J_1(b)_3_Pricing_Template.xlsx
XLSX spreadsheet 43 KB Posted
- Attached to
- Amendment 1 to RFP
- Solicitation number
- NNA16555182R
About this file
J.1(b)3 Pricing Schedule
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 1 TOTAL EVALUATED PRICE
TOTAL EVALUATED PRICE
| FFP PRICING SCHEDULE TOTAL | ERROR:#VALUE! |
| IDIQ PRICING SCHEDULE TOTAL | ERROR:#VALUE! |
| TOTAL EVALUATED PRICE | ERROR:#VALUE! |
| These numbers will autofill from the totals calculated on Exhibits 2-6 |
&"Arial,Bold"&14LOGISTICS MANAGEMENT SERVICES RFP NNA16555182R ATTACHMENT J.1(b) 3 PRICING TEMPLATE
Exhibit 1
Exhibit 2 FFP PS
| FIRM FIXED PRICE | ||
| PRICING SCHEDULE | ||
| NASA LMS CLIN Value Structure | ||
| Period | CLIN | Total |
| CORE REQUIREMENTS | ||
| Phase-in | ||
| Phase-in | 001 | $TBP |
| FFP Core Requirements 4.1 Supply Mgmt | ||
| Base Period | 002 | $TBP |
| Option 1 | 102 | $TBP |
| Option 2 | 202 | $TBP |
| Option 3 | 302 | $TBP |
| FFP Core Requirements 4.2 Equipment Mgmt | ||
| Base Period | 003 | $TBP |
| Option 1 | 103 | $TBP |
| Option 2 | 203 | $TBP |
| Option 3 | 303 | $TBP |
| FFP Core Requirements 4.3 Property Disposal | ||
| Base Period | 004 | $TBP |
| Option 1 | 104 | $TBP |
| Option 2 | 204 | $TBP |
| Option 3 | 304 | $TBP |
| FFP Core Requirements 4.4 Janitorial Svs | ||
| Base Period | 005 | $TBP |
| Option 1 | 105 | $TBP |
| Option 2 | 205 | $TBP |
| Option 3 | 305 | $TBP |
| FFP Core Requirements 4.5 Refuse, Recyclable | ||
| Base Period | 006 | $TBP |
| Option 1 | 106 | $TBP |
| Option 2 | 206 | $TBP |
| Option 3 | 306 | $TBP |
| FFP Core Requirements 4.6 Shipping, Rcg, Mail | ||
| Base Period | 007 | $TBP |
| Option 1 | 107 | $TBP |
| Option 2 | 207 | $TBP |
| Option 3 | 307 | $TBP |
| FFP Core Requirements 4.7 Fleet Mgmt | ||
| Base Period | 008 | $TBP |
| Option 1 | 108 | $TBP |
| Option 2 | 208 | $TBP |
| Option 3 | 308 | $TBP |
| FFP Core Requirements 4.8 Business Office Spt | ||
| Base Period | 009 | $TBP |
| Option 1 | 109 | $TBP |
| Option 2 | 209 | $TBP |
| Option 3 | 309 | $TBP |
| OPTIONS | ||
| FFP Option 4.9 NACC | ||
| Period | CLIN | Total |
| Base Period | 010 | $TBP |
| Option 1 | 110 | $TBP |
| Option 2 | 210 | $TBP |
| Option 3 | 310 | $TBP |
| FFP Option 4.10 Reproduction Services | ||
| Base Period | 011 | $TBP |
| Option 1 | 111 | $TBP |
| Option 2 | 211 | $TBP |
| Option 3 | 311 | $TBP |
| Core Base and All Options | All CLINs | ERROR:#VALUE! |
NNA16555182R
Attachment J.1 (b)3 Pricing Template Exhibit 2
NNA16555182R Attachment J.1(b)3 Exhibit 2
Exhibit 3 IDIQ PS - BASE PD
| PRIME | REGULAR | PRIME LABOR | SUB | SUB REGULAR | SUB | PRIME | SUB LABOR COST | ||||||
| PD | SHIFT | OVERTIME | PRIME | TOTAL | PD | SHIFT | OVERTIME | COEFFICIENT | PLUS PRIME | ||||
| CLIN | DESCRIPTION OF SERVICES/SUPPLIES | QTY | UNIT | UNIT PRICE | UNIT PRICE | COEFFICIENT | PRICE | QTY | UNIT | UNIT PRICE | UNIT PRICE | ON SUB LABOR | MARKUP |
| ARC LOGISTICS MANAGEMENT SERVICES |
| IDIQ PRICING SCHEDULE |
| CLIN | 012-014 | INDEFINITE DELIVERY INDEFINITE QUANTITY WORK: | ||||||||
| OPTION PERIOD 1 | As set forth in Section B and at the unit rate prices set forth below | |||||||||
| BASE | Pricing Model to perform indefinite delivery indefinite quantity work per all the terms of this contract. | |||||||||
| CLIN | 012-014 | IDIQ HOURLY UNIT PRICE WORK (SOW 5.1-5.3) | MAXIMUM PRIME REGULAR SHIFT BASE RATE (UNBURDENED DIRECT LABOR RATE) | MAXIMUM PRIME OFF-SHIFT (OVERTIME) RATE (UNBURDENED OVERTIME LABOR RATE) | PRIME COEFFICIENT ON PRIME LABOR (ALL BURDENS, MARKUPS,OH & PROFIT) | PRIME COST | MAXIMUM SUB REGULAR SHIFT BASE RATE (BURDENED DIRECT LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | MAXIMUM SUB OVERTIME RATE (BURDENED OVERTIME LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | * PRIME COEFFICIENT ON SUB LABOR (ALL MARKUPS, OH & PROFIT) | SUB LABOR COST PLUS PRIME MARKUP |
| Journeymen (Motor Vehicle Mechanic) | 550 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 275 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail/Supply HazMat Specialist | 600 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Truck Driver Mover | 7,000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 3500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Property Specialist | 500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Specialist | 400 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail Supply Specialist | 600 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Bus Driver | 600 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Recycling Processor (Recycling Specialist) | 600 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mover Helper (Truck Driver, Medium) | 3,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor | 8,000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 4000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor/Cleaning Specialist | 5,000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 2500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Technician | 400 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| TOTAL IDIQ LABOR HOURS AND VALUE (PRIME & SUB) | 27,750 | TOTAL IDIQ LABOR PRICE PRIME CONTRACTOR | ERROR:#VALUE! | 13,875.0 | TOTAL IDIQ LABOR PRICE SUBCONTRACTORS PLUS PRIME MARKUP | ERROR:#VALUE! |
| PRIME HOURS | SUB HOURS |
*PRIME COEFFICIENT ON PRIME MATERIAL & EQUIPMENT (ALL MARKUPS, OH AND PROFIT) * PRIME COEFFICIENT ON SUB MATERIAL & EQUIPMENT (ALL MARKUPS, OH & PROFIT)
Materials and Equipment Cost for IDIQ Work PLUG NUMBER $200,000.00 TB PROPOSED ERROR:#VALUE! PLUG NUMBER $100,000.00 TB PROPOSED ERROR:#VALUE!
TOTAL PRIME IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE! TOTAL SUB IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE!
| TOTAL PRIME & SUB IDIQ LABOR, MATERIAL AND EQUIPMENT | ERROR:#VALUE! |
| THIS TOTAL ALONG WITH OTHER BASE AND OPTION TOTALS WILL BE USED IN THE PRICE EVALUATION FOR THE IDIQ PORTION OF PRICE |
&"Arial,Bold"&16NNA16555182R &"Arial,Bold"&16&K000000EXHIBIT 3 - INDEFINITE DELIVERY INDEFINITE QUANTITY
PRICING SCHEDULE (IDIQPS)
BASE PERIOD &"Arial,Bold"&14&K000000Attachment J.1 (b)3 Pricing Template &"Arial,Regular"&12
&K000000RFP #NNA16555182R &K000000J1 - &P
NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is for price evaluation purposes only for the IDIQ portion. This total represents pricing for all base period IDIQ CLINS 012-014. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders and will become contract attachment J.1(a)6 Labor rates and coefficients.
* The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup)
Exhibit 4 IDIQ PS-OPTON PD 1
| PRIME | REGULAR | PRIME LABOR | SUB | SUB REGULAR | SUB | PRIME | SUB LABOR COST | ||||||
| PD | SHIFT | OVERTIME | PRIME | TOTAL | PD | SHIFT | OVERTIME | COEFFICIENT | PLUS PRIME | ||||
| CLIN | DESCRIPTION OF SERVICES/SUPPLIES | QTY | UNIT | UNIT PRICE | UNIT PRICE | COEFFICIENT | PRICE | QTY | UNIT | UNIT PRICE | UNIT PRICE | ON SUB LABOR | MARKUP |
| ARC LOGISTICS MANAGEMENT SERVICES |
| IDIQ PRICING SCHEDULE |
| CLIN | 112-114 | INDEFINITE DELIVERY INDEFINITE QUANTITY WORK: | ||||||||
| OPTION PERIOD 1 | As set forth in Section B and at the unit rate prices set forth below | |||||||||
| 1 | Pricing Model to perform indefinite delivery indefinite quantity work per all the terms of this contract. | |||||||||
| CLIN | 112-114 | IDIQ HOURLY UNIT PRICE WORK (SOW 5.1-5.3) | MAXIMUM PRIME REGULAR SHIFT BASE RATE (UNBURDENED DIRECT LABOR RATE) | MAXIMUM PRIME OFF-SHIFT (OVERTIME) RATE (UNBURDENED OVERTIME LABOR RATE) | * PRIME COEFFICIENT ON PRIME LABOR (ALL BURDENS, MARKUPS,OH & PROFIT) | PRIME COST | MAXIMUM SUB REGULAR SHIFT BASE RATE (BURDENED DIRECT LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | MAXIMUM SUB OVERTIME RATE (BURDENED OVERTIME LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | * PRIME COEFFICIENT ON SUB LABOR (ALL MARKUPS, OH & PROFIT) | SUB LABOR COST PLUS PRIME MARKUP |
| Journeymen (Motor Vehicle Mechanic) | 275 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 137.5 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail/Supply HazMat Specialist | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Truck Driver Mover | 3,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Property Specialist | 250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 125 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Specialist | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 100 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail Supply Specialist | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Bus Driver | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Recycling Processor (Recycling Specialist) | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mover Helper (Truck Driver, Medium) | 1,750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 875 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor | 4,000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 2000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor/Cleaning Specialist | 2,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Technician | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 100 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| TOTAL IDIQ LABOR HOURS AND VALUE (PRIME & SUB) | 13,875 | TOTAL IDIQ LABOR PRICE PRIME CONTRACTOR | ERROR:#VALUE! | 6,937.5 | TOTAL IDIQ LABOR PRICE SUBCONTRACTORS PLUS PRIME MARKUP | ERROR:#VALUE! |
| PRIME HOURS | SUB HOURS |
* PRIME COEFFICIENT ON PRIME MATERIAL & EQUIPMENT (ALL MARKUPS, OH AND PROFIT) * PRIME COEFFICIENT ON SUB MATERIAL & EQUIPMENT (ALL MARKUPS, OH & PROFIT)
Materials and Equipment Cost for IDIQ Work PLUG NUMBER $200,000.00 TB PROPOSED ERROR:#VALUE! PLUG NUMBER $100,000.00 TB PROPOSED ERROR:#VALUE!
TOTAL PRIME IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE! TOTAL SUB IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE!
| TOTAL PRIME & SUB IDIQ LABOR, MATERIAL AND EQUIPMENT | ERROR:#VALUE! | |
| THIS TOTAL ALONG WITH OTHER BASE AND OPTION TOTALS WILL BE USED IN THE PRICE EVALUATION FOR THE IDIQ PORTION OF PRICE | ||
| 275 | ||
| 300 | ||
| 3,500 | ||
| 250 | ||
| 200 | ||
| 300 | ||
| 300 | ||
| 300 | ||
| 1,750 | ||
| 4,000 | ||
| 2,500 | ||
| 200 |
&"Arial,Bold"&16NNA16555182R &"Arial,Bold"&16&K000000EXHIBIT 4 - INDEFINITE DELIVERY INDEFINITE QUANTITY
PRICING SCHEDULE (IDIQPS)
OPTION PERIOD 1 &"Arial,Bold"&14&K000000Attachment J.1 (b)3 Pricing Template
&K000000RFP #NNA15888152R &K000000J1 - &P
NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is for price evaluation purposes only for the IDIQ portion. This total represents pricing for all base period IDIQ CLINS 112-114. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders and will become contract attachment J.1(a)6 Labor rates and coefficients.
* The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup)
Exhibit 5 IDIQ PS-OPTON PD 2
| PRIME | REGULAR | PRIME LABOR | SUB | SUB REGULAR | SUB | PRIME | SUB LABOR COST | ||||||
| PD | SHIFT | OVERTIME | PRIME | TOTAL | PD | SHIFT | OVERTIME | COEFFICIENT | PLUS PRIME | ||||
| CLIN | DESCRIPTION OF SERVICES/SUPPLIES | QTY | UNIT | UNIT PRICE | UNIT PRICE | COEFFICIENT | PRICE | QTY | UNIT | UNIT PRICE | UNIT PRICE | ON SUB LABOR | MARKUP |
| ARC LOGISTICS MANAGEMENT SERVICES |
| IDIQ PRICING SCHEDULE |
| CLIN | 212-214 | INDEFINITE DELIVERY INDEFINITE QUANTITY WORK: | ||||||||
| OPTION PERIOD 1 | As set forth in Section B and at the unit rate prices set forth below | |||||||||
| 2 | Pricing Model to perform indefinite delivery indefinite quantity work per all the terms of this contract. | |||||||||
| CLIN | 212-214 | IDIQ HOURLY UNIT PRICE WORK (SOW 5.1-5.3) | MAXIMUM PRIME REGULAR SHIFT BASE RATE (UNBURDENED DIRECT LABOR RATE) | MAXIMUM PRIME OFF-SHIFT (OVERTIME) RATE (UNBURDENED OVERTIME LABOR RATE) | * PRIME COEFFICIENT ON PRIME LABOR (ALL BURDENS, MARKUPS,OH & PROFIT) | PRIME COST | MAXIMUM SUB REGULAR SHIFT BASE RATE (BURDENED DIRECT LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | MAXIMUM SUB OVERTIME RATE (BURDENED OVERTIME LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | * PRIME COEFFICIENT ON SUB LABOR (ALL MARKUPS, OH & PROFIT) | SUB LABOR COST PLUS PRIME MARKUP |
| Journeymen (Motor Vehicle Mechanic) | 275 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 137.5 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail/Supply HazMat Specialist | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Truck Driver Mover | 3,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Property Specialist | 250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 125 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Specialist | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 100 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail Supply Specialist | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Bus Driver | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Recycling Processor (Recycling Specialist) | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mover Helper (Truck Driver, Medium) | 1,750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 875 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor | 4,000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 2000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor/Cleaning Specialist | 2,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Technician | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 100 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| TOTAL IDIQ LABOR HOURS AND VALUE (PRIME & SUB) | 13,875 | TOTAL IDIQ LABOR PRICE PRIME CONTRACTOR | ERROR:#VALUE! | 6,937.5 | TOTAL IDIQ LABOR PRICE SUBCONTRACTORS PLUS PRIME MARKUP | ERROR:#VALUE! |
| PRIME HOURS | SUB HOURS |
* PRIME COEFFICIENT ON PRIME MATERIAL & EQUIPMENT (ALL MARKUPS, OH AND PROFIT) * PRIME COEFFICIENT ON SUB MATERIAL & EQUIPMENT (ALL MARKUPS, OH & PROFIT)
Materials and Equipment Cost for IDIQ Work PLUG NUMBER $200,000.00 TB PROPOSED ERROR:#VALUE! PLUG NUMBER $100,000.00 TB PROPOSED ERROR:#VALUE!
TOTAL PRIME IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE! TOTAL SUB IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE!
| TOTAL PRIME & SUB IDIQ LABOR, MATERIAL AND EQUIPMENT | ERROR:#VALUE! |
| THIS TOTAL ALONG WITH OTHER BASE AND OPTION TOTALS WILL BE USED IN THE PRICE EVALUATION FOR THE IDIQ PORTION OF PRICE |
NNA16555182R &"Arial,Bold"&16&K000000EXHIBIT 5 - INDEFINITE DELIVERY INDEFINITE QUANTITY
PRICING SCHEDULE (IDIQPS)
OPTION PERIOD 2 &"Arial,Bold"&14&K000000Attachment J.1 (b)3 Pricing Template
&K000000RFP #NNA15888152R &K000000J1 - &P
NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is for price evaluation purposes only for the IDIQ portion. This total represents pricing for all base period IDIQ CLINS 012-014. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders and will become contract attachment J.1(a)6 Labor rates and coefficients. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is for price evaluation purposes only for the IDIQ portion. This total represents pricing for all base period IDIQ CLINS 212-214. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders and will become contract attachment J.1(a)6 Labor rates and coefficients.
* The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup)
Exhibit 6 IDIQ PS-OPTION PD 3
| PRIME | REGULAR | PRIME LABOR | SUB | SUB REGULAR | SUB | PRIME | SUB LABOR COST | ||||||
| PD | SHIFT | OVERTIME | PRIME | TOTAL | PD | SHIFT | OVERTIME | COEFFICIENT | PLUS PRIME | ||||
| CLIN | DESCRIPTION OF SERVICES/SUPPLIES | QTY | UNIT | UNIT PRICE | UNIT PRICE | COEFFICIENT | PRICE | QTY | UNIT | UNIT PRICE | UNIT PRICE | ON SUB LABOR | MARKUP |
| ARC LOGISTICS MANAGEMENT SERVICES |
| IDIQ PRICING SCHEDULE |
| CLIN | 312-314 | INDEFINITE DELIVERY INDEFINITE QUANTITY WORK: | ||||||||
| OPTION PERIOD 1 | As set forth in Section B and at the unit rate prices set forth below | |||||||||
| 3 | Pricing Model to perform indefinite delivery indefinite quantity work per all the terms of this contract. | |||||||||
| CLIN | 312-314 | IDIQ HOURLY UNIT PRICE WORK (SOW 5.1-5.3) | MAXIMUM PRIME REGULAR SHIFT BASE RATE (UNBURDENED DIRECT LABOR RATE) | MAXIMUM PRIME OFF-SHIFT (OVERTIME) RATE (UNBURDENED OVERTIME LABOR RATE) | PRIME COEFFICIENT ON PRIME LABOR (ALL BURDENS, MARKUPS,OH & PROFIT) | PRIME COST | MAXIMUM SUB REGULAR SHIFT BASE RATE (BURDENED DIRECT LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | MAXIMUM SUB OVERTIME RATE (BURDENED OVERTIME LABOR RATE INCLUDING ALL SUB BURDENS, MARKUPS, OH & PROFIT) | PRIME COEFFICIENT ON SUB LABOR (ALL MARKUPS, OH & PROFIT) | SUB LABOR COST PLUS PRIME MARKUP |
| Journeymen (Motor Vehicle Mechanic) | 275 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 137.5 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail/Supply HazMat Specialist | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Truck Driver Mover | 3,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Property Specialist | 250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 125 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Specialist | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 100 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mail Supply Specialist | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Bus Driver | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Recycling Processor (Recycling Specialist) | 300 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 150 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Mover Helper (Truck Driver, Medium) | 1,750 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 875 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor | 4,000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 2000 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Janitor/Cleaning Specialist | 2,500 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 1250 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| Supply Technician | 200 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! | 100 | HR | $ | TB PROPOSED | $ | TB PROPOSED | TB PROPOSED | ERROR:#VALUE! |
| TOTAL IDIQ LABOR HOURS AND VALUE (PRIME & SUB) | 13,875 | TOTAL IDIQ LABOR PRICE PRIME CONTRACTOR | ERROR:#VALUE! | 6,937.5 | TOTAL IDIQ LABOR PRICE SUBCONTRACTORS PLUS PRIME MARKUP | ERROR:#VALUE! |
| PRIME HOURS | SUB HOURS |
PRIME COEFFICIENT ON PRIME MATERIAL & EQUIPMENT (ALL MARKUPS, OH AND PROFIT) PRIME COEFFICIENT ON SUB MATERIAL & EQUIPMENT (ALL MARKUPS, OH & PROFIT)
Materials and Equipment Cost for IDIQ Work PLUG NUMBER $200,000.00 TB PROPOSED ERROR:#VALUE! PLUG NUMBER $100,000.00 TB PROPOSED ERROR:#VALUE!
TOTAL PRIME IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE! TOTAL SUB IDIQ LABOR, MATERIAL AND EQUIPMENT ERROR:#VALUE!
| TOTAL PRIME & SUB IDIQ LABOR, MATERIAL AND EQUIPMENT | ERROR:#VALUE! |
| THIS TOTAL ALONG WITH OTHER BASE AND OPTION TOTALS WILL BE USED IN THE PRICE EVALUATION FOR THE IDIQ PORTION OF PRICE |
&14NNA16555182R &"Arial,Bold"&16&K000000EXHIBIT 6 - INDEFINITE DELIVERY INDEFINITE QUANTITY
PRICING SCHEDULE (IDIQPS)
OPTION PERIOD 3 &"Arial,Bold"&14&K000000Attachment J.1 (b)3 Pricing Attachment
&K000000RFP #NNA15888152R &K000000J1 - &P
NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is evaluation purposes. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders. The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup) NOTE: This form is for price evaluation purposes only for the IDIQ portion. This total represents pricing for all base period IDIQ CLINS 312-314. The hourly quantities listed are estimates only and no contract adjustments will be made to the labor or coefficient rates based upon differences in the quantities stated . The IDIQ labor rates and all coefficients proposed will contractually represent the maximum rates that the prime and any subcontractor can use during the execution of the IDIQ FFP Task Orders and will become contract attachment J.1(a)6 Labor rates and coefficients.
* The coefficients shall be in the form of 1 plus the markup (ex. 1.20 to indicate a 20% markup)
File details come from the government source that posted it. Updated .