JA-1_N6945026R0007_Summary of Changes_0003.pdf

PDF 75 KB Posted

Attached to
Base Operations Support (BOS) Services at Naval Air Station (NAS) Jacksonville, FL and Outlying Areas
Solicitation number
N6945026R0007
Issued by

About this file

This document is Amendment 0003 to a federal contract solicitation, detailing multiple updates across various sections of the original solicitation. Key changes include updates to Section F (Deliverables) with a transition period now extending to 02 October 2026 and a 90-day mobilization timeframe, modifications to Section C attachments across multiple annexes involving facility management, investment, utility management, and environmental services, and revisions to Exhibit Line Item Numbers (ELINs) such as adding recurring ELINs for Security Systems, HVAC, Vertical Transportation Equipment, and Auxiliary Generators.

Significant administrative updates were made to Sections I, J, L, and M, including adding FAR clauses related to continuation of essential contractor services, updating collective bargaining agreements, modifying proposal submission requirements (reducing copies to 2 and changing page limits), and revising evaluation factors for corporate experience, technical approach, and past performance. The proposal due date remains 2:00 PM EST on 27 January 2026, with changes primarily focusing on clarifying requirements for joint ventures, adjusting technical approach evaluation criteria, and streamlining submission guidelines.

View the file

Other files

File Type Posted
N6945026R0007-0005.pdf PDF
J-0200000-23 ELINs_0004.xlsx XLSX spreadsheet
N6945026R0007-0004.pdf PDF
N6945026R0007_SectionJ_0003.pdf PDF
N6945026R0007_SectionC_0003.pdf PDF
N69450256R0007_SectionF_0003.pdf PDF
J-0200000-02-04_WD2015-4539 (Rev-29)_0003.pdf PDF
J-0200000-02 CBA-2014-6756_0003.pdf PDF
N6945026R0007-0003.pdf PDF
J-0200000-02-05_FL20260202_Duval_Bldg_0003.pdf PDF
J-0200000-02 CBA-2020-719_0003.pdf PDF
JL-8_N6945026R0007_GPI Responses_0003.pdf PDF
JL-1_N6945026R0007_Labor Hours Spreadsheet_0003.xlsx XLSX spreadsheet
J-1502000-03 Asset Inventory_0003.xlsx XLSX spreadsheet
J-1501000-03 Facility Description_0003.pdf PDF
J-0200000-23 ELINs_0003.xlsx XLSX spreadsheet
N6945026R0007-0002.pdf PDF
JL-8_N6945026R0007_GPI Responses_0001.pdf PDF
JL-6_N6945026R0007_Site Visit Brief_0001.pdf PDF
JL-7_N6945026R0007_Site Visit Sign-In Sheets_0001.pdf PDF
N6945026R0007-0001.pdf PDF
J-1502000-04 Sample of Historical Work Order - DHA.pdf PDF
JM-1_N6945026R0007_Corporate Experience.docx DOCX document
J-1800000-03 NAS Jacksonville FRP.pdf PDF
J-1800000-10 101S Vent Cover Inspection Checklist.pdf PDF
J-0200000-10 Asset Information.xlsx XLSX spreadsheet
J-0200000-07 Fire Warden Report.pdf PDF
J-0200000-23 ELINs.xlsx XLSX spreadsheet
JL-3_N6945026R0007_AMAG.xlsx XLSX spreadsheet
J-0200000-02-04_WD2015-4539 (Rev-28).pdf PDF
J-0200000-02 CBA-2020-719.pdf PDF
J-1601000-07 Utility Asset Tags.pdf PDF
J-0200000-17 NAS JAX HWMP.pdf PDF
J-1800000-05 Stormwater Pollution Prevention Plan.pdf PDF
J-1601000-04 Meter Inventory.xlsx XLSX spreadsheet
J-1602000-04 Electric Meter Schedule and Meter Data File.xlsx XLSX spreadsheet
J-1601000-03 Utility Real Property Point of Demarcation.pdf PDF
N6945026R0007_SectionJ.pdf PDF
J-1605000-05 Production Report.pdf PDF
J-0200000-21 BOS CAT Call Request.pdf PDF
JL-1_N6945026R0007_Labor Hours Spreadsheet.xlsx XLSX spreadsheet
J-0200000-04 Sample Partnering Agreement.pdf PDF
J-1800000-08 Sample Analytical Results of Environmental Cleaning.pdf PDF
J-0200000-09 Service Provider Information (JAX).xlsx XLSX spreadsheet
JM-2_N6945026R0007_PPQ.doc DOC document
J-0200000-16 Navy Region Southeast Instruction 4101.1 Series.pdf PDF
J-1502000-04 Mega Door OM System.pdf PDF
J-1800000-07 Environmental Cleaning Floor Plans.pdf PDF
J-0200000-11 Specification Information.xlsx XLSX spreadsheet
J-0200000-14 Maximo Direct Entry Procedures.docx DOCX document
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0003 SUMMARY OF CHANGES

This amendment is issued to make the following changes:

1. Section A - Solicitation/Contract Form, A.5 Prior Contract Information, to update contract values.

2. Section C – The Section C attachment has been updated. Changes within the attachment are shown in red strikethrough for deletions and blue font for additions. The revised Section C is provided via attachment under file name N6945026R0007_SectionC_0003.pdf. A summary of the revised spec items is as follows:

a. Annex 0200000 – Management and Administration Spec Item 2.4 Government-Furnished Items - Page 13 of 291 Spec Item 2.10.3.2 Use of Recovered Materials – Page 46 of 291

b. Sub-annex 1501000 – Facility Management Spec Item 3.1.3 Work Order Tracking – Page 59 of 291

c. Sub-annex 1502000 – Facility Investment Spec Item 3.1.2 Emergency Unaccompanied Housing (UH) – Page 78 of 291 Spec Item 3.2.1 Aircraft Rinse Facility – Pages 81-82 of 291 Spec Item 3.2.7 Fire Protection Systems – Page 87 of 291 Spec Item 3.2.19 Wash Rack – Page 94 of 291 Spec Item 3.4.13 Security Systems and Equipment – Pages 66 & 114 of 291

d. Sub-annex 1502000 – Facility Investment – DHA Spec Item 3.4.2 Duty Crew – Page 155 of 291

e. Sub-annex 1503040 – Other (Training Pools) Spec Item 3.3.1 Pool Systems – Page 167 of 291 (Deleted)

f. Sub-annex 1601000 – Utility Management Spec Item 3.1.1 Emergency Work Orders – Page 179 of 291 Spec Item 3.4 NAVFAC Maximo Data Entry – Page 185 of 291

Spec Item 3.4.1 Notification of Work Exceeding the Limits of Liability – Page

g. Sub-annex 1604000 – Wastewater

Spec Item 3.2 Preventative Maintenance (PM) Program – Page 209 of 211

h. Sub-Annex 1606000 – Water – Pages 230-244 of 291 (Header only) Spec Item 3.1 Operation - Page 235 of 291

i. Annex 1800000 – Environmental

Spec Item 3.1 Oil and Regulated Substance Spill Response and Cleanup Ashore –

3. Section F – Deliverables, has been updated as follows:

a. F.3 Transition Period, has been updated to 02 October 2026 and 90 days to mobilize and transition.

b. The Section F attachment has been updated. Changes within the attachment are shown in red strikethrough for deletions and blue font for additions. The revised Section F is provided via attachment under file name N6945026R0007_SectionF_0003.pdf. A summary of the revised spec items is as follows:

i. Annex/Spec Item 0200000/2.9.3 Activity Hazard Analysis – Page 4 of 40

ii. Annex/Spec Item 0200000/2.9.4 Compliance Plans, Programs, and Procedures – Page 4 of 40

4. Section I - Contract Clauses has been updated to add has been updated to add FAR clause 252.237-7023 Continuation of Essential Contractor Services (OCT 2010).

5. Section J - The Section J attachment has been updated. Changes within the attachment are shown in red strikethrough for deletions and blue font for additions. The revised Section J is provided via attachment under file name N6945026R0007_SectionJ_0003.pdf. A summary of the revised spec items is as follows:

a. Annex 0200000 – Management and Administration Attachment J-0200000-06 Directives, Instructions, and Attachments – Page 19 of

Attachment J-0200000-07 Forms – Pages 24-25 of 335

b. Sub-annex 1502000 – Facility Investment Attachment J-1502000-03 Asset Inventory – Page 100 of 335

c. Sub-annex 1502000 – Facility Investment – DHA Attachment J-1502000-09 Food Service Equipment and Systems – DHA – Pages 132-136 of 335 Attachment J-1502000-10 General Equipment – DHA – Pages 144-145 & 190- Attachment J-1502000-19 Electrical Transformers, Breakers, and Switches – DHA – Page 227 of 335 (Attachment number only)

6. Section J – The Table of Contents has been updated as follows:

a. The Amendment 0003 Summary of Changes has been added and is provided as file name JA-1_N6945026R0007_0003.pdf.

b. The JL-1 Labor Hours Spreadsheet has been updated in accordance with the ELINs changes below and is provided as file name JL-1_N6945026R0007_Labor Hours Spreadsheet_0003.xlsx.

c. Responses to Government Preaward Inquiries (GPIs) have been added and are provided as file name JL-8_N6945026R0007_GPI Responses_0003.pdf.

d. Collective Bargaining Agreement CBA-2014-6756, between JLL-Midnight Sun IFMS, LLC and the International Brotherhood of Electrical Workers, has been updated and is provided as file name J-0200000-02 CBA-2014-6756_0003.pdf.

e. Collective Bargaining Agreement CBA-2020-719, between Midnight Sun Technologies LLC and the International Union of Operating Engineers, has been updated and is provided as file name J-0200000-02 CBA-2020-719_0003.pdf.

f. The Service Contract Act Wage Determination 2015-4539 has been updated and is provided as file name J-0200000-02- 04_WD2015-4539 (Rev-29)_0003.pdf.

g. The Construction Wage Rate Requirements - Building - Duval County has been updated and is provided as file name J-0200000-02-05_FL20250202_Duval_Bldg_0003.pdf.

h. The Exhibit Line Item Numbers (ELINs) Spreadsheet has been updated as follows and is provided as file name J-0200000-23 ELINs_0003.xlsx.

i. Recurring ELIN/Sub-ELIN X002/X002BU Security Systems and Equipment was added and subsequent X002 Sub-ELINs have been renumbered accordingly.

ii. Recurring ELINs/Sub-ELINs X006/X006AD HVAC and Refrigeration and X006AH HVAC Seasonal Start-Up and Shutdown were added and subsequent X006 Sub-ELINs have been renumbered accordingly.

iii. Recurring ELIN/Sub-ELIN X008/X008AE Vertical Transportation Equipment (VTE) was added and subsequent X008 Sub-ELINs have been renumbered accordingly.

iv. Recurring ELIN/Sub-ELIN X009/X009AD Fire Protection Systems was deleted and renamed HVAC and Refrigeration Systems and subsequent X009 Sub-ELINs have been renumbered accordingly.

v. Recurring ELINs/Sub-ELINs X011/X011AB Auxiliary Generators and X011AK Uninterruptible Power Supplies (UPS) were added and subsequent X011 Sub-ELINs have been renumbered accordingly.

vi. Recurring CLIN 0017 updates all Sub-ELINs with a quantity of months to 6 months.

(X indicates all periods of performance)

vii. Attachment J-1501000-03 Facility Description has corrected the attachment number in the title and is provided as file name J-1501000-03 Facility Description_0003.pdf.

viii. Attachment J-1502000-03 Asst Inventory updated tabs 6, 22, 23, 27, 30, 33, and 34 and is provided as file name J-1502000-03 Asset Inventory_0003.xlsx.

7. Section L - Instructions, Conditions, & Notices to Offerors or Quoters has been updated as follows:

a. L.2 Proposal Delivery has been updated to state that no hand delivered proposals will be accepted.

b. L.12 Content of Proposals, (b), (2) Price Proposal Binder, has been updated as follows:

i. Copies have been revised to 2 copies (1 original and 1 copy).

ii. Item d. removes the note about historical customer funding/pricing allocations.

iii. Item h. removes information about price narrative.

c. L.12 Content of Proposals, (b), (3) Non-Price Proposal, has updated Item h. to 150 pages.

d. Add FAR provision 252.237-7024 Notice of Continuation of Essential Contractor Services (OCT 2010).

8. Section M – Evaluation Factors for Award is revised as follows:

a. Factor (1) Corporate Experience:

i. (a) Solicitation Submittal Requirements has been updated to clarify recent/relevant experience requirements for Joint Ventures (JVs) established pursuant to 13 C.F.R. § 125.8(b)(1)).

ii. (b) Basis of Evaluation has been updated to clarify recent/relevant experience requirements for JVs established pursuant to 13 C.F.R. § 125.8(b)(1)), experience that will be considered unacceptable and experience that may be rated more favorably for these types of JVs.

b. Factor (3), Technical Approach:

i. (a) Solicitation Submittal Requirements, (ii), updates the note for Annex 17 to Base Support Vehicles and Equipment (BSVE) and (iii) removes

Emergency/Urgent/Routine (E/U/R) Work Order/Service Orders from submittal requirements and renumbers subsequent requirements.

ii. (b) Basis of Evaluation, (ii), removes the statements regarding the methodologies for performing service orders and state-of-the-art, reliability centered inspection, testing, maintenance and repair program and (vi) updates Transportation to

BSVE.

c. Factor (4), Past Performance:

i. (b) Basis of Evaluation is updated to remove performance recognition documents.

All other terms and conditions remain unchanged. The proposal due date/time remains 2:00 PM EST, 27 January 2026.

File details come from the government source that posted it. Updated .