This file consists of three cost-related attachments for an Indefinite-Delivery/Indefinite-Quantity (ID/IQ) Small Business Environmental Remedial Action Contract (SBRAC VI) for sites in Hawaii, Guam, and other Naval Facilities Engineering Systems Command Pacific area locations.

Attachment J.3 establishes the indirect ceiling rates and fee application framework, requiring offerors to submit separate rate sheets for the prime contractor, each joint venture member, and each cost-reimbursable subcontractor. The indirect rate pools include fringe benefits, home overhead, field overhead, and general and administrative costs, with allocation bases tied to direct labor and total cost input. Offerors must propose both their estimated indirect rates for pricing and maximum ceiling rates for each contract period (Base Year, Option Years 1-4, and Service Extension), not to exceed 7.0% fixed fee. The government will incorporate these ceiling rates into the awarded contract as maximum allowable rates, with any costs exceeding the ceiling deemed unallowable unless authorized by the Contracting Officer. Attachment J.4 requires offerors to document the proposed distribution of work as a percentage breakdown among the prime, joint venture members, and cost-reimbursable subcontractors, reconciling to the cost model summary. Attachment J.6 provides an alternative format for offerors unable to complete J.3, requiring submission of historical indirect rates for the latest three complete fiscal years and current year-to-date rates, which must reconcile to the proposed and ceiling rates submitted in J.3.

View the file

Other files

File Type Posted
J.1_J.1A_J.2_J.7_J.7A_AMD0005.xlsx XLSX spreadsheet
N6274226R1801_AM0005.pdf PDF
J.8 Specialized Experience Information_AMD004.docx DOCX document
N6274226R1801_AM0004.pdf PDF
QA_Q46-53_AMD 0004.pdf PDF
J.9 Workload Experience Form_AMD0004.docx DOCX document
J.10 Key Personnel Experience Qualifications_AMD0004.docx DOCX document
J.1_J.1A_J.2_J.7_J.7A_AMD0004.xlsx XLSX spreadsheet
J.9 Workload Experience Form_AMD0003.docx DOCX document
N6274226R1801_AMD0003.pdf PDF
QA_Q27-45_AMD 0003.pdf PDF
J.8 Specialized Experience Information_AMD003.docx DOCX document
J.1_J.1A_J.2_J.7_J.7A_AMD0003.xlsx XLSX spreadsheet
J.10 Key Personnel Experience Qualifications_AMD0002.docx DOCX document
J.8 Specialized Experience Information_AMD002.docx DOCX document
QA_Q3-26_AMD 0002.pdf PDF
N6274226R1801_AMD0002.pdf PDF
J.1_J.1A_J.2_J.7_J.7A_AMD0002.xlsx XLSX spreadsheet
J.9 Workload Experience Form_AMD0002.docx DOCX document
N6274226R1801_AMD 0001.pdf PDF
QA_Q1-2_AMD 0001.pdf PDF
J.13_GD HI20260001 HI.pdf PDF
J.1_J.1A_J.2_J.7_J.7A.xlsx XLSX spreadsheet
J.9 Workload Experience Form.docx DOCX document
J.8 Specialized Experience Information.docx DOCX document
J.11 PPQ.docx DOCX document
J.16 PIEE_Solicitation_Module_Guide.pdf PDF
J.10 Key Personnel Experience Qualifications.docx DOCX document
J.5 SCA & DBA Ceiling Labor Rates.docx DOCX document
J.14_WD 2015-5693 GU.pdf PDF
J.15_GD GU20260001 GU.pdf PDF
J.12_WD 2015-5689 HI.pdf PDF
N6274226R1801.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Att J.3 - Rate Ceilings_Fee

N62742-26-R-1801
J.3 -- INDIRECT CEILING RATES AND FEE APPLICATION (Note 1)
Indirect Rate PoolsAllocation BaseBase YearOption Year 1Option Year 2Option Year 3Option Year 4Service Extension
Proposed RateCeiling RateProposed RateCeiling RateProposed RateCeiling RateProposed RateCeiling RateProposed RateCeiling RateProposed RateCeiling Rate
(Note 2)(Note 2)(Note 3)(Note 4)(Note 3)(Note 4)(Note 3)(Note 4)(Note 3)(Note 4)(Note 3)(Note 4)(Note 3)(Note 4)
PRIME RATES
Fringe BenefitsDirect Labor $
Home Overhead (OH)Direct Labor Home Office $
Field Overhead (OH)Direct Labor Field Office $
General & Administrative (G&A)Total Cost Input
Fixed Fee (Note 5)
(not to exceed 7.0%)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
FCCOM - Field
FCCOM - Home
FCCOM - General & Administrative
FCCOM - Equipment

(Contractor-Owned)

MULTIPLIER 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

JOINT VENTURE MEMBER RATES
Fringe BenefitsDirect Labor $
Home Overhead (OH)Direct Labor Home Office $
Field Overhead (OH)Direct Labor Field Office $
General & Administrative (G&A)Total Cost Input
Fixed Fee (Note 5)
(not to exceed 7.0%)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
FCCOM - Field
FCCOM - Home
FCCOM - General & Administrative
FCCOM - Equipment

(Contractor-Owned)

MULTIPLIER 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

COST REIMBURSABLE SUB 1, 2, ETC. RATES
Fringe BenefitsDirect Labor $
Home Overhead (OH)Direct Labor Home Office $
Field Overhead (OH)Direct Labor Field Office $
General & Administrative (G&A)Total Cost Input
Fixed Fee (Note 5)
(not to exceed 7.0%)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
FCCOM - Field
FCCOM - Home
FCCOM - General & Administrative
FCCOM - Equipment

(Contractor-Owned)

MULTIPLIER 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Note 1 - A separate rate sheet shall be submitted for the prime, each joint venture member, and each cost reimbursable subcontractor. If the Offeror is a JV and the JV partners are proposing separate rates, separate rate sheets must be provided by each member. One submittal may be submitted for the JV entity, only if the JV has an established separate cost center for the JV entity with an adequate accounting system for a cost reimbursement contract. The indirect rate ceilings will be incorporated into the awarded contract. The Government will not accept discounted indirect rates. The offeror may adjust the columns or rows to be consistent with its cost accounting system.
Note 2 - Indirect rate pools and allocation bases listed above are EXAMPLES ONLY. Offeror shall list indirect rate pools and allocation bases consistent with its estimating/accounting system.
Note 3 - Offerors (Prime, each JV member, each cost reimbursable subcontractor) shall enter their proposed indirect rates utilized in pricing of the proposal.
Note 4 - The Government is seeking to establish maximum or ceiling rates for the Prime, each JV member, each cost reimbursable subcontractor. Offerors should identify their proposed ceiling rates applicable to the various contract periods. The indirect rates as detailed in this Attachment J.3 will be incorporated into the contract and will establish ceiling rates for the Contractor’s indirect rate pools. Any amount incurred by the Contractor above the ceiling rate shall be unallowable unless otherwise authorized by the Contracting Officer. The ceiling rates represent the maximum indirect rates that may be charged on any effort performed under the contract. Should actual indirect rates experienced during performance of the contract be lower than those shown on this Attachment J.3, the actual rates will be charged.
Note 5 - The proposed Fixed Fee Percentage shall be effective for the Base Year, all subsequent Option Years, and the Service Extension. The Fixed Fee Percentage (%) shall remain constant, shall not fluctuate from period to period, and shall not exceed 7.0%. Fixed Fee shall not be applied to Equipment (Contractor – Acquired Property), Travel, Facilities Capital Cost of Money, and Fee on Cost Reimbursable Subcontractor’s cost at any tier.

&F N62742-24-R-3570 Page &P of &N

Att J.4 - Distr of Work

N62742-26-R-1801
J.4 -- PROPOSED DISTRIBUTION OF WORK
(Note 1)

Offerors shall provide the percentage of work expected to be performed by the prime, each Joint Venture member, and/or any cost reimbursable subcontractor.

Name Percentage Prime

Joint Venture
Company A(if applicable)
Company B(if applicable)
Cost Reimbursable Subcontractor(if applicable)
Cost Reimbursable Subcontractor(if applicable)

TOTAL 0.00%

Note 1 - Proposed percentages shall reconcile to Attachment J.7A Cost Model Summary Sheet.

&A N62742-26-R-1801 Page &P of &N

Att J.6 - Indirect (Historical)

N62742-26-R-1801
ATTACHMENT J.6 - PROPOSED, HISTORICAL, AND YEAR-TO-DATE INDIRECT RATES (Note 1)
Indirect Rate PoolsAllocation BaseFY2023FY2024FY2025FY2026
Year-to-DateBase

Indirect Rates (Note 2) Indirect Ceiling Rates (Note 3)

Fringe BenefitsDirect Labor $0.00%0.00%
Home Overhead (OH)Direct Labor Home Office $0.00%0.00%
Field Overhead (OH)Direct Labor Field Office $0.00%0.00%
General & Administrative (G&A)Total Cost Input0.00%0.00%
Etc.
Note 1 - For Offerors unable to provide the information required under Attachment J.3 (as specified in Section L, SECTION II, Tab 1, b., (1)), Offerors shall complete Attachment J.6, which illustrates a sample format that may be edited to be in accordance with their established accounting practices. Offerors shall provide historical information pertaining to the latest complete three (3) years indirect rates, and current year to date indirect rates (indicate "as of" date).
Note 2 - The "Base Indirect Rates" (Column G) shall reconcile to Attachment J.3 Indirect Ceiling Rates and Fee Application "Proposed Rate" (i.e. Column C).
Note 3 - The "Indirect Ceiling Rates" (Column H) shall reconcile to Attachment J.3 Indirect Ceiling Rates and Fee Application "Ceiling Rate" (i.e. Column D).