Traffic_Cabinet_-_Special_Requirements.pdf

PDF 155 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

This document is a proprietary specifications letter from the City of Plant City Traffic Operations, addressed to Frank Coughenour, Senior Engineer, regarding the Collins St Complete Street Phase One project. The letter outlines specific technology and infrastructure equipment required for the city's Advanced Traffic Management System (ATMS), including a detailed list of eight proprietary items. These items range from a Cubic Trafficware Controller cabinet assembly with multiple components to specific technology such as an ITS Express managed hardened switch, a pre-emption system, roadside unit (RSU), LED street name signs, CCTV cameras, and video detection systems.

The specifications are strictly focused on maintaining product compatibility and uniformity with the current Plant City Intelligent Transportation Systems (ITS) and signalization infrastructure. The document emphasizes the need for exact product specifications, including model numbers and precise equipment configurations, to ensure seamless integration with the city's existing traffic management technology. The letter is signed by Fred Baxter, Traffic Operations Manager, and provides contact information for the City of Plant City, indicating this is a precise technical procurement document for urban infrastructure technology upgrades.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 1, 2024

Mr. Frank Coughenour, P.E.

Senior Engineer City of Plant City

RE: Collins St Complete Street Phase One

Dear Mr. Coughenour:

Please find the proprietary specifications for phase one complete street signalization. The City of Plant City Traffic Operations require the specific use of products identified below to maintain product compatibility and uniformity with the current Plant City ITS/Signalization infrastructure. The items listed below are all proprietary to the maintenance and operations of the centralized Advanced Traffic Management System (ATMS).

1. 70006-TS2/FLPP32-E2-WCD8012400 Cubic Trafficware Controller cabinet ASSY, TS@P44x26x77 , RK, PH, AUX, Piggy Back Cabinet for batteries. Includes the following items

a. COM-11841014 : Cubic/Trafficware Commander controller with TS-1, 7A card

b. MMU2-16LEip Trafficware smart monitor

c. 8005-0123-APC-1300-BYP12: Uninterruptible Power Supply Online Double

Conversion

d. Garmin GPS

e. Corning 24 port 19inch rack mount patch panel

f. Tripp-lite Power strip 12 port

g. APC UPS w (4) batteries 100ah, Extended Temp

2. ITS Express-8012-24 Plus Kit Managed Hardened Switch

3. AI 500-086-02 FMU Pre-Emption System

4. Iteris BlueToad Spectra RSU

5. TCS Britelite LED Edge Lit Street Name Sign T-8 LED bulbs.

6. POEB from TCS Transportation Control Systems Inc.

7. Bosch 7000i CCTV Camera

8. Iteris Vantage Next Video Detection

Sincerely, Fred Baxter, CPM Traffic Operations Manager

302 W Reynolds St; Plant City, FL 33563 | 813-659-4200 | www.plantcitygov.com

302 W Reynolds St; Plant City, FL 33563 | 813-659-4200 | www.plantcitygov.com

File details come from the government source that posted it. Updated .