, Inc. 7/25/2019 Geotechnical Report – Mast Arms Terracon Consultants, Inc. 10/30/2019 Utility Work Schedule TECO 2/2021 Utility Work Schedule Charter Communications 2/2021 Utility Work Schedule Frontier Communications 2/2021 Right / Way Use Permit Application City of Plant City 9/6/2023 FY2024-25 Standard Plans for Road and Construction (incorporated by reference)

Florida Department of Transportation

Copy available at: https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25

CITY OF PLANT CITY

ENGINEERING

302 W.REYNOLDS ST.

PLANT CITY, FL 33563

Collins Street Complete Street

Improvements-Phase I

25-014EN-FC-IFB

https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25 https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25

File details come from the government source that posted it. Updated .