Attachment L4 - TOR 213-00 - Statement of Work
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Task Order Contract (MATOC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work NIEHS Triple Module Lab Renovation
National Institute of Environmental Health Sciences Task Order Request 13-00
This Scope of Work details requirements for a project to provide construction services to remodel a typical triple module lab in the NIEHS Rall Building per the attached construction documents. The Contractor is to provide all services for review of existing conditions and construction in accordance with contract requirements.
I. GENERAL:
A. The Contractor will submit a preliminary construction schedule before completion of task order negotiations for acceptance by NIH.
B. The Contractor shall provide a submittal registry with the preliminary schedule detailing all items to be submitted for government review and acceptance. The submittal registry shall include submission dates coordinated with the preliminary construction schedule. The schedule should provide 10 business days for government review of each submittal package.
C. The Contractor shall construct the project per the attached drawings. If the
Contractor deviates from the attached construction drawings the change must be denoted and NIH/ORF must be informed prior to the change.
D. The Contractor shall comply with the quality control requirements for construction in accordance with the Contractor Quality Control Program and the contract.
E. The Contractor shall provide an overall project schedule detailing all major and minor features of work. The schedule shall be updated and submitted with each pay request.
II. SCOPE OF WORK
A. The Contractor shall provide all services necessary to perform the work detailed in the attached drawings.
B. As a minimum, the Contractor shall submit the following material for Government approval:
1. Control Devices
2. HVAC equipment and ductwork
3. Electrical raceway
4. Gas / Air / Vacuum Turrets
5. Sink and faucets
6. Safety Showers / Eyewash Stations
III. CLOSE-OUT REQUIREMENTS
A. In addition to standard requirements provided in the contract base specifications additional services are required for close-out and completion of this task order.
B. Fume Hood Set-up and Certification: Where chemical safety fume hoods are installed, the fume hood shall be tested and calibrated per the modified ASHRAE 110 test (1995) which includes NIH specification 230594. This testing will include flow visualization, face velocity measurement, and tracer gas contaminants. If the hood fails the initial ASHRAE 110 test, airflow will be adjusted by the contractor, and the contractor will retest until the hood is in compliance. The Contractor shall provide 5 working days notice for testing and set-up so the Project Officer can coordinate with the NIEHS Health and Safety Branch to witness the ASHRAE 110 certification. The acceptable face velocity range will be provided by the NIEHS Health and Safety Branch through the NIH/ORF Project Officer in advance of testing. Contractor shall provide a report detailing the results of the test per the ASHRAE 110 standard.
C. Metasys: The Contractor shall update the Metasys graphics/user views. The Contractor shall provide .pdf files of as-builts, along with hard copies to be inserted in hard bound as-built sets. The Contractor shall update the NIEHS master as-built set on the NIEHS ADX server.
D. New Equipment Data Worksheets: The Contractor shall complete the attached
New Equipment Data Worksheet whenever new equipment is installed. This data will be used to replace or add new equipment to real property equipment lists and schedule preventative maintenance tasks. In addition, the contractor shall return to the Project Officer any existing equipment identification tags found on existing equipment so the equipment can be revised on real property equipment lists. New equipment identification tags will be issued to the Contractor for placement on the new equipment. Equipment tag checks will become part of the Pre-Final Inspection.
E. Spare Parts Provisions: Spare parts and one interval of preventative maintenance parts and supplies shall be furnished by the Contractor for “non-standard” equipment.
The Project Officer and Contractor will agree upon the parts to be supplied during task order negotiations. The parts and supplies will be submitted at the Pre-Final Inspection.
F. Panelboard Circuit Directory: Modify panelboard circuit directory in accordance with NFPA 70, Article 408. Every circuit and circuit modification shall be legibly identified as to its clear, evident, and specific purpose or use. The identification shall include sufficient detail to allow each circuit to be distinguished from all others.
Spare positions that contain unused overcurrent devices or switches shall be described accordingly. The identification shall be included in a circuit directory that is located on the face or inside of the panel door in the case of a panelboard, and located at each switch or circuit breaker in a switchboard. No circuit shall be described in a manner that depends on transient conditions of occupancy.
a. On task orders where less than 10% of the total circuit space is affected, the existing panel schedule shall be updated for each affected circuit in accordance with referenced NFPA 70 requirements. The Contractor shall update the NIH electronic circuit directory template and re-type/print the existing circuit directory with an asterisk next to the description for all newly modified spaces/circuits. The hard copy format shall be in accordance with the FMB-NC standard (printed from the NIH electronic circuit directory template). A copy of the new circuit directory file and hard copy shall be submitted to the Contracting Officer’s Representative at or before the pre-final inspection.
G. Tags for Warranted Equipment: The tag for equipment shall be similar to the following. Exact format and size will be as approved by the Project Officer. The date the Contractor’s warranty expires (warranty expiration date) and the final manufacturer's warranty expiration dates will be determined as specified.
EQUIPMENT WARRANTY
CONTRACTOR FURNISHED EQUIPMENT
MFG ___________________ MODEL NO. ____________________________
SERIAL NO. _____________________________________________________
CONTRACT NO. _________________________________________________
CONTRACTOR NAME ____________________________________________
CONTRACTOR WARRANTY EXPIRES ______________________________
MFG WARRANTY(IES) EXPIRE ____________________________________
| I. GENERAL: |
| A. The Contractor will submit a preliminary construction schedule before completion of task order negotiations for acceptance by NIH. |
| B. The Contractor shall provide a submittal registry with the preliminary schedule detailing all items to be submitted for government review and acceptance. The submittal registry shall include submission dates coordinated with the preliminary cons... |
| C. The Contractor shall construct the project per the attached drawings. If the Contractor deviates from the attached construction drawings the change must be denoted and NIH/ORF must be informed prior to the change. |
| D. The Contractor shall comply with the quality control requirements for construction in accordance with the Contractor Quality Control Program and the contract. |
| E. The Contractor shall provide an overall project schedule detailing all major and minor features of work. The schedule shall be updated and submitted with each pay request. |
| II. SCOPE OF WORK |
| A. The Contractor shall provide all services necessary to perform the work detailed in the attached drawings. |
| B. As a minimum, the Contractor shall submit the following material for Government approval: |
| 1. Control Devices |
| 2. HVAC equipment and ductwork |
| 3. Electrical raceway |
| 4. Gas / Air / Vacuum Turrets |
| 5. Sink and faucets |
| 6. Safety Showers / Eyewash Stations |
| III. CLOSE-OUT REQUIREMENTS |
| A. In addition to standard requirements provided in the contract base specifications additional services are required for close-out and completion of this task order. |
| B. Fume Hood Set-up and Certification: Where chemical safety fume hoods are installed, the fume hood shall be tested and calibrated per the modified ASHRAE 110 test (1995) which includes NIH specification 230594. This testing will include flow visua... |
| C. Metasys: The Contractor shall update the Metasys graphics/user views. The Contractor shall provide .pdf files of as-builts, along with hard copies to be inserted in hard bound as-built sets. The Contractor shall update the NIEHS master as-built set... |
| D. New Equipment Data Worksheets: The Contractor shall complete the attached New Equipment Data Worksheet whenever new equipment is installed. This data will be used to replace or add new equipment to real property equipment lists and schedule preve... |
| E. Spare Parts Provisions: Spare parts and one interval of preventative maintenance parts and supplies shall be furnished by the Contractor for “non-standard” equipment. The Project Officer and Contractor will agree upon the parts to be supplied dur... |
| G. Tags for Warranted Equipment: The tag for equipment shall be similar to the following. Exact format and size will be as approved by the Project Officer. The date the Contractor’s warranty expires (warranty expiration date) and the final manufacture... |
| EQUIPMENT WARRANTY |
| CONTRACTOR FURNISHED EQUIPMENT |
| MFG ___________________ MODEL NO. ____________________________ |
| SERIAL NO. _____________________________________________________ |
| CONTRACT NO. _________________________________________________ |
| CONTRACTOR NAME ____________________________________________ |
| CONTRACTOR WARRANTY EXPIRES ______________________________ |
| MFG WARRANTY(IES) EXPIRE ____________________________________ |