This Government Pre-Award Inquiry Form is for Naval Facilities Engineering Systems Command (NAVFAC) Jacksonville Base Operating Support (BOS) contract N6945026R0007, a small business set-aside solicitation for comprehensive facility maintenance and support services at Naval Air Station Jacksonville. The contract has a one-year base period with seven one-year option periods, estimated to start on January 1, 2027, with a total potential duration of eight years. The solicitation covers maintenance and support across multiple functional areas including facility investment, utilities management, electrical systems, wastewater, environmental services, and base support vehicle and equipment maintenance.
Key procurement details include a proposal due date of January 27, 2026, with a 90-day transition period, and an estimated contract value covering recurring and non-recurring work. The government will use a tradeoff source selection approach with technical factors rated as Outstanding, Good, Acceptable, Marginal, or Unacceptable. The contract will require comprehensive asset management, preventive and corrective maintenance, work order management, and compliance with various environmental and operational standards. Offerors must submit detailed technical and management approach volumes, including organizational charts, workforce plans, phase-in strategies, and past performance documentation demonstrating capability to manage complex, multi-discipline facility support services.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945026R0007 Jacksonville BOS
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.
1 11/13/2025
BLUF: we are requesting that the PP requirement for the SB prime to use a SB subcontractor be removed, and replaced with "subcontractor" only, removing the distinction that the Sub be a
SB.
Over the years, having followed several NAVFAC procurements in NAICS 561210, we have been stopped short of responding to the RFP with our SB prime because the RFP dictates that first-tier subcontractors be SB.
Lastly, something critical in NAVFAC RFPs we see is the annual contract value threshold for past performance consideration. For this RFP it is $12M.
The question we always consider is what if a firm had $11M?
Would they be any less qualified if they met the size, scope and complexity requirements? One suggestion we have seen from other agencies is to simply edit your PP template to require contractors to show what they have done, PER ANNEX, on each PP reference. It seems logical (from our perspective) to see if someone is qualified if they detail the scope from another contract, to demonstrate compliance to your requirement(s).
The non-price/technical factors included in the solicitation do not require that first-tier subcontractors be small businesses, nor do they prevent the use of large subcontractors. The Corporate Experience and Past Performance Factors are written to comply with the following Small Business Administration regulations, which apply when a Small Business Prime Contractor is unable to meet the experience and/or past performance requirements of the RFP on its own:
13 C.F.R. 125.2(g), says: "When an offer of a small business prime contractor includes a proposed team of small business subcontractors and specifically identifies the first-tier subcontractor(s) in the proposal, the head of the agency must consider the capabilities, past performance, and experience of each first tier subcontractor that is part of the team as the capabilities, past performance, and experience of the small business prime contractor if the capabilities, past performance, and experience of the small business prime does not independently demonstrate capabilities and past performance necessary for award."
13 C.F.R. 125.11(c)(4), says: "Evaluation. When evaluating the past performance of a small business concern that elected to use a rating for its offer on a prime contract, a contracting officer shall consider the concern's experience and rating of past performance as a first-tier subcontractor. This includes where the small business concern lacks a past performance rating as a prime contractor in the Contractor Performance Assessment Reporting System (CPARS), or successor system used by the Federal Government to monitor or rate contractor past performance."
Please note, as a small business set-aside and a services contract (NAICS 561210), there are certain limitations on subcontracting dictated by the clause at FAR 52.219-14 (DEV 2021-O0008), included in the solicitation (see the clause for the full text).
In regards to the relevancy size requirement, the factor will remain unchanged. The Agency has taken into consideration the estimated annual value of the recurring work for the solicitation, the minimum annual dollar value used in the prior solicitation, as well as the complexity and magnitude of the procurement in order to establish the minimum size required to ensure successful performance without unduly restricting competition.
2 11/13/2025
In the RFP, the PP req states in (1) Factor 1, Corporate Experience: (a) Solicitation Submittal Requirements: ... An offeror may rely on the prime contractor experience of the first-tier small business subcontractor(s) to demonstrate experience if the experience of the small business prime does not independently demonstrate the capabilities necessary for award, provided the offeror submits the following: (i) Specifically identify the proposed team of first-tier small business subcontractor(s) (ii) Teaming agreement/Letter of commitment.
We have seen this PP model exclusively with NAVFAC in the past. We are trying to understand how, or why, in a SB set aside contract, the SB prime has to use a SB subcontractor. We are not aware of any FAR regulations or other federal agency which dictates who a prime must use as their subcontractor, when the focus is on ensuring the prime meets the limitations on subcontracting to be complaint as a SB themselves.
See Response to GPI #1
3 11/17/2025 46 L L.2 Proposals are due via paper copy (with CDs).
Will you consider allowing electronic proposal submission?
The requirement for hard copies and CDs remains unchanged.
Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
4 11/17/2025 50 L L.12, b, 2, h
L.12, b, 2, h states: "With the exception of the price narrative, there is no page limitation on the pricing proposal."
There is no other mention of a Price Narrative. Please provide details on page limitation and content of price narrative.
There is no price narrative. This has been corrected via Amendment 0003. The price proposal maintains no page limitation. 0003
5 12/2/2025 51 RFP, Section L L.12.b.3.h
Please confirm that offerors may include a title page, table of contents, list of figures, and glossary of abbreviations and acronyms that will not count against the non-price volume page limit.
Offerors may include a title page, table of contents, list of figures, and glossary of abbreviations and acronyms; however, it is not required. As stated in the RFP, for the Non-Price Proposal Binder, only blank tab dividers, Past Performance Questionnaires, and Contractor Performance Assessment Reports will not count toward the page limitation.
6 12/2/2025 51 RFP, Section L L.12.b.3.e Would the Government also allow use of colored font in graphics?
No. As stated in the RFP, colored font may be used for headers/footers, section headings, and subheadings only; all other text will be black.
7 12/2/2025 50 RFP, Section L L.12.b.2.h
The instructions state, "With the exception of the price narrative, there is no page limitation on the pricing proposal."
Would the Government please clarify whether a price narrative is required, what topics are to be addressed, and what the applicable page limit is?
See GPI Response #4.
8 12/2/2025 50 RFP, Section L L.12.b.2.b
The instructions state, "Submit all Price factor requirements."
Please confirm that the only price factor requirements are a completed Section B and Section J Attachment J-0200000-09 Exhibit Line Item Numbers.
Correct. As stated in the RFP, the Price factor solicitation submittal requirements include a completed Section B; completed Section J ELINs Pricing Attachment; and both Section B and Section J ELINs in hard copy and electronic format on CD-ROM.
9 12/2/2025 60-61 RFP, Section M M.4.3.b.1.a
In the non-price volume, Factor 1 - Corporate Experience, offerors are instructed to include "Teaming Agreement/Letter of commitment" as applicable for corporate affiliates and first-tier small business subcontractor(s).
Would the Government please exempt these Teaming Agreement(s)/Letter(s) of Commitment from the non-price volume page limitations? Teaming Agreements in particular may be 20 or more pages in length.
No, Teaming Agreements/Letters of Commitment are not exempt from the non-price page proposal limitation.
As a reminder, copies of joint venture or partnership agreements and letters of commitment, as applicable, are to be submitted in the Responsibility Determination Binder, as stated in Section L.12(b)(1)(h). There is no page limitation on the responsibility determination submission.
10 12/2/2025 60-61 RFP, Section M M.4.3.b.1.a Would the Government please confirm that the requirement to provide a Teaming Agreement/Letter of Commitment does not apply to first-tier large business subcontractors?
Factor 1 only requires the submission of a Teaming Agreement/letter of commitment if the offeror proposes to rely on the prime contractor experience of corporate affiliates or first-tier small business subcontractors.
However, the Responsibility Determination Binder requires signed letters of commitment from significant subcontractors (subcontracts exceeding 10% of the total contract value).
11 12/2/2025 63 RFP, Section M M.4.3.b.3.a.i
In the non-price volume, Factor 3 - Technical Approach, offerors are to complete and provide an MS Excel version of the Attachment JL-1 (Labor Hours spreadsheet).
Please confirm that the JL-1 is also to be included as part of the non-price volume in the printed hard copies.
Yes, Attachment JL-1 is also to be included as part of the non-price volume in the printed hard copies.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
12 12/2/2025 63 RFP, Section M M.4.3.b.3.a.i
In the non-price volume, Factor 3 - Technical Approach, offerors are to complete and provide an MS Excel version of the Attachment JL-1 (Labor Hours spreadsheet).
Please confirm that the completed Attachment JL-1 is exempt from the non-price volume page limit.
No, it is not exempt. As stated in the RFP, for the Non-Price Proposal Binder, only blank tab dividers, Past Performance Questionnaires, and Contractor Performance Assessment Reports will not count toward the page limitation.
13 12/2/2025 63 RFP, Section M M.4.3.b.3.a.i
In the non-price volume, Factor 3 - Technical Approach, offerors are to provide a rationale for Basis of Estimate (BOE) for each specification item listed in the Section J Attachment JL-1.
Would the Government please consider making the BOE rationale exempt from the non-price volume page limit?
The BOE rationale is not exempt from the non-price proposal page limitation. As stated in the RFP, for the Non-Price Proposal Binder, only blank tab dividers, Past Performance Questionnaires, and Contractor Performance Assessment Reports will not count toward the page limitation.
In addition, the non-price proposal page limitation has been revised to 150 pages via Amendment 0003.
14 12/2/2025 51;
69-70 RFP, Section M L.12.b.3.h;
M.4.3.b.5.a.iii
In the non-price volume, Factor 5 - Past Performance, the instructions state that CPARS and PPQs will not count towards the page limitation.
The Factor 5 submission instructions also allow offerors to provide information regarding experience performed as a first-tier small business subcontractor on a prime contract.
Please confirm that this information is also exempt from the non-price volume page limit.
Past performance information regarding experience performed as a first-tier small business subcontractor is not exempt from the non-price proposal page limitation.
15 12/2/2025 70 RFP, Section M M.4.3.b.5.b
For Factor 4, Past Performance, the basis of evaluation references "performance recognition documents."
Would the Government please clarify whether these documents are requested with the offeror's proposal. If yes, please confirm that these documents are exempt from the volume page limit.
Amendment 0003 has removed performance recognition documents. Only completed CPARS evaluations and PPQs are requested; however, an offeror may elect to submit performance recognition documents at their discretion. If choosing so, these documents are not exempt from the non-price proposal page limitation.
16 12/2/2025 70 RFP, Section M M.4.3.b.5.b
For Factor 4, Past Performance, the basis of evaluation includes a reference to evaluating "how well the offeror performed on the recent, relevant projects submitted under Factor 1, Corporate Experience, and on other recent, relevant contracts submitted under Factor 4, Past Performance."
Please clarify whether Factor 4 is to be limited to the projects submitted under Factor 1, Corporate Experience or whether offerors can include additional contracts in Factor 4, Corporate Experience.
Factor 4 is not only limited to the projects submitted under Factor 1.
17 12/2/2025 63, 65 RFP, Section M M.4.3.b.3.a.ii.2;
M.4.3.b.3.a.iii.2
In the non-price volume, Factor 3 - Technical Approach requires offerors to provide an approach to perform E/U/R work orders in both M.4.3.b.3.a.ii.2 and M.4.3.b.3.a.iii.2.
Would the Government clarify as this appears to be a duplicate instruction?
Yes, it is duplicative. See Amendment 0003 for updated Factor 3. 0003
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
18 12/2/2025 66 RFP, Section M M.4.3.b.3.b.vi
In the non-price volume, Factor 3 - Technical Approach, Basis of Evaluation includes a paragraph that states, "Demonstrates a methodology that ensures Annex 1700000 vehicles are maintained and repaired within the allowable downtime standard.
Methodology demonstrates an understanding of the maintenance and repair requirements and the Transportation limits of liabilities identified in Section C. Offerors who demonstrate an innovative approach to ensure repairs to transportation equipment are accomplished to minimize down time inclusive of "waiting for parts" may be evaluated more favorably."
This requirement appears only in the basis of evaluation, and not the solicitation submittal requirements. Would the Government please address and clarify whether this topic should be added to the submittal requirements OR removed from the basis of evaluation?
As stated in Factor 3, Technical Approach (a)(ii) the offeror is to describe the methodology to be implemented to accomplish the requirements in each annex and sub-annex and detail how the proposed approach will effectively achieve each performance objective and standard across all annexes and sub-annexes.
The JBOS Annex 17, BSVE, should be addressed as part of this Submittal Requirement.
The subject basis of evaluation is applicable and will not be removed.
19 12/2/2025 65 RFP, Section M M.4.3.b.3.b.ii
In the non-price volume, Factor 3 - Technical Approach, Basis of Evaluation includes a paragraph that states, "The methodology demonstrates a state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that ensures systems are maintained fully functional in accordance with design parameters and OEM specifications."
This requirement appears only in the basis of evaluation, and not the solicitation submittal requirements. Would the Government please address and clarify whether this topic should be added to the submittal requirements OR removed from the basis of evaluation?
This sentence in the basis of evaluation has been removed via Amendment 0003. 0003
20 12/2/2025 66 RFP, Section M M.4.3.b.3.b.iv
In the non-price volume, Factor 3 - Technical Approach, Basis of Evaluation includes a paragraph that states, "The offeror's methodology clearly demonstrates an effective and efficient approach that ensures electrical power distribution and quality water production is available at all times; to include water treatment and laboratory testing. Methodology must ensure that all performance objectives and standards are met and ensures safe, quality electrical and water is provided to NAS Jacksonville."
This requirement appears only in the basis of evaluation, and not the solicitation submittal requirements. Would the Government please address and clarify whether this topic should be added to the submittal requirements OR removed from the basis of evaluation?
As stated in Factor 3, Technical Approach (a)(ii) the offeror is to describe the methodology to be implemented to accomplish the requirements in each annex and sub-annex and detail how the proposed approach will effectively achieve each performance objective and standard across all annexes and sub-annexes.
The JBOS Utility Sub-annexes (1601000 Utilities Management, 1602000 Electrical, 1604000 Wastewater, 1605000 Steam, 1606000 Water, 1608000 Compressed Air) should be addressed as part of this Submittal Requirement.
The subject basis of evaluation is applicable and will not be removed.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
21 12/2/2025 51 RFP, Section L L.12.b.3.e
The instructions state, "NOTE: Margins in forms and attachments provided by the Government are exempt from the margin size requirement and shall be submitted in the format provided."
In reference to the JM-1 Corporate Experience form, please confirm that offerors are to maintain the table width of 7.13 inches, even though that exceeds the 1 inch margins required for the non-price volume.
Correct. Please use the provided attachments as is.
22 12/2/2025 51 RFP, Section L L.12.b.3.f
The instructions for the non-price volume state, "Foldouts are permitted only for the organization charts and Gantt charts for phase-in/out schedules. Foldouts are limited to 11 by 17 inch white paper that must be folded to fit within the binder, with printing on one side only. 11 by 17 foldouts are considered one page;"
Would the Government also allow the Attachment JL-1 Staffing Levels to be submitted using 11 by 17 inch paper and to be considered as one page?
No.
23 12/2/2025 62 RFP, Section M M.4.3.b.2.a
The submittal requirements state, "For organizational purposes, address the requested information in the following format limiting the Factor 2 submission to a maximum of 20 pages."
Please clarify whether these 20 pages are included in OR separate from the non-price proposal volume page limitation of 100 pages.
The page limitation for the non-price proposal binder has been updated to 150 pages via Amendment 0003. 0003
24 12/2/2025 62 RFP, Section M M.4.3.b.2.a
The submittal requirements state, "For organizational purposes, address the requested information in the following format limiting the Factor 2 submission to a maximum of 20 pages."
Would the Government please consider increasing the page limit for Factor 2 to 50 pages in order to allow sufficient page count to address the requested information in sufficient detail?
The page limitation for the Factor 2 submission remains a maximum of 20 pages.
25 12/2/2025 62 RFP, Section M M.4.3.b.1.b
The Basis of Evaluation for Factor 1 Corporate Experience states, "For multiple award contracts (MACs) or indefinite delivery/indefinite quantity (IDIQ) contracts, the specific relevant task order, not the entire MAC or IDIQ contract, will be considered a project for evaluation purposes."
Please confirm that a single C-type contract that utilizes task orders for recurring core contract work by option year and over-and-above projects can be submitted as a single contract reference.
A task order cannot be issued against a C-type contract.
For contracts structured similar to NAVFAC BOS/FSC Contracts (facility support indefinite quantity), which contain recurring requirements on the D-type contract itself, the entire contract will be considered a project for evaluation purposes.
26 12/2/2025 69 RFP, Section M M.4.3.b.5.a.i
Please confirm that offerors are to submit with the proposal the ONE most recent completed CPARS evaluation for each project, rather than ALL CPARS from all periods of performance that are available for that project.
All completed CPARs evaluations should be submitted with the proposal.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
27 12/2/2025 60-61
RFP, Section M and JL- 8_N6945026R00 07_GPI+Respons es_0001
M.4.3.b.1
The submittal instructions appear to limit corporate experience and past performance references from subcontractors to "first-tier small business subcontractor(s)." The Amendment 0001 GPI Response #1 state that this was not the Government's intention, stating "The non-price/technical factors included in the solicitation do not require that first-tier subcontractors be small businesses, nor do they prevent the use of large subcontractors."
Would the Government consider revising Section M to clarify this point, specifically by changing the references to "first-tier small business subcontractor(s)" to state "first-tier large or small business subcontractors"?
This will clearly allow offerors to demonstrate the capabilities brought to the team by their large business subcontractors.
No. This is a small business set-aside. Refer to GPI Response #1. The non-price/technical factors included in the solicitation do not require that first-tier subcontractors be small businesses, nor do they prevent the use of large subcontractors.
The Small Business Administration regulations do not allow the use of/reliance on large business subcontractor experience when a Small Business Prime Contractor is unable to meet the experience and/or past performance requirements of the RFP on its own.
28 12/2/2025 10 C-0200000 2.2.1.1 The Observed Federal Holidays are listed as 12 total, including National Independence Day and Independence Day. Please describe the difference between the two.
The holidays in reference are Juneteenth National Independence Day & Independence Day, which are two separate holidays. For further information, see the list of holidays identified in Section C Annex 0200000 Spec Item 2.2.1.1. Also, the federal holidays listed in the Service-Contract, CBA, and the OPM website.
29 12/2/2025 13 C-0200000 2.4
The Spec Item states "The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the Government.
Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall generate work orders in NAVFAC Maximo per Spec Item 2.6.8 for all servicing, maintenance, and repair activities performed on Government- Furnished Items."
If maintenance of GFI is "at no additional cost to the Government," does that mean all costs of labor and materials to perform such maintenance should not be captured in NAVFAC Maximo? Please clarify what data should be captured in NAVFAC Maximo for GFI maintenance.
No, GFI data does not need to be captured in NAVFAC Maximo. Spec Item 2.4 Government-Furnished Items updated via Amendment 0003.
30 12/2/2025 17 C-0200000 2.6.7
Spec Item states "Scheduled utility outages and interruptions to equipment, system(s) operation, or other services shall be scheduled after hours of operation."
To facilitate the accuracy of offeror estimates, will the Government please provide historical data showing the number of scheduled outages per year that are conducted after hours?
Approximate number of scheduled after-hours outages per year:
Compressed Air - 5 Sewer - 2 Steam - 7 Water - 15 Electric: FY23 - 8; FY24 - 37; FY25 - 26
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
31 12/2/2025 28 C-0200000 2.8.12
The Spec Item states in part "The introduction or use onboard NAS Jacksonville of cameras, tape recorders, wire recorders or any other type recording device is prohibited except" under certain conditions as stated.
Are contractor technicians and other contractor personnel prohibited from carrying smart devices (for example, iPhones, Android devices, and/or cellular enabled devices such as e-tablets)?
No.
32 12/2/2025 39 C-0200000 2.10.2.2
Spec Item states in part "Contractor shall provide the KO and COR with an updated copy of OTIS database or representative software data files quarterly and at conclusion/termination of contract, per Section F. Contractor’s ODS records shall be readily available for inspection by government and regulators."
Please describe the OTIS database and what version it is, and indicate who owns it (Contractor or Government).
Reference Spec Item 2.10.2.2, ODS (Ozone-Depleting Substance); The Contractor shall comply with all federal, state, local environmental laws and regulations, and specifically requirements of Sections 608 and 609 of the Clean Air Act (CAA), 40 Code of Federal Regulation Part 82 (40 CFR 82), 40 Code of Federal Regulation Part 84 (40 CFR 84), paragraph 22-3.6 (Management of Ozone-Depleting Substances) of OPNAVINST 5090.1(series) Environmental Readiness Program Manual, and Navy ODS Advisory 96-02 Refrigerant Leak Repair and Record Keeping as pertaining to this contract.
A Government ODS Tracking and Inventory System (OTIS) database will be provided for contractor use.
Contractor may choose to use a commercially available ODS recordkeeping and tracking software if it provides similar recordkeeping and is deemed acceptable to the KO. Other methods of maintaining and tracking ODS recordkeeping requirements and compliance demonstration may be presented for consideration in lieu of using one of the above cited software if it meets regulatory recordkeeping requirements and is approved by KO.
33 12/2/2025 41 C-0200000 2.10.2.3
The Spec Item states in part "Historical used oil collection locations are provided in the table below."
The referenced table contains 4 columns and 3 rows of data. The columns are not labeled, specifically the 3rd and 4th columns.
Please label/title those columns for clarity.
The table in reference is labeled. The column headings identified in the table are Facility Number, Description, Tank Size (Gallons) and Tank Quantity. See Spec Item 2.10.2.3.
34 12/2/2025 41-42 C-0200000 2.10.2.4 - 2.10.2.5
The Spec Item states in part, "The Contractor shall recycle concrete, scrap metal, tires, wooden pallets, cardboard, asphalt, yard waste and submit quarterly reports with recycling weight ticket receipts per Section F," and further states in part, "Disposal of all non-regulated debris and rubbish resulting from the work under this contract shall comply with the federal regulations in 40 CFR Part 258 (Subtitle D of RCRA), or equivalent state regulations and be disposed of at appropriate off installation waste handling facilities."
This activity will require the use of costly refuse collection and hauling equipment. Is such equipment the responsibility of the Contractor? If so, what is the content of the incumbent contractor's refuse collection and hauling equipment?
Whatever activity the Contractor generates waste from, the Contractor is responsible for.
Information on the incumbent contractor's equipment is not available to the Government.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
35 12/2/2025 46 C-0200000 2.10.3.2
The Spec Item contains a link to the EPA Comprehensive Procurement Guideline (CPG) Product Index website. However, the message received when using that link states "Sorry, but this web page does not exist." Please provide a working link.
The EPA Comprehensive Procurement Guideline (CPG) Product Index website is https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. Updated via Amendment. 0003
36 12/2/2025 n/a J-1502000-03 Tab #19 On lines 247-249 and 289-299, the text is colored blue vs black.
Is there any significance to that change? No, there's no significance to the color change.
37 12/2/2025 79 C-1502000 Facility Investment
3.1.2
The last entry under 3.1.2 at top of page under Related Information states, "Maintenance Work Order Processes for Unaccompanied Housing provided in J-105000-07." However, the RFP files do not contain that specific document. Please provide.
Maintenance Work Order Processes for Unaccompanied Housing in J-1502000-07, Spec Item 3.1.2 corrected via Amendment. 0003
38 12/2/2025 81 C-1502000 Facility Investment
3.2 The last paragraph references condition assessment of dynamic equipment. Please define what type(s) of equipment are considered dynamic equipment.
Dynamic Equipment types are listed in Spec Item 3.2.2, Condition Assessment (Dynamic).
39 12/2/2025 82 C-1502000 Facility Investment
3.2.1
The Performance Objective states, "The Contractor shall provide monthly GPRS cellular modem service to allow for communication between the Contractors office and each site remote monitoring." Is a separate monthly mobile data service required for each rinse facility, or can both facilities be accommodated by a single monthly service? Please clarify.
It is at the Contractor's discretion. The requirement is to ensure proper communication between the Contractor's office and each site.
40 12/2/2025 82 C-1502000 Facility Investment
3.2.1
The final entry under Performance Objective states, "The Contractor shall replenish [aircraft rinse facility] chemicals monthly." Is the cost of these chemicals included in the FFP? If so, please identify the list of chemicals and monthly usage.
There are no chemicals needed for the Aircraft Rinse Facility. Spec Item 3.2.1 Aircraft Rinse Facility has been updated via Amendment. 0003
41 12/2/2025 86 C-1502000 Facility Investment
3.2.4.1
Under Related Information, the Spec Item states in part, "The Contractor shall ensure that sufficient fuel is available for boiler operations at Building 327, up to 500 gallons per year."
A check of J-1501000-03 Facility Description, indicates that Bldg. 327 is the AUW Shop. What does AUW stand for and what is its significance? Also, is the boiler there fueled by oil or diesel versus natural gas like the majority of boilers at JAX?
AUW is a storage facility within a secure area and awardee will receive access upon start of contract. See 1502000-03 Storage TanksTab#25 for fuel type.
42 12/2/2025 86-87 C-1502000 Facility Investment
3.2.5
Related Information states in part, "Compressed air systems are provided in J-1502000-03 Sheet Tab #5." A review of Tab #5 shows a Binks paint booth at CNRSE. Please provide make and model number, and any other relevant specifications and configuration data on this paint booth and associated filter bank.
There is no make, model number or any other relevant data provided in Maximo.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
43 12/2/2025 91 C-1502000 Facility Investment
3.2.11
Under Related Information the Spec Item states in part, "HVAC ducts shall be maintained, clean and free of debris, mold, mildew and foreign matter as part of the PM. Ducts include ducting, intake vents and return registers." Related Information further states, "The HVAC and Refrigeration Systems inventory is provided in J-1502000-03 Sheet Tab #11." A review of Tab #11 shows no quantities of ductwork. Can the Government please provide the quantity of ductwork to be cleaned and maintained?
In addition, does the Government require a specific cleaning frequency (annual, every 2-3 years, etc.)?
There is no quantity of ductwork, make, model number or any other relevant data provided in Maximo.
Spec Item 3.2.11 states, "Maintenance is performed in accordance with Contractor's PM program, work schedule and OEM standards."
44 12/2/2025 N/A RFP N/A
There is a file in the RFP batch labeled J-1501000-03 Facility Description. However, when that file is opened, the title across the top of each page is J-1501000-02 Facility Description. Is there possibly a file missing?
File is mislabeled, add correction to title of J-1501000-03 Facility Description (pdf.) via Amendment 0003. 0003
45 12/2/2025 148-14
C-1502000 Facility Investment -
DHA
3.2.7.1
Spec Item states under Related Information, "The Contractor shall replace all defective sensors within fourteen (14) calendar days of discovery or notification by DDC operator." Please clarify who or what is the DDC operator.
Direct Digital Controls (DDC) operator is the technician responsible for DDC controls responsibilities per the RFP.
46 12/2/2025 188 C-1601000 Utilities Management
3.4
Spec Item states under Related Information, "The data elements and template required to create, update and complete Service Provider Information by flat-file are identified in attachment J- 0200000-07 Service Provider Information."
There are two separate files with that number in the RFP batch: J- 0200000-07 (Monthly) Fire Extinguisher Inspection (Log) and J- 0200000-07 Fire Warden Report. However, the file cited in the Spec Item is not in the RFP batch of files. Please provide.
Service Provider information in provided in J-0200000-09, mislabeled and corrected via Amendment 0003. 0003
47 12/2/2025 196-19C-1602000 Electrical 3.1.1
Spec Item under Related Information states, "A monthly Operating Records Report shall be submitted to the KO and shall include copies of daily operating logs, chemical treatment performed, and steam, boiler feed water and condensate return water laboratory analysis."
Please explain the connection between electrical work and chemical treatment services, as this seems out of place.
Not out of place, electrical components are within multiple systems and plant operations.
48 12/2/2025 222 C-1605000 Steam 2.3.1
Spec Item under Description states "Primary and secondary fuels used by steam plants will be provided by other means."
How exactly is said fuel provided and by what entity?
Primary Steam Plant fuel is provided by TECO Peoples Gas and secondary fuel (diesel) is in the external tanks that are adjacent to each plant. If more secondary fuel were needed, the Government would procure it and have it pumpled into the external fuel tanks.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
49 12/2/2025 and
C-1606000 Water 3.1
Spec Item under Related Information on page 238 states in part, "Operation consists of “watch-standing” or attendance type work by a sufficient staff of qualified persons during a specified time period to ensure safe, reliable, efficient production and distribution of drinking water." Then on page 240 it states, "The water treatment plant shall be operated 8 hours a day between 0700 and 1630 during the week and 4 hours a day on weekends and holidays."
Does the Navy want physical presence for only 8 of the 9.5 hours during the 0700 - 1630 daily time period? This is a bit confusing.
Please clarify.
The water plant operator hours should be 0700-1600 with one hour for lunch for a total of 8 hrs & 4 hours a day on weekends and Holidays. See updated Section C Annex 1606000 Spec Item 3.1 Operation via Amendment 0003.
50 12/2/2025 292 C-1800000 Environmental 3.1
Spec Item under Related Information states "A list of cleanup materials is provided in J-0200000-06." However, Attachment J- 0200000-06 is an extensive list of Directives, Instructions and References.
Please advise where the list of clean up materials is located.
There are no list of clean up materials. See updated J-0200000-06 within Spec Item 3.1 via Amendment 0003. 0003
51 12/2/2025 294 C-1800000 Environmental 3.2.1
Spec Item under Related Information states "Environmental Cleaning Floor Plans J-1800000-07. The Contractor shall submit Environmental Cleaning Floor Plans within 90 days of the cleaning to remove debris, paint sludge, paint remover and other chemicals."
Are the Aircraft Final Finish Facility and the Plating and Cleaning Facility the only facilities where environmental cleaning and associated floor plans are required?
No. The Contractor shall clean designated areas described in J-1800000-06. Provided Floor Plans for Environmental Cleaning Floor Plans J-1800000-07.
52 12/2/2025 n/a J-0200000-23 ELINs
CLIN 0017-52.217-8
Option RW
CLIN 0018-52.217-8
CLIN X0017 is an option extension CLIN and if the Sub-ELIN has a UOM of 12 months it remain 12-months but if the UOM is EA then the quantity has been reduced from the prior Option.
Was the intent that this CLIN be 6 months instead of 12 months?
CLIN X0018 is an option extension CLIN and the quantities have been reduced from the prior Option by half. Was the intent that this CLIN be 6 months instead of 12 months?
Yes, CLIN X0017 52.217-8 Option RW is to be 6 months. Revised in Amendment 0003. 0003
53 12/2/2025 n/a n/a n/a Will the Government please provide seniority rosters where they indicate average years of service for each labor category in all of the CBAs?
Yes, in accordance with FAR 52.222-41(n) Seniority List, not less than 10 days prior to completion of the contract, the incumbent shall furnish the Contracting Officer a certified list of the names and anniversary dates of employment of all service employees on the Contractor's or subcontractor's payroll during the last month of contract performance, which will be turned over to the successor Contractor at the commencement of the succeeding contract.
54 12/2/2025 n/a Attachment J- 1502000-08 n/a What should bidders assume for assets that are listed without a
DCR? Specifically, what condition? All assets listed are operational.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
55 12/2/2025 n/a Attachment J- 1502000-04 n/a
Attachment J-1502000-04 is titled "Sample of Historical Work Orders" (File Name is J-0502000-02 Sample of Historical Work - NAS Jacksonville) and lists 6861 different work orders with 1670 Emergency and 181 Urgent work orders. Are bidders to assume this is the average number of work orders and stratification of the number of types of work orders?
No, Historical work orders are listed throughout the RFP. Historical work orders is a sample, not an average, of work orders.
56 12/2/2025 n/a Attachment J- 1502000-04 n/a
Attachment J-1502000-04 is titled "Sample of Historical Work Orders - DHA" and lists 771 different work orders with 52 Emergency and 83 Urgent work orders. Are bidders to assume this is the average number of work orders and stratification of the number of types of work orders?
Refer to GPI #55.
57 12/2/2025 n/a Solicitation - N6945026R0007
Section B;
Section F.2;
Section M.4.3.a.2.c;
J-0200000-23 ELINs
Section B includes CLINs 0017 and 0018 which are Option 8, extension. This totals 9 years.
Section F.2, CONTRACT TERM, states:
"The estimated start date is 01 January 2027. The initial contract term of performance is for one year. The entire duration of the contract if all options are exercised is eight years (96 months).
There are seven option periods and each option period has a term of performance of one year (12 months). If the Government requires a shorter term or exercises an option for a period shorter than 12 months, the proposed monthly ELIN prices will be used as the basis for establishing the reduced term. The Government may extend the term of the contract in accordance with FAR 52.217-9, Option to Extend the Term of the Contract incorporated into the resulting contract."
Section M.4.3.a.2.c (page 59) states that, "The Government will evaluate the proposal for any inconsistent pricing submitted within Section B and the Section J attachment, and correct any discrepancies in accordance with Section M.3 of the solicitation, or through clarifications, discussions or other means consistent with applicable regulation."
J-0200000-23 ELINs includes the Base and 8 Options (7 options and the extension).
Please confirm that the TEP will be for Base and Options 1 through 7, and will not include Option 8.
The term of performance is a one-year base period and seven one-year option periods (96 months). The Government may extend the performance period beyond the established 96 months using FAR 52.217-8 Option to Extend Services (CLINs 0017 & 0018), which provide authority to extend contract performance up to an additional six months.
As stated in the RFP, the Government will evaluate price based on total price. Total price consists of the basic requirements and all option items. This includes FAR 52.217-8 Option CLINs 0017 and 0018.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
58 12/2/2025 n/a Solicitation - N6945026R0007 Section F.3
Section F.3, TRANSITION PERIOD, states:
"The Government intends to make contract award no later than 02 November 2026 to allow the successful offeror 60 days to mobilize and transition into place. Sixty days prior to completion of the contract term the current contractor will be expected to commence demobilization and support the transition of the follow-on contractor."
Section F.2, CONTRACT TERM, states:
"The estimated start date is 01 January 2027. ....."
Please provide direction on where pricing for the 60-day transition should be included in the proposal. J-0200000-23 ELINs has a Base Period which is 12 months and begins on January 1st so it would not include Transition.
Please confirm that transition pricing is NOT part of the TEP.
Section L.8 states pricing shall include applicable Phase-In and Phase-Out costs. As there are no separately priced phase-in or phase-out CLINs, it is at the discretion of the offeror how to allocate those costs across the CLINS/ELINS included in the solicitation.
59 12/2/2025 62-63 RFP, Section M M.4.3.b.2.a.iv and M.4.3.b.2.b.ii
In reference to the Factor 2 requirement to provide a phase-in plan, the submittal requirements and basis of evaluation refer to a transition period of no more than 90 calendar days. However, Section F.3 refers to a 60-day phase-in period.
Please confirm that offerors are to base their Factor 2 phase-in plans on a transition period of not greater than 90 calendar days.
The phase-in plan shall be limited to no more than 90 calendar days. Section F.3 has been updated in Amendment 0003. 0003
60 12/2/2025 n/a
J-0200000-02
CBA 2005-3001
J-0200000-02
CBA 2017-6756
J-0200000-02
CBA 2020-719
n/a
Please confirm that there are not any MOAs or amendments to the Collective Bargaining Agreements that have not been provided.
Example: an agreement that would have changed an H&W value.
All CBAs have been provided and are updated via Amendment 0003. 0003
61 12/2/2025 18 Section C 2.6.8
Information Note indicates Not all supported commands’ assets are included in NAVFAC Maximo. Not all of the modules available within the commercial Maximo application are utilized by NAVFAC and the modules utilized may not be fully implemented. NAVFAC Maximo does not include a detailed inventory of all assets, components, and equipment that the Contractor is required to service under this contract and may include inaccuracies, omissions, and redundancies."
Is there source data available that can be accessed to develop the asset baseline the contractor assumes responsibility for?
See Section J for asset information.
62 12/2/2025 JL-1 Labor Hours Spreadsheet
Please confirm if the JL-1 Labor Hours Spreadsheet is excluded from the page count. See GPI Response #12.
63 12/2/2025 49-51 L-12 Would the Government consider allowing font sizes smaller than 11 for tables, graphics, headers and footers? The requirement for 11 point font remains unchanged.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
64 12/2/2025 49-51 L-12 Would the Government consider font colors other than black for tables and graphics? See GPI response #6.
65 12/2/2025 51 L-12 Please confirm that tab dividers with printed titles are excluded from the page count.
"Blank" tab dividers simply means there should be not evaluation material on the divider. A printed title on a tab divider will not count toward the page limitation.
66 12/3/2025 4 C-100000 1.7
During the site visit briefings and in Section C - 0100000 Paragraph 1.7, it is indicated that all facilities, systems and assets shall be accepted by the Contractor in "AS IS" condition. Site visits are, at best, a very limited snap shot of the existing assets.
Based upon that snapshot, there seems to be many old and obsolete assets that will require repair/replacement during the term of this contract. Does the Government expect a contractor to take on all of the risk in the bid for recurring services and limits of liability?
See Section C Annex 0100000 General information, Spec Item 1.7; All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
67 12/3/2025 26 C-200000 2.8.6.1 Will the Government provide a list of buildings that require an escort? Will service call response times be adjusted when the Government does not provide an escort?
DoD policy limits the dissemination of information. Secure Areas will be made available to the successful offeror with appropriate credentials post award.
Service call response times will not be adjusted.
68 12/3/2025 47 C-200000 2.11
Please clarify what disaster preparation and recovery actions shall be performed at no additional cost and what more extensive efforts might be performed as non-recurring work? Please provide a historical list of personnel required to remain on board the base during disasters? Please provide a historical list of how many days per year essential personnel were required to remain on board the base.
See NASJAXINST 3440.8E for clarification of disaster preparation and recovery actions. Updated Section J Attachment 0200000-06 Directives, Instructions, and References via Amendment 0003.
Historically, the list of personnel required to remain on board the base during disasters is determined by the KTR & KO.
There is no historical data as to how many days per year essential personnel are required to remain on board the base, as disasters do not occur on an annual basis.
69 12/3/2025
C-1502000 C-1502000 C-1601000
2.2.2 2.2 2.2.2
The Government wants the Contractor to use a systems approach in the management of the inventory under this contract. "Specific equipment adds or deletes upon initial contractor inventory assessment and Preventative Maintenance (PM) program development will not be grounds for Contract modification." The Government wants the Contractor to take on all of the risk associated with 1) unknown quantities/pieces of equipment included within the system, and 2) unknown assets that the Government either doesn't know exists or failed to annotate in J- 1502000-03. What constitutes a system? The definition provided is very broad, "any mechanically and/or electrically interlocked parts". That really gives the Government a broad brush to include assets into a "system" without modifying the Contract.
How are we to estimate labor and materials without knowing how many supporting pieces of equipment are within the system?
The Performance Work Statement (PWS) is based on a Systems Approach. The Contractor is responsible for the Systems described in the PWS and all mechanically and electrically interlocked parts, equipment, and components forming the systems.
There is available cost or pricing information that permits realistic estimates of the probable costs of performance based upon information published in industry standard estimating sources. The Government will not dictate an offeror's estimating practices and expertise.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
70 12/3/2025 75 C-1502000 3.1
Please clarify the limit of liability. Is it direct labor plus materials up to $3500? In other words, if a work order requires $2,600 in direct labor and $1,200 in direct material cost, the Government would issue a task order for $300 in accordance with the Non-recurring Work portion of the contract?
Yes. Refer to Section C Annex 1502000 Spec Item 3.1, "The Contractor has full responsibility for any work up to the E/U/R limit of liability of $3,500 in direct labor and direct material cost per work order.
The Government will only pay for the portion of direct labor and/or direct material that exceeds the E/U/R work order limits of liability."
71 12/3/2025 90 C-1502000 3.2.10 Please clarify. Does the text in Related Information mean that the Government expects Contractor to use ONLY the listed OEM (ASSA ABLOY) for maintenance and repair?
Yes. The Contractor's PM shall comply with manufacturers’ recommended procedures and standards
ASSA ABLOY.
72 12/3/2025 C-1502000
We noticed that Section 1502000 DHA includes a paragraph specifically addressing Locksmith Services, while Section 1502000 Facility Investment does not. Can the government please clarify whether locksmith services are expected under Facility Investment or any other sections outside of DHA?
Locksmith services are expected under DHA, all other services are provided through work orders or non-recurring means.
73 12/3/2025 121 C-1502000
DHA 2.2.1.1
Is the Contractor responsible for providing backfill manpower for the Core Crew staffing requirements when an employee goes on vacation, calls out sick, or is not present at his/her core shift?
As a minimum, the Contractor shall provide the following Core Crew staffing in support of DHA Recurring Work. All Core Crew shall work at the hospital unless otherwise approved by Naval Hospital Facilities Management Department.
74 12/3/2025 127 C-1502000
DHA 2.4.2
In order to put together staffing, materials, and subcontractor estimate for DHA facilities, can the government provide the RPIE report from DMLSS which is government owned and being maintained annually in accordance with Paragraph 2.4.2?
Refer to GPI #73.
75 12/3/2025 134 C-1502000
DHA 3.1
Section states "Contractor has full responsibility for any work up to the work order limit of liability of $3,500 in direct labor not to include core crew labor...". Who decides if service order work could or should be performed by the core crew? The core crew responsibility is to perform PMs. If they are also tasked with roughly 4,400 SOs, then completion time/rates are unachievable.
What about SOs that have to be performed outside of normal working hours? Is the Contractor responsible for the premium rates associated with that work?
The Naval Hospital Facilities Management Department will decide.
Refer to Section C Annex 1502000 Facility Investment - DHA Spec Item 2.2.1.1 Core Crew Requirements DHA Core Crew Manning Requirements.
Yes, the Contractor will be responsible for the premium rates associated with work outside of normal working hours.
76 12/3/2025 170 C-1503040 1.1 Since the 'Training Pools' and 'MWR' pools are under separate Annex areas, can the government provide a list and description for…