CSX_RR_TROE_Locations.pdf

PDF 388 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

This document is a site map from the City of Plant City Engineering Department detailing the Collins Street Phase I Improvements project, specifically highlighting a Temporary Right of Entry (TROE) Agreement location with CSX Railroad. The project is located in Plant City, Florida, and involves infrastructure improvements along Collins Street, with the map indicating approximate project limits spanning several city streets including Dr. Martin Luther King Jr. Blvd, W Warren St, W Alabama St, and others. The map specifically marks a blue-outlined area where a CSX Railroad Temporary Right of Entry Agreement is required, suggesting the project will interface with or cross railroad property.

The aerial map provides precise geospatial context for the project, showing the urban landscape with street grids, buildings, and the purple-lined railroad track. The document is dated 11/7/24, uses a non-standard scale (NTS), and is marked as Sheet 1 of 1, indicating this is a planning or preliminary design document for municipal infrastructure work. The City of Plant City's engineering department is managing the project, with the map serving as a critical visual reference for project scope, railroad interaction, and spatial planning for the Collins Street Phase I Improvements initiative.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PLANT CITY

ENGINEERING

302 W.REYNOLDS ST.

PLANT CITY, FL 33563

COLLINS STREET PHASE I

IMPROVEMENTS

DATE: 11/7/24

SCALE: NTS

CSX Railroad Temporary Right of Entry Agreement Location(s)

SHEET No

CSX Railroad

TROE Agreement Required

Approximate project limits

File details come from the government source that posted it. Updated .