J.9 Workload Experience Form_AMD0002.docx
DOCX document 33 KB Posted
- Solicitation number
- N62742-26-R-1801
About this file
This is a Workload Experience Form template for an Indefinite-Delivery/Indefinite-Quantity (ID/IQ) Small Business Environmental Remedial Action Contract (SBRAC VI) solicitation number N62742-26-R-1801 issued by the Naval Facilities Engineering Command.
Offerors must demonstrate capability and capacity by documenting at least ten (10) recent, relevant concurrent projects totaling a minimum of $10 million in award amounts performed by the offeror's current team at a minimum of two (2) locations within the NAVFAC Pacific area of responsibility. Projects must have occurred concurrently to qualify under this workload experience demonstration. For each project, offerors must provide the concurrent contract or task order number, start and end dates, award amount performed by the offeror's current team, project location, key personnel assigned for the duration of the project, names of all companies performing the work including subcontractors, a description of the scope of work performed by the offeror's current team as relevant to the Section C tasks and Section M evaluation criteria, and identification of work not performed by the offeror's current team. The form accommodates up to ten project entries on the template, with provisions for offerors to add additional projects if necessary to meet the $10 million minimum threshold. The combined submittal for this attachment shall not exceed ten single-sided pages, and the form structure and formatting should not be modified except for vertical cell height and paragraph indentation.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N62742-26-R-1801
AMENDMENT 0002
ATTACHMENT J.9: WORKLOAD EXPERIENCE FORM
Provide the following information to describe your capability and capacity to deliver products similar to the type and complexity of the tasks described in Section C of this solicitation assuming a workload of at least ten (10) recent, relevant projects totaling a minimum of $10 million at a minimum of two (2) locations within the NAVFAC Pacific area of responsibility, as described in Section C subparagraph 1.1, occurring concurrently. The below contracts/task orders should have occurred concurrently to be counted under this workload experience form. Offerors may add additional projects if more than 10 projects are needed to total the $10 million minimum. With exception to vertical cell height and paragraph indentation, do not modify this form (i.e. horizontal cell width, font type and size, etc.). Do not delete this instructional paragraph. Italicized text may be deleted from the form prior to submittal. The combined submittal for Attachment J.9 shall not exceed ten (10) single-sided pages.
Concurrent Contract No. / Task Order No #1:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s current team.
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #2:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #3:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #4:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #5:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #6:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #7:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #8:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #9:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
Concurrent Contract No. / Task Order No #10:
Start and End Dates of the Contract/Task Order:
Award amount performed by the Offeror’s
Location of the Contract/Task Order:
Key Personnel Assigned for Duration of Project/Contract:
Names of the Companies that the Project/Contract was Performed By, including Subcontractors:
Description of the contract or task order scope of work performed by the Offeror’s current team as it is relevant to the Section C tasks and Section M evaluation criteria.
Describe the work that WAS NOT performed by the Offeror’s current team.*
*Offeror’s current team includes: The Offeror and/or JV/LLC/subcontractors where legally binding agreements have been provided in the proposal.
File details come from the government source that posted it. Updated .