Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf
PDF 395 KB Posted
- Attached to
- Collins Street Complete Street - Phase I
- Solicitation number
- 25-014EN-FC-IFB
- Issued by
- Hillsborough County, Florida
About this file
This is an Invitation for Bids (IFB) document issued by the City of Plant City, Florida, for the Collins Street Complete Street - Phase I project (IFB 25-014EN-FC-IFB). The project encompasses a comprehensive street renovation of approximately one-quarter mile of South Collins Street from East Laura Street to south of East Alabama Street, including paving, grading, drainage, concrete curb and sidewalk installation, striping, signage, signalization improvements, landscape, hardscape, irrigation, lighting enhancements, and replacement of an existing potable water main with appurtenances. The contractor must accommodate and coordinate relocation and undergrounding of private utilities concurrent with the project schedule. The project was released on August 18, 2025, with a question submission deadline of September 8, 2025, at 2:00 p.m., and a proposal submission deadline of November 13, 2025, at 2:00 p.m. Work must commence within 30 days after issuance of the Notice to Proceed, with substantial completion required within 365 calendar days. Bids must be submitted electronically through the City's OpenGov E-Procurement Portal at https://procurement.opengov.com/portal/plantcitygov. The City Commission makes the final award decision for contracts exceeding $50,000.
Bidders must provide comprehensive insurance coverage, including Workers' Compensation, Commercial General Liability of at least $1,000,000 per occurrence and $5,000,000 property damage, Comprehensive Automobile Liability of $500,000, and Railroad Protective Liability of $2,000,000 combined single limit with a $6,000,000 annual aggregate if work involves railroad right-of-way. A Payment and Performance Bond equal to the contract amount is required. Contractor qualifications must include a minimum of three years' experience in road, sidewalk, storm sewer, and watermain demolition and reconstruction in an urban setting with FDOT oversight, demonstrated by three similar projects within the previous five years with verifiable client references. The bid must include all-inclusive costs for labor, materials, supervision, equipment, tools, transportation, and supplies, with the City covering application and permit fees. Liquidated damages range from $1,015 to $10,203 plus 0.00005 of amounts exceeding $20 million per calendar day of delay, depending on the contract amount. No specific budget amount is disclosed in the document; bidding is conducted on a line-item basis across road and drainage, watermain replacement, hardscape, landscape, irrigation, signalization, and lighting categories. Bids are valid for 90 days, and the selected bidder must sign and return all required documents within 14 calendar days of notification.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/plantcitygov
IFB Invitation for Bids
25-014EN-FC-IFB
Collins Street Complete Street - Phase I
Release Project Date August 18, 2025
Question Submission Deadline September 8, 2025, 2:00pm
Question Response Deadline October 29, 2025, 4:30pm
Proposal Submission Deadline November 13, 2025, 2:00pm
Bids must be submitted using the City's OpenGov E-
Procurement Portal
Collins Street Complete Street - Phase I
25-014EN-FC-IFB P a g e | 2
City of Plant City
IFB Invitation for Bids
I. Bidder Instructions II. Scope of Work
III. Special Provisions IV. Bid Submission V. Vendor Questionnaire
Attachments:
A - [A] Project_Specifications-Index 10-29-25
B - [B] Scope_of_Work_7-2-25
C - [C] General Specifications_10-29-25
D - [D] General Requirements_7-2-25
E - [E] Watermain_Replacement_Technical_Specification_7-2-25
F - Traffic Cabinet - Special Requirements
G - [G] Project_Exhibits-Index_7-2-25
H - [H] 2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25
I - [I] 2025.02.10_Collins_SPM_Phase1_Signed_7-2-25
J - [J] 2025.02.10_Collins_Signals_S&S_7-2-25
K - [K] 2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25
L - [L] 2025.02.11 - Collins Street_Landscape SS_7-2-25
M - [M] Plans_1.28.22_-_Collins_St_Watermain_7-2-25
N - Soil & Groundwater Management Plan
O - [O] 611 Collins Street Site Exhibit_7-2-25
P - CSX RR TROE Locations
25-014EN-FC-IFB P a g e | 3
Q - ERP_Exemption
R - NOA - PWS General Permit
S - H4185018 Collins Street Core Report S&S
T - H4185018_Collins_St_Mast_Arms_S&S
U - UWS-TECO
V - UWS_Charter
W - UWS_Frontier
X - RW Use Permit Application Form
Y - Collins Street Complete Street Improvements - Phase 1 Draft Contract
Z - [Z] Approved Products List-July2024
25-014EN-FC-IFB P a g e | 4
1. Bidder Instructions
1.1. Bid Submissions
Bids shall be received for 25-014EN-FC-IFB Collins Street Complete Street - Phase I through the
City's e-Procurement located at https://procurement.opengov.com/portal/plantcitygov.
1.2. Valid Term
Bids shall be valid for no less than 90 days from the submittal deadline.
1.3. Rejection
The City reserves the right to reject any or all bids at any time and for any reason or no reason.
Bids submitted after the deadline shall be rejected. Bids submitted in an unsealed or incorrectly marked envelope or box shall be rejected. Fax, e-mail, or telephone bids shall be rejected. Bids that are incomplete, unbalanced, conditional, obscure, or which contain terms or additions not called for, alterations or irregularities of any kind, or which do not comply with the contract documents, if applicable, may be rejected at the sole discretion of the City.
1.4. Response Form
Bids shall be made only on the forms included in title Bid Submittals.
1.5. ITEMS THAT MUST BE INCLUDED WITH BID
See Vendor Questionnaire Section.
1.6. Insurance Requirements
At a minimum, the contractor shall acquire and maintain until completion of the work the insurance coverage listed below, which constitutes primary coverage. The contractor shall not commence the work until the City of Plant City (City) receives and approves Certificates of
Insurance documenting required coverage. Contractor’s General Liability and Automobile
Liability policies shall include Endorsement CG 20101185, or equivalent, naming the City as
Additional Insured. All required policies shall also include (1) endorsement that waives any right of subrogation against the City for any policy of insurance provided under this requirement or any state or federal Workers’ Compensation or employer’s liability act; (2) endorsement to give the City no less than thirty days’ notice in the event of cancellation or material change. Certificates of Insurance must be accompanied by copies of the requested endorsements.
The contractor understands and agrees that the stipulated limits of coverage listed herein in this insurance section shall not be construed as a limitation of any potential liability to the City, or others, and the City’s failure to request, receive or retain, evidence of this insurance coverage shall not be construed as a waiver of the contractor’s obligation to provide and maintain the insurance coverage specified.
A. Workers’ Compensation Insurance: Awardee shall procure and maintain during the life of this contract Workers’ Compensation Insurance (if applicable) for all of its employees to
25-014EN-FC-IFB P a g e | 5 be engaged in work on the Project under this Contract, and in case any such work is sublet, Contractor shall require the Subcontractor similarly to provide Workers’
Compensation Insurance for all the Subcontractor’s employees to be engaged in such work unless such employees are covered by the protection afforded by Contractor’s
Workers’ Compensation Insurance. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers’
Compensation statute, Contractor shall provide and shall cause each Subcontractor to provide adequate insurance for the protection of such of its employees not otherwise protected. Contractor shall indemnify and hold the City of Plant City harmless for any claim made by the Subcontractor for Workers” compensation. Note: If Contractor claims to be exempt from Workers’ Compensation Insurance, then a Certificate of Exemption from the State shall be produced upon request.
B. Commercial General Liability : The contractor shall procure and shall maintain during the life of their contract Comprehensive Liability insurance in an amount satisfactory to the owner, but not less than $500,000.00 for injuries, including accidental death, to any one person, and subject to the same limit for each person, in an amount not less than
$1,000,000.00, on account of one accident, and Property Damage insurance in an amount not less than $5,000,000.00. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The
City and FDOT shall be named as additional insured on the policy, per SFGA Section 14e.
The City shall receive a copy of the Additional Insured Endorsement confirming that the
Contractor's coverage is Primary and not Contributory.
C. Comprehensive Automobile Liability Insurance: The contractor shall procure and shall maintain during the life of their Comprehensive Automobile Liability insurance for
$500,000.00. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The City shall be named as additional insured on the policy. The City shall receive a copy of the Additional Insured
Endorsement confirming that the Contractor's coverage is Primary and not Contributory.
D. Subcontractor’s Comprehensive Liability and Property Damage Insurance: The Awardee shall require each of its subcontractors to procure and maintain during the life of their contract Comprehensive Liability and Property Damage (if applicable) insurance coverage in amounts satisfactory to the contractor for its protection, with an insurance company or companies licensed to do business in the State of Florida.
E. Scope of Insurance and Special Hazards: The insurance required shall provide adequate protection for the contractor and its subcontractors, respectively, against damage claims which may arise from operations under their contract, whether such operations be by the insured or by anyone directly or indirectly employed by the insured, and also against
25-014EN-FC-IFB P a g e | 6 any of special hazards which may be encountered in the performance of their contract.
F. Railroad Protective Liability Insurance: When the Contract includes the construction of a railroad grade crossing, railroad overpass or underpass structure, or any other work or operations within the limits of the railroad right-of-way, including any encroachments thereon from work or operations in the vicinity of the railroad right-of-way, you shall, in addition to the insurance coverage required by FDOT, procure and maintain Railroad
Protective Liability Coverage (ISO Form CG 00 35) where the railroad is the Named
Insured and where the limits are not less than $2,000,000 combined single limit for bodily injury and/or property damage per occurrence, and with an annual aggregate limit of not less than $6,000,000. The railroad shall also be added along with the
Department as an Additional Insured on the policy/ies procured pursuant to FDOT subsection 7-13.2. Prior to the execution of the Contract, and at all renewal periods which occur prior to final acceptance of the work, both the Department and the railroad shall be provided with an ACORD Certificate of Liability Insurance reflecting the coverage described herein. The insurance described herein shall be maintained through final acceptance of the work. Both the Department and the railroad shall be notified in writing within ten days of any cancellation, notice of cancellation, renewal, or proposed change to any policy or coverage described herein. The Department’s approval or failure to disapprove any policy/ies, coverage, or ACORD Certificates shall not relieve or excuse any obligation to procure and maintain the insurance required herein, nor serve as a waiver of any rights the Department may have.
The certificate of insurance shall include as a certificate holder:
City of Plant City
Attn: City Manager
302 West Reynolds Street
Plant City, FL 33563
1.7. Completeness
The City may reject bids that are incomplete, conditional, deficient in any way, or which contain unsolicited additions/alterations.
1.8. Review Documents
Bidders must review all specifications and contract documents related to this bid and project.
Failure to review all specifications, forms, contracts, addenda, or other documents shall not relieve a bidder from any obligations contained in this bid or their Contract with the City.
25-014EN-FC-IFB P a g e | 7
1.9. Familiarity with Project Area
Before submitting a bid, bidders shall become fully acquainted with the project areas. Please see Scope of Work for more detail about the project. Submittal of a bid shall serve as bidder’s acknowledgment that they are fully familiar with the service area.
1.10. Fill-In Required Forms
Bidders must accurately fill in any bid forms included in this packet in Bid Submittals and submit through the City's e-Procurement portal at:
https://procurement.opengov.com/portal/plantcitygov.
Authorized signatures must be included on forms/documents. Incomplete or missing forms/documents may result in the rejection of the bid.
1.11. Certification
Submittal of a bid shall be deemed as certification that a bidder has fully considered all factors associated with this Invitation for Bids, including any addenda.
1.12. Project Owner
The City of Plant City, Florida owns this project. The City Manager or designee is the City’s authorized representative on this project.
1.13. Verification of Bidder's Capability
The City may, at its sole discretion, determine the bidder’s ability and capacity to perform the work specified in this bid based on, but not limited to, evaluation of the following:
A. Comparable prior project experience (particularly ones similar to this project size/scope).
B. Financial resources.
C. Prior bond history.
D. Licensure and certifications.
E. Equipment, machinery, and/or facilities.
F. Background & references.
Bidders deemed to be unqualified to perform the work may have their bid rejected.
1.14. Waiver of Irregularities
The City may waive informalities or irregularities that, in the City’s opinion, do not materially affect a bid.
25-014EN-FC-IFB P a g e | 8
1.15. Notice of Award
Upon review of the bids and when a determination has been made as to the lowest responsive and responsible bidder, the Procurement Manager will issue a Notice of Intent to Award to the selected bidder via the City's e-Procurement Portal.
Once the bidder has completed registration, they will receive "Notice" notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any Notices at https://procurement.opengov.com/portal/plantcitygov.
This notice shall be sent to the recommended bidder with copies to all bidders.
1.16. Award
City personnel will evaluate the bids. Determination of the lowest responsive and responsible bid will be made after a review of all bids submitted. Bid award shall be made to the vendor submitting the lowest responsive and responsible bid meeting specifications for the base bid.
The City may award a Contract based on bid responses received from bidders without further discussion of such bids with the selected bidder. Therefore, bids should be submitted based on the most favorable terms available.
Bids that are not greater than $50,000.00 may be awarded by the City Manager. The City
Commission makes the final decision regarding the award or rejection of bids that are greater than $50,000.00.
1.17. Term
The time for substantial completion on this project shall be 365 days from Notice to Proceed.
1.18. Protest Procedures
Any bidder or proposer who is allegedly aggrieved in connection with the issuance of the
Procurement Manager’s recommendation and intent to make a competitive award of a contract may protest to the City Manager per Sec. 2-152. Protest Procedure, of the City’s Code.
1.19. Revocation of Award
If the City discovers that the bidder has misrepresented anything in their bid or that the bidder
– in the City’s opinion – is no longer reasonably capable of performing the work as bid, then the
City may revoke the award at any time before issuing the formal Notice to Proceed. The
Procurement Manager will issue the revocation in writing.
1.20. Bid Interpretations
The City has the right to define and interpret bid terms, specifications, and conditions.
25-014EN-FC-IFB P a g e | 9
1.21. Contract Execution & Bid Bond
The selected bidder must sign and return the contract, any required bonds or letter of credit, insurance certificates, and all other required documents within 14 calendar days after the City sends the documents to the selected bidder. Once the City receives the signed contract and all other required documents back from the selected bidder, then the City’s authorized representative will sign the contract.
Failure to sign and return the contract and all other required documents within 14 calendar days may result in the City calling the bid bond or cashing the cashier’s check submitted by the selected bidder with its proposal; barring the selected bidder from consideration on future projects; or both. The City may then select another bidder to perform the work or provide the goods/services specified in this bid.
1.22. Sworn Statement on Public Entity Crimes
A person or affiliate as defined in Section 287.133, Florida Statutes, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity above $25,000 for 36 months following the date of being placed on the convicted vendor list.
Bidders must fill out and sign the form titled “SWORN STATEMENT UNDER SECTION
287.133(3)(A), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES.” Failure to do so may disqualify the bid.
1.23. Other Forms & Documents
Bidders are responsible for reviewing and understanding all specifications, forms or other documents associated with the products described in this bid. Submittal of a bid shall serve as the bidder’s acknowledgment that it has reviewed and understood all such documents.
1.24. Notice to Proceed
Following contract signing by the City, a formal “Notice to Proceed” will be issued in writing to the contractor. The start date will be issued by the City’s Project Manager.
If the contractor begins work before receiving the Notice to Proceed or start date, then the City may stop work on the project, may require the work to be redone at the contractor’s expense and without additional compensation from the City, or both. The City also may revoke the project award and select another bidder to perform the work.
25-014EN-FC-IFB P a g e | 1 0
1.25. Changes or Modifications
The City may at any time make changes within the general scope of the contract in any of the following areas:
A. Time of Performance (i.e., hours of the day, days of the week, etc.).
B. Location of performance of the services.
C. Quantities to be ordered.
The contractor shall not commence the performance of additional work or other changes not covered by this contract without an executed notice to proceed or purchase order issued by the
City. If the contractor performs additional work beyond the specific requirements of this contract without an executed change order, it shall be at the contractor’s own risk. The City assumes no responsibility for any additional costs for work not specifically authorized by an executed change order.
1.26. Conditions of Performance
Bidders are required to inform themselves fully of the conditions relating to the performance of the work required, including but not restricted to labor and operating conditions under which the work will be or is now being performed; and the successful bidder must apply, so far as possible, such methods and means in carrying out the work that will not cause any interruption or interference with any other work, construction or operation the Owner has underway.
1.27. Payment and Performance Bond
A Payment and Performance Bond is required for the amount of the contract. The contractor shall be responsible for recording the payment and performance bond before commencing the work, the contractor shall provide to the City Clerk a certified copy of the recorded bond. As required by 255.05, Florida Statutes, the City may not make any payments to the contractor until the City Clerk receives the certified copy of the recorded bond.
1.28. Insurance and Bonds
Insurance and bonds specified in this bid document and the contract shall conform to and shall be insured by companies meeting the criteria outlined below and within the contract document in Bid Submittals.
A. Insurance and bonds shall be countersigned by an agent licensed to do business in the
State of Florida.
B. A surety must be permitted to do business in the State of Florida and shall have been in business and have a record of successful, continuous operation for at least five years.
C. The surety shall have at least the following minimum rating as listed in Best's Financial
Rating: Financial Strength Rating of “A”.
25-014EN-FC-IFB P a g e | 1 1
1.29. UNAUTHORIZED ALIEN(S)
The vendor agrees that unauthorized aliens shall not be employed nor utilized in the performance of the requirements of this solicitation. The City shall consider the employment or utilization of unauthorized aliens a violation of Section 274A(e) of the Immigration and
Naturalization Act (8 U.S.C. 1324a). Such violation shall be cause for unilateral termination of this Agreement by the City. As part of the response to this solicitation, the successful firm will complete and submit the attached form “AFFIDAVIT CERTIFICATION IMMIGRATION LAWS.”
Employers may avail themselves of a program by the U.S. Immigration and Customs
Enforcement called E-Verify. E-Verify is an Internet-based system operated by U.S. Citizenship and Immigration Services (USCIS), part of the Department of Homeland Security (DHS), in partnership with the Social Security Administration (SSA). E-Verify is currently free to employers. E-Verify provides an automated link to federal databases to help employers determine the employment eligibility of new hires and the validity of their Social Security numbers.
If your company wishes to avail itself of this program, you can register online for E-Verify at http://www.dhs.gov/how-do-i/verify-employment-eligibility-e-verify which provides instructions for completing the registration process. At the end of the registration process, you will be required to sign a Memorandum of Understanding (MOU) that provides the terms of the agreement between you as the employer, the SSA, and DHS. An employee who has signatory authority for the employer can sign the MOU. Employers can use their discretion in identifying the best method by which to sign up their locations for E-Verify. To find out more about E-
Verify, please visit E-Verify | USCIS or contact USCIS at 1-888-464-4218.
1.30. Indemnification
Section 1-16, Plant City Code, prohibits the City from indemnifying other parties to an agreement. Therefore, the City cannot indemnify bidders.
1.31. All-Inclusive Cost
The bid shall include all expenses necessary to complete the delivery of products or provide the services described in this Invitation for Bids. The awarded vendor will not be responsible for covering the cost of application fees or permit fees, of applicable permits. The City will pay such authorized fees directly. If selected by the City, the bidder must pay applicable sales tax on any goods or services it purchases. The City is exempt from paying federal and state taxes, including sales tax. The City’s sales tax exemption is not assignable and cannot be applied toward items the vendor purchases, regardless of whether the vendor transfers those items to the City.
1.32. Legal Requirements
Bidders are required to comply with all provisions of federal, state, county and local laws, ordinances, rules and regulations that apply to the services being solicited in this bid. A bidder’s https://www.dhs.gov/verify-employment-eligibility-e-verify
25-014EN-FC-IFB P a g e | 1 2 lack of knowledge shall in no way be a cause for relief from responsibility, nor shall it constitute a cognizable defense against the legal effects thereof.
Submittal of a bid shall constitute the bidder’s affirmation that they are familiar with and shall comply with all federal, state, and local laws, ordinances, rules and regulations which affect those engaged or employed in the provision of such services, or equipment used in the provision of such services, or which in any way affects the conduct of the provision of such services. No plea of misunderstanding shall be considered on account of the bidder’s ignorance thereof. If a bidder believes provisions in the bid documents are contrary to or inconsistent with any law, ordinance, or regulation, then the bidder shall promptly report those provisions in writing to the City.
1.33. Public Records
Bidders understand that Florida has a broad public records law and that documents in the possession of the City can only be maintained confidential to the extent allowed under the
Florida Public Records Act, Florida Statute 119.
1.34. Contract Documents
The contract attached hereto is a draft of the contract required by the City to award the project described in this bid. It is the bidder’s responsibility to review and understand the contract. If the bidder requires any modifications or additional terms and conditions to the contract, the bidder shall detail the desired changes on a separate page titled “Additional
Terms/Modifications”. That page then must be attached to the bid response form and submitted as part of the bidder’s proposal. Contract modification requests after the bidder’s bid has been submitted shall not be considered.
1.35. Bid Preparation & Submittal Expenses
The City shall not be responsible for any expense incurred by a bidder in reviewing, evaluating, preparing, or submitting a bid. Bidders are solely responsible for the entire expense of responding to this bid.
1.36. Cooperative Procurement Agreement
Per Chapter 69-1119, Laws of Florida, Hillsborough County, all municipalities, local public agencies, boards and other authorities existing within Hillsborough County have the authority to purchase goods or services, at the same purchase price obtained by any other such public entity. The submission of a bid in response to this advertisement shall constitute a bid under the same conditions, during the effective period of the bid, to all the other public entities listed herein:
25-014EN-FC-IFB P a g e | 1 3
Hillsborough County Board of
County Commissioners 601 E. Kennedy Blvd. #2500 Tampa, FL 33601 Phone: (813) 272-5790
FAX: (813) 272-6290
www.hillsboroughcounty.org
Hillsborough Co. Aviation
Authority P. O. Box 22287 Tampa International Airport Tampa, FL 33622-2287 Phone: (813) 870-8730
FAX: (813) 875-6670
www.tampaairport.com
Clerk of Circuit Court 601 E. Kennedy Blvd.-13th Floor P.O. Box 1110 Tampa, FL 33601 Phone: (813) 276-8100 Ext.7721
FAX: (813) 272-
5521www.hillsclerk.com
University of South Florida Procurement Services 3702 Spectrum Blvd. UTC135-P Tampa, FL 33612 813-974-2481 – Telephone 813-974-5362 – Fax
Tampa-Hillsborough County Expressway Authority 1104 East Twiggs St. Suite #300 Tampa, Florida 33602 813-272-6740 – Telephone 813-276-2492 – Fax
Tax Collector 601 E. Kennedy Blvd., 14th Floor Tampa, FL 33602 Phone: (813) 307-6222
FAX: (813) 307-
6521www.hillstax.org
Tampa Palms Community Dev.
Dist.
16311 Tampa Palms Blvd W Tampa, FL 33647 Phone: (813) 977-3933 Fax: (813) 977-6571 www.tpoa.net
Hillsborough Area Regional
Transit Authority 4305 E. 21st Street Tampa, FL 33605 813-623-5835 – Telephone 813-664-1119 – Fax
The Children's Board of Hills.
County 1002 E. Palm Avenue Tampa, FL 33605 Phone: (813) 229-2884
FAX: (813) 228-
8122www.childrensboard.org
Tampa Sports Authority 4201 N. Dale Mabry Highway Tampa, FL 33607 813-673-4300 – Telephone 813-673-4312 – Fax
Hillsborough Community
College 39 Columbia Drive Tampa, FL 33606 813-253-7060 – Telephone 813-253-7561 – Fax
Hillsborough Co. Sheriff’s
Office P.O. Box 3371 Tampa, FL 33601 813-247-8033 – Telephone 813-247-8246 – Fax
City of Temple Terrace P.O. Box 16930 Temple Terrace, FL 33687 813-506-6420 – Telephone 813-989-7185 – Fax
Tampa Port Authority P.O. Box 2192 Tampa, FL 33601 813-905-5164 – Telephone 813-905-5109 – Fax
Housing Authority of Plant
City 1306 Larrick Ln.
Plant City, FL 33563 813-752-0569
City of Tampa Housing Auth.
1614 Union Street Tampa, FL 33607 813-253-0551 – Telephone 813-4522 – Fax
Supervisor of Elections 601 E. Kennedy Blvd., 16th Floor Tampa, FL 33602 Phone: (813) 276-8274
FAX: (813) 272-7043
www.votehillsborough.org
Property Appraiser 601 E. Kennedy Blvd., 16th Floor Tampa, FL 33602 Phone: (813) 272-6100
FAX: (813) 272-
5519www.hcpafl.org
Hillsborough County School Board P. O. Box 3408 Tampa, FL 33601-3408 Phone: (813) 272-4329
FAX: (813) 272-4007
Community Redevelopment
Agency of the City of Plant City 302 W. Reynolds Street Plant City, Florida 33563
City of Tampa Procurement Department Tampa Municipal Office Building, 2nd Floor 306 E. Jackson St.
Tampa, FL 33602 https://www.hillsboroughcounty.org/ https://www.tampaairport.com/ https://www.hillsclerk.com/ https://www.hillstax.org/ https://www.tpoa.net/ https://www.childrensboard.org/ https://www.votehillsborough.org/ https://www.hcpafl.org/
25-014EN-FC-IFB P a g e | 1 4
State Attorney’s Office Tampa, FL 33602 813-272-5400 – Telephone 813-272-7014 – Fax
2. Scope of Work
To provide the full scope of work as per the attached plans and specifications for the Collins
Street Complete Street - Phase I.
2.1. Scope of Work
The project is a Complete Street renovation of approximately 1/4 mile of S. Collins Street from
E. Laura Street to south of E. Alabama Street. Work will include paving, grading, drainage, concrete curb and sidewalk, striping, signage, and signalization improvements necessary to reallocate use of the right of way. Work also includes landscape, hardscape, irrigation, and lighting improvements, and replacement of an existing potable water main and appurtenances.
Contractor will accommodate and coordinate relocation and undergrounding of private utilities concurrent with the project schedule.
3. Special Provisions
3.1. Time for Performance
Work is to commence 30 days after Notice to Proceed. The time for substantial completion on this project shall be 365 days from Notice to Proceed.
3.2. Liquidated Damages Schedule
Applicable liquidated damages are the amounts established in the following schedule:
Original Contract Amount Charge Per Calendar Day
$50,000 and under .........................................................$1,015
Over $50,000 but less than $250,000..........................$1,045
$250,000 but less than $500,000.................................$1,170
$500,000 but less than $2,500,000.............................$1,690
$2,500,000 but less than $5,000,000..........................$2,579
$5,000,000 but less than $10,000,000.........................$3,756
$10,000,000 but less than $15,000,000.......................$4,344
$15,000,000 but less than $20,000,000.......................$5,574
$20,000,000 and over ....................................................$10,203 plus 0.00005 of any amount over $20 million (Round to nearest whole dollar)
25-014EN-FC-IFB P a g e | 1 5
3.3. Indefinite Quantity
The quantities of goods and services specified herein have been determined by the City and are deemed to be fairly accurate estimates of the work to be performed. However, payment will be made based on the actual goods and services measured in place. If the measurement is different than the original quantity bid by the contractor, then a change order will be executed for the actual amount whether over or under the quantity that was bid.
3.4. Contractor Qualifications
A. The company responding to this bid must be experienced in road, sidewalk, storm sewer, and watermain demolition and reconstruction in an urban setting with FDOT oversight, and have a minimum of three (3) years’ experience in the same type of work before the bid date. Appropriate documentation to be provided upon request by the
City.
B. The company responding to this bid must demonstrate its road, sidewalk, storm sewer, and watermain demolition and reconstruction in an urban setting work by listing a minimum of three (3) projects of similar size and scope, within the previous 5 year period. List to include a contact name, email address and telephone number of the client’s project manager for the work.
3.5. Additional Information
A. The contractor must provide City’s authorized representative with telephone number(s) and job title for all management personnel assigned to the project before work commences.
B. The contractor shall be responsible for performing the work necessary to meet City standards in a safe, neat, and good workmanlike manner, using only generally accepted methods in carrying out the work, and complying with all federal and state laws, and all ordinances and codes of the City relating to such work.
C. All work performed shall be subject to inspection and acceptance by the City’s appointed representative before payment. The contractor shall be required to correct any work determined to be unsatisfactory or below industry standards at no additional cost to the
City.
3.6. Safety
The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable local, state and federal requirements that are safety-related. The contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work.
25-014EN-FC-IFB P a g e | 1 6
3.7. Cleanup
At the end of each workday, as well as after completion of all work on the project and before making an application for acceptance of the work, the contractor shall clean/police the site of operations, including any areas under the control of the City that have been used by the
Contractor in connection with the work. All debris shall be removed and hauled off by the
Contractor.
3.8. Definitions
Wherever used in any of the contract documents, the meaning shall be given to the terms herein defined:
A. The term “contractor” means the person, bidder or corporation to whom the herein
Contract is awarded by the Owner and who is subject to the terms hereof.
B. The term “subcontractor” means a person, bidder or corporation supplying services and materials, labor and materials, or only services or labor for work in connection with the project.
3.9. Accident Prevention
Precaution shall be exercised the use of modern safety rules and practices at all times for the protection of persons (including employees) and property, and hazardous conditions shall be guarded against or eliminated.
3.10. Qualifications for Employment
No person shall be employed in violation of the State or the National Labor Laws. No person under the age of sixteen years shall be employed on the project under their contract. No person whose age or physical condition is such as to make this employment dangerous to their health or safety or the health or safety of others shall be employed on the project under their contract;
provided, that shall not operate against the employment of physically handicapped persons, otherwise employable, where such persons may be safely assigned to work which they can ably perform.
3.11. Substitutions
Unless otherwise stated, the reference in the specifications to any article, device, product, materials, fixture, form, or type of construction, etc., by name, make or catalog number, shall be interpreted as establishing a standard of quality and shall not be construed as limiting competition. The determination of whether an article, device, product, material, fixture, form or type of construction is equal to that named is solely in the determination of the Owner. No
Substitutions shall be permitted without the prior express written authorization from the Owner.
25-014EN-FC-IFB P a g e | 1 7
3.12. Patents
The contractor shall hold and save the owner and its officers, agents, servants, and employees harmless from liabilities of any nature or kind, including costs and expenses for, or on account of, any patented or unpatented invention, process, article or appliance manufactured or used in the performance of the contract, including its use by the owner at any time during the prosecution or after completion of the work unless otherwise specifically stipulated in the contract documents.
3.13. Use of Premises
See Project attachments.
3.14. Overtime Work by Owner Employees
Where the contractor elects to work on a Saturday, Sunday or a holiday, or longer than an eight-hour work shift on a regular working day, such work shall be considered as overtime work. On all such overtime work an inspector will be present. The contractor shall reimburse the owner for the full amount of the straight time plus overtime costs for employees (including employees of consultants hired by the city) of the owner required to work overtime hours. The
Contractor by these specifications does hereby authorize the owner to deduct the cost of overtime work at the rate of up to $140 per hour from the amount due or to become due him.
Overtime due to special construction problems such as concrete, finishing, asphalt rolling, making live sewer hookups, alleviating traffic problems, etc., may not be charged if the City
Manager considers the overtime to be mutually justified. Normal engineering inspection hours are 7:00 a.m. to 5:00 p.m. Monday through Friday.
Recognized Holidays shall be as follows:
A. New Year’s Day
B. Martin Luther King Day
C. Strawberry Festival Parade Day
D. Memorial Day
E. Independence Day
F. Labor Day
G. Veteran’s Day
H. Thanksgiving Day
I. Day after Thanksgiving
J. Christmas Eve’s Day
K. Christmas Day
25-014EN-FC-IFB P a g e | 1 8
3.15. References
Any reference in this document to any specification, publication, or test method shall be construed as meaning the latest edition, revision, change, or modification of same.
4. Bid Submission
Pursuant to and in compliance with your Invitation to Bid, Instruction to Bidders and other documents related thereto, the undersigned does hereby propose to furnish all labor, materials, supervision, equipment, tools, transportation and supplies necessary for the Collins Street
Complete Street - Phase I, in accordance with all plans and specifications attached hereto. It shall be completed in accordance with the City of Plant City Standards, complete and ready to use; as required by and in strict accordance with the specifications and all addenda.
ROAD & DRAINAGE
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 101-1 - MOBILIZATION 1 LS
2 102-1 - MAINTENANCE OF
TRAFFIC
1 LS
3 104-10-3 - SEDIMENT BARRIER 453 LF
4 104-18 - INLET PROTECTION
SYSTEM
4 EA
5 108-1 - MONITOR EXISTING
STRUCTURES- INSPECTION AND
SETTLEMENT
1 LS
6 110-1-1 - CLEARING AND
GRUBBING
0.38 AC
7 110-4-10 - REMOVAL OF EXISTING
CONCRETE
1,990 SY
8 REMOVAL OF EXISTING GRANITE
CURB
994 LF
9 120-1 - REGULAR EXCAVATION 267 CY
10 120-6 - EMBANKMENT 241 CY
11 160-4 - TYPE B STABILIZATION 7 SY
25-014EN-FC-IFB P a g e | 1 9
Line Item Description Quantity Unit of
Measure Unit Cost Total
12 285-711 - OPTIONAL BASE GROUP
500 SY
13 327-70-2 - MILLING EXIST ASPH
PAVT, 3.5" AVG DEPTH
854 SY
14 327-70-6 - MILLING EXIST ASPH
PAVT, 1.5" AVG DEPTH
3,764 SY
15 334-1-13 - SUPERPAVE ASPHALTIC
CONC, TRAFFIC C
452.1 TN
16 425-1-201 - INLETS, CURB, TYPE
9, <10'
3 EA
17 425-1-203 - INLETS, CURB, TYPE
9, J BOT, <10'
2 EA
18 425-1-351 - INLETS, CURB, TYPE
P-5, <10'
2 EA
19 425-1-451 - INLETS, CURB, TYPE
J-5, <10'
1 EA
20 425-1-521 - INLETS, DT BOT,
TYPE C, <10'
5 EA
21 425-1-711 - INLETS, GUTTER,
TYPE V, <10'
2 EA
22 425-2-71 - MANHOLES, J-7, <10' 1 EA
23 425-2-73 - MANHOLES, J-7,
PARTIAL
1 EA
24 425-3-41 - JUNCTION BOX,
DRAINAGE, P-7 <10'
1 EA
25 430-175-112 - PIPE CULVERT
OPTIONAL MATERIAL, ROUND,
12", S/CD
4 LF
25-014EN-FC-IFB P a g e | 2 0
Line Item Description Quantity Unit of
Measure Unit Cost Total
26 430-175-115 - PIPE CULVERT
OPTIONAL MATERIAL, ROUND,
15", S/CD
200 LF
27 430-175-118 - PIPE CULVERT
OPTIONAL MATERIAL, ROUND,
18", S/CD
247 LF
28 430-175-130 - PIPE CULVERT
OPTIONAL MATERIAL, ROUND,
30", S/CD
30 LF
29 430-175-136 - PIPE CULVERT
OPTIONAL MATERIAL, ROUND,
36", S/CD
8 LF
30 430-175-224 - PIPE CULVERT,
OPTIONAL MATERIAL, OTHER
SHAPE - ELLIP/ARCH, 24"S/CD
20 LF
31 520-1-10 - CONCRETE CURB AND
GUTTER, TYPE F
945 LF
32 520-2-4 - CONCRETE CURB, TYPE
D
1,279 LF
33 CONTAMINATED MATERIALS
ALLOWANCE
1 NTE
34 522-2 CONCRETE SIDEWALK AND
DRIVEWAYS, 6" THICK
2,006 SY
35 524-1-1 CONCRETE DITCH PAVT,
3", NON-REINFORCED
2 SY
36 524-1-4 CONCRETE DITCH PAVT,
6", NON-REINFORCED
6 SY
37 524-1-19 CONCRETE DITCH PAVT,
3", REINFORCED
35 SY
38 527-2 DETECTABLE WARNING 326 SF
25-014EN-FC-IFB P a g e | 2 1
Line Item Description Quantity Unit of
Measure Unit Cost Total
39 570-1-2 PERFORMANCE TURF,
SOD
1,123 SY
40 BRICK PAVER 7,720 SF
41 WATER METER BOX, F&I 12 EA
42 WATER VALVE, ADJUST 6 EA
43 FIRE HYDRANT, F&I, ASSEMBLY 1 EA
44 SANITARY MANHOLE, ADJUST 6 EA
TOTAL
WATERMAIN REPLACEMENT
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 10" Ductile Iron Pipe - Open Cut 910 LF
2 6" Ductile Iron Pipe - Open Cut 49 LF
3 4" Ductile Iron Pipe - Open Cut 14 LF
4 14" HDPE - Open Cut 50 LF
5 2" HDPE - Open Cut 47 LF
6 10x10" Tee - DI 1 EACH
7 10x6" Tee -DI 2 EACH
8 10"x4" Reducer -DI 1 EACH
9 10" 90° Bend -DI 1 EACH
10 10" 45° Bend - DI 10 EACH
11 14" 45° Bend - HDPE 4 EACH
25-014EN-FC-IFB P a g e | 2 2
Line Item Description Quantity Unit of
Measure Unit Cost Total
12 6" 90° Bend - DI 1 EACH
13 6" 45° Bend - DI 2 EACH
14 4" 90° Bend - DI 1 EACH
15 4"x2" Reducer - DI 1 EACH
16 Connection to existing 10-inch
Gate Valve
1 EACH
17 10"x12" Tapping Sleeve and Valve 1 EACH
18 6" Cut-In Tee and Sleeve 1 EACH
19 1" Short Service 4 EACH
20 1" Long Service 6 EACH
21 1" Double Long Service 1 EACH
22 Fire Hydrant Assembly 1 EACH
23 10" Gate Valve 2 EACH
24 6" Gate Valve 1 EACH
25 4" Gate Valve 1 EACH
26 Air Release Valve - Installed
Complete
2 EACH
HARDSCAPE, LANDSCAPE, AND IRRIGATION
Measure Unit Cost Total
1 BENCH 5 EA
25-014EN-FC-IFB P a g e | 2 3
Line Item Description Quantity Unit of
Measure Unit Cost Total
2 HARDSCAPE INSTALLATION 1 LS
3 TREES - MAGNOLIA GRANDIFLORA
"BRACKENS BROWN BEAUTY" - 4"
CALIPER, 14" HEIGHT
4 EA
4 TREES- QUERCUS VIRGINIANA
"QVTIA" - 4" CALIPER, 14"
HEIGHT
10 EA
5 TREES- ILEX VOMITORIA- 4"
CALIPER, 14" HEIGHT
2 EA
6 SHRUBS- BUXUS MICROPHYLLA
JAPONICA - 3 GALLON, 12"
HEIGHT
81 EA
7 SHRUBS - ILEX VOMITORIA
'SCHILLINGS' - 3 GALLON, 12"
HEIGHT
102 EA
8 SHURBS- PENNISETUM
ALOPECUROIDES 'LITTLE BUNNY'
- 1 GALLON BUCKT, 8" HEIGHT
127 EA
9 SHURBS - DIETES IRIDIOIDES - 1
GALLON, 12" HEIGHT
401 EA
10 SHURBS - RHAPHIOLEPIS INDICA
- 3 GALLON, 12" HEIGHT
69 EA
11 GROUND COVERS - ARACHIA
GLABRATA - SOD
1,214 SF
12 GROUND COVERS - PHYLA
NODIFLORA - 1 GALLON, 6"
HEIGHT
188 EA
13 GROUND COVERS -
TRACHELOSPERMUM
JASMINOIDES - 1 GALLON, 10"
HEIGHT
146 EA
14 RUB ROTATOR 63 EA
25-014EN-FC-IFB P a g e | 2 4
Line Item Description Quantity Unit of
Measure Unit Cost Total
15 BUBBLERS 32 EA
16 DRIPLINE 2,574 LF
17 MAIN LINE 1,044 LF
18 PIPE SLEEVE 1,436 LF
19 LATERAL LINES 3,984 LF
20 DRIP CONTROL ZONE KITS 4 EA
21 REMOTE CONTROL VALVES 5 EA
22 BRASS ELECTRIC MASTER VALVE 1 EA
23 BACKFLOW PREVENTER 1 EA
24 IRRIGATION CONTROLLER 1 EA
25 RAIN SENSOR 1 EA
26 FLOW SENSOR 1 EA
27 IRRIGATION INSTALLATION 1 LS
SIGNING AND PAVEMENT MARKINGS
Measure Unit Cost Total
1 654-2-22 RETANGULAR RAPID
FLASHING BEACON, F&I, SOLAR
POWERED, COMPLETE ASSEMBLY,
BACK-TO-BACK
2 AS
2 700-1111 SINGLE OLUMN
GROUND SIGN ASSEMBLY, F&I,
GROUND MOUNT, LESS THAN 12
SF
4 EA
25-014EN-FC-IFB P a g e | 2 5
Line Item Description Quantity Unit of
Measure Unit Cost Total
3 700-1500 SINGLE COLUMN
GROUND SIGN ASSEMBLY,
RELOCATE
3 EA
4 700-1600 SINGLE COLUMN
GROUND SIGN ASSEMBLY,
REMOVE
6 EA
5 706-1-3 RAISED PAVEMENT
MARKER, TYPE B
173 EA
6 710-11-101 PAINTED PAVEMENT
MARKINGS, STANDARD, WHITE,
SOLID, 6"
0.543 GM
7 710-11-123 PAINTED PAVEMENT
MARKINGS, STANDARD WHITE,
SOLID, 12" FOR CROSSWALK AND
ROUNDABOUT
585 LF
8 710-11-124 PAINTED PAVEMENT
MARKINGS, STANDARD WHITE,
SOLID, 18" FOR DIAGONALS AND
CHEVERONS
63 LF
9 710-11-125 PAINTED PAVEMENT
MARKINGS, STANDARD WHITE,
SOLID, 24" FOR STOP LINE AND
CROSSWALK
116 LF
10 710-11-201 PAINTED PAVEMENT
MARKINGS, STANDARD, YELLOW,
SOLID, 6"
0.507 GM
11 710-11-224 PAINTED PAVEMENT
MARKINGS, STANDARD, YELLOW,
SOLID, 18" FOR DIAGONALS AND
CHEVRONS
269 LF
12 710-11-160 PAINTED PAVEMENT
MARKINGS, STANDARD, WHITE,
MESSAGE OR SYMBOL
11 EA
25-014EN-FC-IFB P a g e | 2 6
Line Item Description Quantity Unit of
Measure Unit Cost Total
13 710-11-170 PAINTED PAVEMENT
MARKINGS, STANDARD, WHITE,
ARROW
5 EA
14 711-11-123 THERMOPLASTIC,
STANDARD, WHITE, SOLID, 12"
FOR CROSSWALK AND
ROUNDABOUT
585 LF
15 711-11-124 THERMOPLASTIC,
STANDARD, WHITE, SOLID, 18"
FOR DIAGONALS AND CHEVRONS
63 LF
16 711-11-125 THERMOPLASTIC,
STANDARD, WHITE, SOLID, 24"
FOR STOP LINE AND CROSSWALK
116 LF
17 711-11-160 THERMOPLASTIC,
STANDARD, WHITE, MESSAGE OR
SYMBOL
11 EA
18 711-11-170 THERMOPLASTIC,
STANDARD, WHITE, ARROW
5 EA
19 711-11-224 THERMOPLASTIC,
STANDARD, YELLOW, SOLID, 18"
FOR DIAGONALS AND CHEVRONS
269 LF
20 711-14-125 THERMOPLASTIC,
PERFORMED, WHITE, SOLID, 24"
CROSSWALK
385 LF
21 711-16-101 THERMOPLASTIC,
STANDARD - OTHER SURFACES,
WHITE, SOLID, 6"
0.543 GM
22 711-16-201 THERMOPLASTIC,
STANDARD-OTHER SURFACES,
YELLOW, SOLID, 6"
0.507 GM
SIGNALIZATION
25-014EN-FC-IFB P a g e | 2 7
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 630-2-11 CONDUIT, FURNISH &
INSTALL, OPEN TRENCH
20 LF
2 630-2-12 CONDUIT, FURNISH &
INSTALL, DIRECTIONAL BORE
440 LF
3 630-2-14 CONDUIT, FURNISH &
INSTALL, ABOVE GROUND
10 LF
4 632-7-1 SIGNAL CABLE - NEW OR
RECONSTRUCTED INTERSECTION,
FURNISH & INSTALL
1 PI
5 633-1-420 FIBER OPTIC CABLE,
RELOCATE, UNDERGROUND
150 LF
6 633-3-11 FIBER OPTIC
CONNECTION HARDWARE, F&I,
SPLICE ENCLOSURE
1 EA
7 633-3-12 FIBER OPTIC
CONNECTION HARDWARE, F&I,
SPLICE TRAY
1 EA
8 633-3-14 FIBER OPTIC
CONNECTION HARDWARE, F&I,
BUFFER TUBE FAN OUT KIT
1 EA
9 633-3-15 FIBER OPTIC
CONNECTION HARDWARE, F&I,
PRETERMINATED PATCH PANNEL
1 EA
10 635-2-12 PULL & SPLICE BOX,
F&I, 24" X 36" COVER SIZE
2 EA
11 635-2-14 PULL & SPLICE BOX,
F&I, 17" X 30" COVER SIZE
10 EA
12 639-1-122 ELECTRICAL POWER
SERVICE, F&I, UNDERGROUND,
METER PURCHASED BY
CONTRACTOR
1 AS
25-014EN-FC-IFB P a g e | 2 8
Line Item Description Quantity Unit of
Measure Unit Cost Total
13 639-2-1 ELECTRICAL SERVICE
WIRE, FURNISH & INSTALL
70 LF
14 641-2-12 PRESTRESSED
CONCRETE POLE, F&I, TYPE P-11
SERVICE POLE
1 EA
15 641- 2-70 PRESTRESSED
CONCRETE POLE, SHALLOW POLE
REMOVAL, POLE 30' AND
GREATER
4 EA
16 646-1-11 ALUMINUM SIGNALS
POLE, PEDESTRIAN
2 EA
17 646-1-12 ALUMINUM SIGNAL
POLE, FURNISH & INSTALL
PEDESTRIAL DETECTOR POST
4 EA
18 646-1-60 ALUMINUM SIGNAL
POLE, REMOVE
4 EA
19 649-21-4 STEEL MAST ARM
ASSEMBLY, FURNISH & INSTALL,
DOUBLE ARM 40' -30'
1 EA
20 649-21-5 STEEL MAST ARM
ASSEMBLY, FURNISH & INSTALL,
DOUBLE ARM 40' - 40'
1 EA
21 650-1-14 VEHICULAR TRAFFIC
SIGNAL, FURNISH & INSTALL
ALUMINUM, 3 SECTION, 1 WAY
8 AS
22 650-1-16 VEHICULAR TRAFFIC
SIGNAL, FURNISH & INSTALL
ALUMINUM, 4 SECTION, 1 WAY
2 AS
23 653-1-11 PEDESTRIAN SIGNAL,
FURNISH & INSTALL LED
COUNTDOWN, 1 WAY
6 AS
25-014EN-FC-IFB P a g e | 2 9
Line Item Description Quantity Unit of
Measure Unit Cost Total
24 660-4-11 VEHICLE DETECTION
SYSTEM - VIDEO, FURNISH &
INSTALL CABINET EQUIPMENT
1 EA
25 660-4-12 VEHICLE DETECTION
SYSTEM - VIDEO, FURNISH &
INSTALL, ABOVE GROUND
EQUIPMENT
1 EA
26 663-1-122 SIGNAL PRIORITY AND
PREEMPTION SYSTEM, FURNISH &
INSTALL, GPS, DETECTOR
4 EA
27 665-1-11 PEDESTRIAN DETECTOR,
FURNISH & INSTALL, STANDARD
6 EA
28 670-5-112 TRAFFIC CONTROLLER
ASSEMBLY, F7i, NEMA, 2
PREEMPTION
1 AS
29 670-5-600 TRAFFIC CONTROLLER
ASSEMBLY, REMOVE CONTROLLER
WIHT CABINET
1 AS
30 682-1-113 ITS CCTV CAMERA, F&I,
DOME PTZ ENCLOSURE -
PRESSURIZED, IP, HIGH
DEFINITION
1 EA
31 684-1-1 MANAGED FIELD
ETHERNET SWITCH, FURNISH &
INSTALL
1 EA
32 685-1-11 UNINTERUPTIBLE
POWER SUPPLY, FURNISH &
INSTALL, LINE INTERACTIVE
1 EA
33 700-5-22 INTERNALLY
ILLUMINATED SIGN, FURNISH &
INSTALL, OVERHEAD MOUNT, 12-
18 SF
4 EA
34 715-5-30 LUMINARE & BRACKET
ARM, INSTALL
2 EA
25-014EN-FC-IFB P a g e | 3 0
LIGHTING
Measure Unit Cost Total
1 630-2-11 CONDUIT, FURNISH &
INSTALL, OPEN TRENCH
1,993 LF
2 630-2-12 CONDUIT, F&I,
DIRECTIONAL BORE
390 LF
3 635-2-11 PULL & SPLICE BOX,
F&I, 13"X 24" COVER SIZE
48 EA
4 639-1121 ELECCTRICAL POWER
SERVICE, F&I, UNDERGROUND,
METER FURNISHED BY POWER
COMPANY
1 AS
5 715-1-12 LIGHTING
CONDUCTORS, F&I, INSULTATED
NO. 8 TO NO. 6
10,697 LF
6 715-7-11 LOAD CENTER, F&I,
SECONDARY VOLTAGE
1 EA
7 715-500-1 POLE CABLE
DISTRIBUTION SYSTEM, F&I,
CONVENTIONAL
44 EA
8 715-516-115 LIGHT POLE
COMPLETE - SPECIAL DESIGN,
F&I, POLE TOP MOUNT -
ALUMINUM, 15'
44 EA
SUPPLEMENTAL BID ITEMS
Measure Unit Cost Total
1 334-1-13 - 4" Superpave Asphaltic
Concrete, SP12.5, Traffic C 300 Ton
2 10" Linestop (Watermain- As
Needed)
1 EA
25-014EN-FC-IFB P a g e | 3 1
Line Item Description Quantity Unit of
Measure Unit Cost Total
3 12" Linestop (Watermain- As
Needed)
1 EA
4 CSX Coordination 1 LS
5 CSX Fees, Insurance, Flagger and
Other Reimbursable CSX Costs
1 NTE
5. Vendor Questionnaire
5.1. TIN #, D-U-N-S #, FEIN or SS#*
Please provide your Tax Identification Numbers.
*Response required
5.2. Drug-Free Workplace*
The undersigned vendor per Florida Statute 287.087 hereby certifies that the vendor does:
A. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
B. Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation programs, employee assistance programs and the penalties that may be imposed upon employees for drug abuse violations.
C. Give each employee engaged in providing the commodities or contractual services that are under quote a copy of the statement specified in subsection (1).
D. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under quote, the employee will abide by the terms of the statement and will notify the employer of any conviction of, a plea of guilty or nolo contendre to, any violation of Chapter 1893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction.
25-014EN-FC-IFB P a g e | 3 2
E. Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program, if such is available in the employee’s community, by any employee who is so convicted.
F. Make a good faith effort to continue to maintain a drug-free workplace through the implementation of this section.
As the person authorized to sign the statement, I certify that this firm complies fully with the above requirements.
☐ Please confirm
*Response required
5.3. Conflict of Interest Disclosure*
For purposes of determining any possible conflict of interest, all bidders/proposers must disclose if any Plant City Commissioner(s), employee(s), is also an owner, corporate officer, agency, employee, etc., of their business.
Indicate either “yes” (a City employee, an elected official is also associated with your business), or “no”. If yes, give person(s) name(s) and position(s) with your business.
☐ Yes
☐ No
*Response required
When equals "Yes"
5.3.1. Conflict of Interest "Yes" Response*
Please enter the following information:
Name(s):
Position(s):
Firm Name:
Title:
Address:
Telephone No.:
E-Mail Address:
*Response required
5.4. No Contact Clause*
The City of Plant City has established a solicitation silence policy (No Contact Clause) that prohibits oral and written communication regarding all formal solicitations for goods and services (formal bids, Request for Proposals, Requests for Qualifications) issued by the City through the City Procurement Division.
The period commences when the procurement document is received and terminates when the
City Commissioners, City Manager, or their designee, approves an award.
25-014EN-FC-IFB P a g e | 3 3
When the solicitation silence period is in effect, no oral or written communication is allowed regarding the solicitation between prospective bidders/proposers and members of the City
Commissioners, the City Manager, City…
This is the start of the file's text. The full file is on GovTribe.