NIH_As-Built_Drawing_LOP_for_Contractors.doc

DOC document 232 KB Posted

Attached to
Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
NIHOF2013536
Issued by
Department of Health and Human Services National Institutes of Health

About this file

NIH As-Built Drawing LOP for Contractors

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Attachment_L9_-_TOR_214-26_-_Task_Order_Pricing_Template_-_Revision_3.xlsx XLSX spreadsheet
TOR_00-13_-_Revised_Drawings_-_dated_02-10-14.pdf PDF
Section_H_-_Special_Contract_Requirements_-_Revision_1.pdf PDF
Section_G_-_Contract_Administration_Data_-_Revision_1.pdf PDF
Attachment_L7_-_TOR_214-20_-_Task_Order_Pricing_Template_-_Revision_3.xlsx XLSX spreadsheet
SF_30_-_NIHOF2013536_-_Amendment_0005.pdf PDF
Attachment_L5_-_TOR_13-00_-_Task_Order_Pricing_Template_-_Revision_3.xlsx XLSX spreadsheet
Attachment_L6__TOR_214-20__Statement_of_Work__Revision_3.pdf PDF
Specification_Section_01_33_00_-_Revision_1.pdf PDF
Amendment_0003.docx DOCX document
Attachment_L7_-_TOR_214-20_-_Task_Order_Pricing_Template_-_Revision_2.xlsx XLSX spreadsheet
MATOC_Pre-Proposal_Conference_Sign-in_Sheet.pdf PDF
Attachment_L8_-_TOR_214-26_-_Statement_of_Work_-_Revision_2.pdf PDF
Attachment_L7_-_TOR_214-20_-_Task_Order_Pricing_Template_-_Revision_1.xlsx XLSX spreadsheet
Attachment_L9_-_TOR_214-26_-_Task_Order_Pricing_Template_-_Revision_1.xlsx XLSX spreadsheet
SF_30_-_NIHOF2013536_-_Amendment_0002.pdf PDF
Amendment_0002.docx DOCX document
Attachment_L6_-_TOR_214-20_-_Statement_of_Work_-_Revision_2.pdf PDF
Attachment_L5_-_TOR_13-00_-_Task_Order_Pricing_Template_-_Revision_2.xlsx XLSX spreadsheet
Attachment_L8_-_TOR_214-26_-_Statement_of_Work_-_Revision_1.pdf PDF
Statement_of_Work_-_Revision_1_-_01-24-14.pdf PDF
Attachment_L7_-_TOR_214-20_-_Task_Order_Pricing_Template.xlsx XLSX spreadsheet
Attachment_L4_-_TOR_13-00_-_Statement_of_Work_-_Revision_1.pdf PDF
Section_E_-_Inspection_and_Acceptance_-_Revision_1.pdf PDF
SF_30_-_NIHOF2013536_-_Amendment_0001.pdf PDF
Attachment_L2_-_Past_Performance_Transmittal_Letter_-_Revision_1.docx DOCX document
Attachment_L5_-_TOR_13-00_-_Task_Order_Pricing_Template_-_Revision_1.xlsx XLSX spreadsheet
Attachment_L9_-_TOR_214-26_-_Task_Order_Pricing_Template.xlsx XLSX spreadsheet
Amendment_0001.docx DOCX document
New_Equipment_Submission_Worksheet_Template.xls XLS spreadsheet
Specification_Section_01_33_00.docx DOCX document
Specification_Section_01_35_26.docx DOCX document
Specification_Section_01_45_00.docx DOCX document
FMB-NC_Engineering_Guidelines_and_Material_Requirements--Revision_C.pdf PDF
Attachment_L3_Past_Performance_Questionnaire.pdf PDF
Wage_Determination--NC130093--Highway.pdf PDF
Wage_Determination--NC130080--Heavy.pdf PDF
Wage_Determination--NC130028--Building.pdf PDF
Wage_Determination--NC130019--Heavy_Dredging.pdf PDF
Attachment_L4_TOR_213-00--Statement_of_Work.pdf PDF
Attachment_L5_TOR_214-20--Statement_of_Work.pdf PDF
Safety_and_Health.pdf PDF
Attachment_L2_Past_Performance_Transmittal_Letter.pdf PDF
Attachment_L6_TOR_214-26--Statement_of_Work.pdf PDF
Task_Order_Pricing_Template.xlsx XLSX spreadsheet
SF_1442.pdf PDF
Solicitation_NIHOF2013536_-_RTP_MATOC.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Statement_of_Work--12-6-13.pdf PDF
Attachment_L1_Experience_Summary_Sheet.pdf PDF
Show all 50

Multiple Award Task Order Contract (MATOC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIH Master Electronic As-Built Drawing LOP

This NIH As-Built Drawing local operating procedure contains the steps that a contractor must perform when adding to or editing the master electronic drawings for the NIEHS facility located in Research Triangle Park, NC as a part of a project. A contractor must make these changes when a project affects architectural, mechanical, electrical, etc. aspects of the NIEHS facility so that the drawings stay up-to-date and changes from various projects are incorporated into a single master electronic drawing.

Step 1: Request Current Drawings- This step is appropriate when the contractor has made substantial progress in the project and is ready to integrate the project changes with the master electronic drawings. The master electronic files should be requested after the project as-built drawings are accepted by the PO. The contractor is to contact the Project Officer (PO) for the drawings. The contractor must specify which Building/Module/Floor location(s) they require for the changes and which project number/description the modifications are for. The contractor may not use drawings provided for design for this purpose, as the file has likely been updated.

Step 2: Receive Current Drawings-

The PO will reply to a request for current electronic drawings by emailing the files to the contractor. These electronic files have been standardized so that the number and property of AutoCAD layer names, layer colors, linetypes, and layer descriptions remain constant (Table 1). Once the PO sends a contractor a file, no other contractors will have access to that file until the modifications are complete and determined to be accurate.

Step 3: Make Modifications to Drawings-

The contractor can now edit the drawings to integrate the project changes. The contractor may only use the existing layers and may not delete any layers from the drawings. If a contractor has a question regarding which layer to put an item on, they must contact the PO. The contractor may not make any changes unrelated to the project specified in the request. The contactor may not use referenced files (xrefs).

Step 4: Send Drawings to Project Officer-

The contractor can now send the electronic drawings to the PO through email (or CD based on PO’s preference). The contractor should include which Building/Module/Floor location(s) they are attaching and the project number/description the files are for.

Step 5: Project Officer Will Review Drawings-

The PO will now review the drawings for accuracy. The PO will reject the files if they find any errors, omissions, or standardization changes. The contractor will then need to address or make changes for any inaccuracies.

Step 6: Project Officer Will Accept Drawings- The PO will notify the contractor once the electronic submissions are acceptable.

Table 1. Standardized Layers, Colors, and Linetypes

Layer Name/ Description
Color
Linetype
00001_ELEVATIONS_DIVISIBLE_BY_1
10
continuous
00002_ELEVATIONS_DIVISIBLE_BY_2
50
continuous
00005_ELEVATIONS_DIVISIBLE_BY_5
20
continuous
00010_ELEVATIONS_DIVISIBLE_BY_10
60
continuous
01050_SURVEY_GRID
white
continuous
01051_PROPERTY_LINE
10
continuous
01052_TRACT
50
continuous
01053_EASEMENT
20
continuous
01190_ENVIRONMENTAL
70
continuous
02276_RETAINING_WALL
20
continuous
02280_SOIL_BORING
60
continuous
02300_EARTHWORK
30
continuous
02463_WOOD_PILES
70
continuous
02516_PARKING_LOT
40
continuous
02531_SANITARY_SEWER_PIPING
80
continuous
02555_GAS_DISTRIBUTION_SYSTEMS
200
continuous
02582_MEDIUM_VOLTAGE_UNDERGROUND_POWER_DISTRIBUTION
230
continuous
02585_WOOD_UTILITY_POLES
190
continuous
02610_PIPE_CULVERTS
220
continuous
02635_STORM_SEWERAGE
180
continuous
02640_MANHOLES_COVERS
130
continuous
02645_FIRE_HYDRANT
170
continuous
02741_PAVING
90
continuous
02770_PONDS_RESERVOIRS
150
continuous
02810_IRRIGATION_SYSTEM
110
continuous
02825_CHAIN_LINK_FENCES_AND_GATES
140
continuous
02880_MONUMENT
120
continuous
02920_LANDSCAPING
210
continuous
03011_GRAVEL
10
continuous
03012_SAND
50
continuous
03100_SIDEWALK
20
continuous
03200_WIRE_MESH_RE-BAR
60
continuous
03300_CAST-IN-PLACE_CONCRETE
30
continuous
03413_PRECAST_CONCRETE
70
continuous
03601_CATALYZED_METALLIC_GROUT
200
continuous
03650_FOUNDATION
230
continuous
04200_BRICK_MASONRY
190
continuous
04225_CONCRETE_MASONRY_UNITS
220
continuous
04400_STONE
180
continuous
05090_WELDING_STRUCTURAL
130
continuous
05096_WELDING_ALUMINUM_CONSTRUCTION
170
continuous
05120_STRUCTURAL_STEEL
90
continuous
05210_STEEL_JOISTS
160
continuous
05310_STEEL_DECKS
100
continuous
05400_COLD_FORMED_METAL_FRAMING
150
continuous
05500_METAL_FABRICATIONS
110
continuous
05510_METAL_STAIRS
140
continuous
05520_HANDRAILS_AND_RAILINGS
120
continuous
05700_ORNAMENTAL_METAL
210
continuous
06060_FIBERBOARD
10
continuous
06100_CARPENTRY
50
continuous
06182_STRUCTURAL_GLUE-LAMINATED_TIMBER
20
continuous
06190_PRE-FAB_JOIST_TRUSS
60
continuous
06400_CABINETS
30
continuous
07100_DAMPPROOFING_AND_WATERPROOFING
70
continuous
07220_INSULATION
40
continuous
07400_SHINGLES_ROOFING_AND_SIDING_PANELS
80
continuous
07420_EXTERIOR_WALL
240
continuous
07467_STEEL_SIDING
200
continuous
07500_MEMBRANE_ROOFING
230
continuous
07511_ASPHALT_BUILT-UP_ROOFING
190
continuous
07530_EPDM_ROOF_MEMBRANE
220
continuous
07550_MODIFIED_BITUMINOUS_MEMBRANE_ROOFING
180
continuous
07600_FLASHING_AND_SHEET_METAL
130
continuous
07800_FIRE_AND_SMOKE_PROTECTION_MATERIAL
170
continuous
07920_JOINT_SEALANTS
90
continuous
08110_DOORS_AND_FRAMES
160
continuous
08510_WINDOWS
50
continuous
08600_SKYLIGHTS
60
continuous
08805_GLASS_AND_GLAZING
70
continuous
08900_GLAZED_CURTAIN_WALLS
80
continuous
09130_CEILING
240
continuous
09200_INTERIOR_WALL
200
continuous
09210_GYPSUM_PLASTER
230
continuous
09212_FIREPROOFING_PLASTER
190
continuous
09310_CERAMIC_TILE_QUARRY_TILE_AND_PAVER_TILE
180
continuous
09330_QUARRY_TILE
130
continuous
09510_ACOUSTICAL_CEILINGS
170
continuous
09630_STONE_AND_BRICK_FLOORING
90
continuous
09650_RESILIENT_FLOORING
160
continuous
09675_HEAVY_DUTY_EPOXY_FLOORING
100
continuous
09680_CARPET
150
continuous
09720_WALL_COVERINGS
110
continuous
09920_ARCHITECTURAL_PAINTING
140
continuous
09960_HIGH-PERFORMANCE_COATINGS
120
continuous
09970_COATINGS_FOR_STEEL
210
continuous
10100_VISUAL_DISPLAY_BOARDS
10
continuous
10160_TOILET_COMPARTMENTS
50
continuous
10275_ELEVATED_FLOOR_SYSTEM
60
continuous
10350_FLAGPOLES
30
continuous
10500_LOCKERS
70
continuous
10523_FIRE_EXTINGUISHERS_AND_HOSES
40
continuous
10600_PARTITIONS
80
continuous
10800_TOILET_BATH_AND_LAUNDRY_ACCESSORIES
190
continuous
11025_FIRE_INSULATED_RECORD_VAULT_DOORS
220
continuous
11120_VENDING_EQUIPMENT
180
continuous
11161_DOCK_LEVELERS
130
continuous
11400_FOOD_SERVICE_EQ
170
continuous
11600_LABORATORY_EQ
90
continuous
12303_STEEL_AND_WOOD_CASEWORK
210
continuous
12485_ENTRANCE_AND_FLOOR_MATS
100
continuous
12490_WINDOW_TREATMENT
150
continuous
12495_HORIZONTAL_LOUVER_BLINDS
110
continuous
12600_FURNITURE
140
continuous
13100_LIGHTNING_PROTECTION_SYSTEMS
120
continuous
13110_CATHODIC_PROTECTION
210
continuous
13121_PRE-ENGINEERED_BUILDINGS
50
continuous
13210_ELEVATED_STEEL_WATER_TANK
20
continuous
13215_FIBERGLASS-REINFORCED_POLYESTER_STORAGE_TANK
60
continuous
13412_INSTRUMENTATION
30
continuous
13701_VIDEO_SURVEILLANCE
70
continuous
13704_SECURITY_ACCESS_SYSTEM
40
continuous
13803_PROGRAMMABLE_CONTROLLERS
80
continuous
13852_FIRE-ALARM_SYSTEMS
240
continuous
13854_GAS_DETECTION_SYSTEMS
200
continuous
13930_FIRE_SPRINKLER_SYSTEMS
230
continuous
13930_FIRE_SPRINKLER_SYSTEMS_INTERSTITIAL
230
continuous
13960_CARBON_DIOXIDE_EXTINGUISHING_SYSTEMS
220
continuous
14210_ELEVATORS
130
continuous
14600_HOISTS_AND_CRANES
90
continuous
15003_GENERAL_MECHANICAL_PROVISIONS
100
continuous
15050_BASIC_MECHANICAL_MATERIALS_AND_METHODS
150
continuous
15055_WELDING_MECHANICAL
110
continuous
15072_VIBRATION_ISOLATION_FOR_AIR_CONDITIONING_EQUIPMENT
140
continuous
15083_DUCT_INSULATION
120
continuous
15085_PIPING_INSULATION
210
continuous
15102_PLUMBING
10
continuous
15106_FERROUS_PIPE_AND_FITTINGS
50
continuous
15107_PLASTIC_PIPE_AND_FITTINGS
20
continuous
15108_STAINLESS_STEEL_PIPE_AND_FITTINGS
60
continuous
15110_VALVES
30
continuous
15119_SELF-CONTAINED_CONTROL_AND_RELIEF_VALVES
70
continuous
15120_PIPING_SPECIALTIES
40
continuous
15125_STEAM_TRAPS
80
continuous
15126_STEAM_PIPING_5LBS
240
continuous
15126_STEAM_PIPING_20LBS
200
continuous
15126_STEAM_PIPING_60LBS
230
continuous
15130_STEAM_SUPPLY
30
ST-S
15130_STEAM_RETURN
30
ST-R
15131_STEAM_SUCTION
50
continuous
15135_PUMPS
190
continuous
15145_DEMIN_WATER
100
continuous
15146_FEED_WATER
80
continuous
15181_CONDENSER_WATER_PIPING
220
continuous
15183_CHILLED_WATER_PIPING_SUPPLY
180
CHWS
15183_CHILLED_WATER_PIPING_RETURN
180
CHWR
15185_REFRIGERATION_PIPING_AND_SPECIALTIES
170
continuous
15186_CONDENSATE_PUMPS
90
continuous
15187_CONDENSATE_DRAIN
220
continuous
15187_CONDENSATE_RETURN
150
continuous
15187_PUMPED_CONDENSATE
20
continuous
15187_CONDENSATE
130
continuous
15187_HUMIDIFIED_STEAM
10
continuous
15187_STEAM_VENT
90
continuous
15189_CHEMICAL_WATER_TREATMENT
160
continuous
15195_NATURAL_GAS_SYSTEMS
100
continuous
15211_LOW-PRESSURE_COMPRESSED_AIR_SYSTEMS
110
continuous
15212_HIGH-PRESSURE_COMPRESSED_AIR_SYSTEMS
140
continuous
15214_LABORATORY_GAS_CO2
120
CO2
15214_LABORATORY_GAS_N2
210
N2
15214_LABORATORY_GAS_Ar
190
Ar
15214_LABORATORY_GAS_O2
10
O2
15216_GLYCOL_SUPPLY
160
GLY-S
15216_GLYCOL_RETURN
160
GLY-R
15218_VACUUM_SYSTEMS
50
continuous
15225_CHEMICAL-WASTE_DRAINAGE_SYSTEMS
20
continuous
15240_MEDICAL_GAS
140
continuous
15250_LABORATORY_AIR
180
continuous
15310_GLASS_DISTILLED_WATER
210
continuous
15320_TIN_DISTILLED_WATER
10
continuous
15350_FILTERED_WATER_SUPPLY
90
FILW-S
15350_FILTERED_WATER_RETURN
90
FILW-R
15410_PLUMBING_FIXTURES
60
continuous
15444_SAFETY_SHOWER_AND_EYEWASH_STA
30
continuous
15445_SUMP_PUMPS_AND_SUMP_BASINS
70
continuous
15455_DRINKING_FOUNTAIN_WATER_COOLER
40
continuous
15491_FUEL_OIL
80
continuous
15492_FUEL_GAS
240
continuous
15494_FUEL_LIQUID
200
continuous
15510_BOILERS
230
continuous
15520_COLD_WATER_DOMESTIC_RETURN
30
CWDR
15520_COLD_WATER_DOMESTIC_SUPPLY
30
CWDS
15520_COLD_WATER_LAB_SUPPLY
150
CWS-LAB
15550_HIGH_TEMP_HOT_WATER_RETURN
70
HTHWR
15550_HIGH_TEMP_HOT_WATER_SUPPLY
70
HTHWS
15560_HOT_WATER_DOMESTIC_SUPPLY
180
HWD
15560_HOT_WATER_180_SUPPLY
20
HWS-180
15560_HOT_WATER_180_RETURN
20
HWR-180
15560_HOT_WATER_SUPPLY
160
HWS
15560_HOT_WATER_RETURN
160
HWR
15560_HOT_WATER_LAB_SUPPLY
100
HWS-LAB
15560_HOT_WATER_LAB_RETURN
100
HWR-LAB
15560_HOT_WATER_PREHEAT_SUPPLY
40
HWS-PH
15560_HOT_WATER_PREHEAT_RETURN
40
HWR-PH
15560_HOT_WATER_REHEAT_SUPPLY
240
HWS-HEAT
15560_HOT_WATER_REHEAT_RETURN
240
HWR-HEAT
15560_HOT_WATER_RAD_SUPPLY
130
HWS-RAD
15560_HOT_WATER_RAD_RETURN
130
HWR-RAD
15570_SOFTENER_WATER
50
continuous
15580_WASTE
90
WASTE
15610_REFRIGERATION_COMPRESSORS
180
continuous
15625_CHILLED_WATER_AIR_CONDITIONING
130
continuous
15626_WATER_CHILLERS
170
continuous
15675_AIR-COOLED_CONDENSERS
160
continuous
15700_HEATING_VENTILATION_AIR_CONDITIONING_SYSTEMS
100
continuous
15720_AIR_HANDLING_UNITS
150
continuous
15725_AIR_HANDLING
110
continuous
15736_AIR_CONDITIONING_UNITS
120
continuous
15740_HEAT_PUMPS
210
continuous
15762_AIR_COILS
10
continuous
15764_FAN-COIL_UNITS
50
continuous
15765_FAN-COIL_PIPING_SUPPLY
60
FCS
15765_FAN-COIL_PIPING_RETURN
60
FCR
15766_UNIT_HEATERS
30
continuous
15767_ELECTRIC_RESISTANCE_HEATING
70
continuous
15768_DUCT_HEATERS
40
continuous
15815_LOW_PRESSURE_DUCTWORK
80
continuous
15818_FLEX_DUCTWORK
240
continuous
15830_FANS
200
continuous
15835_CONVECTORS_RADIATORS
230
continuous
15840_AIR_TERMINAL_UNITS
220
continuous
15852_DIFFUSERS
180
continuous
15855_VENTS
130
continuous
15865_FILTERS
170
continuous
15877_FUME_EXHAUST_EQUIPMENT
90
continuous
15885_AIR_CLEANING_EQUIPMENT
160
continuous
15902_CONTROL_SYSTEMS
100
continuous
15942_REGISTERS_GRILLES
110
continuous
15950_MECH_CONTROLS_INSTRUMENTATION_TESTING_&_ADJUSTING_THERMOSTATS
140
continuous
16003_GENERAL_ELECTRICAL_PROVISIONS
120
continuous
16050_BASIC_ELECTRICAL_MATERIALS_AND_METHODS
210
continuous
16065_SECONDARY_GROUNDING
10
continuous
16121_FIBER_OPTIC_CABLE_AND_OUTLETS
50
continuous
16124_MEDIUM_VOLTAGE_CABLE
20
continuous
16130_RACEWAYS_CONDUITS
60
continuous
16135_CABLE_TRAYS
30
continuous
16145_STANDARD_WIRING_SYSTEMS
70
continuous
16200_POWER_GENERATOR
40
continuous
16225_MOTORS
80
continuous
16275_TRANSFORMERS
240
continuous
16288_SURGE_ARRESTERS
220
continuous
16305_OVERHEAD_MEDIUM-VOLTAGE_WIRING
180
continuous
16315_MEDIUM_VOLTAGE_OVERHEAD_POWER_DISTRIBUTION
130
continuous
16325_LOAD-BREAK_SWITCHES_&_DISCONNECT_SWITCHES
170
continuous
16345_MOTOR_CONTROL
100
continuous
16365_PRIMARY_UNIT_SUBSTATION
150
continuous
16366_SECONDARY_UNIT_SUBSTATION
110
continuous
16390_GROUNDING_DEVICES
140
continuous
16425_VARIABLE_FREQUENCY_CONTROLLERS
120
continuous
16435_AUTOMATIC_TRANSFER_SWITCHES
210
continuous
16445_SWITCHGEAR_ASSEMBLIES
10
continuous
16446_PANELBOARDS_CONTROL_PANELS_ELEC_PANELS_CIRCUIT_BREAKERS
50
continuous
16495_MEDIUM_VOLTAGE_FUSES
20
continuous
16511_LIGHTS
60
continuous
16512_HIGH_INTENSITY_DISCHARGE_(HID)_LUMINAIRES
30
continuous
16522_FLOOD_LIGHTING
40
continuous
16524_ROADWAY_LIGHTING
80
continuous
16529_PHOTO_CONTROL_DEVICES
240
continuous
16535_EMERGENCY_LIGHTING
200
continuous
16536_EXIT_LIGHTING
230
continuous
16700_COMMUNICATION_AND_COMMUNICATION_OUTLETS
190
continuous
16720_COMPUTER
220
continuous
16720_ALARM_DETECTION_SYSTEM
180
continuous
16821_PUBLIC_ADDRESS_AND_MUSIC_EQUIPMENT
130
continuous
20000_NORTH_ARROW_AND_DRAWING_SCALE
255
continuous
20200_PHANTOM_LINE
255
continuous
20500_LEADERS_AND_LEADER_TEXT
255
continuous
20700_MISCELLANEOUS
255
continuous
20710_GRID
255
continuous
0
white
continuous
Defpoints
white
continuous
GROS
magenta
continuous
GROS$
red
continuous
GROS$TXT
red
continuous
RM
cyan
continuous
RM$
blue
continuous
RM$TXT
blue
continuous
FN
green
continuous
FN-FREE
red
continuous
EQ
140
continuous
EQ_TEXT
white
continuous

File details come from the government source that posted it. Updated .