Bid_Form_-_Watermain_Replacement.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

The document is a Bid Form for a Watermain Replacement project located in Florida, specifically associated with the Collins Street Complete Street - Phase I municipal infrastructure improvement initiative. The bid form details a comprehensive list of 27 line items for water infrastructure components, including various sizes of ductile iron and HDPE pipes (ranging from 2" to 10"), fittings such as tees, reducers, and bends, gate valves, service connections, fire hydrant assemblies, and other related infrastructure elements. The project involves replacing an existing potable water main and its appurtenances as part of a broader street renovation covering approximately 1/4 mile of S. Collins Street from E. Laura Street to south of E. Alabama Street.

The bid form provides a detailed breakdown of quantities for each infrastructure component, with contractors expected to provide unit costs for each line item. The project encompasses multiple technical elements including open cut installations, pipe connections, valve installations, and utility accommodations. While specific budget details are not explicitly stated, the comprehensive nature of the bid form suggests a complex municipal infrastructure upgrade that requires precise technical specifications and careful cost estimation. The project appears to be funded through municipal infrastructure improvement channels and involves coordinating utility relocations and underground infrastructure improvements concurrent with street renovation efforts.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form-Watermain Replacement Line Item Description of Item Unit of Measure Quantity Unit Cost Vrinda Sawhney: Keep this blank for contractor to enter unless you have defined unit cost that you need contractor to bid on.

110" Ductile Iron Pipe - Open CutLF910
26" Ductile Iron Pipe - Open CutLF51
34" Ductile Iron Pipe - Open CutLF14
412" HDPE - Open CutLF50
52" HDPE - Open CutLF47
610x10" TeeEACH1
710x6" TeeEACH2
810"x4" ReducerEACH1
910" 90° BendEACH1
1010" 45° Bend - DIEACH10
1110" 45° Bend - HDPEEACH8
126" 90° BendEACH1
136" 45° BendEACH2
144" 90° BendEACH1
154"x2" ReducerEACH1
16Connection to existing 10-inch Gate ValveEACH1
1710"x12" Tapping Sleeve and ValveEACH1
186" Cut-In Tee and SleeveEACH1
191" Short ServiceEACH1
201" Long ServiceEACH4
211" Double Long ServiceEACH6
22Fire Hydrant AssemblyEACH1
2310" Gate ValveEACH2
246" Gate ValveEACH1
254" Gate ValveEACH1
26Transition Coupling - Installed CompleteLS1
27Air Release Valve - Installed CompleteEACH2

&"Helvetica Neue,Regular"&12&K000000&P

File details come from the government source that posted it. Updated .